RFI Answers for W912D025QA004.pdf

PDF 45 KB Posted

Attached to
Emergency Pull Stations for Access Control System
Solicitation number
W912D025QA004
Issued by

About this file

This document is a Request for Information (RFI) containing answers to 12 questions regarding Emergency Pull Stations for a federal contract opportunity at Fort Wainwright (FWA) and Joint Base Elmendorf-Richardson (JBER). The project involves replacing existing secur-i-tron devices with pull stations at 9 exit points, with one additional spare pull station, connected to a Lenel OnGuard system. Technical specifications include 160 ft of 1/2" EMT conduit, eighteen single-gang electrical outlets, 1/2" EMT connectors and straps, and an estimated 5 feet of wire per pull station with 20% excess. The work will be performed in a concrete building during day working hours (8-5 AM), with the control head located in a secured area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI ANSWERS for

Emergency Pull Stations W912D025QA004

(Brand name or equal)

Questions 1: I will need part numbers to be able to assist you.

Ans: 160 ft 1/2" EMT conduit

Question 2: What is SDC unit and the Cable Specification

Ans: Eighteen (18) YXX-TECH-Single-Gang-Electrical-outlet (or equivalent), 1/2" EMT connectors and straps

Questions 3: The door schedule or door take off.

Ans: The project only requires replacing the existing secur-i-tron device with a Pull Station. No software modification or door schedule required.

Question 4: The building floor plan with dimensions

Ans: As built or diagram will be provided

Question 5: The jobsite shows a Ft Wainwright address, but “Place of Performance” shows JBER address?

Ans: Contracting office is at FWA, place of performance is JBER.

Question 6: What control system are these pull stations tied to? (Manufacturer, Type and Output Voltage).

Ans Lenel OnGuard system

Question 7: Where is the control (head end) located in the building relative to the exit doors.

Ans: Control head located in secured area.

Question 8: SOW species installation at 9 exits but shows 10 pulls, is one for spare? Is there already 1 pull installed at an exit?

Ans: Correct 1 is a spare

Question 9: SOW to install 9 pull stations but only includes 100ft of wire?

Ans: Estimated 5 feet of wire per pull station with 20% excess. Conduit has 50 percent excess

Question 10: What is the building construction (Concrete, Wood Frame, Hard lid, Drop Ceiling Etc.).

Ans: Concrete building

Question 11: What is the distance between doors?

Ans: Distance between doors is irrelevant. just need to replace secur-i-tron with pull station at each door

Question 12: Working Hours (Days, Nights Etc.)

Ans: day working hours (8-5).

File details come from the government source that posted it. Updated .