RFQ_Attachments_-_Long_Branch_Lake_20180301pdf.pdf
PDF 12 MB Posted
- Solicitation number
- W912DQ18R1023
About this file
RFQ Attachments - Long Branch Lake 20180301pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_W912DQ18R1023_-_Long_Branch_Lake_20180301.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8 R 23
Building Strong
Vegetation and Herbicide Management
Long Branch Macon County, Missouri
Request for Quote Attachments
March 8
Supplemental Bid Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Each
Vegetation and Herbicide Mgmt Services – Base Year FY 2018
The contractor shall furnish all labor, equipment, and materials to provide Vegetation and Herbicide Management Services for the Long Branch Lake Project as defined in the Performance Work Statement (PWS) dated 01 January 2018.
FFP
Period of Performance: 1 April 2018 through 31 March 2019
FOB: Destination
TOTAL AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AA 1 Each
Guardrails on Dam Area 5.2
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AB 1 Each
Sand Strainers on Dam Area 5.3
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
FFP
NET AMT
0001AC 1 Each
Rip Rap Dam Area 5.4
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AD 1 Each
Rock Stockpile Area 5.5
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement..
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AE 1 Each
Boundary Area 5.6
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
0002 Each
OPTION
Vegetation and Herbicide Mgmt Services – Option Year FY 2019
The contractor shall furnish all labor, equipment, and materials to provide Vegetation and Herbicide Management Services for the Long Branch Lake Project as defined in the Performance Work Statement (PWS) dated 01 January 2018.
FFP
Period of Performance: 1 April 2019 through 31 March 2020
FOB: Destination
TOTAL AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AA 1 Each
Guardrails on Dam Area 5.2
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AB 1 Each
Sand Strainers on Dam Area 5.3
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
0002AC 1 Each
Rip Rap Dam Area 5.4
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AD 1 Each
Rock Stockpile Area 5.5
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement..
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AE 1 Each
Boundary Area 5.6
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
0003 Each
OPTION
Vegetation and Herbicide Mgmt Services – Option Year FY 2020
The contractor shall furnish all labor, equipment, and materials to provide Vegetation and Herbicide Management Services for the Long Branch Lake Project as defined in the Performance Work Statement (PWS) dated 01 January 2018.
FFP
Period of Performance: 1 April 2020 through 31 March 2021
FOB: Destination
TOTAL AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AA 1 Each
Guardrails on Dam Area 5.2
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AB 1 Each
Sand Strainers on Dam Area 5.3
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
0003AC 1 Each
Rip Rap Dam Area 5.4
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AD 1 Each
Rock Stockpile Area 5.5
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement..
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AE 1 Each
Boundary Area 5.6
The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement.
FFP
GRAND TOTAL BASE YEAR PLUS ALL OPTION YEARS
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
VEGETATIVE MANAGEMENT/HERBICIDE APPLICATION
LONG BRANCH LAKE PROJECT
01 March 2018
1. GENERAL INFORMATION
1.1. Scope of Work. The Contractor shall furnish all labor, supervision, equipment, herbicides and supplies necessary to accomplish vegetative management and herbicide applications at the Long Branch Lake
Project, near Macon, Missouri. The Contractor shall perform services as defined in this performance work statement (PWS).
1.1.1. Post-Award Conference. After award, but prior to commencement of work, the Contractor shall contact the Contracting Officer’s Representative, to arrange a mutually agreeable time to meet to review the requirements and details of the work.
1.2. Facilities. The facilities subject to service are as follows.
1.2.1. Long Branch Dam (guardrails, rip rap, sand strainers), Rock Stock Piles, and Government Boundary.
1.3. Contractor Personnel
1.3.1. Contractor personnel shall be fully clothed, at all times, while performing these services. "Fully clothed" shall be deemed to mean a shirt, trousers, and shoes shall be worn at all times. Clothing shall be clean and neat in appearance. While on duty the Contractor's employees shall wear shoes that are enclosed. Sandals or open shoes are prohibited.
1.3.2. Contractor personnel shall safeguard all government property.
1.3.3. The Contractor will be expected to take a vital interest in safety hazards, and educate their employees to work and plan their work safely, and comply will all pertinent provisions of the Federal, State, and local regulations. Proper driving techniques and defensive driving will be practiced to prevent vehicle accidents and property damage. Proper warning signage, vehicle warning lights and safety vests will be utilized when working in high traffic areas such as the top of the dam.
1.3.4. Any injury, property damage, equipment malfunction, or safety hazard observed by the Contractor shall be immediately reported to the Technical Point of Contact or the Project Office.
1.4. Quality Control
1.4.1. The Contractor shall develop a Quality Control Plan designed to demonstrate how the Contractor will meet the needs of the project. The Quality Control Plan shall document how the Contractor will identify and correct performance shortfalls. Complete records of all inspection work performed by the contractor must be maintained and made available to the government during contract performance.
1.4.2. The Contractor shall designate, in writing if other than the contractor, a responsible on-site representative of each work crew who shall serve as the contact for matters involving quality and performance or nonperformance of the required work assigned to that crew. The government reserves the right to discuss matters regarding quality, performance or nonperformance with any employee on-site and currently employed by the contractor.
1.5. Quality Assurance
1.5.1. A Quality Assurance Plan (QAP) will be used during the life of the contract to ensure that the
Contractor is performing the services required by this PWS in an acceptable manner. The
Government develops the QAP and administers the Plan through Quality Assurance Evaluators
(QAE)s.
1.5.2. The government reserves the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government will perform inspections and tests in a manner that will not unduly delay the work.
1.5.3. If any of the services do not conform to contract requirements, the government will request the contractor to perform the services again, where appropriate, in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
1.5.4. If the contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the government may by contract, or otherwise: (1) perform the services and charge to the Contractor any cost incurred by the government that is directly related to the performance of such service or (2) terminate the contract in whole or in part.
1.6. Physical Security
1.6.1. The Contractor shall provide a report listing the general location and nature of any observed encroachments on Government Property land which appear to be new works and are permanent in nature (encroachments include roads, driveways, fills, structures or residences).
1.6.2. The Contractor shall provide the Project Office with a list (to include location) of any damaged or missing boundary monuments observed during boundary clearing services.
1.7. Period of Required Services
1.7.1. The awarded contract shall have a one year duration from the date of award (estimated 1 April 2018 through 31 March 2019). The two one-year renewal options, if exercised, are estimated to be from 1-
April 2019 through 31 March 2020 and 1 April 2020 through 31 March 2021.
1.7.2. The Contractor shall perform services required when individual orders are issued by telephone and confirmed in writing by the Contracting Officer /Contracting Officer Representative or Technical
Point of Contact. The Contractor shall commence work within 48 hours (weather dependent) after receipt of verbal telephone order or date which is specified in the written order (whichever is later).
1.7.3. The Government may order multiple Contract Line Items per order.
1.7.4. Services shall be performed per the following schedule:
1.7.4.1. Spray Guardrails on Dam shall be subject to two herbicide applications between May 1st and
June 1st and the second application between July 1st and August 1st.
1.7.4.2. Spray Sand Strainers on Dam shall spot coverage, subject to two herbicide applications. The first between May 1st and June 1st and the second application between July 1st and August 1st.
1.7.4.3. Spray Rip Rap on Dam shall be spot coverage, subject to subject to one herbicide application between June 1st and August 1st.
1.7.4.4. Spray Rock Stock Piles shall be spot coverage, subject to one herbicide application between June
1st and August 1st.
1.7.4.5. Boundary Maintenance Clearing shall be cut stump, subject to one herbicide application conducted between April 1st and March 31st. No herbicide application shall be conducted during times when the average five day temperatures are below 45º Fahrenheit.
1.7.5. Services will not be permitted on Saturday, Sunday, or Federal holidays.
1.7.6. All work shall be accomplished within the timeframes specified. Services rendered outside of the time periods specified will not be compensated unless specifically approved in writing by the
Contracting Officer or Contracting Officer Representative.
1.8. Environmental Controls. The Contractor shall be knowledgeable of and comply with all applicable
Federal, State, and Local laws, environmental requirements and instructions to protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.
1.8.1. The Contractor will be responsible for selecting the appropriate chemical to be used based on site location, proximity to the public and water, environmental concerns, target species and best commercial practices.
1.8.2. Contractor signed documentation shall be submitted to the Government at least 3 business days prior to the start of on-site work stating Atrazine, Prometon, and Paraquat dichloride chemicals will not be used for the work identified within this contract. In addition, the signed documentation shall state only those chemicals approved by the Government will be used for the work identified within this contract.
1.9. Coordination with Project Office
1.9.1. The Contractor shall meet with the Contracting Officer Representative and Technical Point of
Contact prior to the first services being performed to coordinate the work schedule in compliance with the contract specifications.
1.9.2. The Government reserves the right to schedule meetings at the Project Office as necessary to insure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract.
1.9.3. Any evidence of vandalism, safety hazard, facilities not operating properly, or facilities in need of repair shall be reported to Project personnel.
1.9.4. To assist the visiting public in reclaiming lost articles, all property left by visitors and found during spraying operations shall be turned into the Project Office.
1.10. Insurance. The Contractor shall provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required by the State of Missouri. The Contractor shall furnish proof of required insurance in the form of a copy of the insurance policy, a binder issued by the insurer, or a vehicle insurance card. Proof of proper insurance shall be delivered to the Contracting
Officer either at the post award conference or prior to starting work. Information regarding State requirements may be obtained by contacting Division of Insurance, 573-751-4126 or http://insurance.mo.gov/.
1.11. Payment. To be made monthly by the Disbursing Officer, U.S. Army Engineer District, Millington, Tennessee, in accordance with the Prompt Payment Act (Public Law 100-496). As stated in this law, the
Government has 30 days after the date of invoice receipt in the correct office, or after constructive acceptance, whichever of the two dates is last, to issue payment. Constructive acceptance is deemed to occur on the 7th calendar day after delivery. Under the terms of this contract, invoices are to be submitted to the Long Branch Project Office 30174 Visitor Center Road, Macon, Missouri 63552.
http://insurance.mo.gov/
2. DEFINITIONS AND ACRONYMS. The following definitions and descriptions apply wherever the work, phrase, or acronym is used in this performance work statement.
2.1. Guardrails on Dam: Located on the Long Branch Dam, the guardrails are located on each side of the road
(North & South). The Dam is approximately 3800 feet in length.
2.2. Sand Strainers on Dam: Located on the downstream side of the Long Branch Dam, there are 13 gravel strainers, rectangular in shape approximately 17 feet by 12 feet and 3 strainers approximate sizes 160 feet by 16 feet, 130 feet by 10 feet, and 75 feet by 16 feet.
2.3. Rip Rap on Dam: Located on the upstream side of the Long Branch Dam. There are two sections of rip rap; the lower section is located just above the waterline of the lake and the upper section is located just below the guardrail. Both layers of rip rap are 2/3 to ¾ mile in length.
2.4. Rock Stock Piles: Two rock stockpiles located on either end of Long Branch Dam. The small stock pile is located east of the Project Visitor Center/Office north of Visitor Center Road. The large rock stock pile is located west of the Dam just south of Visitor Center Road.
2.5. Boundary Maintenance Clearing: Approximately 11.5 miles of government boundary. Three to four miles will be cut and treated annually. The areas run from 2.3 miles south of the Macon State Park Boat Ramp north to Axtell Road on the east side of Long Branch Lake and from north of the Bloomington State Park
Area to Axtell Road on the west side of Long Branch Lake.
2.6. Contracting officer's representative (COR): Personnel designated by the Contracting Officer as official representative of the Government to the Contractor.
2.7. Defect: A service output that does not meet the standard of performance specified in the contract for that service.
2.8. Performance Requirement: The point that divides acceptable and unacceptable performance of a task according to the Performance Requirement Summary and the Inspection of Services clause.
2.9. Professional: Conforming to the technical or ethical standards of a profession. Displaying the conduct, appearance, and qualities that characterize or mark a profession. Possessing skill, experience and competence in a profession.
2.10. Technical Point of Contact: Long Branch Lake Staff assigned to oversee the technical aspects of contract services and answer questions regarding contract requirements.
3. GOVERNMENT-FURNISHED FACILITIES, SUPPLIES, SERVICES, AND UTILITIES
3.1. Government-Furnished Facilities. The government will not furnish any facilities for contract.
3.2. Government-Furnished Supplies. The government shall provide the following items for use in the performance of the contract.
3.2.1. Contractor Herbicide Report
3.3. Government-Furnished Services. The government will not furnish any services for contract.
4. CONTRACTOR-FURNISHED EQUIPMENT AND SUPPLIES. The Contractor shall furnish all manpower, equipment, fuel, herbicides, water, etc. necessary to accomplish the required services. All equipment and supplies shall be approved by the Project Office prior to initial use. The Contractor or contractor representative who applies herbicides are required to maintain a commercial applicator license. The
Contractor shall furnish a telephone number attended during normal business hours (8:00 a.m. - 4:00 p.m.
C.S.T.) to which calls concerning performance or other contractual matters can be placed. For the purpose of time and date, a message will be deemed delivered to the Contractor, at such time as it is delivered to the number provided by the Contractor.
4.1. Equipment Breakdown. At no time shall the equipment breakdown relieve the Contractor of the responsibility of performing the required work. It is the contractor’s responsibility to ensure that they have, or can obtain on short notice, sufficient backup equipment to perform the services without interruption in the event of mechanical failure of the primary equipment.
5. SPECIFIC TASKS
5.1. General Information. The Contractor shall provide all management, labor, equipment and supplies necessary to ensure that vegetative management and herbicide services are performed in a manner that will maintain a satisfactory clean, vegetation free area with all target species being killed.
5.1.1. All Pesticide products shall be approved by the Government prior to application.
5.1.2. Upon notification by the government, the Contractor is required to reapply herbicide in those areas that did not receive an adequate vegetation kill.
5.1.3. The Contractor shall submit a herbicide report form after each days services are completed.
5.1.4. The Contractor shall mix a marker dye with the chemical in sufficient concentration to leave an obvious and durable stain on treated areas.
5.1.5. Application of chemicals shall be in accordance with label directions for the material used and all empty herbicide containers shall be disposed of in accordance to label directions. Label directions and/or warnings relative to temperature or other weather conditions shall be closely adhered to.
5.1.6. The Contractor shall ensure protection of desirable (non-targeted) species from damage by required chemical applications. This includes but is not limited to the desirable grasses on
Long Branch Dam that is required to control erosion.
5.2. Spray Guardrails on Dam. The Contractor shall provide and apply a three foot wide by approximately 3800 foot long area of liquid herbicide to all vegetation growing along the length of the guardrails on the north and south sides of Visitor Center Road, Long Branch Dam, for a total area of approximately 0.53 acres. Guardrails on the north and south sides of the road shall be subject to two applications between May 1st and June 1st and the second application between July 1st and
August 1st. The herbicide chemicals for the first application shall be selected to provide, season long control pre-emergence and post-emergence non-selective complete burndown herbicide and requires a single complete coverage of the area. The herbicide chemicals for the second application shall be selected to provide for post-emergence non-selective herbicide burndown and shall be spot coverage for the area.
5.3. Sand Strainers on Dam. The Contractor shall provide and apply liquid herbicide to all vegetation growing on the sand strainers (gravel pads) on the downstream side (south side) of Long Branch
Dam. Sand strainers shall be subject to two applications. The first between May 1st and June 1st and the second application between July 1st and August 1st. The herbicide chemicals for the first application shall be selected to provide, season long control pre-emergence and post-emergence non-selective complete burndown herbicide and requires a single complete coverage of the area. The herbicide chemicals for the second application shall be selected to provide for post-emergence non-selective herbicide burndown and shall be spot coverage for the area.
5.4. Riprap/Rock on Dam, Outlet Channel and Gutters. The Contractor shall provide and apply liquid herbicide to all vegetation (woody, grass, broadleaf) growing in the riprap sections on the face of the
Long Branch Dam, strip of un-mowed vegetation adjacent to the riprap, outlet channel side slopes and rock gutters. The area shall be subject to one herbicide application; June 1st thru August 1st. The herbicide chemicals for the application shall be selected to provide for post-emergence non-selective herbicide burndown and shall be spot coverage for the areas.
5.5. Rock Stock Piles. The rock and aggregate surfaces associated with the rock stockpiles and the perimeter staging areas shall be subject to one spot coverage herbicide chemicals applications during the time period of June 1st thru August 1st. There are two emergency rock stockpiles—the left abutment location and the right abutment location—as shown on the attached plan view. The area of the rock stockpiles covers a total of approximately 3.5 acres. Each rock stockpile and the perimeter out 15 feet from the edge of the stockpile, atop of the stock piles and the access road shall be subject to herbicide chemicals applications. Coverage of the stockpile areas shall provide emphasis on eliminating woody vegetation and noxious weeds.
5.6. Boundary Maintenance Clearing
5.6.1. The Contractor shall clear woody vegetation, brush, trees, stumps and downed trees and limbs from an area extending from the Government Boundary line back onto Government Property for a distance of six (6) feet. Higher limbs overhanging the cut area shall be trimmed back to provide a cleared height of seven (7) feet above the ground.
• Contractor may use mechanical equipment such as a Skid Steer/Timber Ax, Brush Hog, to accomplish the work. Any damages caused by the use of mechanical equipment, as determined by the Government, shall be repaired by the contractor at no expense to the Government or additional cost to the contract. Repairs shall include but are not limited to grading, seeding and mulching of any damaged area that is prone to sheet and rill erosion. Areas equipment is tracked shall be smooth after work is accomplished.
5.6.2. All woody stub and stump cuts shall be horizontal, so as to preclude sharp stubs and as close to the ground level as possible. In no case shall remaining stumps or stubs exceed two (2) inches in height.
Brush shall be deposited on Government Property, clear of the cut area dispersed in such a way that does not created piles of brush. No cut trees shall be left entangled in standing trees.
5.6.3. All woody stubs and stumps shall be treated within one hour from being cut with an appropriate herbicide. All cut stump chemical applications shall be conducted when five day average temperatures are 45º Fahrenheit or above.
5.6.4. Clearing shall be accomplished only on the Government side of the property boundary line.
Boundary monuments (set on property line) and reference posts (set one foot inside) are spaced in a manner to allow a line of sight from one marker to the next. All clearing and herbicide treatment of boundary line between Government monuments shall be completed before moving on to the next segment. Difficulty in locating monuments or property line shall be reported to the Project
Technical Support Person for assistance. Boundary Maintenance Clearing may be conducted throughout the contract performance period, excluding times when five day average temperatures are below 45º Fahrenheit.
5.6.5. The Government reserves the right to designate and mark any trees location within the work area to be left uncut.
5.6.6. The Contractor shall clear three to four miles annually of Government boundary. The
Government reserves the right to designate the starting point and segments, which may be non-continuous, or boundary to be cleared. The annual boundary line segments to be cleared are identified on the attached map.
5.6.7. The Contractor will obtain access to the Government boundary line by public access roads. It shall be the responsibility of the Contractor to secure permission for access by any other route or at any other point. At no time shall the Contractor trespass on private (adjacent) property without the permission from the property owner.
5.6.8. The Contractor shall, by use of flagging, ranger poles or other methods establish the location of the boundary line within his immediate work area prior to cutting. Any aids in determining boundary lines, such as flags, string lines, etc. shall be removed upon completion of each clearing segment.
LIST OF PERFORMANCE WORK STATEMENT ATTACHMENTS
Attachment No. 1: Performance Requirements Summary
Attachment No. 2: Location Map
Attachment No 3: Jobsite Diagram
Attachment No 4: Herbicide Report
ATTACHMENT 1
PERFORMANCE REQUIREMENTS SUMMARY
Section (Para)
Contract Requirement
Performance Standard
Lot Description
ALP*
Method of Surveillance
5.2
Spray Guardrails on Dam
Maintain a satisfactory clean, vegetation free area with all target species being killed set in Sections 5.1 – 5.1.5 and 5.2
2 applications 1
– Pre‐Emergent & Post-Emergent (May) 1 – Post‐ Emergent (June)
4%
100% Inspection
5.3
Spray Sand Strainers on Dam
Maintain a satisfactory clean, vegetation free area with all target species being killed set in Sections 5.1 – 5.1.5 and 5.3
2 applications May – June July – August
5.4
Spray Rip Rap on Dam
Maintain a satisfactory clean, vegetation free area with all target species being killed set and 5.4
1 Application June – August
5.5
Spray Rock Stock Piles
Maintain a satisfactory clean, vegetation free area with all target species being killed set and 5.5
1 Application June – August
5.6
Boundary Maintenance Clearing
Maintain a satisfactory clean, vegetation free area with all target species being killed set and 5.6 – 5.6.8
3-4 Miles Cleared April – March
*ALP: Acceptable Level of Performance
ATTACHMENT 2
LOCATION MAP
NOTE: 1 Information on Long Branch Lake can be found on the Internet at http://www.nwk.usace.army.mil
Project Office/Visitor center
ATTACHMENT 3
JOBSITE DIAGRAM
ATTACHMENT 3
JOBSITE DIAGRAM
Year 1 Begin
2.3 Mi.
Year 1 End
1.0 Mi.
Total 3.3 Mi.
Year 2 Begin
Year 2 End
4.29 Mi. Year 3
Begin
Year 3 End
3.88 Mi.
Axtell Road
Lo n g
Br an ch La ke R d
Jungle Street
Lake Street
US
Hig hw ay
US Highway 36
Innsbruck PL
Irvine Pl
Iro nw o o dA ve
Visitor Center Rd.
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Long Branch Lake Boundary Clearing = Year 1
= Year 2
= Year 3
Total Contract Length = 11.5 Mi.
ATTACHMENT 4
HERBICIDE REPORT
SITE VISIT
VEGETATION AND HERBICIDE MANAGEMENT SERVICES
LONG BRANCH LAKE PROJECT
KANSAS CITY DISTRICT
U.S. ARMY CORPS OF ENGINEERS
An organized site visit has been scheduled for: 16 March 2018 at 10:00 CST
Participants will meet at:
Address: Long Branch Project Office & Visitor Center
U.S. Army Corps of Engineers
30174 Visitor Center Road
Macon, MO 63552
POC:
Name: Raymond Frana
Email Address: Raymond.H.Frana@usace.army.mil
Telephone: (816) 389-3122
WD 15-5095 (Rev.-6) was first posted on www.wdol.gov on 01/16/2018
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5095
Daniel W. Simms Division of | Revision No.: 6
Director Wage Determinations| Date Of Revision: 01/10/2018
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Service Contract
Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts
State: Missouri
Area: Missouri Counties of Adair, Atchison, Carroll, Chariton, Daviess, Gentry, Grundy, Harrison, Holt, Linn, Livingston, Macon, Mercer, Nodaway, Putnam, Schuyler, Sullivan, Worth
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations
01011 - Accounting Clerk I 13.97
01012 - Accounting Clerk II 15.69
01013 - Accounting Clerk III 17.77
01020 - Administrative Assistant 21.80
01035 - Court Reporter 18.32
01041 - Customer Service Representative I 11.12
01042 - Customer Service Representative II 12.50
01043 - Customer Service Representative III 13.64
01051 - Data Entry Operator I 12.47
01052 - Data Entry Operator II 14.14
01060 - Dispatcher, Motor Vehicle 18.55
01070 - Document Preparation Clerk 14.22
01090 - Duplicating Machine Operator 14.22
01111 - General Clerk I 12.95
01112 - General Clerk II 14.22
01113 - General Clerk III 15.96
01120 - Housing Referral Assistant 20.79
01141 - Messenger Courier 11.41
01191 - Order Clerk I 12.73
01192 - Order Clerk II 15.29
01261 - Personnel Assistant (Employment) I 16.17
01262 - Personnel Assistant (Employment) II 17.97
01263 - Personnel Assistant (Employment) III 20.54
01270 - Production Control Clerk 20.04
01290 - Rental Clerk 14.97
01300 - Scheduler, Maintenance 15.96
01311 - Secretary I 15.96
01312 - Secretary II 17.90
01313 - Secretary III 20.79
01320 - Service Order Dispatcher 21.18
01410 - Supply Technician 23.09
01420 - Survey Worker 17.02
01460 - Switchboard Operator/Receptionist 13.87
01531 - Travel Clerk I 12.96
01532 - Travel Clerk II 14.00
01533 - Travel Clerk III 15.03
01611 - Word Processor I 14.09
01612 - Word Processor II 15.81
01613 - Word Processor III 17.69
05000 - Automotive Service Occupations
05005 - Automobile Body Repairer, Fiberglass 23.30
05010 - Automotive Electrician 19.32
05040 - Automotive Glass Installer 18.59
05070 - Automotive Worker 18.59
05110 - Mobile Equipment Servicer 16.51
05130 - Motor Equipment Metal Mechanic 20.03
05160 - Motor Equipment Metal Worker 18.59
05190 - Motor Vehicle Mechanic 21.70
05220 - Motor Vehicle Mechanic Helper 15.47
05250 - Motor Vehicle Upholstery Worker 17.54
05280 - Motor Vehicle Wrecker 18.59
05310 - Painter, Automotive 19.32
05340 - Radiator Repair Specialist 18.59
05370 - Tire Repairer 15.18
05400 - Transmission Repair Specialist 20.03
07000 - Food Preparation And Service Occupations
07010 - Baker 14.52
07041 - Cook I 10.88
07042 - Cook II 12.54
07070 - Dishwasher 9.60
07130 - Food Service Worker 10.31
07210 - Meat Cutter 15.48
07260 - Waiter/Waitress 9.27
09000 - Furniture Maintenance And Repair Occupations
09010 - Electrostatic Spray Painter 21.23
09040 - Furniture Handler 15.75
09080 - Furniture Refinisher 21.23
09090 - Furniture Refinisher Helper 17.01
09110 - Furniture Repairer, Minor 19.27
09130 - Upholsterer 15.08
11000 - General Services And Support Occupations
11030 - Cleaner, Vehicles 11.24
11060 - Elevator Operator 12.93
11090 - Gardener 16.01
11122 - Housekeeping Aide 12.93
11150 - Janitor 12.93
11210 - Laborer, Grounds Maintenance 13.34
11240 - Maid or Houseman 10.52
11260 - Pruner 12.93
11270 - Tractor Operator 15.37
11330 - Trail Maintenance Worker 13.34
11360 - Window Cleaner 13.33
12000 - Health Occupations
12010 - Ambulance Driver 17.12
12011 - Breath Alcohol Technician 17.12
12012 - Certified Occupational Therapist Assistant 25.80
12015 - Certified Physical Therapist Assistant 24.94
12020 - Dental Assistant 16.52
12025 - Dental Hygienist 34.35
12030 - EKG Technician 25.83
12035 - Electroneurodiagnostic Technologist 25.83
12040 - Emergency Medical Technician 17.12
12071 - Licensed Practical Nurse I 15.24
12072 - Licensed Practical Nurse II 17.05
12073 - Licensed Practical Nurse III 19.00
12100 - Medical Assistant 14.08
12130 - Medical Laboratory Technician 17.49
12160 - Medical Record Clerk 13.62
12190 - Medical Record Technician 15.23
12195 - Medical Transcriptionist 17.62
12210 - Nuclear Medicine Technologist 37.46
12221 - Nursing Assistant I 10.14
12222 - Nursing Assistant II 11.40
12223 - Nursing Assistant III 12.44
12224 - Nursing Assistant IV 13.97
12235 - Optical Dispenser 14.12
12236 - Optical Technician 15.24
12250 - Pharmacy Technician 14.84
12280 - Phlebotomist 13.97
12305 - Radiologic Technologist 25.29
12311 - Registered Nurse I 23.68
12312 - Registered Nurse II 27.27
12313 - Registered Nurse II, Specialist 27.27
12314 - Registered Nurse III 33.15
12315 - Registered Nurse III, Anesthetist 33.15
12316 - Registered Nurse IV 39.45
12317 - Scheduler (Drug and Alcohol Testing) 21.11
12320 - Substance Abuse Treatment Counselor 15.84
13000 - Information And Arts Occupations
13011 - Exhibits Specialist I 20.11
13012 - Exhibits Specialist II 27.35
13013 - Exhibits Specialist III 29.94
13041 - Illustrator I 18.65
13042 - Illustrator II 22.33
13043 - Illustrator III 27.90
13047 - Librarian 30.95
13050 - Library Aide/Clerk 10.37
13054 - Library Information Technology Systems 23.49
Administrator
13058 - Library Technician 13.99
13061 - Media Specialist I 17.03
13062 - Media Specialist II 19.04
13063 - Media Specialist III 21.24
13071 - Photographer I 17.20
13072 - Photographer II 19.24
13073 - Photographer III 23.84
13074 - Photographer IV 29.17
13075 - Photographer V 35.29
13090 - Technical Order Library Clerk 15.49
13110 - Video Teleconference Technician 17.91
14000 - Information Technology Occupations
14041 - Computer Operator I 16.03
14042 - Computer Operator II 17.93
14043 - Computer Operator III 19.99
14044 - Computer Operator IV 23.48
14045 - Computer Operator V 24.61
14071 - Computer Programmer I (see 1) 22.38
14072 - Computer Programmer II (see 1) 26.04
14073 - Computer Programmer III (see 1)
14074 - Computer Programmer IV (see 1)
14101 - Computer Systems Analyst I (see 1)
14102 - Computer Systems Analyst II (see 1)
14103 - Computer Systems Analyst III (see 1)
14150 - Peripheral Equipment Operator 16.03
14160 - Personal Computer Support Technician 23.48
14170 - System Support Specialist 22.54
15000 - Instructional Occupations
15010 - Aircrew Training Devices Instructor (Non-Rated) 28.84
15020 - Aircrew Training Devices Instructor (Rated) 34.89
15030 - Air Crew Training Devices Instructor (Pilot) 41.81
15050 - Computer Based Training Specialist / Instructor 28.84
15060 - Educational Technologist 26.64
15070 - Flight Instructor (Pilot) 41.81
15080 - Graphic Artist 25.30
15085 - Maintenance Test Pilot, Fixed, Jet/Prop 40.84
15086 - Maintenance Test Pilot, Rotary Wing 40.84
15088 - Non-Maintenance Test/Co-Pilot 40.84
15090 - Technical Instructor 20.74
15095 - Technical Instructor/Course Developer 25.38
15110 - Test Proctor 17.30
15120 - Tutor 17.30
16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations
16010 - Assembler 9.48
16030 - Counter Attendant 9.48
16040 - Dry Cleaner 12.22
16070 - Finisher, Flatwork, Machine 9.48
16090 - Presser, Hand 9.48
16110 - Presser, Machine, Drycleaning 9.48
16130 - Presser, Machine, Shirts 9.48
16160 - Presser, Machine, Wearing Apparel, Laundry 9.48
16190 - Sewing Machine Operator 13.13
16220 - Tailor 14.03
16250 - Washer, Machine 10.44
19000 - Machine Tool Operation And Repair Occupations
19010 - Machine-Tool Operator (Tool Room) 21.23
19040 - Tool And Die Maker 27.26
21000 - Materials Handling And Packing Occupations
21020 - Forklift Operator 19.24
21030 - Material Coordinator 20.04
21040 - Material Expediter 20.04
21050 - Material Handling Laborer 16.19
21071 - Order Filler 13.52
21080 - Production Line Worker (Food Processing) 19.24
21110 - Shipping Packer 15.57
21130 - Shipping/Receiving Clerk 15.57
21140 - Store Worker I 13.27
21150 - Stock Clerk 19.19
21210 - Tools And Parts Attendant 19.24
21410 - Warehouse Specialist 19.24
23000 - Mechanics And Maintenance And Repair Occupations
23010 - Aerospace Structural Welder 25.87
23019 - Aircraft Logs and Records Technician 21.78
23021 - Aircraft Mechanic I 24.88
23022 - Aircraft Mechanic II 25.87
23023 - Aircraft Mechanic III 26.77
23040 - Aircraft Mechanic Helper 19.23
23050 - Aircraft, Painter 23.93
23060 - Aircraft Servicer 21.78
23070 - Aircraft Survival Flight Equipment Technician 23.93
23080 - Aircraft Worker 23.09
23091 - Aircrew Life Support Equipment (ALSE) Mechanic 23.09
I
23092 - Aircrew Life Support Equipment (ALSE) Mechanic 24.88
II
23110 - Appliance Mechanic 22.04
23120 - Bicycle Repairer 18.08
23125 - Cable Splicer 32.60
23130 - Carpenter, Maintenance 23.76
23140 - Carpet Layer 25.78
23160 - Electrician, Maintenance 30.95
23181 - Electronics Technician Maintenance I 24.99
23182 - Electronics Technician Maintenance II 27.18
23183 - Electronics Technician Maintenance III 27.74
23260 - Fabric Worker 19.50
23290 - Fire Alarm System Mechanic 23.01
23310 - Fire Extinguisher Repairer 18.08
23311 - Fuel Distribution System Mechanic 25.39
23312 - Fuel Distribution System Operator 19.91
23370 - General Maintenance Worker 20.36
23380 - Ground Support Equipment Mechanic 24.88
23381 - Ground Support Equipment Servicer 21.78
23382 - Ground Support Equipment Worker 23.09
23391 - Gunsmith I 18.08
23392 - Gunsmith II 20.90
23393 - Gunsmith III 23.01
23410 - Heating, Ventilation And Air-Conditioning 22.80
Mechanic
23411 - Heating, Ventilation And Air Contidioning 23.71
Mechanic (Research Facility)
23430 - Heavy Equipment Mechanic 23.02
23440 - Heavy Equipment Operator 23.00
23460 - Instrument Mechanic 23.01
23465 - Laboratory/Shelter Mechanic 22.04
23470 - Laborer 13.44
23510 - Locksmith 22.04
23530 - Machinery Maintenance Mechanic 25.10
23550 - Machinist, Maintenance 22.01
23580 - Maintenance Trades Helper 16.53
23591 - Metrology Technician I 23.01
23592 - Metrology Technician II 23.91
23593 - Metrology Technician III 24.82
23640 - Millwright 25.77
23710 - Office Appliance Repairer 22.04
23760 - Painter, Maintenance 21.30
23790 - Pipefitter, Maintenance 27.67
23810 - Plumber, Maintenance 24.62
23820 - Pneudraulic Systems Mechanic 23.01
23850 - Rigger 23.01
23870 - Scale Mechanic 20.90
23890 - Sheet-Metal Worker, Maintenance 26.89
23910 - Small Engine Mechanic 21.10
23931 - Telecommunications Mechanic I 25.53
23932 - Telecommunications Mechanic II 26.46
23950 - Telephone Lineman 26.99
23960 - Welder, Combination, Maintenance 22.01
23965 - Well Driller 23.01
23970 - Woodcraft Worker 23.01
23980 - Woodworker 18.08
24000 - Personal Needs Occupations
24550 - Case Manager 13.66
24570 - Child Care Attendant 10.63
24580 - Child Care Center Clerk 14.51
24610 - Chore Aide 10.13
24620 - Family Readiness And Support Services 13.66
Coordinator
24630 - Homemaker 16.12
25000 - Plant And System Operations Occupations
25010 - Boiler Tender 25.16
25040 - Sewage Plant Operator 21.93
25070 - Stationary Engineer 25.16
25190 - Ventilation Equipment Tender 17.01
25210 - Water Treatment Plant Operator 21.93
27000 - Protective Service Occupations
27004 - Alarm Monitor 17.02
27007 - Baggage Inspector 13.88
27008 - Corrections Officer 18.89
27010 - Court Security Officer 20.41
27030 - Detection Dog Handler 16.62
27040 - Detention Officer 18.89
27070 - Firefighter 21.35
27101 - Guard I 13.88
27102 - Guard II 16.62
27131 - Police Officer I 22.07
27132 - Police Officer II 24.51
28000 - Recreation Occupations
28041 - Carnival Equipment Operator 11.98
28042 - Carnival Equipment Repairer 13.10
28043 - Carnival Worker 9.01
28210 - Gate Attendant/Gate Tender 15.25
28310 - Lifeguard 12.47
28350 - Park Attendant (Aide) 17.05
28510 - Recreation Aide/Health Facility Attendant 12.45
28515 - Recreation Specialist 20.00
28630 - Sports Official 13.59
28690 - Swimming Pool Operator 19.20
29000 - Stevedoring/Longshoremen Occupational Services
29010 - Blocker And Bracer 23.29
29020 - Hatch Tender 23.29
29030 - Line Handler 23.29
29041 - Stevedore I 21.62
29042 - Stevedore II 24.53
30000 - Technical Occupations
30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 37.52
30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 25.87
30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 28.49
30021 - Archeological Technician I 18.04
30022 - Archeological Technician II 20.18
30023 - Archeological Technician III 24.76
30030 - Cartographic Technician 25.01
30040 - Civil Engineering Technician 25.17
30051 - Cryogenic Technician I 23.90
30052 - Cryogenic Technician II 26.40
30061 - Drafter/CAD Operator I 18.04
30062 - Drafter/CAD Operator II 20.18
30063 - Drafter/CAD Operator III 22.51
30064 - Drafter/CAD Operator IV 27.69
30081 - Engineering Technician I 15.54
30082 - Engineering Technician II 19.08
30083 - Engineering Technician III 21.95
30084 - Engineering Technician IV 24.41
30085 - Engineering Technician V 29.54
30086 - Engineering Technician VI 36.00
30090 - Environmental Technician 21.58
30095 - Evidence Control Specialist 21.58
30210 - Laboratory Technician 20.07
30221 - Latent Fingerprint Technician I 23.90
30222 - Latent Fingerprint Technician II 26.40
30240 - Mathematical Technician 25.01
30361 - Paralegal/Legal Assistant I 17.22
30362 - Paralegal/Legal Assistant II 21.79
30363 - Paralegal/Legal Assistant III 26.66
30364 - Paralegal/Legal Assistant IV 32.25
30375 - Petroleum Supply Specialist 26.40
30390 - Photo-Optics Technician 25.01
30395 - Radiation Control Technician 26.40
30461 - Technical Writer I 21.58
30462 - Technical Writer II 26.40
30463 - Technical Writer III 31.94
30491 - Unexploded Ordnance (UXO) Technician I 23.85
30492 - Unexploded Ordnance (UXO) Technician II 28.85
30493 - Unexploded Ordnance (UXO) Technician III 34.58
30494 - Unexploded (UXO) Safety Escort 23.85
30495 - Unexploded (UXO) Sweep Personnel 23.85
30501 - Weather Forecaster I 27.69
30502 - Weather Forecaster II 33.69
30620 - Weather Observer, Combined Upper Air Or (see 2) 22.51
Surface Programs
30621 - Weather Observer, Senior (see 2) 25.01
31000 - Transportation/Mobile Equipment Operation Occupations
31010 - Airplane Pilot 28.85
31020 - Bus Aide 12.37
31030 - Bus Driver 17.28
31043 - Driver Courier 14.58
31260 - Parking and Lot Attendant 12.07
31290 - Shuttle Bus Driver 15.77
31310 - Taxi Driver 11.26
31361 - Truckdriver, Light 15.77
31362 - Truckdriver, Medium 21.15
31363 - Truckdriver, Heavy 21.54
31364 - Truckdriver, Tractor-Trailer 21.54
99000 - Miscellaneous Occupations
99020 - Cabin Safety Specialist 14.07
99030 - Cashier 10.19
99050 - Desk Clerk 9.42
99095 - Embalmer 26.90
99130 - Flight Follower 23.85
99251 - Laboratory Animal Caretaker I 10.08
99252 - Laboratory Animal Caretaker II 10.99
99260 - Marketing Analyst 21.67
99310 - Mortician 30.24
99410 - Pest Controller 17.98
99510 - Photofinishing Worker 12.76
99710 - Recycling Laborer 15.79
99711 - Recycling Specialist 18.79
99730 - Refuse Collector 14.15
99810 - Sales Clerk 12.20
99820 - School Crossing Guard 13.19
99830 - Survey Party Chief 21.44
99831 - Surveying Aide 13.33
99832 - Surveying Technician 18.25
99840 - Vending Machine Attendant 17.56
99841 - Vending Machine Repairer 21.12
99842 - Vending Machine Repairer Helper 17.56
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal
Contractors, applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is the victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.41 per hour or $176.40 per week or $764.40 per month
HEALTH & WELFARE EO 13706: $4.13 per hour, or $165.20 per week, or $715.87 per month*
*This rate is to be used only when compensating employees for performance on an SCA-covered contract also covered by EO 13706, Establishing Paid Sick Leave for Federal
Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706.
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor, 3 weeks after 8 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (See 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year: New Year's Day, Martin Luther
King Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4.174)
THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE FOLLOWING:
1) COMPUTER EMPLOYEES: Under the SCA at section 8(b), this wage determination does not apply to any employee who individually qualifies as a bona fide executive, administrative, or professional employee as defined in 29 C.F.R. Part 541. Because most Computer System Analysts and Computer Programmers who are compensated at a rate not less than $27.63 (or on a salary or fee basis at a rate not less than $455 per week) an hour would likely qualify as exempt computer professionals, (29 C.F.R. 541.
400) wage rates may not be listed on this wage determination for all occupations within those job families. In addition, because this wage determination may not list a wage rate for some or all occupations within those job families if the survey data indicates that the prevailing wage rate for the occupation equals or exceeds
$27.63 per hour conformances may be necessary for certain nonexempt employees. For example, if an individual employee is nonexempt but nevertheless performs duties within the scope of one of the Computer Systems Analyst or Computer Programmer occupations for which this wage determination does not specify an SCA wage rate, then the wage rate for that employee must be conformed in accordance with the conformance procedures described in the conformance note included on this wage determination.
Additionally, because job titles vary widely and change quickly in the computer industry, job titles are not determinative of the application of the computer professional exemption. Therefore, the exemption applies only to computer employees who satisfy the compensation requirements and whose primary duty consists of:
(1) The application of systems analysis techniques and procedures, including consulting with users, to determine hardware, software or system functional specifications;
(2) The design, development, documentation, analysis, creation, testing or modification of computer systems or programs, including prototypes, based on and related to user or system design specifications;
(3) The design, documentation, testing, creation or modification of computer programs related to machine operating systems; or
(4) A combination of the aforementioned duties, the performance of which requires the same level of skills. (29 C.F.R. 541.400).
2) AIR TRAFFIC CONTROLLERS AND WEATHER OBSERVERS - NIGHT PAY & SUNDAY PAY: If you work at night as part of a regular tour of duty, you will earn a night differential and receive an additional 10% of basic pay for any hours worked between 6pm and 6am.
If you are a full-time employed (40 hours a week) and Sunday is part of your regularly scheduled workweek, you are paid at your rate of basic pay plus a Sunday premium of 25% of your basic rate for each hour of Sunday work which is not overtime
(i.e. occasional work on Sunday outside the normal tour of duty is considered overtime work).
** HAZARDOUS PAY DIFFERENTIAL **
An 8 percent differential is applicable to employees employed in a position that represents a high degree of hazard when working with or in close proximity to ordnance, explosives, and incendiary materials.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.