Questions and Answers Amendment 1.pdf
PDF 45 KB Posted
- Attached to
- DPW-18065-8J, Roof Repair, B1045
- Solicitation number
- W912D020B0001
About this file
This document contains a solicitation for a roof repair project at Fort Wainwright in Alaska. The U.S. Army is seeking a contractor to repair the roof of Building 1045, as the current cold roof design is failing. The contractor must provide all engineering, labor, equipment, and materials to complete the work in accordance with specifications and drawings. A site visit will be held on July 30th, 2020, and any questions must be submitted by August 4th, 2020. The period of performance is 400 calendar days from notice to proceed. The project value is between $500,000 and $1,000,000. The solicitation is a total small business set-aside for NAICS code 238160 with a size standard of $16.5 million. One firm-fixed price contract will be awarded. Electronic bids must be received by the specified date and time via email to the points of contact listed.
The first document contained in the file is a questions and answers amendment pertaining to the application of gypsum wallboard and fire protection, but does not provide information on required products or services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Question 1:
Confirm that we are to apply GWB around the collar tie connections and continue up the hand framed truss to the peak. We are not to apply to the collar tie creating a ceiling.
Response: Correct. GWBx will be applied to collar tie connections and continue up the hand framed truss to the peak. The intent is to provide a fire barrier directly to the application of foam.
Question 2:
If we are to apply to the collar tie's creating a ceiling, does that space need to be sprinklered? As it will create a space without fire protection on exposed foam and framing.
Response: N/A. GWBx will be applied to collar tie connections and continue up the hand framed truss to the peak.
Question 3:
Is any emergency lighting at doorways required as part of the contract?
Response: No lighting is required as part of this scope.