W912DQ-11-B-1011.pdf

PDF 336 KB Posted

Attached to
Temporary Firehouse #2 and #4 located in Joplin Missouri
Solicitation number
W912DQ-11-B-1011
Issued by

About this file

Soliciation W912DQ-11-B-1011

View the file

Other files

File Type Posted
Bids.pdf PDF
Site visit sign in sheet.pdf PDF
W912DQ-11-B-1011 0002.pdf PDF
W912DQ-11-B-1011 0001.pdf PDF
Drawings of sites.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 14 Jun 2011

X

A X B X C

D E

G F

H 83 - 115 nicholas.p.emanuel@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 115

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912DQ 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

NICHOLAS P EMANUEL 816-389-2288

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 21

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT

PACKAGING AND MARKING

22 - 41 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 42 - 47

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

48 - 82

PART II - CONTRACT CLAUSES

USACE, KANSAS CITY

FEDERAL BLDG, CT-C

601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896 816-389-3812

816-389-2029/2030FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

10 Jun 2011

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912DQ-11-B-1011

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

FIRE STATION NUMBER 2

FFP

Fire Station number 2 at 2216 South Maiden Lane, Joplin Missouri FOB: Destination

NET AMT

0001AA 1 Lump Sum Site Visit / Work Plan

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features and supervision needed to complete the attached scope of work dated June 2011, for the Work Plan for Fire Station number 2

0001AB 1 Lump Sum Site prep with Utility Connections

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features and supervision needed to complete the attached scope of work dated June 2011, for the site prep with Utility Connection (Excluding Debris Removal) for Fire Station number 2.

0001AC 12 Months Fire Truck Tent Structure Lease

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011 for the Fire Truck Tent Structure Lease.

0001AD 6 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope fo work dated Jun 2011, for the Fire Truck Tent Lease Extension

0001AE 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0001AF 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0001AG 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0001AH 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0001AJ 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0001AK 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0001AL 12 Months Modular Unit Lease

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, for the Modular Unit Lease

0001AM 6 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, for the Modular Unit Lease Extension

0001AN 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0001AP 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0001AQ 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0001AR 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0001AS 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0001AT 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0001AU 1 Lump Sum Demobilization

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, for the Fire Truck Tent and Modular Unit Demobilization.

FIRE STATION NUMBER 4

FFP

Fire Station number 4 at 2010 East 15th Street, Joplin Missouri

0002AA 1 Lump Sum Site Visit / Work Plan

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features and supervision needed to complete the attached scope of work dated June 2011, for the Work Plan for Fire Station number 4

0002AB 1 Lump Sum Site prep with Utility Connections

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features and supervision needed to complete the attached scope of work dated June 2011, for the site prep with Utility Connection (Excluding Debris Removal) for Fire Station number 4.

0002AC 12 Months Fire Truck Tent Structure Lease

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011 for the Fire Truck Tent Structure Lease.

0002AD 6 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope fo work dated Jun 2011, for

0002AE 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0002AF 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0002AG 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0002AH 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0002AJ 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0002AK 1 Months OPTION Fire Truck Tent Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision need to complete the attached scope of work dated Jun 2011, for

0002AL 12 Months Modular Unit Lease

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, for the Modular Unit Lease

0002AM 6 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0002AN 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0002AP 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0002AQ 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0002AR 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0002AS 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0002AT 1 Months OPTION Modular Unit Lease Extension

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, 0002AU 1 Lump Sum Demobilization

FFP

Contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to complete the attached scope of work dated June 2011, for the Fire Truck Tent and Modular Unit Demobilization.

Section C - Descriptions and Specifications

SCOPE OF WORK

Performance Work Statement

General: This project consists of site preparation and installation of Portable Building Units, fabric tent structures, making site improvements, installing all utilities including utility connections to sanitary sewer, water and electricity, as further defined, for portable buildings and fabric tent structures. Units may consist of, portable or modular office units or manufactured homes. The site location and number of unit(s) shall be as defined in APPENDIX A: Site Specific Information and Requirements. Provide all equipment, labor, materials, all supplies and all incidentals necessary to complete the installation and preparation of the portable buildings.

The contractor shall inspect storm sewer for blockages in coordination with the city of Joplin, and fill any pavement depressions or perform any grading as required for portable building installation. Contractor shall clean out the sewer if any blockages are present in coordination with the city of Joplin. Contractor shall hook up to the local water supply and connect to the City sewer in coordination to the city of Joplin. Limited excavation may be required to facilitate hook-ups to City water and sanitary sewer. This scope of work includes requirements for several types of tasks expected to be performed under this contract. As such, not all requirements and attachments will apply to all sites. The contractor shall adhere to those requirements that apply to the specific site as necessary and as defined in the information provided for each site. The Contractor shall obtain and pay for all required permits for installation and local inspection, including water, sewer and electric tapping fees, as required by state/local authority having jurisdiction.

All work performed in accordance with these specifications shall be in accordance with all applicable Federal, State and local codes and regulations.

Concept Sketches: General concept sketches are provided in APPENDIX A: Site Specific Information and Requirements. The dimensions and layouts indicated in these sketches will serve as guidance only. Contractor may modify the dimensions and layouts indicated in the Concept Sketches. The Contractor will submit a proposed site sketch along with equipment data sheets for approval prior to ordering any equipment.

Supervision: The Contractor shall provide adequate supervision and quality control to assure the accuracy, quality, completeness, and progress of the work.

Site Set-up: Contractor shall layout and mark traffic lanes to facilitate vehicle movement through the site. The Contractor shall coordinate with the local Fire Department and Emergency Medical Services to ensure adequate access to all portable buildings units in the event of an emergency. Site layout shall be field adjusted to accommodate emergency vehicles.

Parking areas for individual buildings shall also be marked. Security fencing and gates shall be provided around perimeter of portable buildings site to provide security and privacy for the portable building occupants.

Concrete: All concrete shall have a minimum 28-day compressive strength of 3000 psi.

Concrete shall be batched, delivered and placed in accordance with ACI standards.

Load Bearing Stone: For reconstruction of load bearing roads and/or filling wet areas to be used to support Portable Buildings use a 1”(-) crushed stone or 1” (-) reclaimed concrete or asphalt to a depth of 6 “ or more.

Standard Products: Materials and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of such products and shall essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Equipment shall be supported by a service organization that is in the opinion of the Contracting Officer, reasonably convenient to the site.

Parking Areas: Each Portable Building shall be provided with one, marked, off-street parking location. Parking layout shall be coordinated with the Resident Engineer.

Mailboxes: If required for the specific site. The Contractor shall provide and install United States Postal Service (USPS) approved mailboxes. The mailbox units shall have enough boxes to service the completed stage(s) and shall be located in a place that will be convenient for both the USPS and the residents. Coordinate with postal service for mail delivery and Postal requirements.

Address/Numbering System: The Contractor shall clearly mark each unit with an address or house number as directed by the Contracting Officer Representative.

Protection of Travel Lanes: The Contractor shall maintain and protect traffic on all roads impacted by the Contractors operations. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by the State and local authorities having jurisdiction.

Survey: The Contractor is responsible for providing all required surveying services during construction. Surveys during construction shall be at the discretion of the Contractor.

Sanitation: The Contractor shall provide and maintain within the construction area field-type sanitary facilities in accordance with EM 385-1-1.

Operational Plan: The Contractor shall develop and provide a written operation plan and warranties to each resident at move in. The operational plan shall include information on all emergency and regular operation of equipment supplied. Contact numbers and names and locations of installation contractors, sub-contractors and warranty providers shall be included in the operational plan. Contractor and/or vendor shall guarantee all labor, materials, and equipment for a period of one year after final acceptance of units in contract.

Schedule: All work under this contract shall be completed within 21 calendar days of Notice to Proceed (NTP)

Utility As-Builts: A general sketch will be maintained and turned over to the Corps of Engineers, upon completion of the site work, showing point used as base elevation, all survey work, final locations and elevations of utilities, manholes and hydrants. Final elevations shall be determined for all inverts and castings.

Demobilization: Upon termination of the lease, the contractor will remove all portable building units and fabric tent structures. All utilities will be disconnected, cutback, capped, per utility company and/or city requirements. The site will be returned to an operational condition. Curb cuts that were installed to facilitate the temporary facilities may remain as well as stone base.

Basis of Award: Basis of award will be made upon the lowest bid of the base CLINs plus option CLINs. Any unbalanced bid will be rejected.

Appendix A

Site Specific Information and RequirementsAppendix A1

Fire Station #2 2216 South Maiden Lane

1. Submit a work plan that includes the following:

a. Site plan showing layout of existing and proposed structures, utility connections, grading, etc.

b. Equipment Data Sheets

c. Safety Plan

d. Quality Control Plan

e. Schedule

2. Furnish and Install one (1) insulated fabric tent structure that will include the following:

a. Dimensions – The structure shall be sized so that two typical full-size fire trucks can placed side by side. The structure must also have enough space in the rear to place metal racks for storing equipment. See attached sketch for approximate dimensions.

b. Floor – The floor shall consist of 1” (-) crushed stone, reclaimed asphalt, or reclaimed concrete to a depth of 6” or more.

c. Doors - Two (2) fourteen feet high doors for vehicle access and one (1) side entrance door.

Type of doors shall be as recommended by manufacturer to meet heating needs.

d. Plans – Contractor shall provide a plan that shows anchorage of structure. Structure shall be anchored according to manufacturer’s recommendations and shall be in accordance with all applicable Federal, State, and Local codes for this type of structure.

e. Lighting and power – The structure shall contain three overhead lights with 2-way switches at vehicle and man doors.. These lights shall be designed and installed to meet minimum lighting standards. 5 GFCI 120 volt power receptacles shall be installed to the interior frame as shown.

f. Utilities – All utility connections and associated connection fees to this unit must be completed by the contractor.

g. Fabric – Tent fabric shall be fire-rated in accordance with federal, state, and local codes and regulations.

h. Heating and Ventilation – Heating must be provided such that the temperature inside the tent structure will be maintained at 45 degrees Fahrenheit or higher. A minimum of one roof vent must be provided. Gas heating is preferred.

i. Leasing – In accordance with the bid schedule outline in section B of the solicitation, the lease date shall begin on the date of the facitliy being accepted by the authorized Government representative. The contractor will be required to remove the structure at the end of the lease period.

3. Furnish and Install one (1) modular office unit that will include the following:

a. Dimensions – Sized to accommodate two offices, one full bathroom with shower, one conference room, and one sleeping room to accommodate four (4) beds.

b. Utilities – All utility connections and associated connection fees to this unit must be completed by the contractor

c. Plans – Contractor shall provide a plan that shows floor plan and anchorage of structure.

Structure shall be anchored according to manufacturer’s recommendations and shall be in accordance with all applicable Federal, State, and Local codes for this type of structure.

d. Furnishings – Two (2) desks, Two (2) executive chairs, Eight (8) folding chairs, Four (4) twin sized beds (frames/mattresses).

e. HVAC – Units shall be furnished with heat, air conditioning, and thermostatic controls.

f. Leasing – In accordance with the bid schedule outline in section B of the solicitation, the lease date shall begin on the date of the facitliy being accepted by the authorized Government representative. The contractor will be required to remove the structure at the end of the lease period.

4. Construct a parking area as shown on sketch sized to allow parking for 6 cars. Parking area shall consist only of a 6” deep crushed stone base.

5. Placement of temporary structures and utilities for these structures shall be such that they will not interfere with the reconstruction of the permanent facilities. The permanent facilities will be replaced in their existing location.

Appendix A2

Fire Station #4

2010 East 15th Street

1. Submit a work plan that includes the following:

a. Site plan showing layout of existing and proposed structures, utility connections, grading, etc.

b. Equipment Data Sheets

c. Safety Plan

d. Quality Control Plan

e. Schedule

2. Furnish and Install one (1) insulated fabric tent structure that will include the following:

a. Dimensions – The structure shall be sized so that two typical full-size fire trucks can placed side by side. The structure must also have enough space in the rear to place metal racks for storing equipment. See attached sketch for approximate dimensions.

b. Floor – The floor shall consist of 1” (-) crushed stone, reclaimed asphalt, or reclaimed concrete to a depth of 6” or more.

c. Doors - Two (2) fourteen feet high doors for vehicle access and one (1) side entrance door.

Type of doosr shall be as recommended by manufacturer to meet heating needs.

d. Plans – Contractor shall provide a plan that shows anchorage of structure. Structure shall be anchored according to manufacturer’s recommendations and shall be in accordance with all applicable Federal, State, and Local codes for this type of structure.

e. Lighting and power – The structure shall contain three overhead lights with 2-way switches at vehicle and man doors.. These lights shall be designed and installed to meet minimum lighting standards. 5 GFCI 120 volt power receptacles shall be installed to the interior frame as shown.

f. Utilities – All utility connections and associated connection fees to this unit must be completed by the contractor.

g. Fabric – Tent fabric shall be fire-rated in accordance with federal, state, and local codes and regulations.

h. Heating and Ventilation – Heating must be provided such that the temperature inside the tent structure will be maintained at 45 degrees Fahrenheit or higher. A minimum of one roof vent must be provided. Gas heating is preferred.

i. Leasing – In accordance with the bid schedule outline in section B of the solicitation, the lease date shall begin on the date of the facitliy being accepted by the authorized Government representative. The contractor will be required to remove the structure at the end of the lease period.

3. Furnish and Install one (1) modular office unit that will include the following:

a. Dimensions – Sized to accommodate two offices, one full bathroom with shower, one conference room, and one sleeping room to accommodate four (4) beds.

b. Utilities – All utility connections and associated connection fees to this unit must be completed by the contractor

c. Plans – Contractor shall provide a plan that shows floor plan and anchorage of structure.

Structure shall be anchored according to manufacturer’s recommendations and shall be in accordance with all applicable Federal, State, and Local codes for this type of structure.

d. Furnishings – Two (2) desks, Two (2) executive chairs, Eight (8) folding chairs, Four (4) twin sized beds (frames/mattresses).

e. HVAC – Units shall be furnished with heat, air conditioning, and thermostatic controls.

f. Leasing – In accordance with the bid schedule outline in section B of the solicitation, the lease date shall begin on the date of the facitliy being accepted by the authorized Government representative. The contractor will be required to remove the structure at the end of the lease period.

4. Install a walkway from tent structure man door to steps of modular facility. Walkway may be constructed of 4” crushed stone, decking lumber or pavers.

5. Placement of temporary structures and utilities for these structures shall be such that they will not interfere with the reconstruction of the permanent facilities. The permanent facilities will be replaced in their existing location.

Appendix B

General SpecificationsTEMPORARY UTILITY CONNECTIONS:

1. EXCAVATIONS

a. Excavation: Unless otherwise indicated, trench excavation shall be by open cut except that short sections may be jacked or bored if the utility can be safely and properly installed and ground loss can be properly controlled. All excavation shall be constructed in accordance with the Safety and Health Requirements Manual (EM 385-1-1) and/or OSHA Standards. Allowable trench widths, depths, side slopes, sheet and bracing requirements, and other considerations are given in the OSHA Standard; and an abbreviated version is given in the Safety and Health Requirements Manual.

b. Trench Excavation: Excavation shall be performed to the lines and grades indicated. During excavation, material satisfactory for backfilling shall be stockpiled in a neat and orderly manner at a sufficient distance from the banks of the trench to avoid overloading and to prevent slides or caving. Topsoil shall be stockpiled separately from suitable backfill material. Grading shall be done as may be necessary to prevent surface water from flowing into the excavation, and any water accumulating therein shall be removed to maintain the stability of the bottom and sides of the excavation.

c. Bottom Preparation: The bottoms of trenches shall be accurately graded to provide uniform bearing and support for the bottom quadrant of each section of the pipe. Pipe shall rest on undisturbed or properly placed and compacted soil along its entire length.

d. Backfilling and Compaction: For trenches in road subgrades, common backfill above the bedding shall be placed in 12" lifts and compacted with special purpose compaction equipment. Compaction equipment shall be selected to avoid damage to the pipe.

e. Pipe bedding: Classes I, II, or III, as described in ASTM D2321 shall be used and carefully compacted for all plastic pipe.

f. Burial Depth: Burial Depth of specific utilities is given below:

A. Water lines. Trenches shall be of a depth to provide a minimum cover of 48 inches from the finished grade to the top of the pipe or to provide the amount of cover required by local codes and regulations.

B. Cables and Conduits. Direct burial cable and conduit or duct line shall have a minimum cover of 24 inches from the finished grade.

2. WATER DISTRIBUTION SYSTEM

a. PIPING

1. Service Lines

Piping for water service lines shall have a nominal size of ¾" diameter. Pipe shall be polyvinyl chloride (PVC) plastic, Oriented PVC plastic polyethylene, or copper tubing.

2. Supply and Distribution Lines

Piping for water distribution lines shall be 6", and supply lines shall be 6" or 8", as shown on the drawings. Pipe shall be polyvinyl chloride (PVC), Oriented PVC plastic filament-wound or centrifugally cast reinforced thermosetting resin.

3. Potable Water Lines

Piping and components of potable water systems which come in contact with the potable water shall conform to NSF 61. Plastic piping system components (PVC, polyethylene, thermosetting resin and reinforced plastic mortar pressure) intended for transportation of potable water shall comply with NSF 14 and be legibly marked with their symbol.

b. PIPE MATERIALS

1. Cathodic Protection

Cathodic protection shall be provided for all materials subject to corrosion. Cathodic protection shall comply with the provisions of the National Association of Corrosion Engineers (NACE) criteria and standards. All ferrous underground material shall receive a protective coating with a coating efficiency of 90 percent after 15 years.

2. PVC Plastic Pipe

Pipe, couplings and fittings shall be manufactured of material conforming to ASTM

D 1784, Class 12454B. Pipe shall conform to dimensional requirements of ASTM D

1785 Schedule 40, with joints meeting the requirements of 150 psi working pressure, 200 psi hydrostatic test pressure, or equivalent.

For pipe 4 inches through 12 inches diameter, pipe shall conform to AWWA C900, Class 150, CIOD pipe dimensions, elastomeric-gasket joint. Fittings shall conform to AWWA C907 and AWWA C908.

3. Copper Tubing

Copper tubing shall conform to ASTM B 88, Type K, annealed.

c. VALVES

1. Gate Valves

Gate valves shall be designed for a working pressure of not less than 150 psi. Valve connections shall be as required for the piping in which they are installed. Valves shall have a clear waterway equal to the full nominal diameter of the valve, and shall be opened by turning counterclockwise. The operating nut or wheel shall have an arrow, cast in the metal, indicating the direction of opening. Valves shall be iron body, bronze mounted, and shall conform to AWWA C500. Flanges shall not be buried. An approved pit shall be provided for all flanged connections. All gate valves shall be non-rising stem type furnished with O-ring seals.

2. Service Stops

All service lines shall include a 3/4 inch curb stop (shutoff) valve.

Service stops shall be water-works inverted-ground-key type, oval or round flow way, tee handle, without drain. Pipe connections shall be suitable for the type of service pipe used. All parts shall be of bronze with female iron-pipe-size connections or compression-pattern flared tube couplings, and shall be designed for a hydrostatic test pressure not less than 200 psi, and shall conform to AWWA C800.

d. VALVE BOXES

Valve boxes shall be cast iron, concrete, or plastic. Boxes shall be extension type with slide-type adjustment and with flared base. The word "water" shall be cast in the cover. The boxes shall be of such length as will be adopted without full extension to the depth of cover required over the pipe at the valve location. Valve boxes shall be suitable for traffic. If cast iron boxes are used, they shall be bonded with the ferrous valve and be cathodically protected. The valve box shall have a protective coating applied using a coal tar epoxy.

e. FIRE HYDRANTS Fire hydrants shall conform to AWWA C-502.

f. LEAKAGE TEST

The water line shall be tested by the Contractor after the pipe is laid, the joints completed and the trench partially backfilled. The joints are to be left exposed for examination during the test. The water lines shall be subjected for one hour to a hydrostatic pressure of 200 psi. Each valve shall be opened and closed twice during the test. Exposed pipe, joints, fittings and valves shall be carefully examined during the test.

Any leaks shall be repaired and the test repeated until satisfactory results are achieved. At the discretion of the COR, an additional leakage test will be conducted. The duration of the test will be 2 hours at a pressure of not less than 200 psi. Leakage is defined as the quantity of water to be supplied into the newly laid pipe necessary to maintain pressure within 5 psi of the test pressure after the pipe has been filled with water and the air expelled. The leakage shall not exceed the allowable as determined by the following formula:

L = 0.0001351ND(P raised to 0.5 power)

L = Allowable leakage in gallons per hourN = Number of joints in the length of pipeline testedD = Nominal diameter of the pipe in inchesP = Average test pressure during the leakage test, in psi gauge

Should any test of pipe disclose leakage greater than that calculated by the above formula, the defective joints shall be located and repaired until the leakage is within the specified allowance, without additional cost to the Government.

g. DISINFECTION

Chlorinating materials shall conform to the following:

Chlorine, Liquid: AWWA B301.

Hypochlorite, Calcium and Sodium: AWWA B300.

Before acceptance of potable water operation, each unit of completed waterline shall be disinfected as prescribed by AWWA C651. After pressure tests have been made, the unit to be disinfected shall be thoroughly flushed with water until all entrained dirt and mud have been removed before introducing the chlorinating material. The chlorinating material shall be either liquid chlorine (ANSI/AWWA B301), calcium hypochlorite (ANSI/AWWA B300), or sodium hypochlorite (ANSI/AWWA B300). The chlorinating material shall provide a dosage of not less than 50 ppm. Valves on the lines being disinfected shall be opened and closed several times during the contact period. The line shall then be flushed with clean water until the residual chlorine is reduced to less than 1.0 ppm. During the flushing period, each fire hydrant on the line shall be opened and closed several times. From several points in the unit, the Contracting Officer will take samples of water in proper sterilized containers for bacterial examination. The commercial laboratory shall be certified by the state's approving authority for examination of potable water. The disinfection shall be repeated until tests indicate the absence of pollution for at least 2 full days. The unit will not be accepted until satisfactory.

3. SANITARY SEWERS

a) NON-PRESSURE PIPE

Laterals shall be 4 inches in size. Trunk lines shall be 6 inches in size.

Acrylonitrile-butadiene-styrene (ABS) and polyvinyl chloride (PVC) composite sewer pipe and fittings shall conform to ASTM D 2680. Fittings shall be compatible with the pipe supplied and shall have a strength not less than that of the pipe.

PVC Pipe and fittings: ASTM D 3034, Type PSM with a maximum SDR of 35. PVC shall be certified by the compounder as meeting the requirements of ASTM D 1784, cell Class 12454B.

b) JOINTS

ABS and PVC composite joints shall conform to ASTM D 2680.

Flexible plastic pipe (PVC or high density polyethylene pipe) gasketed joints shall conform to ASTM D 3212.

c) MANHOLES, FRAMES AND COVERS

Manholes shall be prefabricated of precast concrete sections conforming to ASTM

C 478. Joints shall be cement mortar, an approved mastic, rubber gaskets, a combination of these types; or the use of external preformed rubber joint seals and extruded rolls of rubber with mastic adhesive on one side. A ladder shall be provided where the depth of a manhole exceeds 4 feet. The ladder shall be constructed in accordance with OSHA.

Frames and covers shall be cast iron, ductile iron or reinforced concrete. Cast iron frames and covers shall be as indicated or shall be of type suitable for the application, circular, without vent holes. The frames and covers shall have a combined weight of not less than 400 pounds. Reinforced concrete frames and covers shall be as indicated or shall conform to ASTM C 478.

d) EXECUTION

Sewer lines shall be laid at a minimum slope of 1%, unless otherwise shown on the drawings.

The sewer riser shall be vertical and terminate no more than 4 inches above ground level with a standing wye (preferred method) at the staked location. The cleanout inlet will be plugged with a threaded cap. The vertical inlet shall be plugged or capped until such time as it is connected to the mobile home unit.

e) LEAKAGE TESTS

Lines shall be tested for leakage. Visible leaks encountered shall be corrected regardless of leakage test results. Leakage as measured by either the infiltration test or exfiltration test shall not exceed 100 gal per inch diameter per mile of pipeline per day.

When leakage exceeds the maximum amount specified, satisfactory correction shall be made and retesting accomplished. Testing, correction, and retesting shall be made at no additional cost to the Government. Test in accordance with applicable requirements of

UBPPA UNI-B-6.

f) DISPLACEMENT OF SEWERS:

After other required tests have been performed and the trench backfill compacted to 2 feet above the top of the pipe, the pipe shall be inspected to determine whether significant displacement has occurred. This inspection shall be conducted in the presence of the Contracting Officer. Pipe sizes larger than 36 inches shall be entered and examined, while smaller diameter pipe shall be inspected by shining a light or laser between manholes or manhole locations, or by the use of television cameras passed through the pipe. If, in the judgment of the Contracting Officer, the interior of the pipe shows poor alignment or any other defects that would cause improper functioning of the system, the defects shall be remedied as directed at no additional cost to the Government.

g. LIFT STATIONS

Lift stations shall be sized and installed as shown in ATTACHMENT: Site

Specific Information and Requirements, and shall have the following features:

1. Pumps

Duplex raw sewage pumps shall be explosion-proof type and shall conform to NEMA MG 1.

2. Controls

Pumps shall be automatically controlled by float-type level switches. The controls shall automatically alternate the pumps upon completion of each operation. All switches, relays, and auxiliary equipment required for pump operation shall be provided. A magnetic starter and a combination manual on-off control and circuit breaker shall be provided for each pump. All controls shall be in conformance with NEMA ICS 1. All parts in contact with sewage shall be constructed of corrosion resistant material. Enclosure for controls shall be NEMA 250 Type 4.

3. Pumping Structures

Pumping structures may employ a wet well type system or a dry well type system. Wet wells shall be sized to permit access to pumps and other equipment for maintenance. Drywells, if used, shall be provided with sump pumps and dehumidifiers to protect the equipment against corrosion. Pump houses, if required, shall be weatherproof and shall be louvered for ventilation.

Wet wells shall be sized to handle part or all of short term peak flows and shall provide for minimum pump run times.

4. Pressure Piping Systems

Force main piping shall be PVC conforming to ASTM D1785. Joints shall conform to ASTM F477.

4. UTILITIES: This contract includes installation of all basic utilities necessary to support portable buildings, including main lines and service lines.

a. Utility Separation:

The water lines shall be placed in a trench separate from the sewer line and at a distance that is in compliance with State and local codes. The lateral separation for distribution lines shall be 10 feet or more. In the case of water and sewer lines crossing, the vertical separation must be 18 inches or more when measured from the top of the sewer to the bottom of the line.

Water lines shall not be laid in the same trench with sewer lines, gas lines, fuel lines, or electric wiring.

b. Connections to Utilities:

The Contractor shall coordinate all utility relocation requirements and make payment to the utility companies for all services, fees, and permits required to relocate and reestablish service. Utility services shall not be interrupted except for brief periods to facilitate cut-ins. The Contractor shall be responsible for all costs related to protecting existing utilities.

The Contractor shall connect to existing electric, city water, and sanitary sewer shown on the plans. All connections shall be in accordance with local requirements. Drinking water shall be provided until testing ensures a water supply is potable.

c. Utility Corridor:

The utility corridor running between building rows shall be below ground unless otherwise directed by the Contracting Officer. Any above ground installations shall be fenced, preventing access to the utility corridor.

5. ELECTRICAL DISTRIBUTION:

The Contractor shall coordinate with the electrical utility company to provide electric power to the site. The Contractor shall assure that the electrical utility company is aware of the schedule for construction and has the capability to install the electrical distribution in accordance with the schedule. If the electrical utility company cannot install the distribution system in accordance with the schedule, the Contractor shall provide and install the distribution system or utilize portable generators until the permanent power can be provided. The Contractor shall be responsible for coordination and costs for phone and electrical power required for the Contractor's operations, including all costs for utility company hookup, installation/dismantling of transformers and distribution lines.

1. All material shall be new and shall be UL labeled or listed.

2. All exterior switches and panels shall be in NEMA 3R enclosures.

3. The electrical power distribution system shall be installed in accordance with all applicable requirements of the latest edition of the National Electrical Code (NEC), including article 550. All electrical work shall be in accordance with NFPA-70, 2008, and National Electrical Safety Code (NESC), 2007 Edition, ANSI/IEEE C2-2007.

4. Portable unit service equipment shall be installed in accordance with NEC article 550.

5. The circuit breaker disconnects on the meter poles shall be rated suitable for use as service equipment and shall have an interrupting capacity equal to the available short circuit current at the line terminals of the disconnect or 22,000 AIC, whichever is larger.

6. Poles within the area shall be 35 feet total length, Class 4.

7. Security lighting shall be 100-watt HPS fixtures; fixtures shall be approved for damp locations. Each fixture shall have a photocell integral to the fixture. All security lighting will be furnished, installed and maintained by the power company.

8. All services shall be grounded according to NFPA-70, Art 250 with grounding wiring sized as shown on the drawings or as required by the NEC. A ground shall be carried to each trailer panel as required by the NEC.

9. There shall be no splices in the wiring between the load side of the portable unit service disconnects and the line side lugs on the portable unit load center.

10. All exposed PVC conduit installed on poles shall be securely strapped with two-hole straps, a minimum of two per 5-foot length or fraction thereof.

11. The Contractor shall coordinate the installation with the serving utility.

12. Before the system is energized, the haul and install contractor shall be notified to verify all necessary lockouts are in place, appropriate circuit breakers are off, and electric water heaters are full.

6. SITE LIGHTING:

The Contractor shall investigate utilizing existing parking lot lighting and provide the most economical lighting for the site. Existing Parking lot lights can be utilized if available.

Minor repairs can be made to existing lighting to provide lighting. If existing lighting is not available economical, portable light stands shall be utilized for site lighting.

7. TELEPHONE:

The Contractor shall coordinate with the local telephone company for service to the project. In general, FEMA will not authorize funding for installation of telephone services to the portable buildings. The telephone company shall be given the opportunity to use installed poles to install their lines and equipment. The telephone company shall be notified in advance of the time frame that they have to install their lines and equipment.

PORTABLE BUILDING INSTALLATION SPECIFICATIONS

A. GENERAL

1. All work performed in accordance with these specifications shall be in accordance with all applicable federal, state and local codes and regulations. The provision of these specifications and typical details shall not be construed as lowering standards established by local laws, ordinances or regulations.

2. The following installation items represent minimum requirements. Exceptions or substitutions must be approved by the Government prior to performing the work.

Approval will be on an individual portable building basis, based on availability of materials or conditions peculiar to the intent of installation or work.

3. All contractor’s construction debris, waste and excess material shall be cleaned, removed from the site, and properly disposed of in accordance with applicable laws and regulations. Contractor shall be available for move-in inspection.

1. Portable Buildings shall be delivered and installed sequentially, with complete installations, so that the portable buildings can be accepted, released to FEMA, and inhabited as soon a practical.

2. Schedule – see above

B. BASIC INSTALLATION – PORTABLE BUILDING SET-UP

1. Blocking and Leveling:

Portable Building piers shall be installed according to the manufacturer’s recommendations and/or as recommended by Federal, State, and Local agencies.

The Contractor shall clean away all grass roots, loose dirt, rocks or debris where blocks meet grade. The Contractor will determine soil conditions pertinent to pier support through contact with local building officials, soils engineers or other methods acceptable to local authorities. If not installed on paved surface, the Contractor shall provide a 3/4” x 24” x 24” exterior grade plywood base for each pier or an ABS pad for each pier.

After the weight of the portable building is transferred to the piers, the piers shall be vertically aligned and tightly shimmed with wooden wedges. If the piers are not vertical at the time of final inspection, they shall be removed and reinstalled by the Contractor at no additional cost. The Contractor will be responsible for all necessary re-leveling and re-blocking of the portable building for 90 days. All wood used in blocking must be treated.

2. Anchor and Strapping

Anchoring and strapping for tie-down of manufactured homes shall be based on the wind zone and soil conditions of the installation site. The manufacturer’s installation instructions will be followed in determining the location and number of unit tie-down connecting points and method of securing the anchors. The Contractor is responsible for determining the specific type anchors to be used and the method of securing the anchors based on the anchor manufacturer’s instructions and local soil conditions. The Contractor will determine soil conditions pertinent to anchor pullout resistance through contact with local building officials, soils engineers or other methods acceptable to local authorities.

3. Wooden Steps and American Disabilities Act (ADA) Approved Ramp:

The Contractor shall provide a set of stairs and one ADA approved ramp for each building. Stairs, ramps and landings shall be provided that meet all federal, state, and local codes. In general, risers shall not exceed 7-3/4 inches in height and treads shall not be less than 9 inches in width.

Wooden steps and ramp shall be made of treated exterior grade framing lumber. A landing shall be provided which meets all federal, state, and local codes. The Contractor shall install steps in accordance with state and local codes, and the following minimum requirements: Steps shall be constructed 36 inches wide.

Handrails constructed with 2” x 4” safety edge lumber shall be provided on all steps and installed on the outside of the steps. Steps shall have a stable and secure foundation, be level in both directions. Riser height shall not exceed 7-3/4 inches and treads shall be not less than 9 inches. Treads less than 10 inches wide shall have a nosing or effective projection of approximately 1 inch over the level immediately below that tread.

The ramp shall meet or exceed the following:

a. The least possible slope shall be used for any ramp.