Statement of Work (SOW) Building 2400
Project Name – Fabricate Rail Spanner
Location: Building 2400, Fort Wainwright, Alaska
Item Description – Logistics Readiness Center (LRC) requires 100 portable aluminum Rail Spanners with carry handles.
1.1 Scope of Work: The contractor shall provide material and service to include but not limited to the production, load certification, and delivery of 100 portable aluminum Rail Spanners with carry handles.
1.1.1 Background: Logistics Readiness Center (LRC) mission is to provide logistical support to the 1-25 Stryker Brigade Combat Team, 4-25 Airborne Brigade Combat Team, 16th Combat Aviation Brigade, 2nd Engineer Brigade, Separate Battalions, U.S.
Army Garrison, tenant organizations and visiting units on an area-wide basis. The current inventory of rail spanner is not sufficient to meet deployment timelines, additional rail spanners are required to meet deployment timelines.
2.0 Objectives: Rail spanner are used to bridge the gap between rail cars when loading rolling stock. Rail spanners are rated at 20,000 pounds capacity and are required to load/tensile tested every 5 years. Rail Spanners are to be constructed of 6061 T6 Aluminum welded per Industry Standards, 96 inches in length, 24 inches wide, with knife edge toe, reinforced kick plate, with 20,000 pound capacity, and spec plates etched with part number and maximum capacity.
3.0 Tasks: Work will be performed at contractor’s location. Contractor shall be responsible for establishing a schedule to meet construction time. Contractor will deliver the finished product to: Building 3030, Fort Wainwright, Alaska 99703.
3.1.1 Contractor will be responsible productions, load certification and delivery to Fort Wainwright, Alaska of the rail spanners.
3.1.2 The contractor will provide one year warranty on parts and labor.
3.1.3 The contractor will provide contract service information and warranty forms.
4.0 Governing Laws and Ordinances: Work to be performed under this contract shall be in full accordance with the laws and ordinances pertinent to such work, including all applicable DoD Unified Facilities Criteria. In case of any conflict wherein the methods or standards of installation or the material specified or manufacturer’s recommendation do not equal or exceed the requirements of the laws and ordinances, the laws and ordinances shall govern. The words "laws and ordinances" as used herein shall mean all local, state, and national codes, laws, ordinances, standards, rules and regulations of any nature which are in any way pertinent to or regulatory over the work covered in this project.
5.0 Period of Performance: 60 days after receipt of order (ARO)
6.0 Place of Performance: Contractors facility
7.0 Security Requirements: Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative).
8.0 Government Furnished Property (GFP) and Services: U.S. Government will not provide any equipment, fuel, or personnel; utilities or facilities.
9.0 POC is William Mark Richardson, (907) 353-1115.