A.07.23_Solicitation_W912DQ-15-R-1056.pdf
PDF 277 KB Posted
- Attached to
- Harry Truman Lake Boundary Maintenance
- Solicitation number
- W912DQ-15-R-1056
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.01.13_Drawings_2016_Boundary_Contract_(3).jpg | JPG image | |
| A.02.11.03_-_Experience_Form_-_20150821.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DQ-15-R-1056 25-Aug-2015
b. TELEPHONE NUMBER
816-389-3500
8. OFFER DUE DATE/LOCAL TIME
03:00 PM 10 Sep 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DQ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
HILARY O WINANS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 966475 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
USACE, KANSAS CITY +
MARGIE A SLAVENS
HARRY S TRUMAN PROJECT OFFICE 15968 TRUMAN R
WARSAW MO 65355
TEL: 816-389-3606 FAX: 660-438-7815
816-389-2029/2030FAX:
TEL: 816-389-3812 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
7,500,000
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF60
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912DQ-15-R-1056
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job OF-HT Boundary Maintenance BASE
FFP
The services to be furnished under this CLIN shall consist of a post-award conference, reports, meetings, daily worksheets, etc., and furnishing all labor, equipment, supplies, and supervision, as necessary to accomplish the clearing of and application of chemical to the Harry S. Truman Project boundary, according to the attached performance work statement (PWS) and elsewhere in the contract.
Period of Performance: 1Oct2015 through 31March2016 FOB: Destination
NET AMT
0002 1 Job OPTION OF-HT Boundary Maintenance OPTION 1
FFP
The services to be furnished under this CLIN shall consist of a post-award conference, reports, meetings, daily worksheets, etc., and furnishing all labor, equipment, supplies, and supervision, as necessary to accomplish the clearing of and application of chemical to the Harry S. Truman Project boundary, according to the attached performance work statement (PWS) and elsewhere in the contract.
Period of Performance: 1Apr2016 through 31March2017
0003 1 Job OPTION OF-HT Boundary Maintenance OPTION 2
FFP
The services to be furnished under this CLIN shall consist of a post-award conference, reports, meetings, daily worksheets, etc., and furnishing all labor, equipment, supplies, and supervision, as necessary to accomplish the clearing of and application of chemical to the Harry S. Truman Project boundary, according to the attached performance work statement (PWS) and elsewhere in the contract.
Period of Performance: 1Apr2017 through 31March2018
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
SECTION C
HARRY S. TRUMAN DAM AND RESERVOIR
Performance Work Statement
C.1 GENERAL INFORMATION.
C.1.1 Background. Truman Reservoir is the largest flood control reservoir in Missouri, with a storage capacity of more than 5 million acre-feet (an acre-foot = 325,000 gal.).
Recreational development is extensive. Twenty parks and access areas, managed by or leased from the U.S. Army Corps of Engineers, are conveniently located around the reservoir. Park areas at Truman Reservoir offer a wide variety of recreation facilities including boat launching ramps, campgrounds, full service marinas, picnic areas, sand swimming beaches, and a regional visitor center. Many routine maintenance items are contracted to the private sector. Mowing, refuse collection, and facility cleanup are just a few of the activities that are performed by private contractors for the Corps.
C.1.2 Scope of Work. The services to be furnished under this procurement shall consist of a post-award conference, reports, meetings, daily worksheets, etc., and furnishing all labor, equipment, supplies, and supervision, as necessary to accomplish the clearing of and application of chemical to the Harry S. Truman Project boundary, according to the attached performance work statement (PWS) and elsewhere in the contract. The Contractor shall perform tasks listed in Section C.5. Acceptable performance standards and current regulations are provided for each task. The Contractor shall monitor performance and ensure compliance in accordance with the terms and conditions.
All quantities are estimated and may be varied + or - 10% at the discretion of the COR.
Areas subject to service shall be as follows:
BOUNDARY CLEARING
AND HERBICIDE APPLICATION MAXIMUM POSTS
YEAR MILEAGE TO REPLACE
FY 2016 Base Contract 35.95 37 FY 2016 Option I 39.36 39 FY 2017 Option II 37.25 37
The location and vicinity map showing the various contract boundary clearing mileage is for the purpose of offering on the solicitation. Detailed survey maps are available and can be reviewed at the Harry S. Truman Project Office, and will be furnished to the successful bidder.
C.1.3 Dates of Performance.
C.1.3.1 Period of Contract. Services shall become effective (start) on October 1, 2015, and shall continue until the Contractor has cleared and sprayed the boundary mileage required for the base contract and has completed all the contract requirements, or until 31 March 2016, whichever comes first.
C.1.3.2 Options. Dates for renewal options, if exercised, will be from 1 April through 31
March.
C.1.3.3 Work within Timeframes. All work shall be accomplished within the timeframes specified. Services rendered outside the time periods specified will not be compensated unless specifically approved, in writing, by the Contracting Officer or his/her authorized representative.
C.1.3.4 Mileage. See the table in paragraph C.1.2 for boundary mileage requirements.
C.1.3.5 Period for Exercise of Options. Pursuant to FAR Clause 52.232-19, Availability of
Funds for the Next Fiscal Year, the Government shall have a period of 60 days from the ending date of the initial contract period, or any extension thereto, to exercise the option to extend the term of the contract. This period is not conditioned upon the giving of any notice to extend. A modification exercising the option to extend the contract will be issued, as soon funds are made available to the Contracting Officer.
C.1.4 Hours of Operation. The contractor shall not begin performance before sunrise and shall complete performance no later than sunset of any scheduled workday.
C.1.5 Post-Award Conference. After award, but prior to commencement of work, the
Contractor shall contact the Contracting Officer’s Representative, to arrange a mutually agreeable time to meet at the Truman Project Office to review the requirements and details of the work.
C.1.6 Documents and Correspondence. After award, all documents and related correspondence shall be routed through the Contracting Officer's Representative (COR) at the Project Office.
C.1.7 Legal Compliance.
C.1.7.1 Compliance. It shall be the responsibility of the Contractor to comply with all Federal, State, and local laws and regulations governing health, safety, training, operational, and licensing requirements as may be applicable and required for application of commercial pesticides (including OSHA Hazard Communication Standard 29CFR 1910.1200).
C.1.7.2 License. The Contractor’s employee(s) applying chemical under this contract shall possess a Commercial Applicator’s License acceptable to the State of Missouri; or in lieu thereof (unless otherwise prohibited), applicator may be unlicensed, if he or she is closely supervised by an on-site supervisor who is licensed according to the above requirements.
C.1.8 Required Submissions. The Contractor shall submit the following documents to the
COR at the Project Office, proof of proper licensing and proof of insurance, to be delivered no later than the start of the contract period.
C.1.9 Required Insurance. With reference to FAR Clause 52.228-0005, Insurance – Work on a Government Installation, the Contractor shall provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the below. Before commencing work under this contract, the Contractor shall present to the Contracting Officer proof of the required insurance.
REQUIRED INSURANCE SCHEDULE
TYPE AMOUNT
Worker's Compensation Coverage complying with applicable State Statute Comprehensive General Liability Minimum limits of $500,000.00 per occurrence Employer’s Liability Minimum amount of $100,000 Commercial Automobile Liability Minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage
NOTE: Coverages required above are minimums. If higher limits of coverage are required by State Statute, the Contractor shall be responsible for obtaining such additional coverage. Information regarding State requirements may be obtained by contacting: Missouri Division of Insurance, 573-751-3365.
C.1.10 Quality Control.
C.1.10.1 QC Plan. The Contractor shall develop a Quality Control Plan designed to demonstrate how the Contractor will meet the needs of the project. The Quality Control Plan shall contain a list of chemicals and supplies to be used in performing the contract duties. The Plan shall identify the contractor furnished equipment and state how the work will be accomplished, i.e. pressure water pump etc. The Plan shall document how the Contractor will identify and correct performance shortfalls. Complete records of all inspection work performed by the contractor must be maintained and made available to the government during contract performance.
C.1.10.2 Contractor Representative. The services required by this contract shall be performed the Contractor may designate, in writing, a responsible on-site representative of each work crew who shall serve as the contact for matters involving quality and performance or nonperformance of the required work assigned to that crew. In the absence of a designated on-site representative, or if the designated on-site representative is not present, the Contractor warrants that any and all members of each work crew are qualified and fully competent to insure that the required work is performed in strict accordance with the contract specifications. The government reserves the right to discuss contract matters with any employee on-site, in the absence of the on-site representative.
C.1.10.3 Contractor Telephone. The Contractor shall furnish to the Contracting
Officers Representative, a telephone number attended during normal business hours (8 a.m. - 4:30 p.m.) to which calls concerning the ordering of services, performance, or other contractual matters can be placed. For the purposes of time and date, a message will be deemed to be delivered to the Contractor at such time as it is delivered to the telephone number provided by the Contractor.
C.1.10.4 Contractor Worksheets. As work is completed each day, the Contractor, or his/her authorized representative at the job, shall enter the location, date, weather conditions, amount and type of work completed, chemicals used, and any other pertinent information, onto a daily work sheet. Completed and signed worksheets shall be delivered weekly, or as otherwise directed by the COR, to the COR at the Truman Project Office. Contractor Daily Worksheet forms (See Section C.6) shall be furnished by the Government.
C.1.10.5 Encroachments. The Contractor shall identify and document, on the daily worksheet, all encroachments on the Government boundary. These encroachments consist of all unauthorized uses of Government property, including, but not limited to, placement of personal property or structures, roads, trails, mowing, clearing, fencing, haying, or grazing.
C.1.10.6 Deficiencies and Equipment Breakdown. Failure to correct noted deficiencies may result in withholding payment for the work not performed. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified.
It shall be the responsibility of the Contractor to assure that he/she has, or can obtain on short notice, sufficient backup equipment to continue the services, as specified, without interruption in the event of mechanical failure of his/her primary equipment.
C.1.10.7 Performance Requirements Summary. Refer to the following table:
Item PWS Para Performance Standard/AQL (Acceptable Quality Level)
Surveillance Method
Maintain Improved Grounds
C.5.1 Clear all woody vegetation, per the requirements of the PWS.
100% Inspection or Random Inspection
Maintain Improved Grounds
C.5.1.2 Apply chemical to cut stubs, stumps and stems per the requirement of the
PWS
100% Inspection or Random Inspection
Maintain Improved Grounds
C.5.1.4 Straighten and/or reset all damaged boundary reference posts per the requirement of the PWS
100% Inspection or Random Inspection
Maintain Improved Grounds
C.5.1.6 Clear and spray all vegetation within a
3 foot radius of all offset posts 100% Inspection or Random Inspection
Maintain Improved Grounds
C.5.1.7 Report, in writing any encroachments onto government property.
100% Inspection or Random Inspection
Annual Coordination
Meeting C.1.5 No more than one (1) error per year.
Complete prior to start of work for the contract award and each option exercise period.
Quality Control Plan
C.1.10
No more than one (1) error per year.
Complete prior to start of work.
C.1.11 Quality Assurance.
C.1.11.1 Quality Assurance Surveillance Plan. A Quality Assurance Surveillance Plan
(QASP) will be used during the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government develops the QASP and the Project Office administers the Plan through Quality Assurance Evaluators (QAEs).
C.1.11.2 Monitoring Performance. The government will monitor the Contractor’s performance under this contract using quality assurance procedures developed by the Government. Typical procedures might include periodic sampling, checklists and customer complaints. This should not be considered an exhaustive list. A primary objective of Government Quality Assurance will be to determine the effectiveness of the Contractor’s quality control system.
C.1.11.3 Inspection. The government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government shall perform inspections and tests in a manner that shall not unduly delay the work.
C.1.11.4 Defects. If any of the services do not conform to contract requirements, the government may require the contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
C.1.11.5 Missed Areas. In the event that an area or work within an area is missed, the
Contractor shall return and re-service the area or affected work immediately upon receipt of such notice by the Contracting Officer, or his/her authorized representative. Failure to correct noted deficiencies will result in withholding of payment for the work not performed. During the progress of this contract, if it becomes apparent that the Contractor is unable to perform the work in accordance with the contract specifications, he/she shall acquire additional supplies, equipment, and personnel, as may be required by the Contracting Officer, to ensure that the work is accomplished as specified in the contract.
C.1.12 Coordination with the Contracting Officer’s Representative.
C.1.12.1 Contact. Day to day contact with Government personnel, and telephone communication shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to insure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract.
C.1.13 Contractor Personnel.
C.1.13.1 Clothing. All Contractor personnel shall be fully clothed at all times while performing these services. Clothing shall be clean and neat in appearance. "Fully clothed" shall be deemed to mean that a shirt (or T-shirt), trousers, and shoes or boots shall be worn at all times, except that this requirement shall not be construed to replace or eliminate the necessity for wearing appropriate personal protective equipment, devices, or clothing, as may be required for the application of chemicals.
C.1.13.2 Visitor Interaction. Contractor personnel shall utilize tact, diplomacy and courtesy at all times during contact with the public.
C.1.14 Safety Requirements.
C.1.14.1 Injury, Damage, Hazards. Any injury property damage, equipment malfunction, or safety hazard observed by the contractor shall immediately be report to the Contracting Officer’s Representative.
C.1.14.2 Safe Performance. In order to provide safety controls for protection of life and health of employees and other persons; for the prevention of damages to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all pertinent provisions of Federal, State, and local regulations and shall take, or cause to be taken, such additional measures as the Contracting Officer may determine to be reasonable and necessary for the performance of the work.
C.1.14.3 Vehicle Flasher Lights. Contractor vehicles shall be equipped with 4-way flashers and turn signals in operating condition. Flashers shall be activated when vehicles are parked on or traveling slowly along roadways.
C.1.14.4 No Off-Road Vehicles. The use of off-road vehicles such as ATV’s or pick-ups is not permitted except on authorized trails and roads.
C.1.15 Other Contractors. The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees. All work must be carefully planned and fitted not to interfere with such other work. The Contractor shall not commit or permit any act that will interfere with the performance of work by other contractors or by Government employees.
C.1.16 ANTITERRORISM/OPERATION SECURITY REQUIREMENTS
All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
All contractor and all associated sub‐contractors employees will receive a CORPS Watch information paper (provided by the authorized government representative) and provide a written acknowledgement to the COR, no later than 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract.
The Contractor must pre‐screen candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of government issued identification to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
Per the E-Verify Website the following exemptions apply:
Employers whose contracts are exempt from the E-Verify federal contractor rule are not required to enroll in E-Verify. A contract is considered exempt if any one of the following applies: (1) It is for fewer than 120 days. (2) It is valued at less than $150,000, the simplified acquisition threshold (Source: http://www.uscis.gov/e-verify/federal-contractors/exemptions-and-exceptions).
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
(End of Antiterrorism/Operation Security Requirements)
C.2 DEFINITIONS AND ACRONYMS. The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.
Contracting Officer's Representative (COR): An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
PWS: Performance Work Statement
Performance-Based Contract: (FAR 2.101) Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.
Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable quality level (AQL) for each work requirement.
Quality Assurance Surveillance Plan (QASP): An organized written document used by Government for quality assurance surveillance. Document contains sampling/evaluation guides, checklists, and the performance requirements summary (PRS).
ALP: Acceptable Level of Performance
Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.
Quality Assurance (QA): A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Service contract: A contract that directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task rather than to furnish an end item of supply. A service contract may cover services
C.3 GOVERNMENT-FURNISHED EQUIPMENT, MATERIALS & SUPPLIES.
C.3.1 Government Furnished Property. The Government will furnish to the Contractor the following identified property to be used in performing the services required by the contract. When the property is delivered, the Contractor shall verify its quantity and condition in writing to the Contracting Officer or his authorized representative on Memorandum Receipt, ENG Form 4866, within 48 hours of receipt. Damages will be reported in writing to the Contracting Officer or his authorized representative, within 72 hours.
Item (description) Quantity Storage Location Approx. Value Steel posts as needed Maintenance building $15.50 each Boundary signs as needed Maintenance building $ 7.00 each
C.3.2 Government Furnished Consumable Items. The following consumable items, exempt from accounting procedures under EFARS 45.105(a), will be furnished to the Contractor by the Government from stock. The Government will retain control of expendables, to be dispensed on an as-needed basis for use in the performance of this contract.
1. Nuts, bolts, and washers for the installation of boundary signs.
2. Daily worksheets.
C.4 CONTRACTOR FURNISHED EQUIPMENT & SUPPLIES.
C.4.1 Equipment and Supplies. The Contractor shall furnish all equipment and supplies not identified in Section C.3 of this PWS.
C.4.2 Other Items. The Contractor shall furnish all transportation; power equipment with fuel;
Garlon 4 herbicide with marker dye; herbicide sprayer; post drivers, axes, and other hand tools; flagging; and all other supplies and equipment necessary to accomplish the services specified herein other than materials listed in C.3 and C.4.
C.4.3 COR Approval. All contractor furnished materials, equipment and supplies must be approved by the Contracting Officer’s Representative prior to initial use.
C.5 SPECIFIC TASKS.
C.5.1 Services. The Contractor shall clear all woody vegetation (including vines, briars, shrubs, and brush) from an area extending from the Government boundary line back onto Government property a distance of four (4) feet. All stumps and stub cuts shall be horizontal (to preclude sharp stubs) and shall be cut as close to the ground as possible. In no case shall any cut stumps or stubs exceed four (4) inches in height. All trees 6 (six) inches in diameter or less (as measured at a height of four (4) feet above the ground) shall also be removed from this area. Trees exceeding 6 (six) inches in diameter shall have all limbs removed to a height of seven (7) feet above ground level. All cleared brush and limbs shall be piled on Government land, outside of the cut area. The Contractor shall remove or cut a four (4) foot wide path through all dead trees previously dropped or fallen in the area of required clearing. Limbs from trees outside the (4) foot cleared area that intrude into the cleared line shall be cut a minimum height of (7) feet above ground.
C.5.1.2 Chemical Treatment. Except as stated in C.5.1.2.1, the Contractor shall apply
Garlon 4 (or equivalent substitute, at the discretion of Project personnel) herbicide to all cut stubs, stumps, and stems (except the cut ends of limbs on trees greater than 6 (six) inches within the cleared area. An adequate marker dye shall be mixed with the chemical in sufficient concentration to leave an obvious and durable stain on the treated stubs, stumps, and stems. All such stems shall be treated on the same day that they are first cut.
C.5.1.2.1 Application Procedures. Application of chemicals shall be according to the label directions for the material used. When it is the professional opinion of the Contractor that the use of chemicals, mix ratios, carriers, or rates of application, other than those specified, will result in equal or better results, the Contractor may request permission for their use. Any such request shall be submitted in writing and shall specify the chemical, its uses, rates of application, and cost. A label for the chemical shall be submitted with the Contractor's request. Requests shall be submitted to the Project Manager, Harry S. Truman Project Office, at least 30 days prior to the intended use. If granted, permission for the use of an alternate chemical, mix ratio, carrier, or rate of application will be in writing from the Contracting Officer, or his authorized representative. Chemicals, mix ratios, carriers, or application rates other than specified in the label will not be used in the absence of the above specified request and approval.
When the use of approved alternate chemicals, mix ratios, carriers, or application rates requested by the Contractor results in an increase in Contractor cost or time, an equitable adjustment will be made to the contract price through the issuance of a contract modification.
C.5.1.2.2 Label Directions. Label directions and/or warnings relative to temperature or other climatic factors shall be closely adhered to. Care shall be exercised at all times by the Contractor to protect desirable (non-target) species from damage by the required application of chemicals. The Contractor shall not apply chemicals to cleared areas where the Government boundary adjoins park areas, subdivisions, private residences, pastures, or animal pens. The Contractor will receive payment for chemical application only for the portion of boundary on which chemical was actually applied.
C.5.1.3 Mileage. The Contractor shall clear the mileage specified in the table C.1.2 for
FY-2016, and FY-2016 option and FY-2017 option if exercised. Contingencies, such as flooding, will not relieve the Contractor from clearing the required mileage, but may result in identification of alternate work areas at the discretion of the COR.
C.5.1.4 Boundary Markers. The Contractor shall provide the Contractor Officer
Representative a list, to be delivered weekly, showing the location and number of any missing or damaged boundary monuments observed during the course of the work. The Contractor shall straighten and reset, as necessary, all damaged boundary reference posts.
Missing posts, broken posts, and posts that cannot be straightened shall be replaced with a new post set two (2) feet deep and one (1) foot on the Government side of the boundary monument. "U.S. Reservation Boundary Mark" signs that are missing or not legible (more than 2 words or 2 letters in any word) shall be removed and replaced with a new sign. All signs shall face toward the adjoining private property. Damaged posts and signs that have been replaced shall be delivered to the project maintenance building on the Access Road below Truman Dam.
C.5.1.5 Access. Access to the Government boundary shall within reason be by public access roads. The contractor shall be responsible for securing needed access by non-public routes. At no time shall the contractor trespass without written permission from the landowner(s). Clearing work shall be performed only on the Government side of the boundary line. Boundary monuments (located on the property line) and reference posts (located 1 foot inside the boundary line) are installed to allow line-of-sight from post to post. The Contractor shall, by using flagging, range poles, or similar aids, establish the location of the boundary within the immediate work area prior to cutting. The Contractor shall make diligent efforts to locate and expose each monument. Difficulty in locating monuments or the boundary line shall be referred to the COR for assistance.
C.5.1.6 Boundary Offsets. In areas where the boundary is marked by boundary offsets
(e.g.- actual boundary is located along the centerline of a road or creek), the Contractor will clear and spray all vegetation as described in paragraphs 5.1 within a (3) foot radius of all offset posts.
C.5.1.7 Encroachments.
C.5.1.7.1 Reporting. The contractor shall report in writing any encroachment onto government property. This includes but not limited to fences, trash, abandoned vehicles, buildings or structures, trails and roadways, sewage and sewer lateral lines, mowing or clearing of vegetation or branches. Encroachments shall be documented by date and time when the encroachment was discovered, type of encroachment, and location using county, section, township, range, and A.P. and P.O.L. boundary markers. An encroachment is any unauthorized use of government land by adjacent land owners, persons, or businesses.
C.6. APPLICABLE PUBLICATIONS AND FORMS.
C.6.1 Map. Information on Truman Lake can be found on the Internet at http://www.nwk.usace.army.mil/ht/
C.6.2 Quality Assurance Plan:
QUALITY ASSURANCE SURVEILLANCE PLAN
For Boundary Maintenance Services
Contract Number: W912DQ-12-C-XXXX Contract Description: Boundary Maintenance at Harry S. Truman Lake
Contractor’s name:
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored.
How monitoring will take place.
Who will conduct the monitoring.
How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type:
52.212-4 – Contract Terms and Conditions – Commercial Items
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned KO:
Organization or Agency:
Telephone:
Email:
b. Project Manager (PM) - The PM acts as an acquisition consultant and serves as liaison between the US Army Corps of Engineers, Kansas City District (CENWK) and the requesting program office, as well as liaison between the CENWK and the supporting contracting office.
Assigned PM:
Telephone:
Email:
c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.
Assigned COR:
Email:
3. CONTRACTOR REPRESENTATIVES:
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract.
a. Program Manager:
Telephone:
Email: _______________________________
b. Task Manager:
Email: _______________________________
4. PERFORMANCE STANDARDS.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, paragraph #C.1.10.7 in the Performance Work Statement, includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Item
PWS
Para
Performance Standard/AQL (Acceptable Quality Level)
Surveillance Method
Maintain Improved Grounds
C.5.1 Clear all woody vegetation, per the requirements of the PWS.
100% Inspection or Random Inspection
Maintain Improved Grounds
C.5.1.2 Apply chemical to cut stubs, stumps and stems per the requirement of the
PWS
100% Inspection or Random Inspection
Maintain Improved Grounds
C.5.1.4 Straighten and/or reset all damaged boundary reference posts per the requirement of the PWS
100% Inspection or Random Inspection
Maintain Improved Grounds
C.5.1.6 Clear and spray all vegetation within a 3 foot radius of all offset posts 100% Inspection or Random Inspection
Maintain Improved Grounds
C.5.1.7 Report, in writing any encroachments onto government property.
100% Inspection or Random Inspection
Annual Coordination
Meeting C.1.5 No more than one (1) error per year.
Complete prior to start of work for the contract award and each option exercise period.
Quality
Control Plan
C.1.10 No more than one (1) error per year.
Complete prior to start of work.
5. METHODS OF QA SURVEILLANCE.
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the PM, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.
a. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.)
b. 100% INSPECTION. (Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.)
c. RANDOM SAMPLING. (Designed to evaluate the outputs of the award requirement by randomly selecting and inspecting a statistically significant sample. Highly recommended for large quantity repetitive activities with objective and measurable quality attributes.)
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the KO’s actions.
6. RATINGS.
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
EXCEPTIONAL:
Performance significantly exceeds contract requirements to the Government’s benefit.
SATISFACTORY: Performance meets contractual requirements.
UNSATISFACTORY: Performance does not meet contractual requirements.
7. DOCUMENTING PERFORMANCE.
a. ACCEPTABLE PERFORMANCE (EXCEPTIONAL/SATISFACTORY).
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.
b. UNACCEPTABLE PERFORMANCE (UNSATISFACTORY).
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.
8. FREQUENCY OF MEASUREMENT.
a. Frequency of Measurement.
During contract/order performance, the COR shall take periodic measurements, as specified in the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor to assess performance and shall provide a written assessment.
Performance Report
1. CONTRACT NUMBER:
2. Prepared by:
3. Date and time of observation:
4. Observation:
Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations
Prepared by:
Signature – Contracting Officer’s Representative Date
Contract Discrepancy Report (CDR)
1. Contract Number:
2. TO:
3. FROM:
4. Date and time of observed discrepancy: ______________________
5. DISCREPANCY OR PROBLEM:
Describe in detail. Identify any attachments.
6. Corrective action plan:
A written corrective action plan ____is / ____ is not required.
If a written corrective action plan is required include the following:
The written Corrective Action Plan will be provided to the undersigned not later than ___ days after receipt of this CDR.
Prepared by:
Signature – Contracting Officer’s Representative Date
Received by:
Signature - Contractor Task Manager or on-site representative Date
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 01-OCT-2015 TO
31-MAR-2016
N/A USACE, KANSAS CITY +
MARGIE A SLAVENS
HARRY S TRUMAN PROJECT OFFICE
15968 TRUMAN R
WARSAW MO 65355
816-389-3606
966475
0002 POP 01-APR-2016 TO
31-MAR-2017
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-APR-2017 TO
31-MAR-2018
N/A (SAME AS PREVIOUS LOCATION)
Section H - Special Contract Requirements
WAGE DETERMINATION
WD 05-2311 (Rev.-17) was first posted on www.wdol.gov on 07/14/2015
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2005-2311 Daniel W. Simms Division of | Revision No.: 17 Director Wage Determinations| Date Of Revision: 07/08/2015 Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Service Contract Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Missouri
Area: Missouri Counties of Barry, Barton, Benton, Bollinger, Butler, Camden, Cape Girardeau, Carter, Cedar, Christian, Dade, Dallas, Dent, Douglas, Dunklin, Greene, Hickory, Howell, Iron, Jasper, Laclede, Lawrence, Madison, Maries, McDonald, Miller, Mississippi, Moniteau, Morgan, New Madrid, Newton, Oregon, Ozark, Pemiscot, Perry, Phelps, Polk, Pulaski, Reynolds, Ripley, Scott, Shannon, St Clair, Stoddard, Stone, Taney, Texas, Vernon, Wayne, Webster, Wright **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 12.21 01012 - Accounting Clerk II 13.71 01013 - Accounting Clerk III 15.33 01020 - Administrative Assistant 17.39 01040 - Court Reporter 13.70 01051 - Data Entry Operator I 10.72 01052 - Data Entry Operator II 11.70 01060 - Dispatcher, Motor Vehicle 13.70 01070 - Document Preparation Clerk 11.35 01090 - Duplicating Machine Operator 11.35 01111 - General Clerk I 10.87 01112 - General Clerk II 11.86 01113 - General Clerk III 13.87 01120 - Housing Referral Assistant 15.00 01141 - Messenger Courier 10.41 01191 - Order Clerk I 10.72 01192 - Order Clerk II 12.17 01261 - Personnel Assistant (Employment) I 12.67 01262 - Personnel Assistant (Employment) II 14.17 01263 - Personnel Assistant (Employment) III 17.38 01270 - Production Control Clerk 16.57 01280 - Receptionist 10.49 01290 - Rental Clerk 12.62 01300 - Scheduler, Maintenance 12.02 01311 - Secretary I 12.02 01312 - Secretary II 13.45 01313 - Secretary III 15.00
01320 - Service Order Dispatcher 12.52 01410 - Supply Technician 17.39 01420 - Survey Worker 13.59 01531 - Travel Clerk I 11.95 01532 - Travel Clerk II 12.86 01533 - Travel Clerk III 13.72 01611 - Word Processor I 11.09 01612 - Word Processor II 12.45 01613 - Word Processor III 14.10 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 22.23 05010 - Automotive Electrician 16.87 05040 - Automotive Glass Installer 15.76 05070 - Automotive Worker 15.76 05110 - Mobile Equipment Servicer 14.19 05130 - Motor Equipment Metal Mechanic 17.31 05160 - Motor Equipment Metal Worker 15.76 05190 - Motor Vehicle Mechanic 17.31 05220 - Motor Vehicle Mechanic Helper 13.33 05250 - Motor Vehicle Upholstery Worker 15.36 05280 - Motor Vehicle Wrecker 15.76 05310 - Painter, Automotive 16.62 05340 - Radiator Repair Specialist 15.76 05370 - Tire Repairer 10.96 05400 - Transmission Repair Specialist 17.31 07000 - Food Preparation And Service Occupations 07010 - Baker 12.02 07041 - Cook I 9.41 07042 - Cook II 10.55 07070 - Dishwasher 8.09 07130 - Food Service Worker 8.82 07210 - Meat Cutter 12.88 07260 - Waiter/Waitress 8.77 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 15.84 09040 - Furniture Handler 10.52 09080 - Furniture Refinisher 15.84 09090 - Furniture Refinisher Helper 12.95 09110 - Furniture Repairer, Minor 14.06 09130 - Upholsterer 14.59 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 9.26 11060 - Elevator Operator 10.55 11090 - Gardener 14.73 11122 - Housekeeping Aide 10.55 11150 - Janitor 10.82 11210 - Laborer, Grounds Maintenance 11.42 11240 - Maid or Houseman 9.04 11260 - Pruner 11.41 11270 - Tractor Operator 13.68 11330 - Trail Maintenance Worker 11.42 11360 - Window Cleaner 12.23 12000 - Health Occupations 12010 - Ambulance Driver 16.46 12011 - Breath Alcohol Technician 16.46 12012 - Certified Occupational Therapist Assistant 20.83 12015 - Certified Physical Therapist Assistant 18.20 12020 - Dental Assistant 15.71 12025 - Dental Hygienist 30.78 12030 - EKG Technician 23.85 12035 - Electroneurodiagnostic Technologist 23.85 12040 - Emergency Medical Technician 16.46 12071 - Licensed Practical Nurse I 14.72 12072 - Licensed Practical Nurse II 16.46 12073 - Licensed Practical Nurse III 18.36 12100 - Medical Assistant 11.54
12130 - Medical Laboratory Technician 13.19 12160 - Medical Record Clerk 13.26 12190 - Medical Record Technician 14.83 12195 - Medical Transcriptionist 13.22 12210 - Nuclear Medicine Technologist 31.37 12221 - Nursing Assistant I 10.30 12222 - Nursing Assistant II 11.58 12223 - Nursing Assistant III 12.64 12224 - Nursing Assistant IV 14.19 12235 - Optical Dispenser 12.71 12236 - Optical Technician 12.35 12250 - Pharmacy Technician 13.41 12280 - Phlebotomist 14.19 12305 - Radiologic Technologist 23.85 12311 - Registered Nurse I 21.22 12312 - Registered Nurse II 25.95 12313 - Registered Nurse II, Specialist 25.95…