This document is a Request for Information (RFI) containing answers to 12 questions regarding Emergency Pull Stations for a federal contract opportunity at Fort Wainwright (FWA) and Joint Base Elmendorf-Richardson (JBER). The project involves replacing existing secur-i-tron devices with pull stations at 9 exit points, with one additional spare pull station, connected to a Lenel OnGuard system. Technical specifications include 160 ft of 1/2" EMT conduit, eighteen single-gang electrical outlets, 1/2" EMT connectors and straps, and an estimated 5 feet of wire per pull station with 20% excess. The work will be performed in a concrete building during day working hours (8-5 AM), with the control head located in a secured area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Salient Characteristics Bld 1 Pull Station PDF.pdf | ||
| Solicitation - W912D025QA004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI ANSWERS for
Emergency Pull Stations W912D025QA004
(Brand name or equal)
Questions 1: I will need part numbers to be able to assist you.
Ans: 160 ft 1/2" EMT conduit
Question 2: What is SDC unit and the Cable Specification
Ans: Eighteen (18) YXX-TECH-Single-Gang-Electrical-outlet (or equivalent), 1/2" EMT connectors and straps
Questions 3: The door schedule or door take off.
Ans: The project only requires replacing the existing secur-i-tron device with a Pull Station. No software modification or door schedule required.
Question 4: The building floor plan with dimensions
Ans: As built or diagram will be provided
Question 5: The jobsite shows a Ft Wainwright address, but “Place of Performance” shows JBER address?
Ans: Contracting office is at FWA, place of performance is JBER.
Question 6: What control system are these pull stations tied to? (Manufacturer, Type and Output Voltage).
Ans Lenel OnGuard system
Question 7: Where is the control (head end) located in the building relative to the exit doors.
Ans: Control head located in secured area.
Question 8: SOW species installation at 9 exits but shows 10 pulls, is one for spare? Is there already 1 pull installed at an exit?
Ans: Correct 1 is a spare
Question 9: SOW to install 9 pull stations but only includes 100ft of wire?
Ans: Estimated 5 feet of wire per pull station with 20% excess. Conduit has 50 percent excess
Question 10: What is the building construction (Concrete, Wood Frame, Hard lid, Drop Ceiling Etc.).
Ans: Concrete building
Question 11: What is the distance between doors?
Ans: Distance between doors is irrelevant. just need to replace secur-i-tron with pull station at each door
Question 12: Working Hours (Days, Nights Etc.)
Ans: day working hours (8-5).