AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Sanitary Sew er Flow Diversion at Fort Riley, KS
The purpose of this modification is to:
1) Add clause SCR_DB_014 and clause SCR_DB_015 under Section 00 73 00
2) Update the Building Wage Rates under Section 00 73 46
3) Change the bid opening from 19 April 2016 1:00 PM CST to 19 April 2016 at 2:00 PM CST
SEE CONTINUATION PAGE FOR FURHTER DETAILS
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-16-B-4000
X 9B. DATED (SEE ITEM 11)
18-Mar-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Apr-2016
CODE
USACE, KANSAS CITY +
FEDERAL BUILDING CT-M, RM 647 601 EAST 12TH S
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ-16-B-4000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CONTINUATION PAGE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The Solicitation is amended as follows:
Deleted text is shown with a strikethrough. Added text is shown with underline.
1. Section 00 73 00 – Special Contract Requirements
Clauses Incorporated by Full Text
Add Clause SCR_DB_014 and SCR_DB_015
SCR_DB_014 Government-Furnished Specifications, Drawings, Surveys, and Specifications in the Request for Proposal (JUL 2002)
This is to clarify DFARS 252.236-7001, Contract Drawings and Specifications, refers to any Government-furnished design or design criteria included in the Request for Proposal (RFP).
(End)
SCR_DB_015 Contractor's Role During Design Process (JUN 1998)
The contractor's construction management key personnel shall be actively involved during the design process to effectively integrate the design and construction requirements of this contract. In addition to the typical required construction activities, the Contractor's involvement includes, but is not limited to actions such as: integrating the design schedule into the Master Schedule to maximize the effectiveness of fast-tracking design and construction (within the limits allowed in the contract), ensuring constructability and economy of the design, integrating the shop drawing and installation drawing process into the design, executing the material and equipment acquisition programs to meet critical schedules, effectively interfacing the construction QC program with the design QC program, and maintaining and providing the design team with accurate, up-to-date redline and as-built documentation. The Contractor shall require and manage the active involvement of key trade subcontractors in the above activities.
(End)
2. Section 00 73 46 – Wage Determination Schedule
Building Construction Wage Rates have been updated to General Decsion Number: KS160054 04/01/2016 KS54.
See Attachement 1 for current wage rates.
3. The proposal due date has been extended to 19 April 2016 at 2:00 PM CST.
4. Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided.
Failure to acknowledge all amendments may cause rejection of the bid.
5. All other terms and conditions remain unchanged and in full force.
ATTACHMENT 1 – UPDATE TO BUILDING WAGE RATE KS160054 04/01/2016 KS54
General Decision Number: KS160054 04/01/2016 KS54
Superseded General Decision Number: KS20150054
State: Kansas
Construction Type: Building
County: Geary County in Kansas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/29/2016 2 03/04/2016 3 04/01/2016
ASBE0015-001 01/01/2014
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (MECHANICAL (Duct, Pipe & Mechanical System Insulation)).....................$ 18.66 3.34
BRKS0015-011 06/01/2014
Rates Fringes
TILE SETTER......................$ 33.76 13.16
BRKS0015-013 04/01/2015
Rates Fringes
BRICKLAYER.......................$ 20.70 9.11
BRKS0015-014 06/01/2015
Rates Fringes
TILE FINISHER....................$ 16.70 7.55
CARP0918-002 05/01/2015
Rates Fringes
CARPENTER (Drywall Hanging Only)............................$ 17.28 9.48
ELEV0012-004 01/01/2013
Rates Fringes
ELEVATOR MECHANIC................$ 42.34 25.185+a+b
a. VACATION PAY: 6% for 6 months to 5 years service; 8% with 5 or more years of service.
b. PAID HOLIDAYS: Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Friday after, and Christmas Day.
ENGI0101-041 04/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR:
Oiler.......................$ 31.49 15.51 Paver (Asphalt, Aggregate, and Concrete)...............$ 37.85 15.51
IRON0010-033 04/01/2015
Rates Fringes
IRONWORKER (Ornamental and Structural)......................$ 31.25 27.60
* LABO1290-013 04/01/2016
Rates Fringes
LABORER
Mason Tender - Brick........$ 27.55 15.40
PAIN2012-009 05/01/2012
Rates Fringes
PAINTER (Spray)..................$ 22.93 11.51
SFKS0669-002 01/01/2016
Rates Fringes
SPRINKLER FITTER (Fire Sprinkler).......................$ 30.87 17.90
SHEE0002-011 07/01/2015
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 39.85 20.11
TEAM0541-010 04/01/2014
Rates Fringes
TRUCK DRIVER (Lowboy Truck)......$ 30.71 13.20
TEAM0541-011 04/01/2014
Rates Fringes
TRUCK DRIVER (Semi-Trailer Truck)...........................$ 31.14 13.01
* UAVG-KS-0003 01/01/2016
Rates Fringes
SHEET METAL WORKER (HVAC Unit Installation Only)...............$ 33.21 15.43
SUKS2015-018 07/08/2015
Rates Fringes
CARPENTER (Form Work Only).......$ 17.58 0.00
CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 18.00 5.18
CEMENT MASON/CONCRETE FINISHER...$ 20.26 0.00
ELECTRICIAN......................$ 29.02 10.27
IRONWORKER, REINFORCING..........$ 27.50 21.45
LABORER: Common or General......$ 15.75 7.34
LABORER: Mason Tender - Cement/Concrete..................$ 17.86 1.01
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 32.88 12.80
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 27.78 12.58
OPERATOR: Bulldozer.............$ 33.12 13.96
OPERATOR: Crane.................$ 33.19 14.16
OPERATOR: Forklift..............$ 37.92 0.00
OPERATOR: Grader/Blade..........$ 28.79 12.73
OPERATOR: Loader................$ 26.30 11.62
OPERATOR: Roller................$ 33.78 13.64
PAINTER (Brush and Roller).......$ 22.07 0.97
PIPEFITTER.......................$ 30.51 13.54
PLUMBER..........................$ 32.35 13.94
ROOFER...........................$ 22.87 6.84
SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation.....................$ 29.93 13.32
TRUCK DRIVER: Dump (All Types)...$ 17.05 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION