W912DQ-17-B-1007_AMENDMENT_ONE.pdf

PDF 300 KB Posted

Attached to
MRLS L-455 St. Joseph Levee Raise Federal contract opportunity
Solicitation number
W912DQ-17-B-1007
Issued by
Department of the Army Corps of Engineers Engineering District Kansas City

About this file

AMENDMENT ONE

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Bidder Inquiry Response, Changes due to BCOES comments, Change response date

1. CONTRACT ID CODE PAGE OF PAGES

J 1 41

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-17-B-1007

X 9B. DATED (SEE ITEM 11)

03-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Aug-2017

CODE

USACE, KANSAS CITY +

FEDERAL BLDG, CT-C

601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ-17-B-1007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The following have been added by full text:

AMENDMENT 0001

The SOLICITATION is amended as follows:

NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.

1. SPECIFICATIONS: Narrative Changes

Section 03 20 00.00 10

Paragraph 3.1.1 Placement

Reinforcement must be free from loose rust and scale, dirt, oil, or other deleterious coating that could reduce bond with the concrete. Place reinforcement in accordance with ACI 318 at locations indicated plus or minus one bar diameter. Do not continue reinforcement through expansion joints and place as indicated through construction or contraction joints. Cover with concrete coverage as indicated on the drawings or as required by ACI 318. If bars are moved more than one bar diameter to avoid interference with other reinforcement, conduits or embedded items, the resulting arrangement of bars, including additional bars required to meet structural requirements, requires approval before concrete is placed.

Section 03 31 01.00 10 is being reissued in its entirety, Section 35 20 16.10 23 Paragraph, 1.3.5.2 Slide Gate

Thimble Seating Unseating Type Head(ft) Head(ft)

Type F 23 35 10 35

Section 03 35 00

Paragraph 3.2 Repairs

Repair in accordance with ACI 301, Section 5. After removal of forms, all ridges, lips, and bulges on surfaces permanently exposed shall be removed. All repairs shall be completed within 48 hours after form removal.

3.2.1 Formwork Finish

Areas determined to be defective by the Contracting officer, voids, and honeycombs smaller than

16 square inches in area and less than 1/2 inch deep and bug holes exceeding 1/2 inch in diameter shall be chipped and filled with dry-packed mortar. Holes left by removal of tie rods shall be reamed and filled with dry-packed mortar as specified in paragraph MATERIAL AND PROCEDURE FOR REPAIRS. Defective and unsound concrete areas larger than described shall be defined by 1/2 inch deep dovetailed saw cuts in a rectangular pattern with lines parallel to the formwork, the defective concrete removed by chipping, and the void repaired with replacement concrete. The prepared area shall be brush-coated with an epoxy resin, a latex bonding agent, or a neat cement grout after dampening the area with water. The void shall be filled with replacement concrete in accordance with paragraph MATERIAL AND PROCEDURE FOR REPAIRS.

All other defects shall be defined and repaired as described in ACI 301.

3.2.2 Materials and Procedure for Repairs

The cement used in the dry-packed mortar or replacement concrete shall be a blend of the cement used for production of project concrete and white portland cement properly proportioned so that the final color of the mortar or concrete will match adjacent concrete. Trial batches shall be used to determine the proportions required to match colors. Dry-packed mortar shall consist of one part cement to two and one-half parts fine aggregate. The fine aggregate shall be that used for production of project concrete. The mortar shall be remixed over a period of at least 30 minutes without addition of water until it obtains the stiffest consistency that will permit placing. Mortar shall be thoroughly compacted into the prepared void by tamping, rodding, ramming, etc. and struck off to match adjacent concrete. Replacement concrete shall be produced using project materials and shall be proportioned to meet the strength requirements of the concrete being repaired. It shall be thoroughly compacted into the prepared void by internal vibration, tamping, rodding, ramming, etc. and shall be struck off and finished to match adjacent concrete. Forms shall be used to confine the concrete. If an expanding agent is used in the repair concrete, the repair shall be thoroughly confined on all sides including the top surface. Metal tools shall not be used to finish permanently exposed surfaces. The repaired areas shall be cured for 7 days. The temperature of the in situ concrete, adjacent air, and replacement mortar or concrete shall be above 40 degrees F during placement, finishing, and curing. Other methods and materials for repair may be used only when approved in writing by the Contracting Officer. Repairs of the so called "plaster-type" will not be permitted.

Section 35 41 00.01, Paragraph 1.3, SD-03

Excavation; G, DO, copy ED-GD

Submit a written excavation plan 15 days prior to the beginning of any excavation. Approval of the detailed plan shall be obtained from the Contracting Officer prior to starting the work. The plan shall be consistent with requirements contained in section 1.5.13 and 3.7. If necessary, the plan shall be modified as required to meet field conditions, and the modifications shall be approved prior to use. As a minimum, the plan shall contain, the following:

a. Proposed methods for preventing interference with, or damage to, existing underground or overhead utility lines, trees designated to remain and other man-made facilities or natural features designated to remain within or adjacent to the construction rights-of-way.

b. Provision for coordinating the work with other Contractors working in the construction rights-of-way or on facilities crossing or adjacent to this work.

c. The proposed methods for controlling surface and ground water in the borrow areas and required excavations.

d. Stockpiling plan for embankment material before it is transported to the project site showing locations, stockpile heights, slopes, limits, and drainage around the stockpile areas.

e. A complete listing of equipment used for excavation and to transport the excavated material.

g. The Contractor's proposals for conserving arable land and for making optimum use of available borrow, including the Contractor's proposed methods for grading the bottom of the borrow areas after completing use of the borrow areas.

h. The Contractor's proposed road pattern, and plan for implementing dust control measures.

i. Excavation plan excavation plan shall be signed and sealed by a professional engineer licensed in the State of Missouri.

Section 35 41 00.01, 1.3, Paragraph 1.3 SD-03, Brown's Branch Levee Tieback Emergency Contingency Plan; G, DO, copy ED-GD

Excavation for construction shall not commence until this work has been submitted and approved.

Refer to requirements in Section 1.5.15, "Brown's Branch Levee Tieback Emergency Contingency Plan".

Section 35 41 00.01

Paragraph, 3.7 EXCAVATION

Excavation shall consist of removal of material required to complete the work indicated on the drawings, in preparing the foundations to the lines and grades shown on the drawings, removal of material from ditches and channels to the lines and grades shown on the drawings, removal of objectionable materials and obtaining required fill materials from the borrow areas. Temporary excavations for construction shall not reduce Brown's Branch tieback levees below elevation 819. Any temporarily excavated levees shall be designed in accordance with EM 1110-2-1913 and EM 1110-2-1902. Over excavation shall be backfilled to grade with similar over excavated material of satistactory material and compacted to a density of at least that of the surrounding material. materials consistant in USCS classification of material removed unless otherwise specified in contract plans or specification. Excavated material shall be compacted to a density consistant with surrounding material unless otherwise indicated in contract plans or specifications. Excavation of levee embankments shall be performed in a manner that keeps from different embankment zones separate so the embankment zones can be restored in kind during reconstruction. All excavation shall comply with the requirements of EM 385-1-1, no excavations shall be sloped steeper than 1V on 1H, and the use of trench boxes is not allowed. Excavation adjacent to the Brown's Branch gatewall structure shall be identified by construction sequencing and stages to be submitted in the Plan of Operation.

Construction sequencing shall assure the gatewell is excavated and removed to assure balanced unloading on all sides and does not extend more than ten feet past grade at any time.

Unbalanced loading that results in foundation movement or slope failure shall be repaired by the contractor at no additional cost to the Government. All failed soil materials shall be removed and replaced with borrow material meeting zone fill requirements as approved by the Contracting Officer.

2.DRAWINGS:

a. CD101 A1 – Removed Brown’s Branch Excavation Cross Section C1 – Removed Brown’s Branch Excavation Profile

b. SF110: A8 - Clarified reinforcing above and below culvert opening A8 - Added "Flush Bottom" to slide gate note

A8 - Added note defining concrete fill in bottom of gatewell

c. SF130: E1 - Added standard hook to bottom of inside vertical bars A1 - Changed reference to Note 2 to Note 3

d. SF500: Detail A4 - Added "Type III" to external joint seal note

e. CS301: C1 – Changed 2 notes referring to “Random” to “Refer to Specification

35 41 00.01, 3.7”

3. Wage Determination has been updated.

4. Response date for bids has been changed from September 5, 2017 @ 1:00 pm to September 7, 2017 at 2:00 pm.

SECTION 00 11 00 - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 05-Sep-2017 01:00 PM to 07-Sep-2017 02:00 PM.

SECTION 00 73 46 - WAGE DETERMINATION SCHEDULE

The following have been modified:

WAGE RATES

Wage Rates –

MRLS L-455

ST. JOSEPH, MISSOURI

Buchanan County

The inclusion of the Davis-Bacon Act General Wage Decision or the Service Contract Act Wage Determination in the solicitation is a statutory requirement. It is not a representation by the U.S. Army Corps of Engineers that any specific work task can be performed by any specific trade. Which work tasks can be performed by what trades depends on and is determined by the prevailing area practice for the local area where the contract is being performed. It is the sole responsibility of the bidder, offeror or contractor to determine and comply with the prevailing area practice. Inquiries regarding a prevailing area practice should be directed to the Corps of Engineers, Contractor Industrial Relations Specialist (telephone number 816-389-3723) or to the Department of Labor Regional Wage and Hour Division.

Application of wage rates and fringe benefits: For the application of the wage rates and fringe benefits contained in the Decision of the U. S. Secretary of Labor, attached to and a part of this contract, all work is considered Heavy Construction.

General Decision Number: MO170001 08/25/2017 MO1

Superseded General Decision Number: MO20160001

State: Missouri

Construction Types: Heavy and Highway

Counties: Missouri Statewide.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/20/2017 2 02/10/2017 3 02/17/2017 4 03/03/2017 5 03/17/2017 6 04/14/2017 7 04/21/2017

8 05/26/2017 9 06/02/2017 10 06/23/2017 11 06/30/2017 12 07/14/2017 13 07/21/2017 14 07/28/2017 15 08/11/2017 16 08/25/2017

CARP0002-002 05/01/2017

ST. LOUIS COUNTY AND CITY

Rates Fringes

Carpenters.......................$ 36.51 16.75

CARP0005-006 05/03/2015

CASS (Richards-Gebauer AFB ONLY), CLAY, JACKSON, PLATTE AND RAY

COUNTIES

Rates Fringes

Carpenters:

CARPENTERS & LATHERS........$ 36.34 15.55

MILLWRIGHTS & PILEDRIVERS...$ 36.34 15.55

CARP0011-001 05/01/2017

Rates Fringes

Carpenter and Piledriver ADAIR, AUDRAIN (West of Hwy 19), BOONE, CALLAWAY, CHARITON, COLE, COOPER, HOWARD, KNOX,LINN, MACON, MILLER, MONITEAU,MONROE, OSAGE, PUTNAM, RANDOLPH, SCHUYLER, SHELBY AND

SULLIVAN COUNTIES...........$ 31.02 16.75

ATCHISON, ANDREW, BATES,

CALDWELL, CARROLL,DAVIESS,

DEKALB,GENTRY, GRUNDY,

HARRISON, HENRY, HOLT,

LIVINGSTON, MERCER,

NODAWAY,ST. CLAIR, SALINE

AND WORTH COUNTIES..........$ 29.56 16.75

AUDRAIN (East of Hwy.19), RALLS, MARION, LEWIS, CLARK AND SCOTLAND COUNTIES.$ 31.03 16.75

BARRY, BARTON, CAMDEN,

CEDAR, CHRISTIAN, DADE,

DALLAS, DOUGLAS, GREENE,

HICKORY,JASPER, LACLEDE,

LAWRENCE, MCDONALD,

NEWTON, OZARK, POLK,

STONE, TANEY, VERNON,

WEBSTER AND WRIGHT COUNTIES.$ 29.18 16.75

BENTON, MORGAN AND PETTIS...$ 29.61 16.75

BOLLINGER, BUTLER, CAPE

GIRARDEAU, DUNKLIN,

MISSISSIPPI, NEW MADRID,

PEMISCOT, PERRY, STE.

GENEVIEVE, SCOTT, STODDARD

AND WAYNE COUNTIES..........$ 30.88 16.75

BUCHANAN, CLINTON, JOHNSON

AND LAFAYETTE COUNTIES......$ 30.27 16.75

CARTER, HOWELL, OREGON AND

RIPLEY COUNTIES.............$ 29.88 16.75

CRAWFORD, DENT, GASCONADE,

IRON, MADISON, MARIES,

MONTGOMERY, PHELPS,

PULASKI, REYNOLDS, SHANNON

AND TEXAS COUNTIES..........$ 30.87 16.75

FRANKLIN COUNTY.............$ 34.16 16.75

JEFFERSON AND ST. CHARLES

COUNTIES....................$ 36.51 16.75

LINCOLN COUNTY..............$ 32.66 16.75

PIKE, ST. FRANCOIS AND

WASHINGTON COUNTIES.........$ 31.63 16.75

WARREN COUNTY...............$ 33.08 16.75

ELEC0001-002 06/04/2017

BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, FRANKLIN,

IRON, JEFFERSON, LINCOLN, MADISON, MISSISSIPPI, NEW MADRID,

PEMISCOT, PERRY,REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,

ST. LOUIS (City and County), STE. GENEVIEVE, SCOTT, STODDARD, WARREN, WASHINGTON AND WAYNE COUNTIES

Electricians.....................$ 36.92 25.22

ELEC0002-001 09/04/2016

ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON,

CLARK, COLE, COOPER, CRAWFORD, DENT, FRANKLIN, GASCONADE,

HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWIS, LINCON, LINN,

MACON, MARIES, MARION, MILLER, MONITEAU, MONROE, MONTGOMERY,

MORGAN, OREGON, OSAGE, PERRY, PHELPS, PIKE, PULASKI, PUTNAM,

RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,

ST. LOUIS (City and County), STE. GENEVIEVE, SCHUYLER, SCOTLAND, SHANNON, SHELBY, SULLIVAN, TEXAS, WARREN AND

WASHINGTON COUNTIES

Line Construction:

Equipment Operator..........$ 37.73 18.83 Groundman & Truck Driver....$ 29.11 15.72 Lineman & Cable Splicer.....$ 43.75 21.00

ELEC0053-004 09/04/2016

Rates Fringes

Line Construction: (ANDREW, ATCHINSON, BARRY, BARTON, BUCHANAN, CALDWELL, CEDAR, CHRISTIAN, CLINTON, DADE, DALLAS, DAVIES,, DEKALB, DOUGLAS, GENTRY, GREENE, GRUNDY, HARRISON, HICKORY, HOLT, JASPER, LACLEDE, LAWRENCE, LIVINGSTON, MCDONALD, MERCER, NEWTON, NODAWAY, OZARK, POLK, ST.

CLAIR, STONE, TANEY, VERNON,

WEBSTER, WORTH AND WRIGHT

COUNTIES)

Groundman Powderman.........$ 27.84 33%+5.00 Groundman...................$ 27.63 25%+6.36 Lineman Operator............$ 39.62 25%+6.84 Lineman.....................$ 42.87 25%+6.97 Line Construction; (BATES, BENTON, CARROLL, CASS, CLAY, HENRY, JACKSON, JOHNSON, LAFAYETTE, PETTIS, PLATTE, RAY AND SALINE COUNTIES)

Groundman Powderman.........$ 27.84 33%+5.00 Groundman...................$ 27.63 25%+6.36 Lineman Operator............$ 39.62 25%+6.84 Lineman.....................$ 42.87 25%+6.97

ELEC0095-001 06/01/2017

BARRY, BARTON, CEDAR, DADE, JASPER, LAWRENCE, MCDONALD, NEWTON,

ST CLAIR, AND VERNON COUNTIES

Electricians:

Cable Splicers..............$ 25.40 12.19 Electricians................$ 26.79 13.86

ELEC0124-007 08/31/2015

BATES, BENTON, CARROLL, CASS, CLAY, COOPER, HENRY, JACKSON,

JOHNSON, LAFAYETTE, MORGAN, PETTIS, PLATTE, RAY AND SALINE

COUNTIES:

Electricians.....................$ 36.69 20.62

ELEC0257-003 03/01/2017

AUDRAIN (Except Cuivre Township), BOONE, CALLAWAY, CAMDEN, CHARITON, COLE, CRAWFORD, DENT, GASCONADE, HOWARD, MARIES, MILLER, MONITEAU, OSAGE, PHELPS AND RANDOLPH COUNTIES

Electricians:

Cable Splicers..............$ 30.42 16.085 Electricians................$ 32.00 14.28

ELEC0350-002 12/01/2016

ADAIR, AUDRAIN (East of Highway 19), CLARK, KNOX, LEWIS, LINN, MACON, MARION, MONROE, MONTGOMERY, PIKE, PUTNAM, RALLS, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES

Electricians.....................$ 30.57 5.93+35%

ELEC0453-001 09/01/2015

Rates Fringes

Electricians:

CHRISITAN, DALLAS,

DOUGLAS, GREENE, HICKORY,

HOWELL, LACLEDE, OREGON,

OZARK, POLK, SHANNON,

WEBSTER and WRIGHT COUNTIES.$ 25.15 14.36 PULASKI and TEXAS COUNTIES..$ 29.80 14.83 STONE and TANEY COUNTIES....$ 20.94 13.55

* ELEC0545-003 06/01/2017

ANDREW, BUCHANAN, CLINTON, DEKALB, ATCHISON, HOLT, MERCER,

GENTRY, HARRISON, DAVIESS, GRUNDY, WORTH, LIVINGSTON, NODAWAY,

AND CALDWELL COUNTIES

Electricians:....................$ 31.00 15.60

ELEC0702-004 07/03/2017

BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON,

MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND WAYNE

Line Construction:

Groundman - Class A.........$ 28.67 13.84 Groundman-Equipment Operator Class II (all other equipment)............$ 36.28 16.05 Heavy-Equipment Operator Class I (all crawler type equipment D-4 and larger)...$ 41.33 17.51 Lineman.....................$ 50.30 20.11

ENGI0101-001 05/01/2016

ANDREW, ATCHISON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL,

CHARITON, CLINTON, COOPER, DAVIESS, DEKALB, GENTRY, GRUNDY,

HARRISON, HENRY, HOLT, HOWARD, JOHNSON, LAFAYETTE, LINN,

LIVINGSTON, MERCER, NODAWAY, PETTIS, SALINE, SULLIVAN AND WORTH

COUNITES

Power equipment operators:

GROUP 1.....................$ 33.38 15.92

GROUP 2.....................$ 32.98 15.92

GROUP 3.....................$ 30.98 15.92

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers - 2; booster pump on dredge; bulldozer operator; boring machine (truck or crane mounted); clamshell operator;

concrete mixer paver; concrete plant operator; concrete pump operator; crane operator; derrick or derrick trucks;

ditching machine; dragline operator; dredge engineman;

dredge operator; drill cat with compressor mounted (self-contained) or similar type self- propelled rotary drill (not air tract); drilling or boring machine (rotary-self-propelled); finishing machine operator;

greaser; high loader-fork lift-skid loader (all types);

hoisting engineer (2 active drums); locomotive operator (standard guage); mechanics and welders (field and plants);

mucking machine operator; pile drive operator; pitman crane or boom truck (all types); push cat; quad track; scraper operators (all types); shovel operator; sideboom cats; side discharge spreader; skimmer scoop operators; slip form paver operator (CMI, Rex, Gomeco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane;

wood and log chippers (all types).

GROUP 2: A-frame truck operator; articulated dump truck;

back filler operator; boilers (1); chip spreader; churn drill operator; compressor; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator;

crusher operator; distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig;

float operator; form grade operator; hoisting engine (one drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra-hammer (or similar type);

paymill operator; power shield; pumps; roller operator (with or without blades); screening and washing plant;

self-propelled street broom or sweeper; siphons and jets;

straw blower; stump cutting machine; siphons and jets; tank car heater operator (combination boiler and booster);

welding machine; vibrating machine operator (not hand held); welding machine.

GROUP 3: (a) Oiler;

(b) Oiiler driver

(c) Mechanic.

HOURLY PREMIUMS:

THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .25) ABOVE

GROUP 1 RATE: Dragline operator - 3 yds. & over; shovel 3 yds. & over; clamshell 3 yds. & over; Crane, rigs or piledrivers, 100' of boom or over (incl. jib.), hoist -each additional active drum over 2 drums

THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .50) ABOVE

GROUP 1 RATE: Tandem scoop operator; crane, rigs or piledrivers 150' to 200' of boom (incl. jib.)

THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .75) ABOVE

GROUP 1 RATE: Crane rigs, or piledrivers 200 ft. of boom or over (including jib.)

ENGI0101-005 04/01/2017

CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 36.17 16.84

GROUP 2.....................$ 35.13 16.84

GROUP 3.....................$ 30.66 16.84

GROUP 4.....................$ 34.01 16.84

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers-2;

booster pump on dredge; boring machine (truck or crane mounted); bulldozer operator; clamshell operator; concrete cleaning decontamination machine operator; concrete mixer paver; concrete plant operator; concrete pump operator;

crane operator; derrick or derrick trucks; ditching machine; dragline operator; dredge engineman; dredge operator; drillcat with compressor mounted (self-contained) or similar type self propelled rotary drill (not air tract); drilling or boring machine (rotary -self-propelled); finishing machine operator; greaser; heavy equipment robotics operator/mechanic; horizontal directional drill operator; horizontal directional drill locator; loader-forklift - skid loader (all types);

hoisting engineer (2 active drums); locomotive operator (standard guage); master environmental maintenance mechanic; mechanics and welders (field and plants);

mucking machine operator; piledrive operator; pitman crane or boom truck (all types); push cat; quad-track; scraper operators (all types); shovel operator; side discharge spreader; sideboom cats; skimmer scoop operator; slip-form paver (CMI, REX, Gomaco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane; ultra high perssure waterjet cutting tool system operator/mechanic;

vacuum blasting machine operator/mechanic; wood and log chippers (all types)

GROUP 2: "A" Frame truck operator; back filler operator;

boilers (1); chip spreader;churn drill operator; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator; crusher operator;

distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig; float operator;

form grader operator; hoisting engine (1 drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra- hammer (or similar type); power shield; paymill operator; pumps; siphons and jets; stump cutting machine; tank car heater operator (combination boiler and booster); compressor; roller operator (with or without blades); screening and washing plant;

self-propelled street broom or sweeper; straw blower; tank car heater operator (combination boiler and booster);

vibrating machine operator (not hand held)

GROUP 3: Oilers

GROUP 4: Oiler Driver (All Types)

FOOTNOTE:

HOURLY PREMIUMS FOLLOWING CLASSIFICATIONS SHALL RECEIVE

($1.00) ABOVE GROUP 1 RATE:

Clamshells - 3 yd. capacity or over; Cranes or rigs, 80 ft.

of boom or over (including jib); Draglines, 3 yd. capacity or over;

Piledrivers 80 ft. of boom or over (including jib);

Shovels & backhoes, 3 yd. capacity or over.

ENGI0101-022 05/01/2016

BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS,

GREENE, HICKORY, JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON,

OZARK, POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER AND

WRIGHT COUNTIES and CITY OF SPRINGFIELD

GROUP 1.....................$ 30.82 13.30

GROUP 2.....................$ 29.88 13.30

GROUP 3.....................$ 30.27 13.30

GROUP 4.....................$ 28.22 13.30

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt finishing machine & trench widening spreader; asphalt plant console operator; autograder;

automatic slipform paver; backhoe; blade operator - all types; boat operator - tow; boilers-2; central mix concrete plant operator; clamshell operator; concrete mixer paver;

crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine - 2 active drums; launch hammer wheel; locomotive operator; -standard guage; mechanic and welders; mucking machine;

off-road trucks; piledriver operator; pitman crane operator; push cat operator; quad trac; scoop operator -all types; shovel operator; sideboom cats; skimmer scoop operators; trenching machine operator; truck crane.

GROUP 2: A-frame; asphalt hot-mix silo; asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant man; asphalt plant mixer operator; asphalt roller operator;

backfiller operator; barber-greene loader; boat operator (bridges and dams); chip spreader; concrete mixer operator

- skip loader; concrete plant operator; concrete pump operator; crusher operator; dredge oiler; elevating grader operator; fork lift; greaser-fleet; hoisting engine - 1;

locomotive operator - narrow gauge; multiple compactor;

pavement breaker; powerbroom - self-propelled; power shield; rooter; side discharge concrete spreader; slip form finishing machine; stumpcutter machine; throttle man;

tractor operator (over 50 h.p.); winch truck.

GROUP 3: Boilers - 1; chip spreader (front man); churn drill operator; clef plane operator; concrete saw operator (self-propelled); curb finishing machine; distributor operator;

finishing machine operator; flex plane operator; float operator; form grader operator; pugmill operator; roller operator, other than high type asphalt; screening & washing plant operator; siphons & jets; sub-grading machine operator; spreader box operator, self-propelled (not asphalt); tank car heater operator (combination boiler & booster); tractor operator (50 h.p. or less); Ulmac, Ulric or similar spreader; vibrating machine operator, not hand;

GROUP 4: Grade checker; Oiler; Oiler-Driver

HOURLY PREMIUMS:

The following classifications shall receive $ .25 above GROUP 1 rate:

Clamshells - 3 yds. or over; Cranes - Rigs or Piledrivers, 100 ft. of boom or over (including jib);

Draglines - 3 yds. or over; Hoists - each additional active drum over 2 drums; Shovels - 3 yds. or over;

The following classifications shall receive $ .50 above GROUP 1 rate:

Tandem scoop operator; Cranes - Rigs or Piledrivers, 150 ft.

to 200 ft. of boom (including jib); Tandem scoop.

The following classifications shall receive $ .75 above GROUP 1 rate:

Cranes - Rigs or Piledrivers, 200 ft. of boom or over (including jib.).

ENGI0513-004 05/02/2016

FRANKLIN, JEFFERSON, LINCOLN, ST CHARLES, AND WARREN COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 32.41 24.01

GROUP 2.....................$ 32.41 24.01

GROUP 3.....................$ 31.11 24.01

GROUP 4.....................$ 30.66 24.01

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Backhoe, Cable; Backhoe, Hydraulic (2 cu yds bucket and under regardless of attachment, one oiler for 2 or 3, two oilers for 4 through 6); Backhoe, Hydraulic over 2 cu yds; Cableway; Crane, Crawler or Truck; Crane, Hydraulic - Truck or Cruiser mounted, 16 tons and over; Crane, Locomotive; crane with boom including jib over 100 ft from pin to pin; Crane using rock socket tool; Derrick, Steam;

Derrick Car and Derrick Boat; Dragline, 7 cu yds and over;

Dredge; Gradall, Crawler or tire mounted; Locomotive, Gas, Steam & other powers; Pile Driver, Land or Floating; Scoop, Skimmer; Shovel, Power (Electric, Gas, Steam or other powers); Shovel, Power (7 cu yds and over); Switch Boat;

Whirley; Air Tugger with air compressor; Anchor Placing Barge; Asphalt Spreaker; Athey Force Feeder Loader, self-propelled; Backfilling Machine; Boat Operator - Push Boat or Tow Boat (job site); Boiler, High Pressure Breaking in Period; Boom Truck, Placing or Erecting; Boring Machine, Footing Foundation; Bullfloat; Cherry Picker; Combination Concrete Hoist and Mixer (such as Mixermobile); Compressor, Two 125 CFM and under; Compressor, Two through Four over 125 CFM; Compressor when operator runs throttle; Concrete Breaker (Truck or Tractor mounted); Concrete Pump (such as Pumpcrete machine); Concrete Saw (self-propelled); Concrete Spreader; Conveyor, Large (not selfpropelled) hoisting or moving brick and concrete into, or into and on floor level, one or both; Crane, Cimbing (such as Linden); Crane, Hydraulic - Rough Terrain, self-propelled; Crane, Hydraulic

- Truck or Cruiser mounted - under 16 tons; Drilling machine - Self-powered, used for earth or rock drilling or boring (wagon drills and any hand drills obtaining power from other souces including concrete breakers, jackhammers and Barco equipmnet no engineer required); Elevating Grader; Engine Man, Dredge; Excavator or Powerbelt Machine;

Finishing Machine, self- propelled oscillating screed;

Forklift; Generators, Two through Six 30 KW or over;

Grader, Road with power blade; Greaser; Highlift; Hoist, Concrete and Brick (Brick cages or concrete skips operating or on tower, Towermobile, or similar equipment); Hoist, Three or more drums in use; Hoist, Stack; Hydro-Hammer;

Lad-A-Vator, hoisting brick or concrete; Loading Machine such as Barber-Greene; Mechanic on job site

GROUP 2: Air Tugger with plant air; Boiler (for power or heating shell of building or temporary enclosures in connection with construction work); Boiler, Temporary;

Compressor, One over 125 CFM; Compressor, truck mounted;

Conveyor, Large (not self- propelled); Conveyor, Large (not self- propelled) moving brick and concrete (distributing) on floor level; Curb Finishing Machine; Ditch Paving Machine; Elevator (outside); Endless Chain Hoist; Fireman (as required); Form Grader; Hoist, One Drum regardless of size (except brick or concrete); Lad-A-Vator, other hoisting; Manlift; Mixer, Asphalt, over 8 cu ft capacity;

Mixer, one bag capacity or less; Mixer, without side loader, two bag capacity or more; Mixer, with side loader, regardless of size, not Paver; Mud Jack (where mud jack is used in conjenction with an air compressor, operator shall be paid $ .55 per hour in addition to his basic hourly rate for covering both operations); Pug Mill operator; Pump, Sump - self powered, automatic controlled over 2"; Scissor Lift (used for hoisting); Skid Steer Loader; Sweeper, Street; Tractor, small wheel type 50 HP and under with grader blade and similar equipment; Welding Machine, One over 400 amp; Winch, operating from truck

GROUP 3: Boat operator - outboard motor, job site; Conveyors (such as Con-Vay-It) regardless of how used; Elevator (inside); Heater operator, 2 through 6; Sweeper, Floor

GROUP 4: Crane type

HOURLY PREMIUMS:

Backhoe, Hydraulic 2 cu yds or less without oiler - $2.00;

Crane,climbing (such as Linden) - $.50;

Crane, Pile Driving and Extracting - $ .50 Crane with boom (including job) over 100 ft from pin to pin - add $.01 per foot to maximum of $4.00);

Crane, using rock socket tool - $ .50;

Derrick, diesel, gas or electric hoisting material and erecting steel (150 ft or more above ground) - $ .50;

Dragline, 7 cu yds and over - $ .50;

Hoist, Three or more drums in use - $ .50;

Scoop, Tandem - $.50;

Shovel, Power - 7 cu yds and over - $ .50;

Tractor, Tandem Crawler - $ .50;

Tunnel, man assigned to work in tunnel or tunnel shaft - $ .50;

Wrecking, when machines are working on second floor or higher - $ .50

ENGI0513-006 05/01/2016

ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CALLAWAY, CAPE

GIRARDEAU, CARTER, CLARK, COLE, CRAWFORD, DENT, DUNKLIN,

GASCONADE, HOWELL, IRON, KNOX, LEWIS, MACON, MADISON, MARIES,

MARION, MILLER, MISSISSIPPI, MONITEAU, MONROE, MONTGOMERY,

MORGAN, NEW MADRID, OREGON, OSAGE, PEMISCOT, PERRY, PHELPS,

PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST.

FRANCOIS, STE. GENEVIEVE, SCHUYLER, SCOTLAND, SCOTT, SHANNON,

SHELBY, STODDARD, TEXAS, WASHINGTON, AND WAYNE COUNTIES

GROUP 1.....................$ 27.94 24.87

GROUP 2.....................$ 27.59 24.87

GROUP 3.....................$ 27.39 24.87

GROUP 4.....................$ 23.74 24.87

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt finishing machine & trench widening spreader, asphalt plant console operator; autograder;

automatic slipform paver; back hoe; blade operator - all types; boat operator tow; boiler two; central mix concrete plant operator; clam shell operator; concrete mixer paver;

crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine 2 active drums; launchhammer wheel; locomotive operator standrad guage; mechanics and welders; mucking machine; piledriver operator; pitman crane operator; push cat operator;

guad-trac; scoop operator; sideboom cats; skimmer scoop operator; trenching machine operator; truck crane, shovel operator.

GROUP 2: A-Frame; asphalt hot-mix silo; asphalt roller operator asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant mixer operator; backfiller operator; barber-greene loader; boat operator (bridge & dams); chip spreader; concrete mixer operator skip loader;

concrete plant operator; concrete pump operator; dredge oiler; elevating graded operator; fork lift; grease fleet;

hoisting engine one; locomotive operator narrow guage;

multiple compactor; pavement breaker; powerbroom self-propelled; power shield; rooter; slip-form finishing machine; stumpcutter machine; side discharge concrete spreader; throttleman; tractor operator (over 50 hp); winch truck; asphalt roller operator; crusher operator.

GROUP 3: Spreader box operator, self-propelled not asphalt;

tractor operator (50 h.p. or less); boilers one; chip spreader (front man); churn drill operator; compressor over 105 CFM 2-3 pumps 4" & over; 2-3 light plant 7.5 KWA or any combination thereof; clef plane operator; compressor maintenance operator 2 or 3; concrete saw operator (self-propelled); curb finishing mancine; distributor operator; finishing machine operator; flex plane operator;

float operator; form grader operator; pugmill operator;

riller operator other than high type asphalt; screening & washing plant operator; siphons & jets; subgrading machine operator; tank car heater (combination boiler & booster);

ulmac, ulric or similar spreader; vibrating machine operator; hydrobroom.

GROUP 4: Oiler; grout machine; oiler driver; compressor over 105 CFM one; conveyor operator one; maintenance operator;

pump 4" & over one.

FOOTNOTE: HOURLY PREMIUMS

Backhoe hydraulic, 2 cu. yds. or under Without oiler - $2.00 Certified Crane Operator - $1.50;

Certified Hazardous Material Operator $1.50;

Crane, climbing (such as Linden) - $0.50;

Crane, pile driving and extracting - $0.50;

Crane, with boom (including jib) over 100' from pin to pin add $0.01 per foot to maximum of $4.00;

Crane, using rock socket tool - $0.50;

Derrick, diesel, gas or electric, hoisting material and erecting steel (150' or more above the ground) - $0.50;

Dragline, 7 cu. yds, and over - $0.50;

Hoist, three or more drums in use - $0.50; Scoop, Tandem - $0.50;

Shovel, power - 7 cu. yds. or more - $0.50;

Tractor, tandem crawler - $0.50;

Tunnel, man assigned to work in tunnel or tunnel shaft - $0.50;

Wrecking, when machine is working on second floor or higher - $0.50;

ENGI0513-007 05/02/2016

ST. LOUIS CITY AND COUNTY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 32.41 24.01

GROUP 2.....................$ 32.41 24.01

GROUP 3.....................$ 31.11 24.01

GROUP 4.....................$ 30.66 24.01

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Backhoe, cable or hydraulic; cableway; crane crawler or truck; crane, hydraulic-truck or cruiser mounted 16 tons & over; crane locomotive; derrick, steam; derrick car & derrick boat; dragline; dredge; gradall, crawler or tire mounted; locomotive, gas, steam & other powers; pile driver, land or floating; scoop, skimmer; shovel, power (steam, gas, electric or other powers); switch boat;

whirley.

GROUP 2: Air tugger w/air compressor; anchor-placing barge;

asphalt spreader; athey force feeder loader (self-propelled); backfilling machine; backhoe-loader; boat operator-push boat or tow boat (job site); boiler, high pressure breaking in period; boom truck, placing or erecting; boring machine, footing foundation; bull- float;

cherry picker; combination concrete hoist & mixer (such as mixer mobile); compressor (when operator runs throttle);

concrete breaker (truck or tractor mounted); concrete pump, such as pump-crete machine; concrete saw (self-propelled), concrete spreader; conveyor, large (not self-propelled), hoisting or moving brick and concrete into, or into and on floor level, one or both; crane, hydraulic-rough terrain, self-propelled; crane hydraulic-truck or cruiser mounted-under 16 tons; drilling machines, self-powered use for earth or rock drilling or boring (wagon drills nd any hand drills obtaining power from other sources including concrete breakers, jackhammers and barco equipment-no engineer required); elevating grader; engineman, dredge;

excavator or powerbelt machine; finishing machine, self-propelled oscillating screed; forklift; grader, road with power blade; highlift. greaser; hoist, stack, hydro-hammer; loading machine (such as barber-greene);

machanic, on job site; mixer, pipe wrapping machines; plant asphalt; plant, concrete producing or ready-mix job site;

plant heating-job site; plant mixing-job site; plant power, generating-job site; pumps, two through six self-powered over 2"; pumps, electric submersible, two through six, over 4"; quad-track; roller, asphalt, top or sub-grade; scoop, tractor drawn; spreader box; sub-grader; tie tamper;

tractor-crawler, or wheel type with or without power unit, power take-offs and attachments regardless of size;

trenching machine; tunnel boring machine; vibrating machine automatic, automatic propelled; welding machines (gasoline or diesel) two through six; well drilling machine

GROUP 3: Conveyor, large (not self-propelled); conveyor, large (not self-propelled) moving brick and concrete distributing) on floor level; mixer two or more mixers of one bag capacity or less; air tugger w/plant air; boiler, for power or heating on construction projects; boiler, temporary; compressor (mounted on truck; curb finishing machine; ditch paving machine; elevator; endless chain hoist; form grader; hoist, one drum regardless of size;

lad-a-vator; manlift; mixer, asphalt, over 8 cu. ft.

capacity, without side loader, 2 bag capacity or more;

mixer, with side loader, regardless of size; pug mill operator; pump, sump-self-powered, automatic controlled over 2" during use in connection with construction work;

sweeper, street; welding machine, one over 400 amp.; winch operating from truck; scissor lift (used for hoisting);

tractor, small wheel type 50 h.p. & under with grader blade & similar equipment; Oiler on dredge and on truck crane.

GROUP 4: Boat operator-outboard motor (job site); conveyor (such as con-vay-it) regardless of how used; sweeper, floor

HOURLY PREMIUMS:

Backhoe, hydraulic 2 cu. yds. or under without oiler $2.00 Certified Crane Operator 1.50 Certified Hazardous Material Operator 1.50 Crane, climbing (such as Linden) .50 Crane, pile driving and extracting .50 Crane, with boom (including jib) over 100' (from pin to pin) add $.01 per foot to maximum of 4.00 Crane, using rock socket tool .50 Derrick, diesel, gas or electric, hoisting material and erecting steel

(150' or more above ground) .50 Dragline, 7 cu. yds. and over .50 Hoist, three (3) or more drums in use .50 Scoop, Tandem .50 Shovel, power - 7 cu. yds. or more .50 Tractor, tandem crawler .50 Tunnel, man assigned to work in tunnel or tunnel shaft .50 Wrecking, when machine is working on second floor or higher .50

* IRON0010-012 04/01/2017

Rates Fringes

Ironworkers:

ANDREW, BARTON, BENTON,

CAMDEN, CEDAR, CHARITON,

CHRISTIAN, COOPER, DADE,

DALLAS, DAVIESS, DE KALB,

GENTRY, GREENE, GRUNDY,

HARRISON, HICKORY, HOLT,

HOWARD, LACLEDE, LINN,

LIVINGSTON, MERCER,

MONITEAU, MORGAN, NODAWAY,

PETTIS, POLK, PUTNAM,

RANDLOPH, ST. CLAIR,

SULLIVAN, TANEY, VERNON,

WEBSTER, WRIGHT and WORTH Counties and portions of

ADAIR, BOONE, MACON,

MILLER and RANDOLPH Counties....................$ 29.65 28.85

ATCHISON, BATES, BUCHANAN,

CALDWELL, CARROLL, CASS,

CLAY, CLINTON, HENRY,

JACKSON, JOHNSON,

LAFAYETTE, PETTIS, PLATTE,

SALINE, AND RAY COUNTIES....$ 32.65 28.85

IRON0321-002 08/01/2012

DOUGLAS, HOWELL and OZARK COUNTIES

Rates Fringes

Ironworker.......................$ 18.40 14.68

* IRON0396-004 08/02/2017

ST. LOUIS (City and County), ST. CHARLES, JEFFERSON, IRON, FRANKLIN, LINCOLN, WARREN, WASHINGTON, ST. FRANCOIS, STE.

GENEVIEVE, and REYNOLDS Counties; and portions of MADISON, PERRY, BOLLINGER, WAYNE, and CARTER Counties

Ironworker.......................$ 33.96 25.11

* IRON0396-009 08/02/2017

AUDRAIN, CALLAWAY, COLE, CRAWFORD, DENT, GASCONADE, MARIES,

MONTGOMERY, OSAGE, PHELPS, PIKE, PULASKI, TEXAS and WRIGHT Counties; and portions of BOONE, CAMDEN, DOUGLAS, HOWELL, LACLEDE, MILLER, MONROE, OREGON, SHANNON and RALLS Counties

Ironworker.......................$ 29.49 25.11

IRON0577-005 08/01/2016

ADAIR, CLARK, KNOX, LEWIS, MACON, MARION, MONROE, RALLS,

SCHUYLER, SCOTLAND, AND SHELBY COUNTIES

Ironworker.......................$ 25.81 21.29

* IRON0584-004 06/01/2017

BARRY, JASPER, LAWRENCE, MCDONALD, NEWTON AND STONE Counties

Rates Fringes

Ironworkers:.....................$ 24.00 14.81

IRON0782-003 05/01/2016

CAPE GIRARDEAU, MISSISSIPPI, NEW MADRID, SCOTT, & STODDARD

Counties; and portions of BOLLINGER, BUTLER, CARTER, DUNKLIN, MADISON, PEMISCOT, PERRY, RIPLEY, and WAYNE Counties

Ironworkers:

Locks, Dams, Bridges and other major work on the Mississippi and Ohio River only........................$ 31.63 24.27 All Other Work..............$ 25.12 19.90

LABO0042-003 03/04/2016

ST. LOUIS (City and County)

LABORER

Plumber Laborer.............$ 31.12 14.47

LABO0042-005 03/04/2016

ST. LOUIS (City and County)

Rates Fringes

LABORER

Dynamiter, Powderman........$ 31.12 14.47 Laborers, Flaggers..........$ 31.12 14.47 Wrecking....................$ 31.12 14.47

LABO0424-002 05/01/2016

Rates Fringes

LABORER

ADAIR, AUDRAIN, BOONE,

CALLAWAY, CHARITON, CLARK,

COLE, COOPER, HOWARD,

IRON, KNOX, LEWIS, LINN,

MACON, MADISON, MARION,

MILLER, MONITEAU, MONROE,

PERRY, PIKE, PUTNAM,

RALLS, RANDOLPH, REYNOLDS,

ST. FRANCOIS, STE.

GENEVIEVE, SCHUYLER,

SCOTLAND, SHELBY AND

SULLIVAN COUNTIES

GROUP 1....................$ 27.96 13.17

GROUP 2....................$ 27.96 13.17

BOLLINGER, BUTLER, CAPE

GIRARDEAU, CARTER,

CRAWFORD, DENT, DUNKLIN,

GASCONADE, HOWELL, MARIES,

MISSISSIPPI, NEW MADRID,

OREGON, OSAGE, PEMISCOT,

PHELPS, PULASKI, RIPLEY,

SCOTT, SHANNON, STODDARD,

TEXAS, WASHINGTON AND

WAYNE COUNTIES

GROUP 1....................$ 27.96 13.17

GROUP 2....................$ 27.96 13.17

FRANKLIN COUNTY

GROUP 1....................$ 29.71 13.17

GROUP 2....................$ 30.31 13.17

JEFFERSON COUNTY

GROUP 1....................$ 29.76 13.17

GROUP 2....................$ 30.36 13.17

LINCOLN, MONTGOMERY AND

WARREN COUNTIES

GROUP 1....................$ 31.18 13.32

GROUP 2....................$ 31.18 13.32

ST.CHARLES COUNTY

GROUP 1....................$ 3.18 13.32

GROUP 2....................$ 31.18 13.32

LABORERS CLASSIFICATIONS

GROUP 1 - General laborer-flagman, carpenter tenders;

salamander Tenders; Dump Man; Ticket Takers; loading trucks under bins, hoppers, and conveyors; track man; cement handler; dump man on earth fill; georgie buggie man;

material batch hopper man; spreader on asphalt machine;

material mixer man (except on manholes); coffer dams;

riprap pavers rock, block or brick; scaffolds over ten feet not self-supported from ground up; skip man on concrete paving; wire mesh setters on concrete paving; all work in connection with sewer, water, gas, gasoling, oil, drainage pipe, conduit pipe, tile and duct lines and all other pipe lines; power tool operator; all work in connection with hydraulic or general dredging operations; form setters, puddlers (paving only); straw blower nozzleman; asphalt plant platform man; chuck tender; crusher feeder; men handling creosote ties or creosote materials; men working with and handling epoxy material; topper of standing trees;

feeder man on wood pulverizers, board and willow mat weavers and cabelee tiers on river work; deck hands; pile dike and revetment work; all laborers working on underground tunnels less than 25 ft. where compressed air is not used; abutement and pier hole men working six (6)

ft. or more below ground; men working in coffer dams for bridge piers and footing in the river; barco tamper;

jackson or any other similar tamp; cutting torch man;

liners, curb, gutters, ditch lines; hot mastic kettlemen;

hot tar applicator; hand blade operator; mortar men or brick or block manholes; rubbing concrete, air tool operator under 65 lbs.; caulker and lead man; chain or concrete saw under 15 h.p.; signal Gan; Guard rail and sign erectors.

GROUP 2 - Skilled laborers - Vibrator man; asphalt raker;

head pipe layer on sewer work; batterboard man on pipe and ditch work; cliff scalers working from bosun's chairs;

scaffolds or platforms on dams or power plants over 10 ft.

high; air tool operator over 65 lbs.; stringline man on concrete paving; sandblast man; laser beam man; wagon drill; churn drill; air track drill and all other similar type drills, gunite nozzle man; pressure grout man; screed man on asphalt; concrete saw 15 h.p. and over; grade checker; strigline man on electronic grade control; manhole builder; dynamite man; powder man; welder; tunnel man;

waterblaster - 1000 psi or over; asbestos and/or hazardous waste removal and/or disposal

LABO0579-005 05/01/2017

Rates Fringes

LABORER (ANDREW, ATCHISON,

BUCHANAN, CALDWELL, CLINTON,

DAVIESS, DEKALB, GENTRY,

GRUNDY, HARRISON, HOLT,

LIVINGSTON, MERCER, NODAWAY

and WORTH COUNTIES.)

GROUP 1.....................$ 25.66 14.07

GROUP 2.....................$ 26.01 14.07

LABORER (BARRY, BARTON,

BATES, BENTON, CAMDEN,

CARROLL, CEDAR, CHRISTIAN,

DADE, DALLAS, DOUGLAS,

GREENE, HENRY. HICKORY,

JASPER, JOHNSON, LACLEDE,

LAWRENCE, MCDONALD, MORGAN,

NEWTON, OZARK, PETTIS, POLK,

ST.CLAIR, SALINE, STONE,

TANEY, VERNON, WEBSTER and

WRIGHT COUNTIES)

GROUP 1.....................$ 24.66 13.27

GROUP 2.....................$ 25.21 13.27

LABORER (LAFAYETTE COUNTY)

GROUP 1.....................$ 26.21 13.52

GROUP 2.....................$ 26.56 13.52

LABORERS CLASSIFICATIONS

GROUP 1: General Laborers - Carpenter tenders; salamander tenders; loading trucks under bins; hoppers & conveyors;

track men & all other general laborers; air tool operator;

cement handler-bulk or sack; dump man on earth fill;

georgie buggie man; material batch hopper man; material mixer man (except…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .