National Geospatial-Intelligence Agency Next NGA West Campus (N2W) Program
Solicitation number
W912DQ-17-R-7000
Issued by

About this file

Pre - Proposal Conference

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.59

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

Prepared by Kansas City District Pre-Proposal Conference 6 April 2017

NEXT NGA WEST (N2W) PROGRAM

DESIGN/BUILD

PRE-PROPOSAL CONFERENCE

INTRODUCTION

Presented by:

Robyn Kiefer– Project Manager Jay Denker – Contracting Officer Dave Walsh – Contracting Officer Gene Morisani – Area Engineer

Today’s Briefing – 30 minutes

CAUTION

Base your proposals on the Solicitation and Amendments to the Solicitation as issued.

Nothing said during this conference can be interpreted as a modification to the solicitation unless it is issued as a formal amendment.

PURPOSE

• Provide a clear understanding of the procurement information, proposal submission requirements, and provide a program update.

AGENDA

• Overview of N2W

• Schedule Update

• Highlights of the RFP

• ProjNet Questions

OVERVIEW OF N2W

WHO IS THE NGA AND WHAT IS N2W?

• The National Geospatial-Intelligence Agency (NGA) delivers products that provide a decisive advantage to

• warfighters

• policymakers

• intelligence professionals

• first responders

• N2W will be NGA’s new state-of-the-art facility in North St.

Louis. It will position NGA to better meet future mission requirements through a more robust information technology infrastructure and collaborative workspace.

SITE LOCATION

DESIGN AND CONSTRUCTION

PROGRAM INFORMATION

• Project expected to be funded in phases o FY16 - Site Selection o FY17 - Real Estate Acquisition o FY18-19 - MILCON Construction o FY22+ - Outfitting and Transition Phase

• NGA desires a “turn-key” construction contract to include Furniture Fixtures & Equipment and Transition to full operations phase services

N2W FACILITY REQUIREMENTS

Main Operations Building 800,000 SF Central Utility Plant 40,000 SF Visitor Control Center 7,300 SF Remote Inspection Facility* 6,500 SF Parking Garages 1,000,000 SF Surface Parking* 175,000 SF Access Control Points* Site Improvements: Roads, perimeter security, utilities, etc.

Landscaping* Temporary Integrated Project Office*

* To be set aside for Small Business Contract Opportunity

N2W UPDATED SCHEDULE TARGETS

Phase 1 Proposals due – May 2, 2017 at 1:00 p.m.

Coordinate with Jay Denker for your proposal delivery.

Down Select announcement – Target Aug/Sept

Phase 2 Site Visit – in St. Louis includes an Industry outreach event - Target Aug/Sept

Issue Phase 2 DRAFT for comment – Target Aug/Sept

Issue Phase 2 RFP – Target Sept 2017

365 DAY EXPLANATION

Proposals good for 365 explanation

M ay

-1

Ju n-

Ju l-1

Au g-

Se p-

O ct

-1

N ov

-1

De c-

Ja n-

Fe b-

M ar

-1

Ap r-

M ay

-1

Ju n-

Ju l-1

Au g-

Se p-

O ct

-1

N ov

-1

De c-

Ja n-

Phase 1 Proposal Due Phase 1 Proposal Valid Phase 1 Down Select Issue DRAFT Phase 2 RFP Comments Phase 2 Issued Phase 2 Interim Interview Phase 2 Proposal Due Phase 2 Proposal Valid Phase 2 Oral Presentation Phase 2 Discussions Phase 2 Request for Final Proposal Phase 2 Final Proposal Due Phase 2 Final Proposal Valid Contract Award

RFP HIGHLIGHTS OF INTEREST

Procurement Integrity – all questions entered in ProjNet, no contact with NGA or N2W team. The Government POC is Jay Denker.

Amendments – No Amendments have been issued to date.

All Amendments must be acknowledged with your Phase 1 submission.

Subcontractors letter of Commitment for Phase 1 – only those Subcontractors/Teaming partners that are contributing to the submitted Corporate Experience.

• Review RFP

PROJECT DESCRIPTION: This Request for Proposal (RFP) solicits for the design and construction of the National Geospatial-Intelligence Agency’s (NGA) Next NGA West (N2W) campus in the greater St. Louis metropolitan area.

This Solicitation will use a 2 Phase Design-Build procurement methodology as described in FAR part 36.3.

NAICS CODE: 236220 (Size Standard: $36.5M) MAGNITUDE OF PROJECT: Estimated price range is over $500M Funds are not presently available for this acquisition. No contract or aw ard will be made until funds areappropriated and made available.

There is no legal liability on the part of the Government for any payment until funds are made available to the Contracting Officer, including proposal costs.

No award will be made without the Federal Government completing all real estate requirements for this project. Real estate requirements are in the process of being completed.

JAY B DENKER 816-389-3934

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

31-Mar-2017

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______ 10 calendar days and complete it within ________ 1461 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ 12 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 02 May 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 365 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE, KANSAS CITY +

CONTRACTING DIVISION FEDERAL BLDG CT 601 E 12

KANSAS CITY MO 64106-2896

W912DQ

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

816-389-3029 FAX: TEL: 816-389-3812 TEL: FAX:

W912DQ-17-R-7000 145

G5CTMJBD

Highlight

G5CTMJBD

Highlight

G5CTMJBD

Highlight

G5CTMJBD

Highlight

G5CTMJBD

Highlight

20B. SIGNATURE

(REV. 4-85) STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE 27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY

(Include ZIP Code) 14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14) 16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.

governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this 28. NEGOTIATED AGREEMENT

(Must be fully completed by offeror) OFFER

W912DQ-17-R-7000

Section 00 11 00 - Solicitation/Contract Form

THIS IS A DRAFT CLIN SCHEDULE

Draft CLIN Schedule Only - Preliminary For Information Only – Final CLIN Schedule to be Provided in

Phase Two – Project currently lacks congressional authorization and appropriations.

Note that no award will be made without the Federal Government completing all real estate requirements for this project. Real estate requirements are in the process of being completed.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

FY18 Design and Construction

FFP

Construction Cost Limit is TBD

FOB: Destination

NET AMT

OPTION FY19 Design and Construction

FFP

Construction Cost Limit is TBD

OPTION 1 Year of O&M (FY18 Facilities)

FFP

One Year of Operations and Maintenance of FY18 Facilities after Substantial

Completion

OPTION 2d Year of O&M (FY18 Facilities)

FFP

Second Year of Operations and Maintenance of FY18 Facilities after Substantial

Completion

OPTION 1 year O&M All (FY18 and 19 Facilities)

FFP

One Year of Operations and Maintenance of all facilities after Substantial

Completion of FY19 Facilities

OPTION 2d year O&M All (FY18 and 19 Facilities)

FFP

Second Year of Operations and Maintenance of all facilities after Substantial

Completion of FY19 Facilities

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Evaluation Factor 1-1

Key Personnel Matrix

31-MAR-2017

Section 00 21 00 - Instructions, Conditions and Notices to Offeror

PHASE1 PRE-PROPOSAL CONFERENCE

A Phase One Pre-Proposal conference for Prime Contractors will be conducted via webinar on 6 April, 2017

@ 1300 CDT. Please contact Jay Denker at Jay.B.Denker@usace.army.mil or 816-389-3934 as soon as possible, and no later than 5 April 2017, to obtain webinar logon instructions and information.

NOTICE

Additional Information Regarding Offer Standard Form 1442, Block 13.D.

Offers providing less than 365 calendar days for Government acceptance of their Phase 1 proposal after the date offers are due will not be considered and will be rejected.

The 365 calendar days for the Government acceptance period starts over in Phase 2. Offers providing less than 365 calendar days for Government acceptance of their Phase 2 proposal after the date Phase 2 offers are due will not be considered and will be rejected.

During Phase 2 discussions, the 365 calendar days for the Government acceptance period starts over for each proposal revision. Offers providing less than 365 calendar days for Government acceptance of their Phase 2 proposal revisions after established cut-off date will not be considered and will be rejected.

OVERVIEW

This Request for Proposal (RFP) solicits for the design and construction of the National Geospatial-Intelligence

Agency’s (NGA) Next NGA West (N2W) facility in the greater St. Louis metropolitan area.

In Phase 1, the Government intends to select up to a maximum of three most highly rated offerors to compete in

Phase 2.

PROJECT DESCRIPTION:

The National Geospatial-Intelligence Agency (NGA) primary function is the collection, analysis and dissemination of geospatial intelligence (GEOINT) in support of national security. As a major combat support agency of the

Department of Defense (DoD) and a member of the Intelligence Community, the NGA provides timely, relevant, accurate imagery intelligence and geospatial information in support of national security.

The Next NGA West (N2W) Program is a phased funded, multiyear, performance based design build construction effort to replace the existing NGA West Campus (NCW) facilities in St. Louis, MO. The phased fund profile is currently anticipated to be 2-3 years. The initial FY 18 phase will be the base contract award with follow on phases as optional contract line items. Each phase of construction will comprise complete and useable facilities.

In the Phase 2 RFP, additional optional contract line items will be included for furniture, fixtures and equipment, and up to 2 years of Operations and Maintenance of the facility by the design builder.

As NGA’s mission remains fluid, adjusting to meet current events and emerging global threats, their facilities require the same flexibility and scalability. NCW requires the ability to surge in crisis, while providing reliability and redundancy across missions and operations centers, provide uninterrupted communications and connectivity, have virtual presence, and provide Continuity of Operations (COOP) within the DoD and the Intelligence

Community (IC). Future mission needs are anticipated to rely to a greater extent, on open source and unclassified mailto:Jay.B.Denker@usace.army.mil strategic partnerships. The N2W must be designed to take advantage of this evolution while still embracing all requisite DoD and IC security criteria.

Key aspects of the N2W Program include: a facility comprised of multiple buildings constructed in accordance with ICD/ICS 705; a robust work environment; on-site support and amenity facilities; resilient communications;

reliable power and cooling; and 24x7 Mission Critical Operational capabilities. The Main Operations Building, Central Utility Plan, Structured Parking, and supporting facilities must designed to allow for future growth of up to

25% by square feet.

The N2W facilities are anticipated to include the following elements on an approximately 97 acre site in St. Louis, Missouri:

a. Main Operations Building (MOB) (approx. 800,000 sf)

b. Central Utilities Plant (CUP) (approx. 40,000 sf)

c. Structured Parking (PG) (approx. 992,000 sf)

d. Visitor Control Center (VCC) (approx. 7,300 sf)

e. Associated Site improvements (roads, utilities, perimeter security, etc.)

f. Installation of Furniture, Fixtures, and Equipment (FF&E),

g. Post Construction Transition to Full Operational Capability (FOC) Phase Services.

The MOB includes open offices, operations areas, collaboration space, information technology rooms, amenities and other support areas. Construction consists of foundations and structure; seismic requirements; weatherproofing and exterior skin; electrical/mechanical service and distribution systems; fire protection, alarm and suppression; passive information technology infrastructure; electronic security systems infrastructure; and interior finishes, power, lighting, and environmental control. The MOB will include unclassified spaces as well as classified spaces with redundant primary power and Uninterruptable Power Supply (UPS) systems to ensure continuity of operations.

Comprehensive interior design will be included in the technical requirements. The office building mechanical and electrical systems will be directly supported by the Central Utility Plant. At a minimum the facility will meet LEED

Silver certification requirements and comply with both the Energy Policy Act of 2005 and the Energy Independence and Security Act of 2007.

The facility requires site preparation, utility infrastructure, perimeter security measures and parking structure. Site infrastructure will include primary electrical service and substation, storm water, natural gas, water, sewer, and telecommunications. This will include coordination for connections with the local / regional utility service providers. Utility site construction will provide emergency backup power generation and cooling equipment. Site preparation includes standard clearing, grubbing, cut, fill, grading exterior lighting, and permitted environmental protection measures. Additional site work consists of roads, curb and gutter, walkways, and turf. Perimeter security construction will include perimeter fence, traffic controls and surveillance capabilities. The parking structure is anticipated to serve approximately 90% of the population.

The N2W facility must be secured using a layered physical security approach in accordance with AT/FP standards, with access to the site controlled for both pedestrians and vehicles. Physical means, such as a fences, bollards and other barriers, provide the outermost layer of security to restrict access. The Visitor Control Center (VCC), Remote

Inspection Facility (RIF) and Access Control Points (ACPs) will manage access to the Main Operations Building

(MOB), which will house another layer of physical security. At the ACPs, officers verify staff identification and perform random screening of vehicles before they enter the facility. Officers perform weapons screening and visitor vetting at the VCC. At the RIF, officers perform screening of up to semi-trailer sized vehicles for explosives. At the

MOB, officers verify credentials of personnel accessing secured areas of the facility.

FAR 9.507-1 Provisions:

POTENTIAL ORGANIZATIONAL CONFLICTS OF INTEREST

(a) The Contracting Officer has determined that the proposed contract may contain a potential organizational conflict of interest. Offerors are directed to FAR Subpart 9.5 for detailed information concerning organizational conflicts of interest.

(b) The firms listed below may have prepared, participated, or assisted the Government in the preparation of the specifications, requirements or a work statement that will be used in this competitive acquisition.

(1) Identified potential conflicts of interest in the Phase 1 RFP:

HDR Architecture, Inc. Booze Allen Hamilton

RTKL Harry Zimmerman Associates, Inc.

Stanton Engineering Services, LLC OGSystems

Construction Cost Systems TASC

Hinman Consulting Engineers Vencore

David Vere Thompson Value Management Strategies, Inc.

Viatech Electromagnetics Delta Engineering, Architects & Land Surveyors

Culinary Advisors HNTB Corporation

Paul Weddelove Associates Faithful & Gould, Inc.

Leidos

(2) Identified potential conflicts of interest in the Phase 2 RFP:

HDR Architecture, Inc. Burns & McDonnell Engineering Company, Inc

RTKL Primary Integrated Solutions

Stanton Engineering Services, LLC Wiss, Janney, Elstner Associates, Inc

Construction Cost Systems Leidos

Hinman Consulting Engineers Booze Allen Hamilton

David Vere Thompson Harry Zimmerman Associates, Inc.

Viatech Electromagnetics OGSystems

Culinary Advisors TASC

Paul Weddelove Associates Vencore

Frontenac Engineering Value Management Strategies, Inc.

SCI Engineering Delta Engineering, Architects & Land Surveyors

Paul Waddelove Associates HNTB Corporation

Shen Milsom Wilke Faithful & Gould, Inc.

Gateway Geospatial Surveying

(c) If a potential offeror prepared, participated, or assisted the Government in the preparation of the specifications, requirements, or work statement in this acquisition, they may not be eligible for award as a prime contractor or subcontractor.

(d) If an offeror requests an exception to the prohibition of paragraph (c) of this provision, the offeror shall submit with its offer a detailed request establishing a factual basis to support the position that an organizational conflict of interest does not exist. If an apparently successful offer has submitted a request for exception, the Contracting

Officer will review the request. If no conflict is determined to exist, the offer will be allowed to proceed to award.

(End of provision)

USE OF NON-GOVERNMENT ADVISORS - POTENTIAL ORGANIZATIONAL CONFLICTS OF

INTEREST (Applicable to Phase 2 RFP Only)

(a) During Phase 2, selected employees of contracted firms may serve as non-government technical advisors to the

Source Selection Evaluation Board (SSEB). If used, the selected employees will be identified in the Phase 2 RFP.

G5CTXDJW

Highlight

G5CTXDJW

Highlight

G5CTXDJW

The Contracting Officer has determined that this is a potential organizational conflict of interest. Offerors are directed to FAR 9.5 for detailed information concerning this potential organizational conflicts of interest.

(b) Offerors are advised that selected employees of HDR Architecture, Inc. and Burns & MacDonnell Engineering

Company, Inc., may serve as non-government technical advisors to the SSEB in the source selection process for

Phase 2 evaluation Factor 2-1, Technical Design Solution. Non-government technical advisors used during source selection have the potential to gain access to proprietary information of other companies in performing this service.

This is considered a potential organizational conflict of interest in accordance with FAR 9.505-4(b).

(c) Selected employees working for these firms may be authorized access to limited portions of the proposal data as necessary to provide an advisory role, if requested, by the SSEB during the Phase 2 evaluation of Factor 2-1, Technical Design Solution. In accordance with FAR 9.505-4(b)., a contractor that gains access to proprietary information of other companies in performing advisory and assistance services for the Government must agree with the other companies to protect their information from unauthorized use or disclosure for as long as it remains proprietary and refrain from using the information for any purpose other than that for which it was furnished. The contracting officer shall obtain copies of these agreements and ensure that they are properly executed. A sample agreement is provided after paragraph (d) below.

(d) In accomplishing their duties, the aforementioned firms may require access to proprietary information contained in the Offeror's proposals. Therefore, pursuant to FAR 9.505-4 – if access to proprietary information is required, these firms must execute an agreement with each Offeror that states that they will (1) protect the Offeror's information from unauthorized use or disclosure for as long as it remains proprietary and (2) refrain from using the information for any purpose other than that for which it is furnished.

The following is a sample format for the consent form:

G5CTXDJW

Contractor Confidentiality and Nondisclosure Agreement

Whereas we have reviewed FAR 9.505 regarding organizational conflicts of interest. To our knowledge, no organizational conflict of interest exists for this procurement between our company and the Offeror. Whereas Offerors were advised that employees of our firm may serve as technical advisors to the Source Selection Evaluation Board in the source selection process or have served in the conceptual development of this project, the development of the RFP and/or have been involved in the value engineering process of this project. Whereas in accomplishing our duties, our firm, may require access to proprietary information contained in your proposal. Pursuant to FAR 9.505-4, we must execute an agreement with each Offeror that states that we will (1) protect the Offeror's information from unauthorized use or disclosure for as long as it remains proprietary and (2) refrain from using the information for any purpose other than that for which it is furnished.

Therefore, we, ___________________________________, agree that we will:

(1) protect _______________________________________’s information from unauthorized use or disclosure for as long as it remains proprietary

And

(2) refrain from using the information for any purpose other than that for which it is furnished.

Signature of Requesting Company Official Date

Signature of Offering Company Official Date

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016

52.204-18 Commercial and Government Entity Code Maintenance JUL 2016

52.211-6 Brand Name or Equal AUG 1999

52.214-34 Submission Of Offers In The English Language APR 1991

52.214-35 Submission Of Offers In U.S. Currency APR 1991

52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (Jan 2004) -

Alternate I

OCT 1997

52.236-28 Preparation of Proposals--Construction OCT 1997

CLAUSES INCORPORATED BY FULL TEXT

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DX rated order; X DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations

System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price Design/Build Construction contract resulting from this solicitation.

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the

Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting

Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance

Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

14.7% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract

Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from

Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract

Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is the Saint Louis

Metropolitan area in the state of Missouri. St. Louis City is not covered by a county designation, it is an independent city.

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under

Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the

Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph

(b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause

52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% (Phase 2 Only) percent of the bid price or $3 Million (Phase 2

Only), whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers, Kansas City District

647 Federal Building

ATTN: CECT-NWK-M/David Walsh

601 East 12th Street

Kansas City, MO 64106-2896

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

To be determined at Phase 2

(c) Participants will meet at--

To be determined at Phase 2

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

PROPOSALS TO BECOME PART OF THE CONTRACT

1. When an offeror submits its proposal in response to a Request For Proposals, and a staffing plan including the names and qualifications of key personnel who are proposed to work on the project is required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the

Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.

2. When an offeror submits its proposal in response to a Request For Proposals, and the name of a specific subcontractor is a required submittal, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.

3. When an offeror submits its proposal in response to a Request For Proposals, and a schedule for the performance of the work on the project is a required submittal, the terms of the proposed schedule will become the schedule that will be utilized for completion of the project, adjusted as necessary to reflect the actual issue date of the Notice to

Proceed

4. When an offeror submits its proposal in response to a Request For Proposals and that proposal contains any work, materials, methods or other type of betterment that provides an advantage to the Government that is above the minimum requirements contained in the RFP, the terms of the proposal will be the basis for evaluation and, if successful, will become the terms of the contract upon award. If a change in one of those terms is made to one that is less favorable to the Government than the one on which the award of the contract was based, a credit to the

Government will be negotiated by the contractor. Only the Contracting Officer has the authority to negotiate a waiver of the terms of the contract.

(End)

Highlight

Section 00 22 10 - Phase 1 of a 2 Phase Selection Procedures

PHASE 1

General Description of the Scope of Work - Preliminary For Information Only – Final Scope of Work to be

Provided in Phase Two – Project currently lacks congressional authorization and appropriations.

Note that no award will be made without the Federal Government completing all real estate requirements for this project. Real estate requirements are in the process of being completed.

RFP SECTION 00 22 10: PHASE 1 OF 2 PHASE SELECTION PROCEDURES

1. Overview

a. This Request for Proposal (RFP) solicits for the design and construction of the National

Geospatial-Intelligence Agency’s (NGA) Next NGA West (N2W) facility in the greater St. Louis metropolitan area.

b. The construction contract for the N2W acquisition will utilize a Design- Build delivery method.

The selected design-build contractor must have the demonstrated capability to manage a complex design effort; plan, and execute large scale projects (with thousands of workers per day on site and placement in the range of tens of millions of dollars per month); and meet construction deadlines on a confined site with multiple facilities commencing at the same time. The entire program will require extensive coordination using an Integrated Master Schedule (IMS). Work for the project will involve site development, general construction, roads, walks, excavation and grading, drainage, mechanical, electrical, plumbing, fire protection work, building automation, building security systems, data cabling of secure and non-secure networks, engineering controls, telecommunications systems, utility systems, lawn irrigation, and landscape work and operation and maintenance. All work will be accomplished in compliance with the RFP criteria, contractor prepared design documents, applicable local, state, and Federal codes, and ICD requirements applicable to the construction of a secure facility.

c. Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. A design firm or construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal.

d. Ownership Disclosure: Offerors shall be required to submit a completed Security Questionnaire pertaining to foreign interest, for the prime contractor (to include all parties in a joint venture), the

Architect-Engineer and all major subcontractors proposed in Phase 1 (Note: if additional subcontractors/team members are added in Phase 2, the Security Questionnaires shall be submitted in accordance with instructions provided to Phase 2 Offerors). Include the Statement of Affiliation (Attachment A) in Tab A.

All Offerors and subcontractors shall be required to comply with DFARS 252.209-7001, Disclosure of Ownership or Control by the Government of a Terrorist Country, DFARS 252.209-

7002, Disclosure of Ownership or Control by a Foreign Government and DFARS 252.209-7004, Subcontracting with Firms that are Owned or Controlled by the Government of a Terrorist

Country.

G5CTMJBD

Highlight

A contract will not be awarded to a firm or subsidiary of a firm if it is determined that the

Government of a terrorist country has significant interest in the firm or subsidiary or if the firm is determined to be under foreign ownership of a country that sponsors or assists terrorism or is an intelligence threat. Subcontracts identified in the proposal are subject to the same eligibility determination.

If the Government determines there is or may be an issue, the Government may seek clarification to make a final determination if the Offeror is eligible for award. If an Offeror is not determined to be free of these issues, the Offeror, may be permitted to submit a mitigation strategy.

e. Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team

Arrangement.

f. Any Offeror submitting an offer in the name of a joint venture, shall include a fully executed copy of the joint venture agreement with the offer. Joint venture agreements which require SBA approval may be submitted absent the requisite SBA Servicing Agency approving authorities’ signature; however, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel.

g. In Phase 1 of the two phase selection procedure, Offerors will submit certain specified performance capability proposals, demonstrating their capability to successfully execute design build construction work under the contract resulting from this solicitation. The Government will evaluate the proposal and intends to invite a maximum of three most highly rated Phase 1 offerors who submitted proposals to compete for the design build construction of the N2W facility.

h. Offerors must submit a complete Phase 1 proposal to be considered for Phase 2. PHASE 1

DOES NOT INVOLVE PRICING SUBMISSION.

i. At the beginning of Phase 2, an amendment will be issued to only the selected offerors from

Phase 1 inviting them to submit a design build technical solution, key sub-contractors/consultants and economy/efficiency, small business participation plan, and price proposals for consideration.

The amendment will request additional information needed to complete the submission of Phase

2 proposals. In Phase 2, the Contracting Officer will award a single firm fixed price contract for the design and construction of the N2W facility to the offeror whose proposal offer the best value

- Trade Off proposal to the Government, considering the price and non-price factors described in

Phase 2. The Government intends to announce the names of Offerors selected for Phase 2 on the

FEDBIZOPPS website.

j. Offerors must submit a complete Phase 2 proposal to be considered for award. Failure to submit a complete proposal may result in the entire proposal being rejected.

k. This solicitation uses the Two-Phase Design-Build selection procedures, as described in FAR Sub

Part 36.3, and provides for payment of a stipend to the unsuccessful Phase 2 Offerors who were not selected for award of the resulting Design-Build contract. To be eligible for a stipend, the unsuccessful Phase 2 offeror’s technical proposal must be rated acceptable in all technical evaluation criteria, essentially meeting this solicitation’s Government furnished criteria. Payment of the stipend will be initiated ten (10) calendar days after contract award provided the award has not been protested. The stipend amount is $650,000.00.

l. Based on lessons learned from NGA’s New Campus East (NCE) project, a critical aspect of the

N2W program is insuring that there is continuity and a single point of responsibility for operations and maintenance of the facilities during the transition period from construction completion to full operational capability. This transition period is from the time that the construction is complete and there is beneficial occupancy to the time that the facilities are fully operational, installation of FF&E, active (classified) IT systems are in-place and operational, and the occupants have moved from the 2nd Street facilities into the new N2W facility. This transition period includes the time required for the construction contractor to complete the punch list items, finalize all commissioning, perform validation and verification of all systems, and validate facility energy performance objectives through four seasons of full occupancy.

m. NGA currently has a contract with Service Source to provide their Base Operations and Support

Services (BOSS) for their 2nd Street & Arnold facilities. Service Source, as a nonprofit participating agency with AbilityOne, will be used to provide O&M/BOSS services as a sub-contractor to the construction contractor. Department of Defense (DoD) prime contractors are allowed to receive credit toward their small business subcontracting goals if they subcontract with qualified nonprofit agencies participating in the AbilityOne Program. This authority can be found at 10 US Code 2410d. As required by FAR 8.002, Priorities for Use of Mandatory Sources and as reminded and encouraged by the DASA(P) Memo issued 9 May 2014. The solicitation will include FAR 52.208-9 Contractor Use of Mandatory Sources of Supply or Services as prescribed in FAR 8.005.

2. GENERAL PROPOSAL SUBMISSION INSTRUCTIONS

All offerors shall be required to submit a proposal with the minimum content as specified herein.

Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:

U.S. Army Engineer District, Kansas City

Federal Building Room 647

ATTN: CECT-NWK-M/Jay Denker

Kansas City, Missouri 64106-2896

3.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS

In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall be submitted in Volumes as follows:

Proposal Characteristics - PHASE 1

Submit the proposal in tabbed, three-ring binders identified by the Solicitation Number (W912DQ-

17-R-7000), project title (N2W, St. Louis, MO), name, address, and telephone number of the offeror.

Arrange the proposal as follows:

Phase 1 - Volume 1, Technical Proposal:

Cover letter - Solicitation number; Name, address, email, and telephone number of the offeror; Names, title, email, and telephone numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .