Performance Work Statement DES-FD705-7J 31 Aug 2018 Repair Bldg 4390 Page 1 of 5

STATEMENT OF WORK

DES-FD705-7J

Repair Vehicle Exhaust Ventilation System Bldg. 4390 Fire Station #2

31 Aug 2018

1. GENERAL: The project is to remove existing fire apparatus vehicle exhaust filtration system and provide a fire apparatus vehicle exhaust removal system (FAVERS). This will eliminate the occurrence of air contaminants to all areas of the building caused by operation of the fire apparatus vehicles inside apparatus bay in lieu of ‘filtering’ the contaminates. Since the standard operating procedure for vehicle start-up is to open the bay doors before operating the vehicles, this work will not have any impact to the existing HVAC system.

2. GENERAL PROJECT REQUIREMENTS:

2.1 Applicable codes:

UFC 1-200-01, DoD Building Code (General Building Requirements) UFC 3-520-01, Interior Electrical Systems UFC 4-730-10, Fire Stations NFPA 1500, Standard of Fire Department Occupational Safety, Health, and

Wellness Program ACGIH Industrial Ventilation, Manual of Recommended Practices ANSI A13.1, Scheme for the Identification of Piping System.

ASHRAE Handbooks.

MICA Manual, National Commercial and Industrial Insulation Standards MSS SP-69, Pipe Hangars and Supports – Section and Application NFPA 70, National Electrical Code NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating

Systems NFPA 101, Life Safety Code OSHA 1910, General Industry OSHA 1926, Construction SMACNA HVAC Duct Construction Standards SMACNA Seismic Restraint Manual UFGS, Unified Facilities Guide Specifications (as referenced) UL Fire Resistance Directory

2.2 The Period of Performance (POP) is 270 days after issuance of NTP. The NTP will be issued 10 days after the date the contract is awarded. The POP includes material procurement and equipment delivery times.

2.3 Building may require lead-based paint (LBP), mold, and asbestos abatement to accomplish required work. No locations have been determined to have asbestos or LBP, but there is a potential for encountering both in remote locations within the facility.

2.3.1 This statement of objectives specifically requires asbestos abatement by a certified worker should there be this hazardous material in the existing construction materials. Test and confirm nature and extent of this hazardous material before commencing demolition.

Abate all affected areas and properly dispose.

Repair Bldg 4390 Page 2 of 5

2.3.2 This statement of objectives specifically requires mold abatement by a certified worker should there be this hazardous material in the existing construction materials. Test and confirm nature and extent of this hazardous material before commencing demolition.

Abate all affected areas.

2.3.3 This statement of objectives specifically requires lead-based paint abatement by a certified worker should there be this hazardous material in the existing construction materials. Abate all lead-based paint associated with demolition; encapsulate all other lead-based paint. Testing for LBP shall be performed prior to demolition. Material exceeding EPA requirements shall be separated from demolition wasted and properly dispose.

2.4 Anything mentioned in the statement of objectives and not shown on the drawings, or shown on the drawings and not mentioned in the statement of objectives, shall be of like effect as if shown or mentioned in both.

2.5 Any direction offered by the customer that conflicts with this statement of work shall not be carried out without proper direction from the government Contracting Officer.

2.6 See attachments for additional information and details. Provided drawings are for reference only and shall not be used as the primary construction set of plans. It is the responsibility of the contractor to verify all on site dimensions, sizes, quantities and conditions prior to submitting a proposal.

3. ARCHITECTURAL:

3.1 Work Description:

3.1.1 Any architectural repairs required to complete the work shall conform to the following in addition to the referenced codes.

3.2 Application of Paint: Patch, repair, and prep/texture for new paint; apply at least one application of prime coat; allow 30 minutes between prime coat applications. After prime coat apply minimum two finish coats as necessary to provide a smooth, opaque surface of uniform finish, color, appearance, and coverage. All paint shall be applied at a 2-mil-per-coat minimum thickness. No paint shall be disposed of in the sinks, tubs, toilets, or any drains. There shall be one wash down area assigned for clean-up. All paint in kitchenette, toilet rooms, and showers shall be semi-gloss; all other walls shall be eggshell.

3.3 Drywall: All installed drywall shall be 5/8” Type “X” drywall with sound deadening material between the studs in walls unless the area is furred over a block or concrete wall; finished, taped, textured to match adjacent walls, and painted. Drywall walls will include 4” or 6” cove base as indicated on drawings or this statement of work, unless otherwise noted. Sound deadening shall be installed in all walls unless the area is furred over a block or concrete walls.

3.4 Where items are to be permanently removed, repair wall and ceiling finishes to match adjacent undisturbed walls and ceilings.

3.5 Temporarily remove receptacles, wall switches, thermostats, wall-mounted light fixtures, exit lights, fire extinguisher cabinets, etc. as necessary for remodel work. Reinstall or replace with new.

Repair Bldg 4390 Page 3 of 5

4. ELECTRICAL:

4.1 Work Description:

4.1.1 Provide new electrical circuits from an existing panel(s) to provide power to new equipment. Electrical circuit shall include a disconnect switch located in an accessible location and within sight of the new equipment to use for maintenance activities.

4.1.2 All electrical to meet NFPA 70 and UFC 3-520-01

4.2 Interior Wiring: All interior wiring in the building shall be run in conduit. Conduit to be minimum ½”, threaded RMC due to damp or wet conditions. Use handle ties for multi-wire circuits. When a shared neutral conductor must be used for three-phase, four-wire systems, size the neural conductor to have an ampacity equal to 1.73 times the ampacity of the phase conductors for non-linear circuits. Limit no more than three single phase circuits in one raceway. When more conductors are required, provide detailed calculations showing compliance with NFPA 70 for derating conductors and conduit fill. Minimum size of power conductors shall be #12 AWG. Provide an insulated green equipment grounding conductor in conduit.

4.3 Additional power requirements-Provide all required power panels, feeders, starters, disconnect switches, controllers, all other power/control equipment and materials for all mechanical/electrical equipment furnished by other sections of the RFP.

4.4 Electrical Penetrations of walls and roof-Any penetrations of the building vapor barrier system shall be appropriately sealed and insulated to retain integrity of the barrier system including, but not limited to conduits and backs of electrical boxes. All power, auxiliary, control, lighting and other circuits shall not penetrate any stair or exit passageway unless this circuit serves an appliance within the stair or passageway and dead ends in the stair or passageway per NFPA 101. Electrical equipment shall not be supported from the building metal deck.

5. HEATING, VENTILATING, AND AIR CONDITIONING

5.1 General Work Description. All work shall be accomplished in accordance with the referenced codes and as specified below.

5.1.1 Ventilation System:

5.1.1.1 Prior to beginning onsite work on this project, all parties (fire chief, contractor and DPW) shall meet to discuss project goals, project schedule and system performance requirements.

5.1.1.2 This project shall be accomplished while the facility is occupied and during normal business hours.

5.1.1.3 Contractor shall demo and remove existing Airvac 911 exhaust filtration system components, controls, conduit and conductors back to the main distribution panel. Existing to remain breaker shall be labeled as ‘spare’.

5.1.1.4 Provide FAVERS vehicle capture and exhaust system. FAVERS shall be designed to handle the existing 4 fire apparatus’ bays. System consists of Qty 4 back-in bays serving qty 1 side exhaust each. FAVERS system to require a total of four side

Repair Bldg 4390 Page 4 of 5 exhaust hose drops. The existing fire apparatus vehicles are shown in pictures and have the exhaust locations shown on the attached drawings. FAVER shall be provided as a system from a single manufacturer. FAVER system manufacturer shall be Magnegrip, Plymovent, or approved equal. The FAVERS shall include:

5.1.1.4.1 No-loop hose system to keep aisle ways clear and apparatus doors accessible with high temperature hose drop for side exhaust vehicles with tailpipe nozzle assembly that completely seals to contain contaminated air, provides easy connection without the use of pneumatics, and provides exhaust cooling ambient air intake.

5.1.1.4.2 Source capture for each apparatus which will auto-disconnect at the exit door.

5.1.1.4.3 Vehicle exhaust pipe modification may be required for system connection as part of the contract. Emergency apparatus exhausts must be modified at the station. Emergency apparatus may not be removed from the station to an offsite location. Contractor shall provide a total of 13 apparatus exhaust adaptors. The base vehicle maintenance contractor shall be installing all exhaust adaptors on all vehicles. A list of fire protection apparatus will be provided at award of contract.

5.1.1.4.4 The fan shall be a backward incline fan made from a welded housing bolted to the fan frame. Fan housings that are screwed together or riveted are not acceptable. Fans shall be tested and balanced prior to installation, be manufactured in an ISO Certified Facility in accordance to AMCA Certification Standards. A safety disconnect in the vicinity of the blower fan motor must be provided. Wireless auto-start control panel with NEMA 4 enclosure with automatic start/stop operation. Assembly shall be UL listed with timer and manual override switch. Motor to be 3-phase motor rated for 208V system, not 230V.

5.1.1.4.5 Wireless receiver fan controller and apparatus ignition voltage transmitters for automatic system activation. Contractor shall provide a total of 13 apparatus voltage transmitters as part of this project. The base vehicle maintenance contractor shall be installing all voltage transmitters on all vehicles. A list of fire protection apparatus will be provided at award of contract.

Tie-in to the building DDC system shall not be part of this project. No makeup air from the existing HVAC system shall be required in this project.

5.1.1.4.6 Updraft backdraft damper with rain cap for roof exhaust.

5.1.1.4.7 Factory start-up and field training.

5.1.2 Controls:

5.1.2.1 FAVERS shall utilize its internal controls. Contractor to provide exhaust fan control via manufacturer provided vehicle ignition controller, installed by others (FTW IMF). Upon apparatus ignition, a wireless voltage output signal shall be detected by the fan controller and activate the exhaust fan. A low voltage timer will keep the exhaust fan operating for a period of time designated by fire department procedures. Contractor is responsible for syncing/coordinating apparatus voltage transmitter signal with fan controller.

Repair Bldg 4390 Page 5 of 5

5.1.2.2 After completion of all mechanical work and after contractor has independently tested the modified system, contractor shall provide a demonstration to the Government showing that the modified systems are working as designed.

5.2 Responsibility:

5.2.1 The Contractor shall be responsible for the modified vehicle exhaust system, exhaust system controls, seismic bracing, and supporting electrical system for the work stated in this performance work statement and shall provide shop drawings as necessary to demonstrate that the layout, system sizing and equipment selections conforms with the requirements of the performance work statement and all referenced design and construction standards.

5.3 Mechanical Insulation shall be installed in accordance with National Commercial & Industrial Insulation Standards (MICA Manual), current edition.

5.3.1 Insulate all exhaust air ducts within 6 feet of discharge to the exterior. Provide rigid insulation on exposed ducts and blanket insulation on concealed ducts. Internally lined ductwork, except for acoustical purposes, shall not be allowed. A minimum of 2 inch insulation with vapor barrier jacket shall be provided where required.

5.4 Seismic Bracing

5.4.1 All mechanical piping, ductwork and equipment shall be seismically braced. Seismic bracing shall comply with SMACNA Seismic Protection Guidelines. Specific mechanical equipment shall comply with manufacturers’ recommendations for seismic protection. This building is designated as a Category IV Critical Facility by the IBC.

5.5 Controls

5.5.1 The Operation & Maintenance (O&M) Manuals that shall include as-built copies of the shop drawings, control schematics, wiring diagrams, equipment schedules and sequences of operations. Manufacturer’s Installation, Operation and Maintenance (IOM) instructions shall be included for each system component. O&M Manuals shall be hard bound, indexed and provided with a table of contents as well as an electronic PDF copy which is also indexed and bookmarked.

5.5.2 Following completion of the work, as-built copies of the control diagrams, wiring schematics and sequences of operations shall be provided in a wall or enclosure mounted “data pocket” for storage of posted instructions.

6. ATTACHMENTS:

6.1 Apparatus Bay Drawings – AutoCAD available upon request.

6.2 Division 1 Specifications

6.3 Submittal Register

DES-FD705-7J - SO 8-31-18