This is a Performance Work Statement (PWS) for a one-time repair contract for three 60' x 120' Sprung Structures located at Donnelly Training Area Intermediate Staging Base (DTA ISB) near Fort Greely and Delta Junction, Alaska. The U.S. Army Installation Management Command issued this requirement because relocatable shelters cannot be serviced by Army Directorate of Public Works personnel. Work must be completed by October 31, 2026, to support JPMRC 27-02, a large-scale Field Training Exercise expected to accommodate over 5,500 personnel.
The contract requires comprehensive repair and maintenance services across multiple system types. Scope includes: repair of detached insulation from interior membrane sides; patching of rips, tears, and holes in outer membranes (approximately 5 yards total); inspection, servicing, and repair of two fuel-fired furnaces per shelter with associated fuel tanks and plumbing; inspection and repair of two 14' x 14' OEM Overhead Door rolling service doors per shelter; inspection and repair of electrical wiring and components to ensure code compliance and safety; specific repair of a non-operational electrical system in Sprung #2 showing signs of shorting/arcing; repair and reinstallation of ceiling insulation retaining bars; and sub-surface burial of primary electrical conduit from power pole to distribution panel. The contractor must be a Sprung Structures "Preferred Contractor" with documented experience on Sprung products and provide all personnel, equipment, supplies, tools, materials, and supervision. All repairs must comply with OEM manufacturer standards using approved OEM materials and parts. A Draft Staffing and Support Plan with manning roster and acknowledgment of installation access requirements must be submitted within 10 working days of contract award. The Quality Assurance Surveillance Plan requires 100% acceptable quality level with TPOC on-site operations review, garrison compliance inspections, and potential work stoppage for non-compliance. Technical points of contact are Charles N. Wallace (907-353-7463) and Aaron D. Owen (907-873-4716) for on-site coordination. Performance will occur entirely at DTA ISB with the government providing portable latrines but the contractor responsible for all other support requirements for on-site personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Repair Sprung Shelter Combined Synopsis.pdf | ||
| Solicitation - W912D026QA010.pdf | ||
| Service Contract WD 2015 5683.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTA ISB Sprung Shelter Repair Contract
Requirements Summary:
1) This is a one-time contract to repair existing faults that aren’t covered under other repair/maintenance capabilities (i.e., DPW).
2) Work is to be completed on the three (3) Sprung shelters located at the Donnelly Training Area Intermediate Staging Base (DTA ISB), which is in the vicinity of Fort Greely, AK, and Delta Junction, AK. Locations of shelters are on attached map.
3) Work to be completed includes:
- Repair insulation that has detached from the interior sides of the membranes of the shelters.
- Repair rips/tears/holes and other faults or flaws in outer membranes of the shelters.
- Inspect, service, and repair if required the furnaces in each shelter (2 per shelter)
- Inspect, service, and repair if required the rolling service doors (2 per shelter)
- Inspect, service, and repair if required the electrical wiring and components on interior of shelters
4) Work should be completed by 31 October 2026 in order to be available for occupation prior to JPMRC 27-02.
Power Drop Power Dist. Panel
Elec. Conduit
SCOPE OF WORK
TITLE: Donnelly Training Area ISB Sprung Structure Repair
DATE: 28 May 2026
1.0 BACKGROUND
This is a non-personnel services contract to provide repairs and servicing to mechanical components to three existing Sprung Structures located at the Donnelly Training Area (DTA) Initial Staging Base (ISB), in the vicinity of Fort Greely, AK for use in support of JPMRC 27-02. The DTA ISB is approximately 2.5 miles from Fort Greely, AK. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
In 2022 U.S. Army Alaska contracted for the installation of three 60’ x 120’ Sprung shelters at the DTA ISB to support a large-scale winter Field Training Exercise. Due to the accelerated timeline required to meet operational requirements, the re-locatable shelters were chosen as the preferred structure. As per U.S. Army Installation Management Command regulations, re-locatable shelters are not authorized to be repaired or serviced by U.S. Army Directorate of Public Works maintenance personnel.
JPMRC 27-02 is a large-scale Field Training Exercise. During the Exercise over 5500 personnel will be transitioning through the Donnelly Training Area and Fort Greely, AK. Extreme cold weather, unknown logistical and operational support requirements and a shortage of available warm sleeping areas makes the use of the existing three Sprung Structures on DTA ISB a significant exercise support capability. The structures require repairs to the exterior membrane, interior insulation and electrical system/connections. The structures also require preventative maintenance inspections on the mechanical components (furnaces, rolling service doors, access doors, electrical systems) installed in the Sprung shelters to make them usable for the exercise. The contractor should be a Sprung Structures ‘Preferred Contractor’ with experience working on Sprung products
The contractor shall provide all personnel, equipment, supplies, facilities, tools, materials, supervision, and other items and non-personal services requested in this statement necessary to support this effort. The contractor shall perform to the standards in this contract.
2.0 OBJECTIVES
2.1 Provide Inspection, Preventative Maintenance and Repairs to the three existing 60’ X 120’ Sprung
Structures located at Donnelly Training Area ISB in the vicinity of Fort Greely, AK. Assess current membranes, insulation, access doors and mechanical components and provide materials and expertise necessary to repair structure NLT 31 October 2026. Repairs shall be made in accordance with OEM manufacturer standards and with approved OEM materials.
2.2 Provide preventative maintenance, servicing and, if required, repairs of fuel-fired furnaces (2 per structure), fuel tanks (2 per structure) and associated plumbing as noted in the attached drawing.
Repairs shall be made in accordance with OEM manufacturer standards and with approved OEM parts and materials. Technician repair will be required to facilitate full operations of the furnaces.
Coordinate both service and repair of these furnaces.
2.3 Provide preventative maintenance, servicing and, if required, repairs of OEM Overhead Door rolling service doors (2 each, 14’ X 14’ rolling service doors per shelter). If repair is required to facilitate full operations of these doors, Technician will repair i/a/w OEM repair manuals.
2.4 Provide service of electrical wiring and components on interior of the shelters as noted in the attached drawing to ensure safety and standardized code compliance. If repairs are required, they must be completed i/a/w common safety standards and, if applicable, i/a/w shelter OEM requirements.
2.5 Provide repairs to the electrical system and/or connections to Sprung #2 (see map). The electrical system in Sprung #2 is not operational and shows signs of shorting out/arcing when power is turned on.
2.6 Perform repairs and re-installation of ceiling insulation retaining system. Some of the retaining bars that hold up the insulation have become loose and dislodged from the shelter structure.
2.7 Perform sub-surface burial of primary electrical conduit which runs from power pole to main distribution panel i/a/w common industry standards.
2.8 Photos and inclusions provided with this Statement of Work (Map, Drawings) allow contractor to gauge repair requirements. On site or virtual site visits can/should be coordinated with the contracting office and installation support staff to better gauge the requirement. Tele-conferencing can be coordinated with the installation to allow a virtual walk through and discussion of repair requirements. See information enclosure provided for details.
2.9 Contractor must coordinate Post Access requirements prior to site tour and Contract Startup.
3.0 SCOPE
The scope of this contract is to provide the listed contractor oversight and technical support necessary to complete the repair, inspection and preventative services of three 60’ X 120’ Sprung Structures in support of the JPMRC 27- 02 Exercise. This repair must be completed by 31 October 2026.
4.0 SERVICE REQUIREMENTS
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide the designated maintenance and service support on Donnelly Training Area, Fort Wainwright, Alaska. This includes the following tasks:
4.1 Provide on site technical expert to assess the repair requirements and supervise the repair of the existing three Sprung Structures.
4.2 Provide on site technical expert and repairman for inspection and repair of existing overhead service doors (2 each, 14’ X 14’ rolling service doors per shelter).
4.3 Provide on site technical expert and repairman for inspection and repair of existing electrical wiring, components and connections/junctions.
4.4 Conduct LTA membrane repair to patch larger holes. Total amount of repairs is approx. 5 yards for the three structures.
4.5 Conduct LTA membrane repair using patch kits to fix small holes.
4.6 Conduct repairs or replacement to any insulation that is debonding or falling away from walls or ceilings of the structures.
4.7 Conduct work to complete burial of electrical power supply cord beneath the surface grade from power pole to power distribution panel.
4.8 Contractor will submit “Draft” Proposal of requirements. Tentative details includes: Proposed
Work Schedule, required/requested Installation support.
5.0 DELIVERABLES
The contractor shall deliver:
DELIVERABLE CRITERIA/ CONTENT DUE DATE RECIPIENT
DRAFT Staffing and
Support Plan DRAFT Staffing/Manning
Roster Contractor Acknowledgement of all
Installation Access Review Requirements
10 Working Days from Contract
Award
Technical
POC
Equipment List and Statement of Materials
Membrane and Repair Parts and listing of components to ensure contract completion and invoice detail of repair/installation equipment and required support Materials or equipment rental.
Details provided in proposal and upon invoicing (IAW stated PWS)
Technical POC
6.0 QUALITY ASSURANCE SURVEILLANCE PLAN
Government shall use the monitoring methods cited below to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
SOW
Paragraph
Performance Standard
Acceptable Quality Level
Method of Surveillance
Incentive (Positive and/or Negative)
(Impact on Contractor)
Objectives 2.1, 2.2, 2.3 and Para.
4.1- 4.6
Repair Existing Membrane of Sprung Structures 100%
TPOC review of on site operations.
Garrison Compliance No –Notice Inspections
Non Compliant Site will be shut down until satisfactory standard is met.
feedback and re-work of the vignettes will be required prior to acceptance / payment Objective
2.4 and Para. 4.7
Supervise and provide Technical Oversight to repair of existing
Sprung Structure
100% TPOC/Safety or designated
Representative Spot Check
Additional feedback and Potential work stoppage until compliance
Objective 2.1, 2.6 and para 4.6
Repair existing Insulation of Sprung Structures and replace, repair, reinstall ceiling insulation retaining bars.
100%
TPOC review of on site operations.
Garrison Compliance No –Notice Inspections
Non Compliant Site will be shut down until satisfactory standard is met.
feedback and re-work of the vignettes will be required prior to acceptance / payment Objective
2.3 and para 4.2
Service and repair (if required) rolling service doors of Sprung
Structures
100%
TPOC review of on site operations.
Garrison Compliance No –Notice Inspections
Non Compliant Site will be shut down until satisfactory standard is met.
feedback and re-work of the vignettes will be required prior to acceptance / payment Objective 2.1, 2.2
Inspect, Service, perform Preventative Maintenance and repair (if required) the existing furnaces, fuel tanks and associated fuel plumbing of Sprung
Structures
100%
TPOC review of on site operations.
Garrison Compliance No –Notice Inspections
Non Compliant Site will be shut down until satisfactory standard is met.
feedback and re-work of the vignettes will be required prior to acceptance / payment Objective Service and repair the existing electrical wiring and components 100% TPOC review of on site operations.
Non Compliant Site will be shut down
2.1, 2.4, 2.5 and para 4.3 installed in Sprung Structures and connections to primary power junction boxes
Garrison Compliance No –Notice Inspections until satisfactory standard is met.
feedback and re-work of the vignettes will be required prior to acceptance / payment
2.7 and para 4.7
Perform burial of primary electrical connection (from power pole to power distribution panel) beneath surface grade i/a/w standard practices.
100%
TPOC review of on site operations.
Garrison Compliance No –Notice Inspections
Non Compliant Site will be shut down until satisfactory standard is met.
feedback and re-work of the vignettes will be required prior to acceptance / payment
7.0 TRAVEL
The contractor has no travel requirements necessary to fulfill the requirements described in this PWS.
8.0 PLACE OF PERFORMANCE
The primary place of performance is at the DTA ISB, vicinity Delta Junction, AK. The work and support will be provided on site at the designated Sprung Structure highlighted in the enclosures provided. The government will provide portable/designated latrines on site but the contractor should support all other support requirements for on-site personnel.
9.0 OTHER INFORMATION
9.1 SECURITY
The work under this contract is unclassified. The support will be provided within the boundaries of DTA ISB, which is part of the Fort Wainwright, AK installation. Contractor will require access to the military installation.
10.0 AVAILABLE SUPPORT BY GOVERNMENT PERSONNEL
As stated in the PWS, identified equipment support may be available to the contractor with coordination with the COR. Temporary MHE, Construction Equipment Support etc. may be available with coordination. Contractor must identify and request support with COR prior to arrival of personnel.
Contractor is authorized to coordinate for “space available” support but is responsible for identifying requirements and cost savings provided to the government for the use of this government support. No equipment provided will be operated by the contractor and will be provided “in support” of contractor requirements. This support could/can include snowplowing of designated area, MHE support for download of equipment, and other support as coordinated and approved by the COR.
11.0 TECHNICAL POINT OF CONTACT (TPOC)
Charles.n.wallace.civ@army.mil , 907-353-7463
The contractor shall coordinate contract performance logistics with these TPOC.
On site coordination for Range Support, Area Access and other designated support requirements
Aaron.d.owen.civ@army.mil 907-873-4716 mailto:Charles.n.wallace.civ@army.mil mailto:Aaron.d.owen.civ@army.mil
(End of Performance Work Statement)