A.07.24_Amendment_0003.pdf
PDF 711 KB Posted
- Attached to
- Building 760 Renovations at Fort Riley, KS
- Solicitation number
- W912DQ-17-B-4009
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07_20_Site-Visit_Documentation.pdf | ||
| Amendment_0002.pdf | ||
| REVISED_INSTRUCTIONS_TO_OFFERORS.docx | DOCX document | |
| W912DQ-17-B-4009_Amendment_0001.pdf | ||
| INSTRUCTIONS_TO_OFFERORS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Building 760 Renovations at Fort Riley, KS The purpose of this amendment is to update Box 10 of the 1442, remove clause TPL_NWK_002 - Proposals To Become Part of the Contract, and update the specifications. SEE THE CONTINUATION PAGE FOR MORE DETAIL.
Proposals are due September 13, 2017 at 2:00 PM CST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ17B4009
X 9B. DATED (SEE ITEM 11)
14-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2017
CODE
USACE, KANSAS CITY +
FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ17B4009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CONTINUATION PAGE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The Solicitation is amended as follows:
Deleted text is shown with a strikethrough. Added text is shown with underline.
1. Standard Form 1442 Block 10 – The Government Requires Performance of the Work Described in These Documents. NAICS is changed to read as follows:
NAICS code for this project is 237220 236220
2. Section 00 10 00 – Solicitation. DELETE TPL_NWK_002 PROPOSALS TO BECOME PART OF THE
CONTRACT in its entirety.
TPL_NWK_002 PROPOSALS TO BECOME PART OF THE CONTRACT
1. When an offeror submits its proposal in response to a Request For Proposals, and a staffing plan including the names and qualifications of key personnel who are proposed to work on the project is required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.
2. When an offeror submits its proposal in response to a Request For Proposals, and the name of a specific subcontractor is a required submittal, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.
3. When an offeror submits its proposal in response to a Request For Proposals, and a schedule for the performance of the work on the project is a required submittal, the terms of the proposed schedule will become the schedule that will be utilized for completion of the project, adjusted as necessary to reflect the actual issue date of the Notice to Proceed
4. When an offeror submits its proposal in response to a Request For Proposals and that proposal contains any work, materials, methods or other type of betterment that provides an advantage to the Government that is above the minimum requirements contained in the RFP, the terms of the proposal will be the basis for evaluation and, if successful, will become the terms of the contract upon award. If a change in one of those terms is made to one that is less favorable to the Government than the one on which the award of the contract was based, a credit to the Government will be negotiated by the contractor. Only the Contracting Officer has the authority to negotiate a waiver of the terms of the contract.
W912DQ17B4009
(End)
3. SPECIFICATION CHANGES:
a. Section 14 93 00.00 23 “Vertical Platform Chair Lift”, Paragraph 1.3.1.1 “vertical platform chair lift Contractor's vertical platform chair lift Technicians” is changed to read as follows:
1.3.1.1 Vertical Platform Chair Lift Contractor's Vertical Platform Chair Lift Technicians
For vertical platform chair lift installations in the United States, including United States territories, perform all vertical platform chair lift related work under the direct guidance of a state certified vertical platform chair lift technician with a minimum of three years of experience in the installation of vertical platform chair lift systems of the type and complexity specified in the contract documents. Provide an endorsement letter from the vertical platform chair lift manufacturer, certifying that the vertical platform chair lift specialist is qualified. All vertical platform chair lift technicians must carry a current certification in accordance with ASME A18.1 issued by one of the following organizations:
a. National Association of Elevator Contractors (NAEC)
b. National Elevator Industry Education Program (NEIEP)
4. REVISED DRAWING SHEETS:
a. Delete the following Drawing Sheets and replace with the revised Drawings sheets that accompanies this amendment.
CS502 Site Details CP501 Pavement Details
5. Proposals are due September 13, 2017 by 2:00 PM CST
6. Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge this amendment may cause rejections of the proposal.
7. All other terms and conditions remain unchanged and in full force.
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
7 IN PORTLAND CEMENT CONCRETE (PCC) COURSE
LIME-MODIFIED SUBGRADE
8 IN SCARIFY AND RECOMPACTED
LIME-MODIFIED SUBGRADE
8 IN SCARIFY AND RECOMPACTED
4 IN PORTLAND CEMENT CONCRETE (PCC)
4 IN AGGREGATE BASE COURSE
LIME-MODIFIED SUBGRADE
6 IN SCARIFY AND RECOMPACTED
2 IN ASPHALT SURFACE COURSE
2 IN ASPHALT BASE COURSE
PRIME COAT
TACK COAT
6 IN DRAINAGE LAYER BASE COURSE
4 IN SEPARATION LAYER SUBBASE COURSE
6 IN DRAINAGE LAYER BASE COURSE
4 IN SEPARATION LAYER SUBBASE COURSE
T
A1
CP501
TABLE 1
12" 16"
MAXIMUM
DOWEL SPACING
PAVEMENT
THICKNESS
MINIMUM
DOWEL LENGTH
MINIMUM
DOWEL DIAMETER
12"8" TO 11" 16" 1"
LESS THAN 8" "4
15"12" TO 15" 20"
18"16" TO 18" 20" "2
"4
TABLE 2
9" TO 10"
11" TO 12"
13" TO 18"
PAVEMENT THICKNESS WELDED WIRE FABRIC
6" to 8" 6x6-W2.9xW2.9
6x6-W4.0xW4.0
4x4-W2.9xW2.9
4x4-W4.0xW4.0
SHOWN IN TABLE 2.
TRANSVERSE DIRECTIONS IS EQUAL TO OR EXCEEDS THAT
AREA (SQUARE INCH PER INCH) IN THE LONGITUDINAL AND
NOTE: OTHER WWF SIZES MAY BE USED PROVIDED THE STEEL
THICKNESS FOR PAVEMENT LESS THAN 12")
T=DEPTH OF INITIAL SAWCUT (1/4 OF THE SLAB
D=DEPTH OF SEALANT (1.0 TO 1.5 TIMES W)
EXCEPT FOR 3/4" EXPANSION JOINTS.
W=WIDTH OF SEALANT RESERVOIR (1/2"MIN-5/8" MAX,
JOINT SEALANT LEGEND:
PAVEMENT.
2. TOP OF SEALANT WILL BE 1/8" TO 1/4" BELOW TOP OF
OF RESERVOIR.
AND TO PREVENT SEALANT FROM BONDING TO BOTTOM
SAWCUT, TO SEPARATE NONCOMPATIBLE MATERIALS
TO PREVENT JOINT SEALANT FROM FLOWING INTO
1. SEPARATING TAPE OR BACKER MATERIAL REQUIRED
JOINT SEALANT NOTES:
T
D D
T
WW
SEE NOTE 2
SEALANT
POURED JOINT
SEE NOTE 1
TAPE
SEPARATING
SEE NOTE 2
SEALANT
POURED JOINT
SEE NOTE 1
MATERIAL
BACKER
5' MIN
T
.2
T
STRUCTURE
EDGE OF
MATERIAL
EXPANSION
3/4" PREMOLDED
A1
CP501
GROUT DOWEL
DRILL AND
END OF DOWEL
PAINT AND OIL
PAVEMENT
EXISTING
PAVEMENT
NEW
SEE TABLE 1
D-DENOTES DOWEL DIAMETER
SPLIT-TYPE DOWEL MAY BE USED
EITHER ONE PIECE OR THREADED
T
T /2
D /2
A1
CP501
SLIP FIT
EXPANSION CAP,
EXPANSION MATERIAL
3/4" PREMOLDED
DOWEL
1"2"3"
PAINT AND OIL
END OF DOWEL
T /2
D /2
T
SEE TABLE 1
D-DENOTES DOWEL DIAMETER
A1
CP501
DS: AEC_Screen.dscript.dscriptPD: AEC_pdf.pltcfg2:57:53 PM 8/24/2017 pw://COE-NWKPWP50KAN.nwk.ds.usace.army.mil:PWNWK500/Documents/Military/Fort Riley, Kansas/Building 760 Renovation/6.0 Engineering-Design/6.1 Drawings/CAD_BIM/_Sheets/CP501 PAVEMENT DETAILS
F
IL
E N
A M
E
A N
S I
D
CP501
M L
A R
S
N
E
E C
O V
E R S
H E
E T
P -4
F
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
F O
R T R
IL
E Y
K A
N S
A S
S E
E C
O V
E R S
H E
E T
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
D R
A W
IN
G C
O D
E
A
M A
R S
K E
R
C P .d g n
H
M
IL
D E
N B
E R
G E
R
P A
V E
M E
N T D
E T
A
IL
S
A1 SCALE: NTS
JOINT SEALANT DETAILS
C1 SCALE: NTS C4 SCALE: NTS
E1 SCALE: NTS E4 SCALE: NTS
NEW AND EXISTING PAVEMENT
DOWELED JOINT BETWEEN
THICKENED EDGE
EXPANSION JOINT AT STRUCTURE
DOWELED EXPANSION JOINT
M
N A
B I
A7
SIDEWALK SECTION (TYPICAL)
SCALE: NTS
C7 SCALE: NTS
E7 SCALE: NTS
(TYPICAL)
HOT MIX ASPHALT SECTION
CONCRETE SECTION (TYPICAL)
PORTLAND CEMENT
CONTRACTION JOINT
A U
G U
S T
AS ADVERTISED
-2
-2
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
10"
M
IN
EQ EQ
L A
P L
E N
G T
H
NOTE: INSTALL AS RECOMMENED BY MANUFACTURER.
COMPACTED SUBGRADE
DOME
TROWEL FINISH
CONC. CAP W/
EXPANSION JOINT
SURROUND W/
SLOPE CONC.
CONC. PIER
24" DIA.
" CL.2
2 #5 BARS,
1" Ø ANCHOR ROD HOLES
" MAX.4
12"12"
VEHICLE BOLLARD
WHEEL STOPS
CONCRETE
BASE COARSE
6" AGGREGATE
#5@10" OC
EVENLY SPACED
(6) #5 BAR CONTINUOUS
WITH (1) #5 BOTTOM CONTINUOUS
8" DEEP BOND BEAM REINFORCE
SELECT FILL
BACKFILL WITH
PAVEMENT
EXPANSION JOINT
ALTERNATE HOOK
DOWELS TO MATCH VERTICALS
WITH (2) #5 BARS CONTINUOUS
16" DEEP BOND BEAM REINFORCE
GROUTED CELLS
#5@8" OC IN SOLID
WITH (1) #5 BOTTOM CONTINUOUS
8" DEEP BOND BEAM REINFORCE
(SUBMIT TO COR FOR APPROVAL)
PRECAST STONE CAP
VEHICLE BOLLARD
(GALVANIZED STEEL)
INSTALL 5 BIKE BICYCLE RACK
ANCHOR BOLT
BASE COURSE
4" AGGREGATE
4" PCC CONCRETE
8" CMU WALL
EXTERIOR FINISH
" FACE BRICK TO MATCH BUILDING 8
18"18" 24" 18"
8.0'
1" MAX
18"
1" MAX
5" MAX
4" MIN
1'
2'
10'
0.5'
.5
0.5'
.5
SEE DETAIL E5
DUMPSTER WALL
2'-0"
4'-8"
.0
1.0'
TRASH ENCLOSURE NOTES:
6. HORIZONTAL JOINT REINFORCING = ASTM A82, GALVANIZED
5. REINFORCEMENT BARS = ASTM A615, GR60 KSI
4. CONCRETE FILL (GROUT) STRENGTH = 2500 psi AT 28 DAYS
3. MASONRY STRENGTH = F'm = 1500 psi AT 28 DAYS
2. MORTAR STRENGTH = 1800 psi MINIMUM AT 28 DAYS
1. CONCRETE MASONRY UNIT (CMU) BLOCK STRENGTH (NORMAL WEIGHT) = 1900 psi
TRASH ENCLOSURE MATERIAL STRENGTHS:
INSPECTION.
FOR PROPER EMBEDMENT OF REINFORCING INTO CONCRETE FOUNDATION. INSTALL UNDER CONTINUOUS
INTO CONCRETE WITH HILTI HIT HY-70 ADHESIVE (OR APPROVED EQUAL). CONTACT CONTRACTING OFFICER
THAN ONE HORIZONTAL IN SIX VERTICAL. IF SLOPE EXCEEDS ONE IN SIX, PROVIDE NEW DOWEL EMBEDDED
10. IF FOUNDATION DOWELS DO NOT LINE UP WITH VERTICAL CMU CELLS, DO NOT SLOPE DOWEL GREATER
DIAMETER.
9. GROUT SHALL BE MECHANICALLY CONSOLIDATED USING A VIBRATOR WITH A MINIMUM 3/4-INCH HEAD
8. GROUTING SHALL STOP 1-1/2 INCHES BELOW THE TOP OF A COURSE TO FORM A KEY AT THE JOINT.
INSIDE FACE OF THE CMU AND A MINIMUM TOTAL COVER INCLUDING MASONRY UNITS OF 2 INCHES.
VERTICAL REINFORCING LAP. VERTICAL REINFORCING SHALL HAVE A MINIMUM GROUT COVER 1/2-INCH TO THE
POSITIONERS SPACED NOT GREATER THAN 10 FEET O.C. LOCATED ONE BAR POSITIONER MINIMUM AT EACH
7. VERTICAL REINFORCING SHALL BE SECURED IN PLACE PRIOR TO PLACEMENT OF GROUT USING BAR
VERTICAL CELLS. REMOVE OVERHANGING MORTAR AND OTHER OBSTRUCTIONS AND DEBRIS FROM THE CELL.
6. ALIGN CMU VERTICAL CELLS TO BE FILLED WITH GROUT TO PROVIDE CONTINUOUS UNOBSTRUCTED
STAGGER HORIZONTAL LAPS. EXTEND HORIZONTAL BARS AROUND CORNERS 24 INCH MINIMUM.
5. PROVIDE THE MINIMUM LAP LENGTHS: #4 = 36 INCH, #5 = 45 INCH, #6 = 54 INCH. FOR REINFORCING BARS, HORIZONTAL JOINT REINFORCING AT 16 INCHES O.C. ABOVE GRADE.
4. HORIZONTAL JOINT REINFORCING SHALL BE GALVANIZED LADDER TYPE CONFORMING TO ASTM A82. PLACE
HORIZONTAL OR VERTICAL REINFORCING UNLESS NOTES OTHERWISE. GROUT ALL CELLS BELOW GRADE.
3. CONCRETE FILL (GROUT) SHALL HAVE A MAXIMUM AGGREGATE SIZE OF 3/8-INCH. GROUT ONLY CELLS WITH
2. ENCLOSURE SHALL BE CENTERED (NORTH - SOUTH) ON PAVEMENT SLAB.
(APPROXIMATELY 1/3" OVER THE EXPOSED HEIGHT).
1. THE ANGULAR VARIATION OF THE WALL FROM A PLUMB LINE SHALL BE EQUAL TO OR LESS THAN 1/200
COMPACTED SUBGRADE
CONC. WALK6' RAMP
SLOPE 1" PER FOOT
GUTTER
CURB &
BASE COURSE
6" SUBBASE
COLLAPSIBLE BOLLARD NOTES:
LPHDHB AS MANUFACTURED BY TRAFFIC GUARD DIRECT.
2. DESIGN BASED ON COLLAPSIBLE BOLLARD MODEL
MANUFACTURER'S INSTRUCTIONS.
1. COLLAPSIBLE BOLLARD SHALL BE INSTALLED PER
BOLLARD BASE
PIER
CONCRETE
18" DIA.
VERTICAL 37" LONG
FOUR #4 REBAR
TWO AT TOP.
ONE AT MIDDLE, AND
LAP. ONE AT BOTTOM,
HOOP TIES WITH 12"
#3 REBAR FOUR 15"
SUPPORT (TYP)
FORM FOR CAGE
#3 REBAR THRU THE
BOLLARD
COLLAPSIBLE
4"x6"x30"
VERTICAL REBAR
HOOP REBAR TIES
BOLLARD BASE
FLAT WASHER (TYP)
HEX NUT (TYP)
REBAR
SUPPORT
PIER
CONCRETE
18" DIA.
3/4"x12" L ANCHOR BOLT (TYP.)
/8
/8
A8
CS502
RAMP BEYOND
TAPERED SIDE
CONT. 1/2" EXP.
JOINT @ RAMP
6" CURB AND GUTTER
W A
LK
R A
M P
6'
(T
YP.
6'
TAPER
3'
SMOOTH
ROUNDED
TRANSI
TI
ON
BETW
EEN
W
ALK
AND
RAMP
E5
CS502
1"
4'
MIN WALL THICKNESS 0.23"
& FILLED W/ CONC.
PAINTED BROWN #10080
8"DIA. STL. PIPE,
DS: AEC_Screen.dscript.dscriptPD: AEC_pdf.pltcfg9:31:11 AM 8/30/2017 pw://COE-NWKPWP50KAN.nwk.ds.usace.army.mil:PWNWK500/Documents/Military/Fort Riley, Kansas/Building 760 Renovation/6.0 Engineering-Design/6.1 Drawings/CAD_BIM/_Sheets/CS502 SITE DETAILS
F
IL
E N
A M
E
A N
S I
D
CS502
M L
A R
S
N
E
E C
O V
E R S
H E
E T
P -4
F
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
F O
R T R
IL
E Y
K A
N S
A S
S E
E C
O V
E R S
H E
E T
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
D R
A W
IN
G C
O D
E
A
M A
R S
K E
R
C S .d g n
H
M
IL
D E
N B
E R
G E
R
IT
E D
E T
A
IL
S
M
N A
B I
A1 SCALE: NTS
WHEEL STOP DETAIL
A8 SCALE: NTS
C1 SCALE: NTS
BICYCLE RACK DETAIL
E1 SCALE: NTS
TRASH ENCLOSURE PAD PLAN
E5 SCALE: NTS
TRASH ENCLOSURE WALL SECTION
A6 SCALE: NTS
C8 SCALE: NTS
COLLAPSABLE BOLLARD
E7 SCALE: NTS
RAMP WITH WALK
A U
G U
S T
AS ADVERTISED
-2
-2
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
SECTION
VEHICLE BOLLARD
| Bldg 760_Amdt 0003 Attachments.pdf |
| R461127_CP501 |
| R461127_CS502 |
File details come from the government source that posted it. Updated .