Supplemental Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment_0001.pdf | ||
| W912DQ-16-R-4025_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supplemental Bid Schedule
| Fort Riley Roof Maintenance | |||||
| Year 1 | |||||
| CLIN | Technical Elements (TEs) | Quantity | UOM | Unit Price | Total |
| 0001-AA | Remove asphalt shingles, underlayment, edge metal, and flashings; up to 2 layers. | 1,500 | SQ | ||
| 0001-AB | Remove any type of batten seam, flat seam, or standing seam metal roofing and flashings. | 100 | SQ | ||
| 0001-AC | Remove BUR system including gravel, gravel stop or edge metal, flashings, and roof insulation. | 200 | SQ | ||
| 0001-AD | Remove MBR system including gravel stop or edge metal, flashings, and roof insulation. | 1,500 | SQ | ||
| 0001-AE | Remove mechanically fastened or fully adhered EPDM, PVC or TPO roofing including, gravel stop or edge metal, flashings, and roof insulation. | 100 | SQ | ||
| 0001-AF | Replace steel roof deck (match existing design and thickness). | 200 | SF | ||
| 0001-AG | Replace any dimension treated lumber. Note - Unit is BF "Board Foot". | 1,000 | BF | ||
| 0001-AH | Replace any dimension western red cedar wood trim. Note - Unit is BF "Board Foot". | 500 | BF | ||
| 0001-AI | Replace 1/2" CDX plywood roof deck | 200 | SF | ||
| 0001-AJ | Replace 5/8" CDX plywood roof deck. | 200 | SF | ||
| 0001-AK | Replace 3/4" CDX plywood roof deck. | 50 | SF | ||
| 0001-AL | Replace any dimension 1" thick nominal lumber roof deck. | 200 | SF | ||
| 0001-AM | Replace any dimension 2" thick nominal lumber roof deck. | 200 | SF | ||
| 0001-AN | Install ice dam protection membrane at eaves, valleys, vertical walls, dormers, and penetrations. | 250 | SQ | ||
| 0001-AO | Install architectural laminated asphalt shingles including synthetic felt underlayment, starter course, painted galvanized steel edge metal and base flashings, and hip and ridge caps. | 1,500 | SQ | ||
| 0001-AP | Install venting base sheet on insulating concrete or poured gypsum deck including all fasteners. | 100 | SQ | ||
| 0001-AQ | Install 1" thick R7.14 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 0001-AR | Install 1-1/2" thick R10.87 polyisocyanurate roof insulation board. | 500 | SQ | ||
| 0001-AS | Install 2" thick R14.29 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 0001-AT | Install 2-1/2" thick R16.67 polyisocyanurate roof insulation board. | 1,000 | SQ | ||
| 0001-AU | Install 3" thick R21.74 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 0001-AV | Install 3-1/2" thick R25 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 0001-AW | Install 4" thick R28.58 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 0001-AX | Install polyisocyanurate tapered insulation board system. | 25,000 | BF | ||
| 0001-AY | Install 1/2" thick asphalt impregnated fiberboard cover board. | 1,500 | SQ | ||
| 0001-AZ | Install asphalt built-up 4-ply roofing system including all base flashings. | 10 | SQ | ||
| 0001-BA | Install 250 mil. (80 mil. base sheet and 170 mil. cap sheet) modified bitumen membrane roofing system including all base flashings. | 1,200 | SQ | ||
| 0001-BB | Install 60 mil. mechanically fastened EPDM roofing system including all base flashings. | 25 | SQ | ||
| 0001-BC | Install 60 mil. mechanically fastened PVC roofing system including all base flashings. | 25 | SQ | ||
| 0001-BD | Install 60 mil. mechanically fastened TPO roofing system including all base flashings. | 25 | SQ | ||
| 0001-BE | Install 60 mil. fully adhered EPDM roofing system including all base flashings. | 25 | SQ | ||
| 0001-BF | Install 60 mil. fully adhered PVC roofing system including all base flashings. | 25 | SQ | ||
| 0001-BG | Install 60 mil. fully adhered TPO roofing system including all base flashings. | 25 | SQ | ||
| 0001-BH | Install batten seam architectural copper roof system including high temperature self-adhering SBS modified bitumen and polyethylene metal roof underlayment. | 10 | SQ | ||
| 0001-BI | Install flat seam architectural copper roof system including high temperature self-adhering SBS modified bitumen and polyethylene metal roof underlayment. | 10 | SQ | ||
| 0001-BJ | Install standing seam architectural copper roof system including high temperature self-adhering SBS modified bitumen and polyethylene metal roof underlayment. | 10 | SQ | ||
| 0001-BK | Replace sealant in concrete or masonry wall control joint: remove deteriorated sealant and backer rod where present; replace new backer rod; replace new sealant; paint joint to match surrounding wall surfaces. | 100 | LF | ||
| 0001-BL | Replace aluminum flashing, .032", painted finish. | 1,000 | SF | ||
| 0001-BM | Replace copper flashing, 16 oz. | 200 | SF | ||
| 0001-BN | Replace EPDM, PVC, or TPO flashing, 60 mil. | 200 | SF | ||
| 0001-BO | Replace galvanized steel flashing, 26 ga., painted finish. | 1,000 | SF | ||
| 0001-BP | Replace lead flashing, 2.5 lb/sf. | 50 | SF | ||
| 0001-BQ | Replace stainless steel flashing, 28 ga. | 50 | SF | ||
| 0001-BR | Install 1-1/4" to 4" galvanized steel/neoprene pipe flashing (for asphalt shingle roofs). | 100 | EA | ||
| 0001-BS | Install 3" to 8" galvanized steel flue pipe "top hat" flashing (for asphalt shingle roofs). | 100 | EA | ||
| 0001-BT | Install 1-1/4" to 4" plumbing vent flashing (complete) in conjunction with roof Installment IAW NRCA Details BUR-18/18S, MB-18/18S, TP-18/18S/18A/18AS, or TS-18/18S/18A/18AS as appropriate. | 100 | EA | ||
| 0001-BU | Install roof drain flashing (complete) in conjunction with roof Installment IAW NRCA Details BUR-20/20S, MB-20/20S/20A/20AS, TP-20/20S, or TS-20/20S as appropriate. | 50 | EA | ||
| 0001-BV | Install 3" to 8" diameter flue pipe flashing IAW NRCA Details BUR-17/17S/17A/17AS, MB-17/17S/17A/17AS, TP-17/17S, or TS-17/17S as appropriate. | 25 | EA | ||
| 0001-BW | Replace aluminum reglet; .025", painted finish. | 50 | LF | ||
| 0001-BX | Replace copper reglet, 10 oz. | 50 | LF | ||
| 0001-BY | Replace galvanized steel reglet; 30 ga., painted finish. | 50 | LF | ||
| 0001-BZ | Replace aluminum termination bar; .125" x 1.0" or equivalent, painted finish. | 50 | LF | ||
| 0001-CA | Replace galvanized steel termination bar; .125" x 1.0" or equivalent, painted finish. | 25 | LF | ||
| 0001-CB | Replace galvanized steel roof louver, painted finish (for asphalt shingle roofs). Acceptable products include Air Vent, Inc. Airhawk RVGL-50 or RVG-55 and Lomanco, Inc. 750-G. | 100 | EA | ||
| 0001-CC | Replace galvanized steel ridge vent, painted finish (for asphalt shingle roofs). Acceptable products include ShingleVent II Shingle Over Ridge Vent SHFV203 and Lomanco, Inc. Shingle Over Ridge Vent LOR9-4. | 100 | LF | ||
| 0001-CD | Replace aluminum splash pan (fabricated IAW SMACNA Figure 1-36, approximately 3.3 sf), .040" thick, painted finish. | 5 | EA | ||
| 0001-CE | Replace copper splash pan (fabricated IAW SMACNA Figure 1-36, approximately 3.3 sf), 16 oz. | 5 | EA | ||
| 0001-CF | Replace galvanized splash pan (fabricated IAW SMACNA Figure 1-36, approximately 3.3 sf), 26 ga., painted finish. | 5 | EA | ||
| 0001-CG | Replace aluminum gutter, any box style, .032", 4" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 50 | LF | ||
| 0001-CH | Replace aluminum gutter, any box style, .032", 5" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 200 | LF | ||
| 0001-CI | Replace aluminum gutter, any box style, .032", 6" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 200 | LF | ||
| 0001-CJ | Replace copper gutter, style K or half round, 16 oz., 4" wide, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 50 | LF | ||
| 0001-CK | Replace copper gutter, style K or half round, 16 oz., 5" wide, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 100 | LF | ||
| 0001-CL | Replace copper gutter, style K or half round, 16 oz., 6" wide, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 50 | LF | ||
| 0001-CM | Replace galvanized steel gutter, any box style, 26 ga., 4" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 50 | LF | ||
| 0001-CN | Replace galvanized steel gutter, any box style, 26 ga., 5" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 200 | LF | ||
| 0001-CO | Replace galvanized steel gutter, any box style, 26 ga., 6" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 200 | LF | ||
| 0001-CP | Replace copper gutter brass or stainless steel spring retaining clip only. | 100 | EA | ||
| 0001-CQ | Replace aluminum gutter lap or butt type expansion joint, any style or size, painted finish. | 40 | EA | ||
| 0001-CR | Replace copper gutter lap or butt type expansion joint, any style or size. | 10 | EA | ||
| 0001-CS | Replace galvanized steel gutter lap or butt type expansion joint, any style or size, painted finish. | 5 | EA | ||
| 0001-CT | Replace aluminum downspout or elbow, .025", 3" round or 2" by 3", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 100 | LF | ||
| 0001-CU | Replace aluminum downspout or elbow, .025", 4" round or 3" by 4", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 200 | LF | ||
| 0001-CV | Replace aluminum downspout or elbow, .025", 5" round or 4" by 5", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 200 | LF | ||
| 0001-CW | Replace copper downspout or elbow, 16 oz., 3" round or 2" by 3", including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 50 | LF | ||
| 0001-CX | Replace copper downspout or elbow, 16 oz., 4" round or 3" by 4", including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 100 | LF | ||
| 0001-CY | Replace copper downspout or elbow, 16 oz., 5" round or 4" by 5", including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 50 | LF | ||
| 0001-CZ | Replace galvanized steel downspout or elbow, 26 ga., 3" round or 2" by 3", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 100 | LF | ||
| 0001-DA | Replace galvanized steel downspout or elbow, 26 ga., 4" round or 3" by 4", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 200 | LF | ||
| 0001-DB | Replace galvanized steel downspout or elbow, 26 ga., 5" round or 4" by 5", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 200 | LF | ||
| 0001-DC | Reinstall/rehang/realign existing gutter or downspout including Installment of damaged or missing hangers and spring retaining clips. | 100 | LF | ||
| 0001-DD | Replace 12" x 36" precast concrete splashblock. | 50 | EA | ||
| 0001-DE | Replace pitch pan during roof replacement. | 50 | EA | ||
| 0001-DF | Replace neoprene and metal flanges expansion joint or roof to wall joint. | 50 | LF | ||
| 0001-DG | Replace all metal expansion joint or roof to wall joint. | 100 | LF | ||
| 0001-DH | Extract and rethread broken or damaged roof drain bolts and install new stainless steel bolts. | 50 | EA | ||
| 0001-DI | Replace 2" to 4" cast-iron body roof drain or floor scupper including dome. | 6 | EA | ||
| 0001-DJ | Replace fixed height roller natural gas or HVAC pipe or electrical conduit support; 2-1/2" min. standoff, up to 3.75" dia. pipe. | 25 | EA | ||
| 0001-DK | Replace adjustable height roller gas or HVAC pipe or electrical conduit support; 2-1/2" min. standoff, up to 3.75" dia. pipe. | 25 | EA | ||
| 0001-DL | Prepare, prime, and paint concrete, masonry, lumber, plywood, sheet metal, roof accessories, or roof specialties. | 1,000 | SF | ||
| 0001-DM | BF-H-1: Repair damaged base flashing by overlaying each localized defect with new base flashing. | 200 | LF | ||
| 0001-DN | BF-H-2: Install extension of counterflashing over exposed top termination of base flashing. Install new BUR or MBR roof membrane at open side laps in base flashing. | 150 | LF | ||
| 0001-DO | BF-H-3: Remove contaminate and affected base flashing material. Prime surface and install new base flashing. | 50 | LF | ||
| 0001-DP | BF-H-4: Prime surface and install new base flashing. | 50 | LF | ||
| 0001-DQ | BF-M-1: Cut and resecure unbonded base flashing, mechanically fasten slipped flashing and coat with heavy bodied asphalt coating. | 500 | LF | ||
| 0001-DR | BF-M-2: Prime exposed and deteriorated base flashing and coat with heavy bodied asphalt coating. | 150 | LF | ||
| 0001-DS | BF-M-3: Remove contaminates from undamaged base flashing, prime and coat areas with heavy bodied asphalt coating. | 50 | LF | ||
| 0001-DT | BF-M-4: Remove temporary repair material from base flashing, reinforce patch as necessary and coat with heavy bodied asphalt coating. | 50 | LF | ||
| 0001-DU | BL-H-1 & BL-H-2: Remove broken blister, repair surface and restore surfacing material where applicable. | 50 | SF | ||
| 0001-DV | BL-M-1 & BL-M-2: Restore surfacing material on blister which has exposed BUR or MBR roof membrane. | 150 | SF | ||
| 0001-DW | DR-H-1: Remove deteriorated stripping around roof drain or scupper, clean surface and prime. Replace stripping and restore surfacing material where applicable. | 10 | EA | ||
| 0001-DX | DR-H-2: Reinstall loose or replace damaged or missing roof drain clamping ring. | 25 | EA | ||
| 0001-DY | DR-H-3: Remove blockage which is clogging roof drain by whatever means are necessary to unclogg drain. | 10 | EA | ||
| 0001-DZ | DR-H-4: Replace damaged scupper. | 10 | EA | ||
| 0001-EA | DR-M-1: Prime and coat surface of roof drain having exposed stripping with heavy bodied asphalt coating. | 10 | EA | ||
| 0001-EB | DR-M-2: Replace damaged or missing roof drain strainer. | 10 | EA | ||
| 0001-EC | DR-M-3: Remove all loose paint and corrosion around distressed scupper, prime and coat with corrosion resistant paint. | 10 | EA | ||
| 0001-ED | DR-M-4: Remove clamping ring and stripping plies around drain. Clean surface and prime. Install new stripping plies. | 10 | EA | ||
| 0001-EE | DS-H-1: Clean and prepare open seam, reseal and overlay with 6" width of BUR or MBR roof membrane. | 20 | LF | ||
| 0001-EF | DS-H-2 & DS-M-2: Cut out fishmouths, wrinkles, blistering or ridging in seam, clean and prepare surface and install BUR or MBR roof membrane patch. | 20 | LF | ||
| 0001-EG | DS-M-1: Clean and prepare defective seam, reseal lap. | 20 | LF | ||
| 0001-EH | DS-M-3: Restore surfacing material on unsurfaced BUR or MBR roof membrane along seam. | 20 | LF | ||
| 0001-EI | DV-H-1 & DV-H-2: Remove contaminate or vegetation penetrating membrane, repair BUR or MBR roof membrane and restore surfacing material where applicable. | 50 | SF | ||
| 0001-EJ | DV-M-1 & DV-M-3: Remove dirt, vegetation, foreign material and objects from roof. | 500 | SF | ||
| 0001-EK | DV-M-2: Remove contaminate from undamaged BUR or MBR roof membrane and restore surfacing material where applicable. | 100 | SF | ||
| 0001-EL | EM-H-1, EM-H-2, & EM-H-3: Prime and apply stripping ply over edge metal flange in area of loose or missing stripping plies, or over edge metal joints which are split or where damaged has occurred. | 500 | LF | ||
| 0001-EM | EM-H-4: Replace section of damaged edge metal. | 50 | LF | ||
| 0001-EN | EM-H-5: Refasten loose edge metal flange into solid support. Replace stripping and surfacing material where applicable. | 250 | LF | ||
| 0001-EO | EM-H-6: Clean interior of gutter to smooth bare metal and line gutter with waterproof membrane. | 50 | LF | ||
| 0001-EP | EM-M-2: Restore surfacing over exposed stripping plies at edge metal. | 50 | LF | ||
| 0001-EQ | EM-M-3: Remove loose nails in embedded edge metal and renail into solid support. Install new BUR or MBR roof membrane over new fasteners. | 50 | LF | ||
| 0001-ER | EM-M-4: Remove surface corrosion, prime and coat edge metal with corrosion resistant paint. | 50 | LF | ||
| 0001-ES | EM-M-5: Renail loose edge metal flange into solid support. Install new BUR or MBR roof membrane (stripping plies) over new fasteners. | 150 | LF | ||
| 0001-ET | EQ-H-1: Repair damaged BUR or MBR roof membrane under improper equipment or piping support and install appropriate equipment or piping support device. | 10 | SF | ||
| 0001-EU | EQ-H-2 & EQ-M-2: Install/replace pitch pan at equipment support and flash into BUR or MBR roof membrane. | 10 | SF | ||
| 0001-EV | EQ-M-1: Replace improper equipment or piping support with support device allowing for movement of equipment or piping. | 20 | SF | ||
| 0001-EW | FP-H-1: Clean, prime and seal unflashed flanges on flashed penetration. | 10 | LF | ||
| 0001-EX | FP-H-2 & FP-H-3: Replace damaged or missing flashing sleeve or curb on flashed penetration. (1 Flashing Sleeve = 1 LF.) | 10 | LF | ||
| 0001-EY | FP-H-4: Prime surface and apply BUR or MBR roof membrane (stripping plies) around unsealed flashed penetration. | 20 | LF | ||
| 0001-EZ | FP-H-5: Prime and apply BUR or MBR roof membrane (stripping plies) over flashing sleeve where damage has occurred. | 20 | LF | ||
| 0001-FA | FP-M-1: Restore surfacing over exposed stripping plies around flashed penetration. | 10 | LF | ||
| 0001-FB | FP-M-2: Seal top of flashing sleeve around flashed penetration. (1 Flashing Sleeve = 1 LF.) | 10 | LF | ||
| 0001-FC | FP-M-3: Replace a damaged or missing rain collar or "umbrella" on flashed penetration. (1 Rain Collar or "Umbrella" = 1 LF.) | 10 | LF | ||
| 0001-FD | FP-M-4: Remove surface corrosion, prime and coat with corrosion resistant material. | 10 | LF | ||
| 0001-FE | HL-H-1: Repair holes in BUR or MBR roof membrane and restore surfacing where applicable. | 50 | SF | ||
| 0001-FF | IN-H-1: Remove BUR or MBR roof membrane, remove wet insulation, allow area to dry, install new insulation and BUR or MBR roof membrane to match existing. | 100 | SF | ||
| 0001-FG | MC-H-1 & MC-M-4: Reinstall displaced metal counterflashing in its original location. | 100 | LF | ||
| 0001-FH | MC-H-2: Replace deteriorated or missing metal counterflashing. | 40 | LF | ||
| 0001-FI | MC-H-3: Replace deteriorated or missing joint covers on metal coping cap. | 40 | LF | ||
| 0001-FJ | MC-M-1: Clean and patch holes in metal counterflashing and coat entire surface with corrosion resistant paint. | 500 | LF | ||
| 0001-FK | MC-M-2: Reseal failed joints in metal coping cap and reattach. | 40 | LF | ||
| 0001-FL | MC-M-3: Replace deteriorated sealant at counterflashing and reglet or termination bar. | 50 | LF | ||
| 0001-FM | MC-M-5: Add extension or replace counterflashing to cover top of base flashing. | 40 | LF | ||
| 0001-FN | PA-H-1 & PA-M-1: Replace distressed or poor quality patch with new BUR or MBR roof membrane and restore surfacing material where applicable. | 150 | SF | ||
| 0001-FO | PP-H-1: Remove all corrosion, prime and coat corroded pitch pan with corrosion resistant paint. | 10 | EA | ||
| 0001-FP | PP-H-2 & PP-H-4: Remove existing sealant and refill pitch pan with sealant and crown to assure moisture runoff. | 20 | EA | ||
| 0001-FQ | PP-H-3: Prime and apply stripping plies around pitch pans having deteriorated stripping. | 10 | EA | ||
| 0001-FR | RG-H-1: Repair breaks in the ridges and restore surfacing material where applicable. | 50 | LF | ||
| 0001-FS | RG-H-2: Remove broken ridges, repair BUR or MBR roof membrane and restore surfacing material where applicable. | 50 | LF | ||
| 0001-FT | RG-M-1 & RG-M-2: Restore surfacing material on ridges or seams on ridges which have exposed felts or membrane. | 50 | LF | ||
| 0001-FU | SL-H-1: Remove BUR or MBR roof membrane irregularities in area of slippage, fasten and repair membrane and restore surfacing material where applicable. | 50 | SF | ||
| 0001-FV | SP-H-1: Repair splits and restore surfacing material where applicable. | 50 | LF | ||
| 0001-FW | SR-H-1: On aggregate surfaced roofs, repair deteriorated ply sheet and restore surfacing material. | 50 | SF | ||
| 0001-FX | SR-H-2 & SR-H-3: On mineral surfaced-cap sheet roofs or smooth liquid applied surfacing, repair deteriorated roof membrane surfaces and restore surfacing material. | 1,000 | SF | ||
| 0001-FY | SR-H-4 & SR-M-4: On smooth liquid applied surfacing, repair roof membrane where alligator cracks extend down to reinforcement and recoat with asphalt. | 50 | SF | ||
| 0001-FZ | SR-H-5: On metal foil surfacing, remove loose foil, repair deteriorated membrane and apply appropriate coating. | 50 | SF | ||
| 0001-GA | SR-H-6: Remove walkway, repair damaged BUR or MBR roof membrane and replace walkway. | 50 | SF | ||
| 0001-GB | SR-M-1: On aggregate surfaced roofs, reinstall aggregate on exposed BUR membrane surfaces. | 50 | SF | ||
| 0001-GC | SR-M-2: On mineral surfaced-cap sheet roofs, restore mineral granules on exposed MBR membrane surfaces. | 150 | SF | ||
| 0001-GD | SR-M-3: On smooth liquid applied surfacing, coat exposed surfaces with asphalt emulsion. | 50 | SF | ||
| 0001-GE | SR-M-5: On metal foil surfacing, remove loose foil, clean exposed membrane and apply appropriate coating. | 50 | SF | ||
| 0001-GF | SR-M-6: On unsurfaced membranes, apply asphalt emulsion coating to deteriorated surface. | 50 | SF | ||
| 0001-GG | BC-H-1: Clean and prepare surface at hole in coated metal base flashing; patch with EPMD, PVC, or TPO stripping membrane and seal edges. | 50 | LF | ||
| 0001-GH | BC-H-2: Remove and replace joint cover at coated metal base flashing, cover with EPDM, PVC, or TPO stripping membrane and seal edges. | 50 | LF | ||
| 0001-GI | BC-H-3 & BC-M-3: Resecure top of coated metal base flashing to vertical surface, seal fasteners, and resecure counterflashing. | 100 | LF | ||
| 0001-GJ | BC-H-4: Remove and replace displaced section of coated metal base flashing. | 25 | LF | ||
| 0001-GK | BC-M-1: Remove unbonded stripping at joint cover of coated metal base flashing. Fasten joint cover and restrip to EPDM, PVC, or TPO roof membrane. | 25 | LF | ||
| 0001-GL | BC-M-2: Remove loose fasteners in coated metal base flashing, replace and seal. | 25 | LF | ||
| 0001-GM | BC-M-4: Replace embrittled joint stripping on coated metal base flashing and seal edges. | 50 | LF | ||
| 0001-GN | BC-M-5: Remove dissimilar repair of coated metal base flashing, patch with EPDM, PVC, or TPO stripping membrane and seal edges. | 25 | LF | ||
| 0001-GO | BF-H-1 & BF-H-2: Clean and prepare damaged or deteriorated surface of base flashing, overlay with EPDM, PVC, or TPO roof membrane patch, and seal edges. | 50 | LF | ||
| 0001-GP | BF-H-3: Seal top of base flashing with new termination bar. | 25 | LF | ||
| 0001-GQ | BF-H-4: Clean and prepare surface at open side lap of base flashing, overlay with EPDM, PVC, or TPO roof membrane patch and seal edges. | 50 | LF | ||
| 0001-GR | BF-H-5: Remove contaminate and affected base flashing, clean and prepare surface, overlay with EPDM, PVC, or TPO roof membrane patch and seal edges. | 50 | LF | ||
| 0001-GS | BF-M-1: Prepare surface of base flashing and install two coats of a compatible EPDM, PVC, or TPO roof membrane repair coating. | 25 | LF | ||
| 0001-GT | BF-M-2: Prepare surface of base flashing, peel back and reglue. Fasten top edge. | 25 | LF | ||
| 0001-GU | BF-M-3: Remove contaminated base flashing, prepare surface and install new base flashing. | 25 | LF | ||
| 0001-GV | BF-M-4: Remove dissimilar repair material on base flashing and replace with new base flashing material. | 25 | LF | ||
| 0001-GW | BF-M-5: Clean and prepare surface, reglue seam and seal edge. | 25 | LF | ||
| 0001-GX | BF-M-6: Replace deteriorated or missing termination bar for base flashing. | 25 | LF | ||
| 0001-GY | BF-M-7: Replace missing nailing strip for base flashing, clean and prepare surface and seal with 6" width EPDM, PVC, or TPO stripping membrane. | 25 | LF | ||
| 0001-GZ | DR-H-1 & DR-H-5: Replace damaged or deteriorated EPDM, PVC, or TPO stripping membrane at roof drain or scupper. | 8 | EA | ||
| 0001-HA | DR-H-2: Reseal stripping edge around roof drain and restrip with new EPDM, PVC, or TPO stripping membrane. | 4 | EA | ||
| 0001-HB | DR-H-3: Reinstall loose or replace damaged or missing roof drain clamping ring. | 4 | EA | ||
| 0001-HC | DR-H-4: Remove blockage which is clogging roof drain by whatever means are necessary to unclogg drain. | 4 | EA | ||
| 0001-HD | DR-H-6: Seal holes in stripping membrane by overlaying with new EPDM, PVC, or TPO roof membrane at roof drain or scupper. | 4 | EA | ||
| 0001-HE | DR-M-1: Clean and prepare crazed stripping around roof drain. Coat damaged stripping with two coats of a compatible EPDM, PVC, or TPO roof membrane repair coating. | 4 | EA | ||
| 0001-HF | DR-M-2: Clean and prepare stripping around roof drain and seal opening in stripping seam. | 4 | EA | ||
| 0001-HG | DR-M-3: Replace damaged or missing roof drain strainer. | 4 | EA | ||
| 0001-HH | DR-M-4: Remove all loose paint and corrosion on scupper, prime and coat with corrosion resistant paint. | 4 | EA | ||
| 0001-HI | DR-M-5: Remove 3' by 3' area of roof membrane at roof drain. Clean and prepare surface. Install new EPDM, PVC, or TPO roof membrane. | 4 | EA | ||
| 0001-HJ | DS-H-1: Clean and prepare open seam, reseal and overlay with 6" width of EPDM, PVC, or TPO roof membrane. | 50 | LF | ||
| 0001-HK | DS-H-2 & DS-M-2: Cut out wrinkles in seam, clean and prepare surface, and install EPDM, PVC, or TPO roof membrane patch. | 50 | LF | ||
| 0001-HL | DS-M-1: Clean and prepare defective seam, reseal lap and seal seam edge. | 50 | LF | ||
| 0001-HM | DV-H-1 & DV-H-2: Remove vegetation which is penetrating membrane or chemically damaged membrane. Clean and prepare surface and install EPDM, PVC, or TPO roof membrane patch over repair area. | 50 | SF | ||
| 0001-HN | DV-M-1 & DV-M-3: Remove dirt, vegetation, foreign material and objects from roof. | 100 | SF | ||
| 0001-HO | DV-M-2: Remove chemically damaged roof membrane, clean and prepare surface and install EPDM, PVC, or TPO roof membrane patch over repair area. | 50 | SF | ||
| 0001-HP | EM-H-1: Replace damaged EPDM, PVC, or TPO roof membrane stripping material at edge metal. | 50 | LF | ||
| 0001-HQ | EM-H-2: Replace damaged or deteriorated joint cover on edge material. Strip into EPDM, PVC, or TPO roof membrane. | 50 | LF | ||
| 0001-HR | EM-H-3: Replace section of damaged or deteriorated edge metal. Strip into EPDM, PVC, or TPO roof membrane. | 50 | LF | ||
| 0001-HS | EM-H-4 & EM-M-5: Remove damaged or deteriorated edge stripping, refasten edge metal, and restrip to EPDM, PVC, or TPO roof membrane. | 50 | LF | ||
| 0001-HT | EM-H-5 & EM-M-7: Clean interior of gutter to smooth metal. Line with waterproof membrane. | 50 | LF | ||
| 0001-HU | EM-H-6: Clean and prepare unbonded coated edge metal. Seal to EPDM, PVC, or TPO roof membrane. | 50 | LF | ||
| 0001-HV | EM-M-1: Remove stripping on edge metal and refasten joint cover. Install new EPDM, PVC, or TPO roof membrane stripping. | 50 | LF | ||
| 0001-HW | EM-M-2: Remove edge metal stripping which covers backed-out fasteners and replace with new fasteners. Install new EPDM, PVC, or TPO roof membrane stripping. | 50 | LF | ||
| 0001-HX | EM-M-3: Clean and prepare crazed stripping edge metal. Surface with two coats of a compatible EPDM, PVC, or TPO roof membrane repair coating. | 50 | LF | ||
| 0001-HY | EM-M-4: Clean and prepare unbonded stripping on edge metal, and seal opening in EPDM, PVC, or TPO stripping seam. | 25 | LF | ||
| 0001-HZ | EM-M-6: Replace embrittled joint stripping at edge metal. | 25 | LF | ||
| 0001-IA | EM-M-8: Clean and prepare unbonded coated edge metal. Seal to EPDM, PVC, or TPO roof membrane. | 25 | LF | ||
| 0001-IB | EQ-H-1: Repair damaged EPDM, PVC, or TPO roof membrane under improper equipment or piping support and install appropriate equipment or piping support device. | 4 | SF | ||
| 0001-IC | EQ-H-2 & EQ-M-2: Install/replace pitch pan at equipment support and flash into EPDM, PVC, or TPO roof membrane. | 8 | SF | ||
| 0001-ID | EQ-M-1: Replace improper equipment or piping support with support device allowing for movement of equipment or piping. | 4 | SF | ||
| 0001-IE | FP-H-1: Remove damaged stripping at flashed penetration and replace with new EPDM, PVC, or TPO roof membrane stripping. | 4 | LF | ||
| 0001-IF | FP-H-2 & FP-M-2: Clean and prepare area and seal opening in stripping seam of flashed penetration. | 8 | LF | ||
| 0001-IG | FP-H-3, FP-H-4, & FP-H-5: Replace damaged, imcompatible, or missing flashing sleeve. | 12 | LF | ||
| 0001-IH | FP-M-1: Clean and prepare crazed stripping of flashed penetration. Coat damaged stripping with two coats of a compatible EPDM, PVC, or TPO roof membrane repair coating. | 4 | LF | ||
| 0001-II | FP-M-3: Seal top of flashing sleeve around flashed penetration. | 4 | LF | ||
| 0001-IJ | FP-M-4: Replace damaged or missing clamping band on flashing sleeve. | 4 | LF | ||
| 0001-IK | FP-M-5: Replace damaged or missing rain collar or "umbrella" on flashed penetration. | 4 | LF | ||
| 0001-IL | FP-M-6: Remove corrosion, prime and coat metal of flashed penetration. | 4 | LF | ||
| 0001-IM | HL-H-1: Clean and prepare area and overlay with new EPDM, PVC, or TPO roof membrane. | 50 | SF | ||
| 0001-IN | HL-H-2: Remove loose fasteners, replace and install EPDM, PVC, or TPO roof membrane patch. | 50 | SF | ||
| 0001-IO | HL-M-1: Clean and prepare surface and coat damaged area of membrane with two coats of a compatible EPDM, PVC, or TPO roof membrane repair coating. | 50 | SF | ||
| 0001-IP | MC-H-1 & MC-H-5: Reinstall displaced metal counterflashing. | 50 | LF | ||
| 0001-IQ | MC-H-2: Replace deteriorated or missing metal counterflashing. | 25 | LF | ||
| 0001-IR | MC-H-3: Replace deteriorated or missing joint cover on metal counterflashing. | 25 | LF | ||
| 0001-IS | MC-H-4: Replace sealant at counterflashing and reglet or termination bar. | 25 | LF | ||
| 0001-IT | MC-H-6: Add extension to counterflashing to cover top of base flashing. | 25 | LF | ||
| 0001-IU | MC-M-1: Clean and patch holes in metal counterflashing and coat surface with corrosion resistant paint. | 25 | LF | ||
| 0001-IV | MC-M-2: Remove loose fasteners and install new fasteners. Reseal failed joints in metal counterflashing. | 25 | LF | ||
| 0001-IW | MC-M-3: Raise counterflashing, install EPDM, PVC, or TPO protection roof membrane material and reinstall counterflashing. | 25 | LF | ||
| 0001-IX | MD-H-1: Clean and prepare deteriorated membrane. Overlay with new EPDM, PVC, or TPO roof membrane. | 50 | SF | ||
| 0001-IY | MD-M-1: Clean and prepare eroded membrane and coat damaged area with two coats of a compatible EPDM, PVC, or TPO roof membrane repair coating. | 50 | SF | ||
| 0001-IZ | MS-M-1: Cut membrane over gaps in underlying insulation. Fill gaps, clean and prepare surface and overlay repair area with EPDM, PVC, or TPO roof membrane patch. | 50 | SF | ||
| 0001-JA | MS-M-2: Cut membrane, rearrange displaced insulation, clean and prepare surface and overlay repair area with EPDM, PVC, or TPO roof membrane patch. | 25 | SF | ||
| 0001-JB | MS-M-3: Cut membrane over underlying lump and remove foreign material. Clean and prepare surface and overlay repair area with EPDM, PVC, or TPO roof membrane patch. | 25 | SF | ||
| 0001-JC | PA-H-1 & PA-M-1: Remove distressed or imcompatible patch and repair with EPDM, PVC, or TPO roof membrane patch. | 100 | SF | ||
| 0001-JD | PD-M-1: Remove wrinkled membrane blocking drainage, clean and prepare surface and install EPDM, PVC, or TPO roof membrane patch. | 50 | SF | ||
| 0001-JE | PD-M-2: Cut membrane over underlying bowed insulation, remove insulation and replace. Clean and prepare surface and patch repair with new EPDM, PVC, or TPO roof membrane. | 50 | SF | ||
| 0001-JF | PP-H-1: Remove damaged stripping around pitch pan and install new EPDM, PVC, or TPO roof membrane stripping. | 4 | EA | ||
| 0001-JG | PP-H-2: Reseal stripping edge around pitch pan and restrip with new EPDM, PVC, or TPO roof membrane material. | 4 | EA | ||
| 0001-JH | PP-H-3 & PP-H-4: Remove deteriorated sealant and refill pitch pan with sealant and crown to assure moisture runoff. | 8 | EA | ||
| 0001-JI | PP-H-5 & PP-M-4: Replace pitch pan and flash into EPDM, PVC, or TPO roof membrane. | 8 | EA | ||
| 0001-JJ | PP-M-1: Clean and prepare crazed stripping around pitch pan. Coat damaged stripping with two coats of a compatible EPDM, PVC, or TPO roof membrane repair coating. | 4 | EA | ||
| 0001-JK | PP-M-2: Clean and prepare stripping around pitch pan and seal opening in stripping seam. | 4 | EA | ||
| 0001-JL | PP-M-3: Remove corrosion, prime and coat corroded pitch pan with corrosion resistant paint. | 4 | EA | ||
| 0001-JM | RG-H-1: Remove ridge. Clean and prepare area and overlay with 9" width of EPDM, PVC, or TPO roof membrane. | 50 | LF | ||
| 0001-JN | SC-M-1: Clean and prepare surface, coat with Hypalon and reembed sand surfacing. | 50 | SF | ||
| 0001-JO | SP-H-1: Clean and prepare area around split, overlay with 9" width of EPDM, PVC, or TPO roof membrane. | 50 | LF | ||
| 0001-JP | SS-H-1 & SS-M-1: Cut unadhered membrane, clean and prepare surface, readhere and install EPDM, PVC, or TPO roof membrane patch over repair area. | 100 | SF | ||
| 0001-JQ | SS-H-2 & SS-M-2: Remove loose fasteners, install new fasteners and install EPDM, PVC, or TPO roof membrane patch over repair area. | 100 | SF | ||
| 0001-JR | SS-H-3 & SS-M-3: Install screws and plates within loose area of membrane, and overlay repair with EPDM, PVC, or TPO roof membrane patch. | 100 | SF | ||
| 0001-JS | SS-H-4 & SS-M-4: Redistribute ballast in areas where ballasted EPDM, PVC, or TPO roof membrane is exposed. | 100 | SF | ||
| Items (1001-AA thru 1001-JS) Sub Total | |||||
| Year 2 | |||||
| CLIN | Technical Elements (TEs) | Quantity | UOM | Unit Price | Total |
| 1001-AA | Remove asphalt shingles, underlayment, edge metal, and flashings; up to 2 layers. | 1,500 | SQ | ||
| 1001-AB | Remove any type of batten seam, flat seam, or standing seam metal roofing and flashings. | 100 | SQ | ||
| 1001-AC | Remove BUR system including gravel, gravel stop or edge metal, flashings, and roof insulation. | 200 | SQ | ||
| 1001-AD | Remove MBR system including gravel stop or edge metal, flashings, and roof insulation. | 1,500 | SQ | ||
| 1001-AE | Remove mechanically fastened or fully adhered EPDM, PVC or TPO roofing including, gravel stop or edge metal, flashings, and roof insulation. | 100 | SQ | ||
| 1001-AF | Replace steel roof deck (match existing design and thickness). | 200 | SF | ||
| 1001-AG | Replace any dimension treated lumber. Note - Unit is BF "Board Foot". | 1,000 | BF | ||
| 1001-AH | Replace any dimension western red cedar wood trim. Note - Unit is BF "Board Foot". | 500 | BF | ||
| 1001-AI | Replace 1/2" CDX plywood roof deck | 200 | SF | ||
| 1001-AJ | Replace 5/8" CDX plywood roof deck. | 200 | SF | ||
| 1001-AK | Replace 3/4" CDX plywood roof deck. | 50 | SF | ||
| 1001-AL | Replace any dimension 1" thick nominal lumber roof deck. | 200 | SF | ||
| 1001-AM | Replace any dimension 2" thick nominal lumber roof deck. | 200 | SF | ||
| 1001-AN | Install ice dam protection membrane at eaves, valleys, vertical walls, dormers, and penetrations. | 250 | SQ | ||
| 1001-AO | Install architectural laminated asphalt shingles including synthetic felt underlayment, starter course, painted galvanized steel edge metal and base flashings, and hip and ridge caps. | 1,500 | SQ | ||
| 1001-AP | Install venting base sheet on insulating concrete or poured gypsum deck including all fasteners. | 100 | SQ | ||
| 1001-AQ | Install 1" thick R7.14 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 1001-AR | Install 1-1/2" thick R10.87 polyisocyanurate roof insulation board. | 500 | SQ | ||
| 1001-AS | Install 2" thick R14.29 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 1001-AT | Install 2-1/2" thick R16.67 polyisocyanurate roof insulation board. | 1,000 | SQ | ||
| 1001-AU | Install 3" thick R21.74 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 1001-AV | Install 3-1/2" thick R25 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 1001-AW | Install 4" thick R28.58 polyisocyanurate roof insulation board. | 50 | SQ | ||
| 1001-AX | Install polyisocyanurate tapered insulation board system. | 25,000 | BF | ||
| 1001-AY | Install 1/2" thick asphalt impregnated fiberboard cover board. | 1,500 | SQ | ||
| 1001-AZ | Install asphalt built-up 4-ply roofing system including all base flashings. | 10 | SQ | ||
| 1001-BA | Install 250 mil. (80 mil. base sheet and 170 mil. cap sheet) modified bitumen membrane roofing system including all base flashings. | 1,200 | SQ | ||
| 1001-BB | Install 60 mil. mechanically fastened EPDM roofing system including all base flashings. | 25 | SQ | ||
| 1001-BC | Install 60 mil. mechanically fastened PVC roofing system including all base flashings. | 25 | SQ | ||
| 1001-BD | Install 60 mil. mechanically fastened TPO roofing system including all base flashings. | 25 | SQ | ||
| 1001-BE | Install 60 mil. fully adhered EPDM roofing system including all base flashings. | 25 | SQ | ||
| 1001-BF | Install 60 mil. fully adhered PVC roofing system including all base flashings. | 25 | SQ | ||
| 1001-BG | Install 60 mil. fully adhered TPO roofing system including all base flashings. | 25 | SQ | ||
| 1001-BH | Install batten seam architectural copper roof system including high temperature self-adhering SBS modified bitumen and polyethylene metal roof underlayment. | 10 | SQ | ||
| 1001-BI | Install flat seam architectural copper roof system including high temperature self-adhering SBS modified bitumen and polyethylene metal roof underlayment. | 10 | SQ | ||
| 1001-BJ | Install standing seam architectural copper roof system including high temperature self-adhering SBS modified bitumen and polyethylene metal roof underlayment. | 10 | SQ | ||
| 1001-BK | Replace sealant in concrete or masonry wall control joint: remove deteriorated sealant and backer rod where present; replace new backer rod; replace new sealant; paint joint to match surrounding wall surfaces. | 100 | LF | ||
| 1001-BL | Replace aluminum flashing, .032", painted finish. | 1,000 | SF | ||
| 1001-BM | Replace copper flashing, 16 oz. | 200 | SF | ||
| 1001-BN | Replace EPDM, PVC, or TPO flashing, 60 mil. | 200 | SF | ||
| 1001-BO | Replace galvanized steel flashing, 26 ga., painted finish. | 1,000 | SF | ||
| 1001-BP | Replace lead flashing, 2.5 lb/sf. | 50 | SF | ||
| 1001-BQ | Replace stainless steel flashing, 28 ga. | 50 | SF | ||
| 1001-BR | Install 1-1/4" to 4" galvanized steel/neoprene pipe flashing (for asphalt shingle roofs). | 100 | EA | ||
| 1001-BS | Install 3" to 8" galvanized steel flue pipe "top hat" flashing (for asphalt shingle roofs). | 100 | EA | ||
| 1001-BT | Install 1-1/4" to 4" plumbing vent flashing (complete) in conjunction with roof Installment IAW NRCA Details BUR-18/18S, MB-18/18S, TP-18/18S/18A/18AS, or TS-18/18S/18A/18AS as appropriate. | 100 | EA | ||
| 1001-BU | Install roof drain flashing (complete) in conjunction with roof Installment IAW NRCA Details BUR-20/20S, MB-20/20S/20A/20AS, TP-20/20S, or TS-20/20S as appropriate. | 50 | EA | ||
| 1001-BV | Install 3" to 8" diameter flue pipe flashing IAW NRCA Details BUR-17/17S/17A/17AS, MB-17/17S/17A/17AS, TP-17/17S, or TS-17/17S as appropriate. | 25 | EA | ||
| 1001-BW | Replace aluminum reglet; .025", painted finish. | 50 | LF | ||
| 1001-BX | Replace copper reglet, 10 oz. | 50 | LF | ||
| 1001-BY | Replace galvanized steel reglet; 30 ga., painted finish. | 50 | LF | ||
| 1001-BZ | Replace aluminum termination bar; .125" x 1.0" or equivalent, painted finish. | 50 | LF | ||
| 1001-CA | Replace galvanized steel termination bar; .125" x 1.0" or equivalent, painted finish. | 25 | LF | ||
| 1001-CB | Replace galvanized steel roof louver, painted finish (for asphalt shingle roofs). Acceptable products include Air Vent, Inc. Airhawk RVGL-50 or RVG-55 and Lomanco, Inc. 750-G. | 100 | EA | ||
| 1001-CC | Replace galvanized steel ridge vent, painted finish (for asphalt shingle roofs). Acceptable products include ShingleVent II Shingle Over Ridge Vent SHFV203 and Lomanco, Inc. Shingle Over Ridge Vent LOR9-4. | 100 | LF | ||
| 1001-CD | Replace aluminum splash pan (fabricated IAW SMACNA Figure 1-36, approximately 3.3 sf), .040" thick, painted finish. | 5 | EA | ||
| 1001-CE | Replace copper splash pan (fabricated IAW SMACNA Figure 1-36, approximately 3.3 sf), 16 oz. | 5 | EA | ||
| 1001-CF | Replace galvanized splash pan (fabricated IAW SMACNA Figure 1-36, approximately 3.3 sf), 26 ga., painted finish. | 5 | EA | ||
| 1001-CG | Replace aluminum gutter, any box style, .032", 4" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 50 | LF | ||
| 1001-CH | Replace aluminum gutter, any box style, .032", 5" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 200 | LF | ||
| 1001-CI | Replace aluminum gutter, any box style, .032", 6" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 200 | LF | ||
| 1001-CJ | Replace copper gutter, style K or half round, 16 oz., 4" wide, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 50 | LF | ||
| 1001-CK | Replace copper gutter, style K or half round, 16 oz., 5" wide, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 100 | LF | ||
| 1001-CL | Replace copper gutter, style K or half round, 16 oz., 6" wide, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 50 | LF | ||
| 1001-CM | Replace galvanized steel gutter, any box style, 26 ga., 4" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 50 | LF | ||
| 1001-CN | Replace galvanized steel gutter, any box style, 26 ga., 5" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 200 | LF | ||
| 1001-CO | Replace galvanized steel gutter, any box style, 26 ga., 6" wide, painted finish, including gutter end caps, miters, and brackets and spacers 2'-8" o.c. | 200 | LF | ||
| 1001-CP | Replace copper gutter brass or stainless steel spring retaining clip only. | 100 | EA | ||
| 1001-CQ | Replace aluminum gutter lap or butt type expansion joint, any style or size, painted finish. | 40 | EA | ||
| 1001-CR | Replace copper gutter lap or butt type expansion joint, any style or size. | 10 | EA | ||
| 1001-CS | Replace galvanized steel gutter lap or butt type expansion joint, any style or size, painted finish. | 5 | EA | ||
| 1001-CT | Replace aluminum downspout or elbow, .025", 3" round or 2" by 3", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 100 | LF | ||
| 1001-CU | Replace aluminum downspout or elbow, .025", 4" round or 3" by 4", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 200 | LF | ||
| 1001-CV | Replace aluminum downspout or elbow, .025", 5" round or 4" by 5", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 200 | LF | ||
| 1001-CW | Replace copper downspout or elbow, 16 oz., 3" round or 2" by 3", including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 50 | LF | ||
| 1001-CX | Replace copper downspout or elbow, 16 oz., 4" round or 3" by 4", including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 100 | LF | ||
| 1001-CY | Replace copper downspout or elbow, 16 oz., 5" round or 4" by 5", including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 50 | LF | ||
| 1001-CZ | Replace galvanized steel downspout or elbow, 26 ga., 3" round or 2" by 3", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 100 | LF | ||
| 1001-DA | Replace galvanized steel downspout or elbow, 26 ga., 4" round or 3" by 4", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 200 | LF | ||
| 1001-DB | Replace galvanized steel downspout or elbow, 26 ga., 5" round or 4" by 5", painted finish, including gutter outlets and downspout brackets 10’-0” o.c. (1 lf of downspout is equivalent to 1 elbow). | 200 | LF | ||
| 1001-DC | Reinstall/rehang/realign existing gutter or downspout including Installment of damaged or missing hangers and spring retaining clips. | 100 | LF | ||
| 1001-DD | Replace precast concrete splashblock. | 50 | EA | ||
| 1001-DE | Replace pitch pan during roof replacement. | 50 | EA | ||
| 1001-DF | Replace neoprene and metal flanges expansion joint or roof to wall joint. | 50 | LF | ||
| 1001-DG | Replace all metal expansion joint or roof to wall joint. | 100 | LF | ||
| 1001-DH | Extract and rethread broken or damaged roof drain bolts and install new stainless steel bolts. | 50 | EA | ||
| 1001-DI | Replace 2" to 4" cast-iron body roof drain or floor scupper including dome. | 6 | EA | ||
| 1001-DJ | Replace fixed height roller natural gas or HVAC pipe or electrical conduit support; 2-1/2" min. standoff, up to 3.75" dia. pipe. | 25 | EA | ||
| 1001-DK | Replace adjustable height roller gas or HVAC pipe or electrical conduit support; 2-1/2" min. standoff, up to 3.75" dia. pipe. | 25 | EA | ||
| 1001-DL | Prepare, prime, and paint concrete, masonry, lumber, plywood, sheet metal, roof accessories, or roof specialties. | 1,000 | SF | ||
| 1001-DM | BF-H-1: Repair damaged base flashing by overlaying each localized defect with new base flashing. | 200 | LF | ||
| 1001-DN | BF-H-2: Install extension of counterflashing over exposed top termination of base flashing. Install new BUR or MBR roof membrane at open side laps in base flashing. | 150 | LF | ||
| 1001-DO | BF-H-3: Remove contaminate and affected base flashing material. Prime surface and install new base flashing. | 50 | LF | ||
| 1001-DP | BF-H-4: Prime surface and install new base flashing. | 50 | LF | ||
| 1001-DQ | BF-M-1: Cut and resecure unbonded base flashing, mechanically fasten slipped flashing and coat with heavy bodied asphalt coating. | 500 | LF | ||
| 1001-DR | BF-M-2: Prime exposed and deteriorated base flashing and coat with heavy bodied asphalt coating. | 150 | LF | ||
| 1001-DS | BF-M-3: Remove contaminates from undamaged base flashing, prime and coat areas with heavy bodied asphalt coating. | 50 | LF | ||
| 1001-DT | BF-M-4: Remove temporary repair material from base flashing, reinforce patch as necessary and coat with heavy bodied asphalt coating. | 50 | LF | ||
| 1001-DU | BL-H-1 & BL-H-2: Remove broken blister, repair surface and restore surfacing material where applicable. | 50 | SF | ||
| 1001-DV | BL-M-1 & BL-M-2: Restore surfacing material on blister which has exposed BUR or MBR roof membrane. | 150 | SF | ||
| 1001-DW | DR-H-1: Remove deteriorated stripping around roof drain or scupper, clean surface and prime. Replace stripping and restore surfacing material where applicable. | 10 | EA | ||
| 1001-DX | DR-H-2: Reinstall loose or replace damaged or missing roof drain clamping ring. | 25 | EA | ||
| 1001-DY | DR-H-3: Remove blockage which is clogging roof drain by whatever means are necessary to unclogg drain. | 10 | EA | ||
| 1001-DZ | DR-H-4: Replace damaged scupper. | 10 | EA | ||
| 1001-EA | DR-M-1: Prime and coat surface of roof drain having exposed stripping with heavy bodied asphalt coating. | 10 | EA | ||
| 1001-EB | DR-M-2: Replace damaged or missing roof drain strainer. | 10 | EA | ||
| 1001-EC | DR-M-3: Remove all loose paint and corrosion around distressed scupper, prime and coat with corrosion resistant paint. | 10 | EA | ||
| 1001-ED | DR-M-4: Remove clamping ring and stripping plies around drain. Clean surface and prime. Install new stripping plies. | 10 | EA | ||
| 1001-EE | DS-H-1: Clean and prepare open seam, reseal and overlay with 6" width of BUR or MBR roof membrane. | 20 | LF | ||
| 1001-EF | DS-H-2 & DS-M-2: Cut out fishmouths, wrinkles, blistering or ridging in seam, clean and prepare surface and install BUR or MBR roof membrane patch. | 20 | LF | ||
| 1001-EG | DS-M-1: Clean and prepare defective seam, reseal lap. | 20 | LF | ||
| 1001-EH | DS-M-3: Restore surfacing material on unsurfaced BUR or MBR roof membrane along seam. | 20 | LF | ||
| 1001-EI | DV-H-1 & DV-H-2: Remove contaminate or vegetation penetrating membrane, repair BUR or MBR roof membrane and restore surfacing material where applicable. | 50 | SF | ||
| 1001-EJ | DV-M-1 & DV-M-3: Remove dirt, vegetation, foreign material and objects from roof. | 500 | SF | ||
| 1001-EK | DV-M-2: Remove contaminate from undamaged BUR or MBR roof membrane and restore surfacing material where applicable. | 100 | SF | ||
| 1001-EL | EM-H-1, EM-H-2, & EM-H-3: Prime and apply stripping ply over edge metal flange in area of loose or missing stripping plies, or over edge metal joints which are split or where damaged has occurred. | 500 | LF | ||
| 1001-EM | EM-H-4: Replace section of damaged edge metal. | 50 | LF | ||
| 1001-EN | EM-H-5: Refasten loose edge metal flange into solid support. Replace stripping and surfacing material where applicable. | 250 | LF | ||
| 1001-EO | EM-H-6: Clean interior of gutter to smooth bare metal and line gutter with waterproof membrane. | 50 | LF | ||
| 1001-EP | EM-M-2: Restore surfacing over exposed stripping plies at edge metal. | 50 | LF | ||
| 1001-EQ | EM-M-3: Remove loose nails in embedded edge metal and renail into solid support. Install new BUR or MBR roof membrane over new fasteners. | 50 | LF | ||
| 1001-ER | EM-M-4: Remove surface corrosion, prime and coat edge metal with corrosion resistant paint. | 50 | LF | ||
| 1001-ES | EM-M-5: Renail loose edge metal flange into solid support. Install new BUR or MBR roof membrane (stripping plies) over new fasteners. | 150 | LF | ||
| 1001-ET | EQ-H-1: Repair damaged BUR or MBR roof membrane under improper equipment or piping support and install appropriate equipment or piping support device. | 10 | SF | ||
| 1001-EU | EQ-H-2 & EQ-M-2: Install/replace pitch pan at equipment support and flash into BUR or MBR roof membrane. | 10 | SF | ||
| 1001-EV | EQ-M-1: Replace improper equipment or piping support with support device allowing for movement of equipment or piping. | 20 | SF | ||
| 1001-EW | FP-H-1: Clean, prime and seal unflashed flanges on flashed penetration. | 10 | LF | ||
| 1001-EX | FP-H-2 & FP-H-3: Replace damaged or missing flashing sleeve or curb on flashed penetration. (1 Flashing Sleeve = 1 LF.) | 10 | LF | ||
| 1001-EY | FP-H-4: Prime surface and apply BUR or MBR roof membrane (stripping plies) around unsealed flashed penetration. | 20 | LF | ||
| 1001-EZ | FP-H-5: Prime and apply BUR or MBR roof membrane (stripping plies) over flashing sleeve where damage has occurred. | 20 | LF | ||
| 1001-FA | FP-M-1: Restore surfacing over exposed stripping plies around flashed penetration. | 10 | LF | ||
| 1001-FB | FP-M-2: Seal top of flashing sleeve around flashed penetration. (1 Flashing Sleeve = 1 LF.) | 10 | LF | ||
| 1001-FC | FP-M-3: Replace a damaged or missing rain collar or "umbrella" on flashed penetration. (1 Rain Collar or "Umbrella" = 1 LF.) | 10 | LF | ||
| 1001-FD | FP-M-4: Remove surface corrosion, prime and coat with corrosion resistant material. | 10 | LF | ||
| 1001-FE | HL-H-1: Repair holes in BUR or MBR roof membrane and restore surfacing where applicable. | 50 | SF | ||
| 1001-FF | IN-H-1: Remove BUR or MBR roof membrane, remove wet insulation, allow area to dry, install new insulation and BUR or MBR roof membrane to match existing. | 100 | SF | ||
| 1001-FG | MC-H-1 & MC-M-4: Reinstall displaced metal counterflashing in its original location. | 100 | LF | ||
| 1001-FH | MC-H-2: Replace deteriorated or missing metal counterflashing. | 40 | LF | ||
| 1001-FI | MC-H-3: Replace deteriorated or missing joint covers on metal coping cap. | 40 | LF | ||
| 1001-FJ | MC-M-1: Clean and patch holes in metal counterflashing and coat entire surface with corrosion resistant paint. | 500 | LF | ||
| 1001-FK | MC-M-2: Reseal failed joints in metal coping cap and reattach. | 40 | LF | ||
| 1001-FL | MC-M-3: Replace deteriorated sealant at counterflashing and reglet or termination bar. | 50 | LF | ||
| 1001-FM | MC-M-5: Add extension or replace counterflashing to cover top of base flashing. | 40 | LF | ||
| 1001-FN | PA-H-1 & PA-M-1: Replace distressed or poor quality patch with new BUR or MBR roof membrane and restore surfacing material where applicable. | 150 | SF | ||
| 1001-FO | PP-H-1: Remove all corrosion, prime and coat corroded pitch pan with corrosion resistant paint. | 10 | EA | ||
| 1001-FP | PP-H-2 & PP-H-4: Remove existing sealant and refill pitch pan with sealant and crown to assure moisture runoff. | 20 | EA | ||
| 1001-FQ | PP-H-3: Prime and apply stripping plies around pitch pans having deteriorated stripping. | 10 | EA | ||
| 1001-FR | RG-H-1: Repair breaks in the ridges and restore surfacing material where applicable. | 50 | LF | ||
| 1001-FS | RG-H-2: Remove broken ridges, repair BUR or MBR roof membrane and restore surfacing material where applicable. | 50 | LF | ||
| 1001-FT | RG-M-1 & RG-M-2: Restore surfacing material on ridges or seams on ridges which have exposed felts or membrane. | 50 | LF | ||
| 1001-FU | SL-H-1: Remove BUR or MBR roof membrane irregularities in area of slippage, fasten and repair membrane and restore surfacing material where applicable. | 50 | SF | ||
| 1001-FV | SP-H-1: Repair splits and restore surfacing material where applicable. | 50 | LF | ||
| 1001-FW | SR-H-1: On aggregate surfaced roofs, repair deteriorated ply sheet and restore surfacing material. | 50 | SF | ||
| 1001-FX | SR-H-2 & SR-H-3: On mineral surfaced-cap sheet roofs or smooth liquid applied surfacing, repair deteriorated roof membrane surfaces and restore surfacing material. | 1,000 | SF | ||
| 1001-FY | SR-H-4 & SR-M-4: On smooth liquid applied surfacing, repair roof membrane where alligator cracks extend down to reinforcement and recoat with asphalt. | 50 | SF | ||
| 1001-FZ | SR-H-5: On metal foil surfacing, remove loose foil, repair deteriorated membrane and apply appropriate coating. | 50 | SF |