Project #DPW-16099-6J Install New LED Fixtures
Structures #3484 A,B,C and D.
Scope of Work (12 March 2018)
1. Project Requirements. The Contractor shall provide all labor, conduit, fittings, equipment, fixtures, mounts, devices, accessories, transportation, and storage as required to perform all work in accordance with these specifications, commercial practices and industry standards. All work shall be accomplished in accordance with applicable federal, state, and local regulations. Work includes but is not limited to the following:
A. Remove existing fixtures B. Install new fixtures
2. The point of contact (POC) for this project will be the contracting office until time of award. Additional project POC’s will be provided to the awardee.
3. The Contractor shall accept directions only from the Regional Contracting Office- Alaska (RCO-AK) Contracting Officer (KO). Requests or desires of the users or using agency made directly to the Contractor will be immediately brought to the attention of the KO, and the Contracting Officer’s Representative (COR) if applicable. Any changes to the project scope or other provisions of the SOW must be authorized in writing by the KO.
4. Remove the existing fixtures/Install new fixtures (see attachment #2). The Contractor will remove and dispose of the existing fixtures. The Contractor will install new LED fixtures. The tasks anticipated under this portion of the scope include but are not limited to:
A. The Contractor will check each of the existing lighting circuits that supply the four canopy areas for current loading with an amperage meter. The Contractor will note those amperage readings and furnish a copy of those readings in a printed format to the FM specialist.
B. The Contractor will disconnect, remove and dispose of all the existing canopy fixtures and associated hardware as needed except for the two identified fixtures.
C. The Contractor has salvage rights to the existing fixtures, mounts, conduit and conductors that are removed.
D. The use of existing conduit, fittings, supports, conductors and boxes is authorized
E. The Contractor will furnish, install, connect and energize sufficient temporary lighting to safely operate the other areas during the removal of the old fixtures and the installation of the new fixtures. The Contractor may remove the existing lights a portion at a time to minimize the use/need for temporary lighting. If there is sufficient daylight to operate the pumps and read the display screen of the authorization pedestal, temporary lighting will not be needed during the daylight hours.
F. The Contractor will furnish, install, connect and energize sufficient conductors within contractor installed and/or reused conduit to install new LED fixtures to replace the existing fixtures which were removed. For every existing fixture that is removed a new fixture will be installed in the same general space.
G. The new fixtures for canopies A and B will have a 10 year warranty and sealed light engines. The existing two fixtures that will be left in place are 66 watt CREE Edge series fixtures. The new fixtures for canopies A and B will be the same or look similar to these fixtures in style, color and mount.
H. The Contractor will furnish and securely mount each new fixture to the building structure/support or bracket where the old fixture was removed.
I. The new fixtures for canopies C and D will have a minimum 60,000 hour rated lifespan, 80-100 watt LED, explosion proof fixture.
J. The Contractor will install a new photo eye(s) to control the canopy lights for all four canopies to turn off the lights during daylight hours.
K. The Contractor will take an amperage draw reading on all of the phase conductors of the supply panels that supply the four canopies. A reading of four minutes on each leg will be acceptable; the contractor will note the highest reading during the four minute observation. The Contractor will notify the facility management specialist of those amperage draw readings in a printed format.
L. The Contractor will be required to paint the conduit, boxes, fittings, supports or other equipment to match the surface color upon which it is mounted; if replacements or new are installed.
M. The Contractor shall make a reasonable effort to verify dimensions and shall examine the project to become aware of the existing conditions and difficulties involved in the completion of the work in accordance with the Scope of Work prior to the submission of your bid and commencement of work.
N. All other circuits, components and/or utilization equipment will be left energized and operational.
O. The finished product and all of its components shall be constructed and assembled to handle the environment in which it is installed.
P. Conflict and/or clarity issues in reference to items, descriptions or drawings within and of this scope of work will be resolved with the writer of this scope.
Q. The Contractor shall perform all activities so as to limit interference with operations of the facility and the work of others.
R. References in specifications to any brand name equipment or material shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may submit proposed equal equipment and/or materials for Government consideration during the submittal process of the contract.
5. Anything mentioned in the Scope of Work and not shown on the drawings, or shown on the drawings and not mentioned in the Scope of Work, shall be of like effect as if shown or mentioned in both.
6. Completion date-Period of Performance not to exceed 60 days after NTP issuance.
7. Upon award of the contract, contractor shall meet with Facility Management staff for a Pre-Con meeting, before beginning work. Work will only commence after the issuance of a Notice to Proceed (NTP). The building included in the scope of this contract will likely be occupied. The Contractor will schedule and perform work under this contract in such a manner as to allow the occupants of the building to continue their normal activities with the least amount of interference. NTP will be issued 10 days after the date the contract is awarded. The construction period includes material and equipment delivery times.
8. All work will be performed by certified personnel, as applicable. All required training and certification costs will be paid by the Contractor.
9. Contractor shall provide Quality Control. The government’s Quality Assurance (QA) individual shall work closely with the Contractor’s QC individual to ensure all contract requirements are included.
10. Security Requirement. All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
11. Required submittals:
With proposal: Please include construction schedule with the proposal
Submittals required prior to start of construction: Canopy Lights
Submittals before final inspection: None
ATTACHMENTS/ENCLOSURES:
Drawings and pictures