Fire_Station_W912DQ-18-B-4001_Amendment_0002.pdf

PDF 14 MB Posted

Attached to
Construct Fire Station One Company HQ
Solicitation number
W912DQ18B4001
Issued by

About this file

The attachment to this file is Amendment 0002.

View the file

Other files

File Type Posted
INSTRUCTIONS_TO_LOCATE_AMENDMENT_0001.docx DOCX document
A.07.20_Sign_In_Sheet.pdf PDF
E-701_-_LIGHT_FIXTURE_SCHEDULE.pdf PDF
EL110_-_LIGHTING_PLAN.pdf PDF
Amendment-0004.pdf PDF
Amendment-0003Attachments.pdf PDF
Amendment-0003.pdf PDF
Site_Visit_signup_20180315.pdf PDF
AMENDMENT_0001.pdf PDF
Solicitation_Notice_Fire_Station.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Construction of a Fire Station at Fort Leonard Wood, Missouri.

The purpose of this Amendment is to provide Draw ing corrections. See SF30, Block 14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-18-B-4001

X 9B. DATED (SEE ITEM 11)

28-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Mar-2018

CODE

USACE, KANSAS CITY +

FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ-18-B-4001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION PAGE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The Solicitation is amended as follows:

Deleted text is shown with a strikethrough. Added text is shown with underline.

1. CONTRACT CHANGES

a. DELETE THE CLIN SCHEDULE in its ENTIRETY and REPLACE with the revised CLIN Schedule that accompanies this amendment (See Attachement).

b. Bid Opening due date is changed from March 30, 2018 to April 3, 2018.

2. SPECIFICATION CHANGES:

a. DELETE the TABLE OF CONTENTS in its ENTIRETY AND REPLACE with the revised TABLE OF CONTENTS that accompanies this amendment.

b. DELETE the SUBMITTAL REGISTER in its ENTIRETY AND REPLACE with the SUBMITTAL REGISTER that accompanies this amendment.

c. DELETE SECTION 11 47 00.00 23 “EQUIPMENT” in its ENTIRETY and REPLACE with the revised section 11 47 00.00 23 that accompanies this amendment.

d. DELETE SECTION 23 09 00 “INSTRUMENTATION AND CONTROL FOR HVAC” in its ENTIRETY and REPLACE with the revised section 23 09 00 that accompanies this amendment.

e. SECTION 23 09 00 “INSTRUMENTATION AND CONTROL FOR HVAC”. ADD the DDC HARDWARE SCHEDULE Attachment to the end of SECTION 23 09 00. A copy of the attachment accompanies this amendment.

f. DELETE SECTION 23 09 13 “INSTRUMENTATION AND CONTROL DEVICES FOR HVAC” in its ENTIRETY and REPLACE with the revised section 23 09 13 that accompanies this amendment.

g. DELETE SECTION 23 09 23.01 “LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS” in its ENTIRETY and REPLACE with the revised section 23 09 23.01 that accompanies this amendment.

h. SECTION 23 09 23.01“LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS”. ADD the FLW Electrical Metering Requirements attachment to the end of SECTION 23 09 23.01. A copy of the attachment accompanies this amendment.

i. DELETE SECTION 23 52 00 “HEATING BOILERS” in its entirety and REPLACE with the revised section 23 52 00 that accompanies this amendment.

j. SECTION 23 81 47 “WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS”, Paragraph

2.2.1 “Water-Source Water-to-Air Heat Pumps (WAHP). Title is changed to read as follows:

2.2.1 Water-Source Water-to-Air Heat Pumps (WSHP)

k. SECTION 23 81 47 “WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS”, Paragraph

2.2.1 “Water-Source Water-to-Air Heat Pumps (WSHP). Item m(1) is changed to read as follows:

(1) Provide a microprocessor based controller that communicates with an electronic multi-stage space thermostat. The microprocessor shall control sequencing, high and low pressure switch monitoring, freeze protection, lockout control, night setback, emergency shutdown, short cycle protection, random start, LED mode and fault indicators, fault memory, input and output diagnostics, and a communications port. Provide a factory-installed low voltage terminal block for field control wiring and a low voltage transformer. Provide communications capability for remote direct digital control (DDC). Use standard communication protocol such as LonWorks, , or other protocol LonWorks communication protocol.

l. SECTION 23 81 47 “WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS”, Paragraph

2.2.2 “Water-Source Water-to-Water Heat Pumps (WWHP). Item i(1) is changed to read as follows:

(1) Provide a microprocessor based controller. The microprocessor shall control sequencing, high and low pressure switch monitoring, freeze protection, lockout control, night setback, emergency shutdown, short cycle protection, random start, LED mode and fault indicators, fault memory, input and output diagnostics, and a communications port. Provide a factory-installed low voltage terminal block for field control wiring and a low voltage transformer. Provide communications capability for remote direct digital control (DDC). Use standard communication protocol such as LonWorks protocol LonWorks communication protocol.

m. SECTION 23 81 47 “WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS”, Paragraph 2.2.3

“Closed Circuit Coolers” is changed to read as follows:

2.2.3 Dry Type Closed Circuit Coolers

a. Fan and Casing: Construct the fan section (up to top of intake louvers) of heavy gage stainless steel and construct casing of hot-dip galvanized steel. Standard pan accessories shall include louver access, overflow, drain, Type 304 stainless steel strainers, and brass make-up valve with plastic float.

b. Axial Propeller Fans: Fans shall be heavy duty axial propeller type statically balanced.

Construct fans with aluminum alloy blades, and install in a closed fitted cowl with venturi air inlet.

c. Fan Motors: Motors shall be totally enclosed, ball bearing type, and suitable for outdoor service. Motors 1 Hp and greater shall be the premium efficiency type in accordance with NEMA MG 1. Fan motor speed control shall be provided for motors 7.5 hp or larger.

d. Drive: Fan drive shall be multi-groove, solid V-belt type with taper lock sheaves designed for 150 percent of nameplate HP. Fan and motor sheave shall be aluminum alloy construction. Belt adjustment shall be accomplished from exterior of unit.

e. Heat Transfer Coil: The coil shall be steel, encased in steel framework with the entire assembly hot-dip galvanized after fabrication. Arrange tubes in a self-spacing, staggered pattern in the direction of airflow for maximum heat transfer efficiency and minimum pressure drop, without the use of additional spacers between the coil tubes. Design coil with sloping tubes for free drainage of liquid and test to 350 psi air pressure under water.

f. Water Distribution System: The system shall provide a water flow rate of not less than 6 gpm over each square foot of unit face area to ensure proper flooding of the coil. Construct spray header of Schedule 40 polyvinyl chloride (PVC) pipe for corrosion resistance. Spray branches shall be removable for cleaning. Distribute water over the entire coil surface by spray nozzles( 15 by 5/16 inch orifice) with internal sludge ring to eliminate clogging.

Thread nozzles into spray header to provide easy removal for maintenance.

g. Water Recirculation Pump: The pump shall be close-coupled, centrifugal type with mechanical seal, installed vertically at the factory to allow free drainage at shutdown.

h. Eliminators: Construct eliminators of inert PVC in easily handled sections. The eliminator design shall incorporate three changes in air direction to ensure complete removal of entrained moisture from the discharge airstream. Maximum drift rate shall be less than

0.001 percent of the circulating water rate.

f. Construct Louvers From PVC: Mount louvers in removable frames for maintenance access to the unitpan. Louvers shall have a minimum of two changes in air direction to prevent splash out and block direct sunlight.

g. Finish: Apply corrosion protection system to the outside of galvanized surfaces. Construct non-stainless metal components of mill hot-dip galvanized steel. Coat component edges and welds with a 95 percent pure zinc-rich compound. Preparation for coating shall include degreasing, cleaning, and a light surface burnishing. The coating shall be suitable for field repair with the same original coating material applied in the same manner.

k. Electric Pan Heater Package: Electric pan heater package consists of electric immersion heaters, heater thermostat, and low water cutout, all installed in pan. Size heaters to maintain plus 40 degrees F pan water temperature with the fans off at design conditions indicated on drawings. Control the heaters with a thermostat, and provide water cutout to prevent heaters from cycling on unless they are completely submerged. Provide heater contactor and wiring under Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.

h. Discharge Hood With Positive Closure Dampers: Provide unit with discharge hood, positive closure dampers, and 120-volt actuator for reduction of heat loss during idle periods of winter time operation. Construct the discharge hood and dampers of hot dipped galvanized steel. Equip hoods with access panels to facilitate maintenance on the eliminators and water distribution system. Factory assemble the dampers, damper actuator, and linkage.Controls:

Controls and safety devices shall be factory wired and mounted within the control box of the unit cabinet.

(1) Provide a microprocessor based controller. Use standard LonWorks communication protocol.

n. DELETE SECTION 25 10 10 “UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND INTEGRATION” in its entirety and REPLACE with the revised section 25 10 10 that accompanies this amendment.

3. NEW SPECIFICATION:

a. ADD NEW SPECIFICATION SECTION 25 05 11 “CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS” that accompanies this amendment.

b. SECTION 25 05 11 “CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS” ADD the Cybersecurity Spreadsheet attachment to the end of SECTION 25 05 11. A copy of the attachment

c. SECTION 25 05 11 “CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS” ADD the Inventory Spreadsheet attachment to the end of SECTION 25 05 11. A copy of the attachment

4. DRAWING CHANGES:

A. REVISED DRAWING SHEETS – Replace the following drawing sheets with the revised drawing sheets that accompany this amendment.

G-002 SHEET INDEX

IF110 INTERIOR FURNITURE PLAN – Revised E10 to “NOT USED”

SE311 FOUNDATION SECTIONS - Knee Section Detail B1 added to the sheet.

M-001 MECHANICAL AND PLUMBING LEGEND, ABBREVIATIONS AND GENERAL

NOTES - Clarifying controls through added symbols and revised notes.

MH-111 VENTILATION FLOOR PLAN - Deleted an extra TAG that was located where the item was not.

MI601 MECHANICAL CONTROLS – Revised Control Notes

MI610 VARIABLE PRIMARY CONDENSER SYSTEM - Removed primary connection to

DHW that is not part of this contract.

MI620 DUEL TEMPERATURE SYSTEM – Added WTW sequence

MI630 DOAU-1 SCHEMATIC AND SEQUENCE - Deleted two temperature sensors, added one humidity sensor and changed exhaust to return on all three reset schedules.

B. NEW DRAWINGS SHEETS – Add the following new drawings sheets that accompany this amendment.

MI600 CONTROL LEGEND

MI612 CD POINTS SCHEDULE

MI622 DT POINTS SCHEDULE

MI632 DOAU POINTS SCHEDULES

MI642 POINTS SCHEDULES

MI651 POINTS SCHEDULES

MI662 POINTS SCHEDULES

MI663 POINTS SCHEDULES

C. DELETED DRAWING SHEET – Delete the following drawing sheet.

MI602 MECHANICAL CONTROLS

D. MISSING SHEETS – ADD the following two sheets that were accidently missing from the

Drawings. Copy of the sheets accompany this amendment.

CG101 GRADING AND EROSION CONTROL PLAN

CU104 SANITARY SEWER LINE 1

E. DUPLICATE SHEETS – The following two sheets were accidently duplicated in the Drawings.

Remove one sheet of each drawing.

CS106 DETENTION POND

CU103 STORM SEWER LINE B

Amendment 0002

TC-2

DEPARTMENT OF THE ARMY

KANSAS CITY DISTRICT, CORPS OF ENGINEERS

601 FEDERAL BUILDING

KANSAS CITY, MISSOURI 64106

SPECIFICATIONS FOR CONSTRUCTION OF

Fire Station – One Company HQs

Fort Leonard Wood, Missouri

VOLUME 1

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00 Solicitation/Contract Form 00 21 -00 Instructions, Conditions and Notices to Offeror 00 45 00 Representatives and Certifications 00 72 00 Contract Clauses 00 73 00 Special Contract Requirements 00 73 46 Wage Determination Schedule

DIVISION 1 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 30 00 Administration Requirements 01 32 01.00 10 Project Schedule 01 33 00 Submittal Procedures 01 33 29 Sustainability Reporting 01 35 26 Governmental Safety Requirements 01 42 00 Sources for Reference Publications 01 45 00.00 10 Quality Control 01 45 00.15 10 Resident Management System contractor Mode (RMS CM) 01 45 35 Special Inspections 01 50 00 Temporary Construction Facilities and Controls 01 57 19 Temporary Environmental Controls 01 74 19 Construction & Demolition Waste Management 01 78 00 Closeout Submittals 01 78 10.00 23 Geospatial Deliverables Created As Part of Military Construction Projects 01 78 23 Operation and Maintenance Data 01 91 00.15 Total Building Commissioning

VOLUME 2

DIVISION 02 - EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03 - CONCRETE

03 11 13.00 10 Structural Cast-In-Place Concrete Forming 03 15 00.00 10 Concrete Accessories 03 20 00.00 10 Concrete Reinforcing 03 30 00.00 10 Cast-In-Place Concrete 03 35 00.00 10 Concrete Finishing 03 39 00.00 10 Concrete Curing 03 42 13.00 10 Plant-Precast Concrete Products For Below Grade Construction

DIVISION 04 - MASONRY

04 20 00 Unit Masonry

DIVISION 05 - METALS

05 12 00 Structural Steel 05 21 00 Steel Joist Framing 05 30 00 Steel Decks 05 40 00 Cold-Formed Metal Framing 05 50 13 Miscellaneous Metal Fabrications

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 20 00 Finish Carpentry 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets 06 61 16 Solid Surfacing Fabrications

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 Pressure Testing an Air Barrier System for Air Tightness 07 11 13 Bituminous Dampproofing 07 21 13 Board and Block Insulation 07 21 16 Mineral Fiber Blanket Insulation 07 22 00 Roof and Deck Insulation 07 27 10.00 10 Building Air Barrier System 07 41 13 Metal Roof Panels 07 60 00 Flashing and Sheet Metal 07 84 00 Firestopping 07 92 00 Joint Sealants

DIVISION 08 - OPENINGS

08 11 13 Steel Doors and Frames 08 11 16 Aluminum Doors and Frames 08 14 00 Wood Doors 08 34 73 Sound Control Door Assemblies 08 36 13 Sectional Overhead Doors 08 51 13 Aluminum Windows 08 71 00 Door Hardware 08 81 00 Glazing 08 87 00 Window Film 08 91 00 Metal Wall and Door Louvers

DIVISION 09 - FINISHES

09 22 00 Supports For Plaster and Gypsum Board 09 29 00 Gypsum Board 09 30 10 Ceramic and Porcelain Tiling 09 51 00 Acoustical Ceilings 09 65 00 Resilient Flooring 09 65 66 Resilient Athletic Flooring 09 67 23.13 Standard Resinous Flooring 09 68 00 Carpeting 09 72 00 Wallcoverings

TC-2

09 77 50 Fiberglass Reinforced Plastic Panels (FRP) 09 90 00 Paints and Coatings

VOLUME 3

DIVISION 10 - SPECIALTIES

10 10 00 Visual Communications Specialties 10 14 00.10 Exterior Signage 10 14 00.20 Interior Signage 10 21 13 Toilet Compartments 10 26 00 Wall and Door Protection 10 28 13 Toilet Accessories 10 44 16 Fire Extinguishers 10 51 13 Metal Lockers 10 56 13 Steel Shelving 10 75 00.00 48 Flagpoles

DIVISION 11 - EQUIPMENT

11 47 00.00 23 Equipment

DIVISION 12 - FURNISHINGS

12 24 13 Roller Window Shades 12 36 00 Countertops 12 48 13 Entrance Floor Mats and Frames

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 Metal Building Systems 13 48 00 Seismic Protection for Miscellaneous Equipment 13 48 00.00 10 Seismic Protection for Mechanical Equipment

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection

DIVISION 22 - PLUMBING

22 00 00 Plumbing, General Purpose

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems 23 05 93 Testing, Adjusting, and Balancing For HVAC 23 07 00 Thermal Insulation for Mechanical Systems 23 09 00 Instrumentation and Control for HVAC 23 09 13 Instrumentation and Control Devices for HVAC 23 09 23.01 LonWorks Direct Digital Control for HVAC and Other Building Control Systems 23 11 25 Facility Gas Piping 23 23 00 Refrigerant Piping 23 25 00 Chemical Treatment of Water for Mechanical Systems 23 52 00 Heating Boilers 23 64 26 Chilled, Chilled-Hot, And Condenser Water Piping Systems 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems 23 82 02.00 10 Unitary Heating and Cooling Equipment

VOLUME 4

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 Cybersecurity for Facility-Related Control Systems 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration

DIVISION 26 - ELECTRICAL

26 05 48.00 10 Seismic Protection for Electrical Equipment 26 08 00 Apparatus Inspection and Testing 26 08 10.00 23 Commissioning of Electrical Systems 26 20 00 Interior Distribution System 26 28 01.00 10 Coordinated Power System Protection 26 29 23 Variable Frequency Drive Systems Under 600 Volts 26 32 14.00 10 Generator Set, Stationary 15-300 Kw, Standby Applications 26 32 33.00 10 Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity 26 36 00.00 10 Automatic Transfer Switch And By-Pass/Isolation Switch 26 41 00 Lightning Protection System 26 42 14.00 10 Cathodic Protection System (Sacrificial Anode) 26 51 00.00 23 Interior Lighting With Led Fixtures 26 56 00 Led Exterior Lighting

DIVISION 27 - COMMUNICATIONS

27 10 00 Building Telecommunications Cabling System 27 51 16 Radio and Public Address Systems

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 Interior Fire Alarm and Mass Notification System

DIVISION 31 - EARTHWORK

31 00 00 Earthwork 31 32 11 Soil Surface Erosion Control

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 Field Molded Sealants for Sealing Joints in Rigid Pavements 32 05 33 Landscape Establishment 32 11 10 Drainage Layer 32 11 16 Base Course For Rigid and Subbases for Flexible Paving 32 11 16.01 Separation Layer 32 11 24 Graded Crushed Aggregate Base Course for Flexible Pavement 32 11 29 Lime-Modified Subgrade 32 12 13 Bituminous Tack and Prime Coats 32 12 16 Hot-Mix Asphalt (HMA) For Roads 32 13 13.06 Portland Cement Concrete Pavement For Roads And Site Facilities 32 16 13 Concrete Sidewalks and Curbs and Gutters 32 17 23 Pavement Markings 32 92 19 Seeding 32 92 23 Sodding 32 93 00 Exterior Plants

DIVISION 33 - UTILITIES

33 11 00 Water Utility Distribution Piping

TC-2

33 30 00 Sanitary Sewers 33 40 00 Storm Drainage Utilities 33 71 02 Underground Electrical Distribution 33 82 00 Telecommunications Outside Plant (OSP)

-End of Table of Contents-

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 96 PAGES

1 Company Fire Station

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.10 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.2.1 G DOPreliminary Sustainability

Notebook 1.5.2.1Preliminary High Performance and Sustainable Building Checklist SD-07 Certificates

1.4.5Third Party Certification (TPC) SD-11 Closeout Submittals

1.5.2.1 G DOFinal Sustainability Notebook

1.5.2.1 G DOFinal High Performance and

Sustainable Building Checklist

1.5.2.1 G DOAmended Final Sustainability

Notebook

3.3.1 G DOThird Party Certification

Certificates 01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 96 PAGES

01 35 26 1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.5Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan 01 45 35 SD-01 Preconstruction Submittals

3.1.1 G DOSIOR Letter of Acceptance

3.1.1 G ROProject Manual

3.1.1 G ROProject Manual

3.1.1Written Practices 3.1.3Written Practices 3.1.1NDT Procedures and Equipment

Calibration Records 3.1.3NDT Procedures and Equipment

Calibration Records SD-06 Test Reports

3.1.1Daily Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 96 PAGES

01 45 35 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1AC472 Accreditation 2.1Steel Joist Institute Membership 2.1Certificate of Compliance

1.5.10 G ROSpecial Inspector of Record

1.5 G ROSpecial Inspector

3.1.1Qualification Records 3.1.3Qualification Records

SD-11 Closeout Submittals

3.1.1 G ROComprehensive Final Report

3.1.3 G ROComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey

1.11 G ROSolid Waste Management Permit

1.6.2 G RORegulatory Notifications

1.7 G ROEnvironmental Protection Plan

3.2.1.2 G ROStormwater Notice of Intent

1.7.9.1 G RODirt and Dust Control Plan

1.6.4Employee Training Records

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 96 PAGES

01 57 19 3.2.1.3Inspection Reports

3.6.2.1 G ROSolid Waste Management Report

SD-07 Certificates

1.6.4 G ROEmployee Training Records

1.6.4.1Certificate of Competency 1.6.4Erosion and Sediment Control

Inspector SD-11 Closeout Submittals

3.2.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 G ROStormwater Notice of Termination

3.6.1 G ROWaste Determination

Documentation

3.6.3.6 G RODisposal Documentation for

Hazardous and Regulated Waste

1.6.4 G ROAssembled Employee Training

Records

1.11 G ROSolid Waste Management Permit

3.6.2.1 G ROSolid Waste Management Report

3.6.3.1 G ROHazardous Waste/Debris

Management

3.6.2.1 G ROSales Documentation

3.6.2.1Contractor Certification 3.2.1.5As-Built Topographic Survey

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROWaste Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 96 PAGES

01 74 19 SD-11 Closeout Submittals 1.7Records

01 78 00 SD-03 Product Data 1.6.1Warranty Management Plan 1.6.5Warranty Tags

SD-08 Manufacturer’s Instructions 1.6.1Instructions

SD-10 Operation and Maintenance Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

3.6As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings 3.5Construction Contract

Specifications

2.3 G ROCertification of EPA Designated

Items

3.9 G ROInterim DD FORM 1354

3.9 G ROChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance Data

1.3 G ROO&M Database

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 96 PAGES

01 78 23 3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.8 G CxCommissioning Firm's

Qualifications

1.8 G CxLead Commissioning Specialist

Qualification

1.8.2 G CxTechnical Commissioning

Specialists

1.8 G CxCommissioning Firm's Contract

3.1.2.1 G CxInterim Construction Phase

Commissioning Plan SD-03 Product Data

3.1.2.2 G CxFinal Construction Phase

Commissioning Plan

SD-06 Test Reports

3.1.2.2 G CxFinal Construction Phase

Commissioning Plan

3.1.2.1.2 G CxTemplate Building Envelope

Inspection Checklists

3.1.4.2 G CxBuilding Envelope Inspection

Checklists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 96 PAGES

01 91 00.15 3.1.4.3 G CxPre-Functional Checklists

1.12 G CxIssues Log

3.2 G CxCommissioning Report

3.3.1 G CxPost-Construction Trend Log

Report

1.14 G CxBuilding Envelope Performance

Test Matrix SD-07 Certificates

1.16 G CxCertificate of Readiness

1.8 G CxCommissioning Firm

1.8.1 G CxLead Commissioning Specialist

1.5.1 G CxApproval Of Envelope Pressure

Test Agency Qualifications

1.5.1 G CxApproval Of Termographer

Qualifications

1.5.1 G CxAir Barrier Inspector

Q!Ualifications SD-10 Operation and Maintenance Data

3.1.5 G CxTraining Plan

3.1.5 G CxTraining Attendance Rosters

3.1.6 G CxSystems Manual and

Computerized Maintenance Management System Manual

3.1.7 G CxMaintenance and Service Life

Plans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 96 PAGES

01 91 00.15 1.10 G CxOperation and Maintenance (O&M) Instructions

3.1.5 G CxTraining Documentation

SD-11 Closeout Submittals

3.1.2 G CxConstruction Phase

Commissioning Plan

3.2 G CxFinal Commissioning Report

1.5.2 G CxAs-Built Drawings

1.7 G CxWarranty

02 41 00 SD-01 Preconstruction Submittals

1.2.1 G RODemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 G RONotification

SD-11 Closeout Submittals 3.3.3Receipts

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G ROFormwork

3.1.1 G ROFormwork

2.2.1 G ROForm Removal Schedule

SD-03 Product Data 2.2Form Materials

SD-06 Test Reports 3.3Inspection

03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 96 PAGES

03 15 00.00 10 2.3Sealant SD-04 Samples

2.3.2Lubricant for Preformed Compression Seals

2.3.3Field-Molded Type SD-07 Certificates

2.2Preformed Expansion Joint Filler 2.3Sealant

03 20 00.00 10 SD-02 Shop Drawings

3.1 G DOReinforcement

SD-03 Product Data

2.3 G DOReinforcing Steel

SD-06 Test Reports

2.7 G ROTests, Inspections, and

Verifications SD-07 Certificates

2.3Reinforcing Steel 03 30 00.00 10 SD-01 Preconstruction Submittals

1.5.2 G DOQuality Control Plan

1.5.1Laboratory Accreditation

3.9.5.6 G ROSampling Plan

SD-03 Product Data Part 2Recycled Content Products 2.2Cementitious Materials 2.11Vapor Barrier 2.9Floor Hardener

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 96 PAGES

03 30 00.00 10 2.4Chemical Admixtures SD-05 Design Data

2.1.1 G DOMixture Proportions

1.7 G DOCHECK PEMB FOUNDATIONS

FOR FINAL PEMB REACTIONS

SD-06 Test Reports

2.1.1 G DOMixture Proportions

3.9 G ROTesting and Inspection for CQC

2.2.4Fly Ash 2.2.7Ground Granulated

Blast-Furnace (GGBF) Slag 2.3Aggregates 3.9.5.1Air Content 3.9.5.3Slump 3.9.5.6Compressive Strength 2.5Water

SD-07 Certificates 1.5Contractor Quality Control personnel 3.2.1Ready-Mix Plant

03 35 00.00 10 SD-04 Samples 1.3.1Field Test Panels 1.3.1.1Sample Wall Panels

03 39 00.00 10 SD-03 Product Data 2.1Curing Materials

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 96 PAGES

03 39 00.00 10 3.2Testing and Inspection for CQC SD-08 Manufacturer’s Instructions

2.1Curing Compound 03 42 13.00 10 SD-01 Preconstruction Submittals

1.3.2.2Quality Control Procedures SD-02 Shop Drawings

2.1.1Standard Precast Units 2.1.2Custom-Made Precast Units 3.2.4.3Special Finishes

SD-03 Product Data 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.5Accessories

SD-05 Design Data 2.1.2Design Calculations 2.1.5.1Concrete Mix Proportions

SD-06 Test Reports 1.3.2.4Test Reports

SD-07 Certificates 1.3.2.2Quality Control Procedures

SD-11 Closeout Submittals 2.2.1Recycled content for fly ash and pozzolan;

2.2.1Recycled content for Ground Iron

Blast-Furnace Slag;

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 96 PAGES

03 42 13.00 10 2.2.1Recycled content for Silica Fume;

2.2.1Recycled content for Synthetic

Fiber Reinforcement;

2.2.1Recycled content for steel;

04 20 00 SD-02 Shop Drawings

3.4.1.1 G DODetail Drawings

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

2.2.2 G ROClay or Shale Brick

2.2.3.1.1 G DOCement

2.4.1.1 G DOCementitious Materials

2.6.7 G ROInsulation

SD-04 Samples

1.3.1.1 G ROMock-Up Panel

2.2.2 G ROClay or Shale Brick

2.2.3.1 G ROConcrete Masonry Units (CMU)

2.2.5 G RODimension Stone Units

2.4.1.4 G ROAdmixtures for Masonry Mortar

2.6.2 G ROAnchors, Ties, and Bar

Positioners

2.6.3 G ROJoint Reinforcement

2.6.5 G ROClay Masonry Expansion-Joint

Materials

2.6.7 G ROInsulation

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 96 PAGES

04 20 00 2.1.2 G DOMasonry Compressive Strength

2.6.2.2.1 G DOCalculations for Brick Tie and

Anchorage Capacity SD-06 Test Reports

3.6.1.1Field Testing of Grout 3.6.1.3Single-Wythe Masonry Wall

Water Penetration Test SD-07 Certificates

1.3.2Special Masonry Inspector Qualifications

2.2.2Clay or Shale Brick 2.2.3.1Concrete Masonry Units (CMU) 2.2.3.2Concrete Brick 2.2.4Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement 2.6.7Insulation

SD-08 Manufacturer’s Instructions 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-11 Closeout Submittals 2.2.2.1.3Clay Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 96 PAGES

04 20 00 2.2.3.1.2Recycled Content 05 12 00 SD-01 Preconstruction Submittals

1.3.1.2 G DOErection Drawings

SD-02 Shop Drawings

1.3.2 G DOFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts

SD-05 Design Data

1.3.1.1 G DOConnection Design Calculations

SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer

Inspection Reports 3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 96 PAGES

05 12 00 1.3.3.1Welding Procedures and Qualifications

2.4.1Welding Electrodes and Rods 05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification SD-02 Shop Drawings

1.3.1 G DOSteel Joist Framing

SD-05 Design Data

2.2 G DODesign Calculations

SD-06 Test Reports

3.3Erection Inspection 3.3Welding Inspections

SD-07 Certificates 1.3.2Certification of Compliance

SD-11 Closeout Submittals 2.3Recycled Content of Steel

Products 05 30 00 SD-02 Shop Drawings

1.3.5 G DOFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1 G RODeck Units

2.2.12 G ROMechanical Fasteners

2.1.3Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 96 PAGES

05 30 00 SD-04 Samples

2.1.1 G ROMetal Roof Deck Units

2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 G DODeck Units

SD-07 Certificates 1.3.3Welder Qualifications

1.3.3 G ROWelding Procedures

1.3.4.1Fire Safety

1.3.4.2 G ROWind Storm Resistance

1.3.1Manufacturer's Certificate 1.3.2Powder-Actuated Tool Operator

SD-11 Closeout Submittals 2.1Recycled Content of Steel

Products 05 40 00 SD-02 Shop Drawings

1.6.1 G DOFraming Components

SD-03 Product Data

2.1 G DOStuds, Joists

SD-05 Design Data

1.6.2 G DOCalculations for design of

members for AT/FP loads

1.6.2 G DOCalculations for design of

connections for AT/FP loads

1.6.2 G DOCalculations for design of other

members

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 96 PAGES

05 40 00 1.6.2 G DOCalculations for design of other connections

SD-07 Certificates

1.4 G DOLoad-Bearing Cold-Formed Metal

Framing

3.2.1 G ROWelds

SD-11 Closeout Submittals 2.1Recycled Content of Steel

Products 05 50 13 SD-02 Shop Drawings

2.12 G DOStructural Steel Door Frames

2.3 G DOAccess Doors and Panels

2.10 G DOStorm Shelter Debris Screens

2.5 G DOExpansion Joint Covers

2.7 G DOApparatus Bay Trench and Catch

Basin Gratings

2.9 G DOAngles and Plates

3.10 G DORoof Hatch

2.9 G DOLoose Steel Lintels

2.8 G DOBollards

2.11 G DOAntenna Support

SD-03 Product Data 2.3Access Doors and Panels 2.4Control-Joint Covers 2.5Expansion Joint Covers 2.12Structural Steel Door Frames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 96 PAGES

05 50 13 3.10Roof Hatch SD-04 Samples

2.5Expansion Joint Covers 2.4Control-Joint Covers

3.4 G DOFall Protection System Design

Analysis 06 20 00 SD-02 Shop Drawings

1.3 G RODetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.2 G ROWood Products

2.3 G ROCountertops

1.4 G ROTreated Wood Products

2.7 G ROHardware and Accessories

SD-04 Samples

1.5 G ROSamples

SD-07 Certificates

1.7.1.1 G ROCertificates of Grade

1.7.1.2 G ROCertified Sustainably Harvested

Wood

1.7.1.3 G ROIndoor Air Quality

SD-11 Closeout Submittals

2.2.3 G ROCertified Sustainably Harvested

Wood for Trim and Frames 2.2.5VOC Content for Hardwood

Plywood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 96 PAGES

06 20 00 2.8.1.2 G ROIndoor Air Quality for Non-aerosol Adhesives

2.8.1.2 G ROIndoor Air Quality for Aerosol

Adhesives

2.2.6Recycled Content for MDF/Particleboard

06 41 16.00 10 SD-02 Shop Drawings

2.9 G DOShop Drawings

3.1 G DOInstallation

SD-03 Product Data

2.1 G DOWood Materials

2.9.7.3 G DOFinish Schedule

SD-04 Samples

2.3 G DOPlastic Laminates

2.5 G DOCabinet Hardware

SD-07 Certificates

1.5 G ROQuality Assurance

3.1 G ROLaminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.5.2 G DODetail Drawings

3.1 G ROInstallation

SD-03 Product Data

2.1 G DOSolid Polymer Material

1.5.1Qualifications

2.3 G ROFabrications

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 96 PAGES

06 61 16 2.1 G DOMaterial

2.3.5 G DOCounter and Vanity Tops

SD-07 Certificates

2.3 G ROFabrications

1.5.1 G ROQualifications

SD-10 Operation and Maintenance Data

3.2 G ROClean-up

SD-11 Closeout Submittals

1.3LEED Documentation 07 05 23 SD-01 Preconstruction Submittals

1.4 G CxAWork Plan

SD-03 Product Data

2.2 G CxAThermal Imaging Camera

SD-05 Design Data

3.2Envelope Surface Area Calculations

SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G CxAPressure Test Procedures

3.5.6 G CxAAir Leakage Test Report

3.6.5 G CxADiagnostic Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 96 PAGES

07 11 13 SD-07 Certificates 1.3Materials

07 21 13 SD-03 Product Data

1.3 G ROManufacturer's Standard Details

2.2 G ROBlock or Board Insulation

2.3 G ROVapor Retarder

2.4 G ROPressure Sensitive Tape

1.4 G ROProtection Board or Coatings

2.6 G ROAccessories

SD-07 Certificates

2.2 G ROBlock or Board Insulation

2.3 G ROVapor Retarder

3.4.3 G ROProtection Board or Coating

1.7 G ROSpecial Warranties

SD-08 Manufacturer’s Instructions 2.2Block or Board Insulation 2.6.1Adhesive

SD-11 Closeout Submittals

2.1.1 G ROVolatile Organic Compound

(VOC) Content

2.1.2 G RORecycled Content

07 21 16 SD-03 Product Data 2.2Blanket Insulation 2.3Sill Sealer Insulation 2.5Vapor Retarder 2.6Pressure Sensitive Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 96 PAGES

07 21 16 2.7Accessories SD-08 Manufacturer’s Instructions

3.3.1Insulation SD-11 Closeout Submittals

2.1.1Recycled Content for Insulation Materials

2.1.2Reduce Volatile Organic Compounds (VOC)

07 22 00 SD-02 Shop Drawings

1.3 G ROInsulation Board Layout

SD-03 Product Data

2.2 G ROInsulation

1.4 G ROCover Board

2.4 G ROFasteners

2.3 G ROMoisture Control

SD-06 Test Reports

1.8.1 G ROFlame Spread Rating

SD-07 Certificates

1.9 G ROVolatile Organic Compounds

(VOC) Content

1.6 G ROInstaller Qualifications

1.6 G ROCertificates Of Compliance For

Felt Materials SD-08 Manufacturer’s Instructions

2.4 G ROFasteners

2.2 G ROInsulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 96 PAGES

07 22 00 SD-11 Closeout Submittals 1.9Volatile Organic Compounds

(VOC) Content 07 27 10.00 10 SD-04 Samples

3.1.2 G CxAMock-Up

SD-06 Test Reports

1.8 G CxADesign Review Report

3.1.3 G CxATesting and Inspection

SD-07 Certificates

1.7 G CxAAir Barrier Inspector

07 41 13 SD-02 Shop Drawings

1.5.5 G DORoofing Panels

1.5.5 G DOFlashing and Accessories

1.5.5 G DOGutter/Downspout Assembly

1.4 G DOFall Protection

2.3.4 G DOIntermediate support

2.4 G DOAttachment Clips

SD-03 Product Data

2.1 G DORoof Panels

1.5.5 G DOFactory-Applied Color Finish

2.5 G DOAccessories

1.5.5 G ROFasteners

2.5.4 G ROFasteners

1.5.5 G ROPressure Sensitive Tape

2.7 G DOUnderlayments

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 96 PAGES

07 41 13 2.8 G ROGaskets and Sealing/Insulating Compounds

1.5.5 G ROCoil Stock

1.2.1.7 G DOSnow Guards

1.5.5 G DOEnamel Repair Paint

SD-04 Samples

2.1 G DORoof Panels

1.5.5 G ROFactory-applied Color Finish

2.5 G DOAccessories

1.5.5 G DOFasteners

2.5.4 G DOFasteners

1.5.5 G ROGaskets and Sealant/Insulating

Compounds

1.4 G DOFall Protection

2.3.4Intermediate Support

SD-05 Design Data

1.2.1.2 G DOWind Uplift Resistance

1.4 G DODesign Calculations

SD-06 Test Reports

1.2.1.1 G ROLeakage Test Report

1.2.1.2 G DOWind Uplift Test Report

1.2.1.6Structural performance

2.2 G ROFactory Finish and Color

Performance Requirements SD-07 Certificates

2.1 G RORoof Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.