PERFORMANCE WORK STATEMENT
FOR
ELEVATORS, LIFTS, AND PLATFORMS SERVICES FOR
EIELSON AFB, FORT WAINWRIGHT, AND FORT GREELY
February 2017 1
PART 1
GENERAL INFORMATION
1. GENERAL. This is a non-personal service contract to provide inspection, testing, maintenance, and repair of elevators, lifts and platforms at Eielson AFB (EAFB), Fort Wainwright (FWA), and Fort Greely (FGA). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform inspection, testing, maintenance, and repair of elevators, lifts and platforms as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Objective: The objective of this service is to maintain and keep government-owned elevators, lifts, and platforms well maintain and at a high degree of reliability.
1.3 Scope: The work under this service contract includes all passenger elevators, freight elevators, wheelchair lifts, chair lifts, stair lifts, platform lifts, and vertical platforms located in EAFB, FWA, and FGA. The Contractor shall perform periodic inspections, testing, preventative maintenance, adjustments, and repairs of elevators, lifts and platforms to ensure continuous, safe and reliable operation of the systems. The Contractor shall provide detailed cost estimates of required repairs, inspection and testing reports, and certificates of inspection to the Contracting Officer (KO) and Contracting Officer’s Representative (COR).
1.4 Place of Performance: The work to be performed under this contract will be in Alaska at the following military installations: Eielson AFB, Fort Wainwright, and Fort Greely.
1.5 Period of Performance (POP):
Base Year: One (1), 12-month period of full performance Option Years: Four (4), 12-month option periods
1.6 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:30 A.M. and 4:30 P.M., Monday thru Friday except Federal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the
February 2017 2
Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.7 Recognized Federal Holidays: The contractor shall not be required to perform services on the recognized Federal holidays. The recognized Federal holidays are included in the attached Department of Labor Service Wage Determination for the State of Alaska. When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday. The contractor shall work on the days the Government is scheduled to work.
1.8 Schedule Coordination: The Contractor shall be responsible for coordinating all contractor activity with the COR who in-turn will be responsible for coordinating with the facilities managers. The Contractor shall notify the COR at least 24-hours prior to performance of any contractor activity. The facilities shall remain in operation while the Contractor is working, and it is up to the Contractor to coordinate around the normal activities of the facilities.
1.9 Changes: The Government anticipates the need and reserves the right to add, delete or change the elevators, lifts, and platforms to be serviced under this contract.
Price adjustments for these changes shall be based on the rates specified in the bid sheets for identical or similar equipment.
1.10 Special Qualifications: The Contractor shall be licensed by the State in which the work is conducted to provide services specified in this contract. All work shall be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and state certification requirements in inspection, testing, and maintenance of elevators, lifts, and platforms. The Contractor shall submit evidence of personnel qualifications to the KO and COR upon request. This information shall be readily available to the Government at pre-award and at any time during the performance of this contract, and shall be a part of any bid tendered. The Contractor shall ensure the appropriate certificates remain current throughout the POP.
1.11 Key Personnel: The following personnel are considered key personnel by the government: Contract Manager and Alternate Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the KO. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between the hours of 7:30 A.M. and 4:30 P.M., Monday thru Friday except Federal Holidays or when the Government facility is closed due to
February 2017 3 local or national emergencies, administrative closings, or similar Government directed facility closings.
1.12 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart
42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.13 Quality Assurance (QA): The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.14 Quality Control: Contractor shall develop and maintain a quality control program (QCP) to ensure inspection, testing, maintenance, and repair services are performed IAW applicable publications and other applicable standards and codes (see Appendix 7). The Contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. As a minimum, the Contractor shall develop quality control procedures that address all the requirements in the PWS. The QCP shall demonstrate how the Contractor ensures quality performance during the contract period of performance (POP). The Contractor shall maintain the QCP throughout the POP of the contract. The KO will be provided updates to the QCP as they occur during the POP. The QCP will identify the procedures in writing for inspections, individual responsible, elevators, lifts and platforms, maintenance control program (MCP), and the location of all inspection records and key control logs which will always be available to the government upon request. The QCP will have the inspection forms and records which will be used for the service. The Contractor will identify to the KO/COR the responsible quality control inspector to notify in case of customer complaints.
1.15 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions:
assure that the Contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including
February 2017 4
Government drawings, designs, specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; and coordinate availability of Government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.16 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.17 Environmental Control: The Contractor shall comply, and assure that all subcontractors comply, with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the Contractor shall use environmentally safe products in the course of completion of their project. The Contractor shall maintain, in company vehicle on site, Material Safety Data Sheets (MSDS) for all chemicals. A copy of all MSDS will be provided to the KO and COR. The MSDS data is subject to random checks by the Government. Contractor shall maintain, and provide on demand, an inventory of materials being brought on the Government facility. The Contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the Government facility. If the Contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the Contractor shall immediately notify the KO and COR and appropriate emergency responders. The Contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The Contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.
1.18 Asbestos: Elevators, lifts, and platforms may be located in facilities that may contain ACM or PACM. The Contractor (not the Government) shall determine if any exposure to ACM may result in performing work under the contract.
February 2017 5
2. SECURITY.
2.1. Security Requirements: Contractor personnel performing work under this contract shall not have been convicted of any felony and shall be able to pass a criminal background check at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254. (The unit security monitor is responsible for initiating this form).
2.2. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use.
2.3. Key Control: No keys or key cards shall be issued to the Contractor under this contract.
2.4. Contractor Access to Military Installations: The Contractor shall comply with requirements of electronic or web-based systems for gaining vehicle and personnel passes in order to gain unfettered access to the military installations.
2.5. Identification of Contractor Employees: All contract personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
2.6. The REAL ID Act: REAL ID compliant IDs can be located at the following website: https://www.dhs.gov/real-id-enforcement-brief
3. EMERGENCY MEDICAL TREATMENT.
3.1. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO and COR within 30 minutes of the incident.
3.2. Emergency medical treatment and services for contractor personnel is the responsibility of the Contractor.
https://www.dhs.gov/real-id-enforcement-brief
February 2017 6
4. ADDITIONAL SAFETY REQUIREMENTS.
4.1. Contractor activities shall be conducted in a safe manner that minimizes accidents as well as impacts on Army operations and members of the public.
The Contractor shall comply with applicable Federal, State, and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirement contained in this PWS. Specific program requirements such as Permit Required Confined Space Entry or Lockout/Tag Out, and Hazard Communication must first be coordinated through the Installation Safety Office. The Contractor shall ensure a sound safety program is in place and that employees understand this program, and shall complete a Job Hazard Analysis of each work site. Both documents must be available for review by FWA Installation Safety Office.
4.2. All accidents or injuries to Contractor personnel within FWA or FGA lands or facilities shall be reported to the Installation Safety Office by the next business day. Serious accidents or injuries including fatalities, amputation, or hospitalization shall be reported to the Installation Safety Office immediately, if possible.
4.3. The Contractor is responsible for record keeping under 29 CFR 1904 or equivalent, including Alaska Occupational Safety and Health (AKOSH) program.
The Contractor shall conduct and document safety inspections of their work areas IAW Federal, State, and local requirements.
February 2017 7
PART 2
SPECIFIC TASKS
1. INSPECTION AND MAINTENANCE SERVICES.
1.1. The work under this contract shall include passenger elevators, freight elevators, wheelchair lifts, chair lifts, platform lifts, and vertical platforms and related subsystems necessary for the safe, reliable operation of each system.
The Contractor shall perform to the standards in this PWS performing scheduled preventative maintenance, repair, inspection, and testing necessary to maintain all elevators, lifts, and platforms in EAFB, FWA, and FGA.
1.2. The Contractor shall perform periodic, comprehensive inspections and preventative maintenance and adjustment of elevators, lifts, and platforms identified in Appendix 5. This work shall be performed IAW recommendations of the manufacturer and requirements of publications in Appendix 7.
1.3. The Contractor shall have available suitable equipment for satisfactory performance IAW contract specifications, and shall provide everything necessary to perform the contract services specified.
1.4. The Contractor with the COR shall determine the working order and condition of all elevators, lifts and platforms listed in Appendix 5 within 30 business days of contract award. The Contractor shall submit a report to the KO of the condition of all elevators, lifts, and platforms. The report shall include make, model, serial number and year of each system. If the replacement of missing items or repair all items not in working order or serviceable condition is required, the Contractor shall wait for the KO’s approval. The KO will give instructions for situations where a unit requires a level of repair potentially constituting alteration. All repair work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the elevator, lift or platform manufacturer in effecting repairs (substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency).
1.5. The Contractor shall develop, maintain and submit to the KO and COR an annual written Maintenance Control Program (MCP) for each elevator, lift and platform within 20 business days after contract award to cover the base contract and any option periods. The MCP shall include required inspections, timelines for inspections and maintenance to be performed. The Contractor shall perform inspections and maintenance of all elevators, lifts and platforms IAW the MCP.
The MCP shall ensure compliance with all minimum code requirements. The Contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be IAW commercial practices or manufacturer’s specifications, if available, and shall be
February 2017 8 intended to maintain the elevators, lifts and platforms in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items. The Contractor shall develop and submit to the KO and COR, one electronic copy, in PDF format, of the MCP within 30 business days of contract award. After acceptance of the MCP the Contractor shall receive the KO’s acceptance in writing of any proposed change to the MCP.
1.6. The Contractor shall be responsible for leaving the equipment and area in a neat and clean condition.
1.7. The Government may perform inspections of the elevators, lifts and platforms at no cost to the Contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the Contractor will be notified in writing of any determination and may be responsible for the corrective actions.
2. REPAIRS.
2.1. The Contractor shall repair broken or malfunctioning elevators, lifts, and platforms as required. When notified by the KO or COR, the Contractor shall respond and begin repairs within 24 hours of notification.
2.2. When repairs are necessary and the Contractor determines that equipment cannot be repaired on-site and/or must be removed from the facility for repair, the Contractor shall obtain the approval of the KO and COR prior to removing the equipment from government lands.
2.3. Repair Service Calls: Contractor shall provide service calls (routine and emergency) at no additional charge. All repair work shall be done in accordance with standard commercial practices. Contractor shall repair and replace components of the elevators, lifts and platforms at no additional cost to the Government. When a component in a labeled product is replaced, it must be replaced with an identical component manufactured under the original labeling service (certifying agency). Substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency. The parts used for replacement are required to comply with all the requirements that the old parts originally complied with.
2.3.1. Routine Calls: Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call. The contractor shall accept service calls only from the KO or COR. The Contractor shall respond in-person to the elevator, lift or platform and begin work on routine service calls at no additional cost to the Government within 24 hours after receipt of the call on regular scheduled work days/hours. The Contractor shall report to the work location, survey the repair, and provide the KO/COR an estimate of time and cost
February 2017 9 of repairs not covered in the full maintenance service contract, but necessary to bring the system back to operation. The Contractor shall commence repair work after notification from the KO/COR. The Contractor shall prepare and submit to the KO/COR a written report within 15 business days after the repair. The report shall include the date and time of the service call, the location of the elevator, lift or platform, the repairs performed, and the name of the technician performing the repairs.
2.3.2. Emergency Calls: Emergency calls are defined as calls made for services when an elevator, lift or platform system fails and constitutes a danger to personnel; threatens to damage properties; or threatens to disrupt activity, operations, and/or training missions. The contractor shall accept service calls only from the KO or COR. The Contractor shall respond in person to the elevator, lift or platform and begin work on emergency service calls within 12 hours after receipt of the call. The Contractor shall report to the work location, survey the repair, and provide the KO an estimate of time to repair and cost of repairs not covered in the basic full maintenance service contract but necessary to bring the elevator, lift or platform back to operation. The Contractor shall commence repair work after notification from the KO/COR. The Contractor shall prepare and submit to the KO/COR a written report within 15 business days after the emergency repair. The report shall include the date and time of the service call, the location of the elevator, lift or platform, the repairs performed, and the name of the technician performing the repairs.
3. REPORTS AND OTHER DOCUMENTATION. Each time inspection, testing, maintenance, and/or repair is performed, the Contractor shall provide records of such services to the KO and COR (see Appendix 4). These records shall include facility number, type of system (include make, model, serial number and year), type of work performed, date of work performed, and any other data pertinent to the inspection, testing, maintenance, and/or repair.
3.1. Inspection & Testing Report: The Contractor shall prepare and submit a written report within 15 business days of work. The report shall identify each elevator, lift and platform (include make, model, serial number, and year), the location, date of inspection, name of inspector, and overall condition of the elevators, lifts and platforms. The Contractor shall maintain a copy of all current elevators, lifts and platforms inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the KO and COR. The index and copies of certificates shall be delivered to the KO and COR upon request; however, no later than 1 business day of a request to review.
3.2. Preventative Maintenance Report: The Contractor shall prepare and submit a written report within 15 business days of work. The report shall identify each elevator, lift and platform (include make, model, serial number, and year), the
February 2017 10 location, maintenance work performed, repairs needed, date of maintenance, and name of contractor.
3.3. Service Call Report – Routine Calls: The Contractor shall prepare and submit a written report within 15 business days of work. The report shall identify each elevator, lift or platform (include make, model, serial number, and year), the location, routine work performed, repairs needed, date, and name of contractor.
3.4. Service Call Report – Emergency Calls: The Contractor shall prepare and submit a written report within 15 business days of work. The report shall identify each elevator, lift or platform (include make, model, serial number, and year), the location, emergency work performed, repairs needed, date, and name of contractor.
February 2017 11
PART 3
APPENDICES
Appendix 1 – Government Furnished Property, Equipment, and Services
Appendix 2 – Contractor Furnished Items and Services
Appendix 3 – Performance Requirements Summary
Appendix 4 – Deliverables Schedule
Appendix 5 – Estimated Workload Data
Appendix 5-1 – Estimated Workload Data for Eielson AFB
Appendix 5-2 – Estimated Workload Data for Fort Wainwright, Alaska
Appendix 5-3 – Estimated Workload Data for Fort Greely, Alaska
Appendix 6 – Map/Site Plans
Appendix 7 – Applicable Publications
Appendix 8 – Definitions and Acronyms
Appendix 8-1 – Definitions
Appendix 8-2 – Acronyms
February 2017 12
APPENDIX 1
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
Services: The Government will not provide services.
Facilities: The Government will not provide workspace for the contractor staff.
Utilities: The Government will not provide utilities.
Equipment: The Government will not provide equipment.
Materials: The Government will not provide materials.
February 2017 13
APPENDIX 2
CONTRACTOR FURNISHED ITEMS AND SERVICES
General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services required to perform work under this contract.
Schedule: Within 20 business days after contract award, the Contractor shall submit an inspection schedule to the KO and COR.
Secret Facility Clearance: Not applicable to this contract.
Communication System: The Contractor shall furnish and maintain, at his/her expense, a toll-free telephone answering service for use in the performance of this contract. The Contractor’s selected type of communication system shall be monitored by the Contractor 24 hours a day, 7 days a week.
Employee’s Transportation: The Contractor shall furnish transportation for employees to and from the work site. The Contractor shall also furnish transportation to and from the Government installation for any equipment evacuated for repair to the Contractor’s establishment.
Manuals: The Contractor shall be responsible to obtain the most current manuals available from the manufacturer of the equipment serviced.
Materials, Parts and Supplies: The Contractor shall furnish all materials, parts and supplies required for inspection, testing, maintenance, and repair of elevators, lifts and platforms to meet requirements under this PWS.
Equipment. The Contractor shall provide all equipment and tools required to meet requirements under this PWS.
Warranty: The Contractor shall warrant all contractor installed parts and materials, and all contractor workmanship for a period of one year from the date of acceptance by the Government or later if the factory warranty for parts is longer than one year. The Contractor shall repair or replace, at his/her expense, any Contractor provided materials and parts that become defective during the warranty period. Warranties shall not apply where the damaged or failed materials and parts results from abuse or neglect by the Government.
Certificates of Inspection: Upon Government request, the Contractor shall provide certificates of inspection for each unit inspected.
February 2017 14
APPENDIX 3
PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Ite m
Performance Objective
PWS
Paragraph
Performance Standard
Performance Threshold
Method of Surveillance
1 Inspection and Testing
Part 2, Paragraph 1
Periodic inspection and testing services performed during the month required based on the previous service.
95% of services performed within required time.
Periodic Inspection
2 Preventative Maintenance
Part 2, Paragraph1
Periodic preventative maintenance services conducted during the period required based on the previous service.
95% of services performed within required time.
Periodic Inspection
3 Repair Service Calls – Respond Time to Routine Calls
Part 2, Paragraph
2.3.1.1.
Respond and begin work on routine service calls at no additional cost to the Government within 24 hours after receipt of the call. Unit must be fully operational the same day unless parts are required.
95% of service calls responded to NLT 24 hours after receipt of the call.
100% Inspection
February 2017 15
4 Repair Service Calls – Respond Time to Emergency Calls
Part 2, Paragraph
2.3.1.2.
Respond in person to the elevator, lift or platform and begin work on emergency service calls within 12 hours after receipt of the call. Unit must be fully operational the same day unless parts are required.
95% of service calls responded to NLT 12 hours after receipt of the call.
100% Inspection
5 Reporting Part 2, Paragraph 3
Submit reports in a manner consistent with this PWS.
Zero deviation from the standard.
100% Inspection
February 2017 16
APPENDIX 4
DELIVERABLES SCHEDULE
m Deliverable Frequency
Number of Copies
Medium/For mat Submit To
1 Inspection and Testing Report
NLT 15
business days after service completion
1 Electronic Copy
Submit by email in PDF format.
KO and COR
2 Preventative Maintenance Report
NLT 15
business days after service completion.
1 Electronic Copy
Submit by email in PDF format.
KO and COR
3 Service Call Report – Routine Calls
NLT 15
business days after service completion.
1 Electronic Copy
Submit by email in PDF format.
KO and COR
4 Service Call Report – Emergency Calls
NLT 15
business days after service completion.
1 Electronic Copy
Submit by email in PDF format.
KO and COR
5 Schedule for Inspection, Testing, Maintenance and Repairs
NLT 15
business days after contract award.
1 Electronic Copy
Submit by email in PDF format.
KO and COR
6 Invoices See Clause 252.232.7001 for instructions
1 Electronic Copy
Submit by email in PDF format.
KO and COR
7 MSDS NLT 5 business days after Government request.
1 Electronic Copy
Submit by email in PDF format.
KO and COR
8 HAZMAT NLT 5 business days after Government request.
1 Electronic Copy
Submit by email in PDF format.
KO and COR
9 QCP NLT 15
business days after contract
1 Electronic Copy
Submit by email in PDF format.
KO and COR
February 2017 17 m Deliverable Frequency
Number of Copies
Medium/For mat Submit To award.
10 MCP Annually 1 Electronic Copy
Submit by email in PDF format.
KO and COR
11 Safety Plan NLT 15 business days after contract award.
1 Electronic Copy
Submit by email in PDF format.
KO and COR
February 2017 18
APPENDIX 5
ESTIMATED WORKLOAD DATA
Appendix 5-1: Estimated Workload Data for Eielson AFB
Item Type of Unit Location Manufacturer Capacity
(LBS)
Year Installed
Inspection Frequency
1 Elevator BLDG 1140 OTIS 2,000 1954 Monthly
2 Elevator BLDG 1216 OTIS 1,200 1975 Monthly
3 Conveyor BLDG 2207 POWERLIFT 3,000 1992 Monthly
4 Elevator BLDG 2270 MINNESOTA 3,500 1993 Monthly
5 Elevator BLDG 2272 MINNESOTA 3,500 1993 Monthly
6 Freight Elevator BLDG 3112 (Amber Hall) OTIS 2,000 1952 Monthly
7 Freight Elevator BLDG 3112 (Amber Hall) OTIS 2,000 2011 Monthly
8 Freight Elevator
BLDG 3310 (Community Center) ESCO 3,000 1980 Monthly
9 Elevator BLDG 3310 (Community Center) ESCO 3,000 1980 Monthly
10 Freight Elevator BLDG 5223 (Aurora Club) OTIS 2,000 1955 Monthly
11 Freight Elevator
BLDG 6203 (Central Heat & Power Plant) MONTGOMERY 2,500 1980 Monthly
12 Elevator BLDG 6203 (Central Heat & Power Plant) ESCO 3,000 1980 Monthly
13 Elevator BLDG 3126 (AFRC) DOVER DMC 2,000 1997 Monthly
14 Elevator BLDG 3343 (Fitness Center) OTIS 2,500 Monthly
15 Inclined Platform Lift
Bldg 3112 (Amber Hall)
GARAVENTA
LIFT 550 2011
Monthly
16 Vertical Platform Lift
Bldg 1176 (Eielson Hangar)
GARAVENTA
LIFT 750 2015 Monthly
February 2017 19
Appendix 5-2: Estimated Workload Data for Fort Wainwright, Alaska
Item Type of Unit Location Manufacturer Capacity
(LBS)
Year Installed
Inspection Frequency
1 Freight Elevator BLDG 1001 Montgomery 2000 Monthly 2 Freight Elevator BLDG 1004 Montgomery 2000 Monthly 3 Passenger
Elevator
BLDG 1555,
(POST HQ)
ESCO 2500 Monthly
4 Passenger Elevator
BLDG 2132
(Hangar)
Thyssen Krupp 2100 Monthly
5 Passenger Elevator
BLDG 2297
(Motor Pool)
Otis 2500 Monthly
6 Passenger Elevator
BLDG 3015
(DPW)
National Wheel-O-Vator
750 Monthly
7 Passenger Elevator
BLDG 3214 (BN
HQ)
Otis 2100 Monthly
8 Passenger Elevator
BLDG 3214 (BN
HQ)
Otis 2100 Monthly
9 Passenger Elevator
BLDG 3437
(BCTC)
EV Elevator 3500 2004 Monthly
10 Passenger Elevator
BLDG 3443 Otis 3500 Monthly
11 Passenger Elevator
BLDG 3002 Otis 3500 Monthly
12 Freight Elevator BLDG 3007 5000 Quarterly 13 Platform Lift BLDG 3441 Garaventa 750 Quarterly 14 Vertical Platform BLDG 1064
(RMO/RCO-AK)
National Wheel-O-Vator
750 Quarterly
15 Freight Elevator BLDG 3401 (Welcome Center)
Otis Quarterly
16 Freight Elevator BLDG 3401 (Welcome Center)
Otis Quarterly
17 Vertical Platform BLDG 3401 (Welcome Center)
Cheney 750 Quarterly
18 Vertical Platform BLDG 4055 Garaventa 7500 Quarterly 19 Passenger
Elevator
BLDG 4070
(CRTA)
Otis 2500 Quarterly
20 Stair Lift BLDG 1045 Cheney 500 Semi- Annually
21 Stair Lift BLDG 1555
(POST HQ)
Garaventa 450 1997 Semi- Annually
22 Stair Lift BLDG 1562 (Law Center)
Access Industries
350 2008 Semi- Annually
23 Stair Lift BLDG 1562 (Law Access 350 2008 Semi-
February 2017 20
Center) Industries Annually 24 Stair Lift BLDG 1562 (Law
Center) Access Industries
350 2008 Semi- Annually
25 Platform Lift BLDG 1928 (DTA) Cheney Semi- Annually
26 Stair Lift BLDG 3015
(DPW)
Garaventa 450 Semi- Annually
27 Stair Lift BLDG 4070
(CRTA)
Garaventa 495 2016 Semi- Annually
28 Platform Lift BLDG 4056 National Wheel-O-Vator
750 Annually
29 Platform Lift BLDG 4063 Cheney Annually
February 2017 21
Appendix 5-3: Estimated Workload Data for Fort Greely, Alaska
Item Type of Unit Location Manufacturer Capacity
(LBS)
Year Installed
Inspection Frequency
1 Freight Elevator BLDG 663 Otis 2000 1953 Quarterly
2 Freight Elevator BLDG 661 ESCO 2500 1992 Quarterly
3 Chair Lift BLDG 661 Garaventa 550 2004 Quarterly
4 Freight Elevator BLDG 612 Otis 2000 1953 Quarterly
5 Dumbwaiter BLDG 612 Otis 500 1953 Quarterly
February 2017 22
APPENDIX 6
MAP/SITE PLANS
Any maps and/or site plans will be provided to the Contractor by the COR at the time of award.
February 2017 23
APPENDIX 7
APPLICABLE PUBLICATIONS
The Contractor shall abide by all applicable regulations, publications, manufacturer’s Operation and Maintenance (O&M) manuals, and local policies and procedures.
The Contractor shall reference current Local/State requirements for elevators, lifts, and platforms including Statutes and Regulations.
Additional requirements and information may be found from the following sources:
American Society of Mechanical Engineers (ASME) American National Standards Institute (ANSI) American Society for Testing and Materials (ASTM) American Welding Society (AWS) National Electrical Manufacturers Association (NEMA) Industrial Controls and Systems (ICS) National Fire Protection Association (NFPA) National Electrical Code (NEC)
The Contractor shall follow mandatory guidance:
ASME A17.1-2007, Safety Code for Elevators and Escalators ASME A18.1-2008, Safety Standard for Platform Lifts and Stairway Chairlifts
February 2017 24
APPENDIX 8
DEFINITIONS AND ACRONYMS
Appendix 8-1: Definitions
Business Day –The number of hours per day the Contractor provides services in accordance with the contract. From 7:30 A.M. to 4:30 P.M., Monday thru Friday.
Business Week – Monday through Friday, unless specified otherwise.
Cannibalize – Remove parts from Government property for use or for installation on other Government property.
Contractor – A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Contractor Acquired Property (CAP) – Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Contracting Officer (KO) – A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Contracting Officer Representative (COR) – An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Defective Service – A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Equipment – A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
February 2017 25
Government Furnished Property (GFP) – Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract.
Government Property – All property owned or leased by the Government. Government property includes both government-furnished property and contractor-acquired property.
Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Inspection – Examining and testing supplies or services (including, when appropriate, raw materials, components, and intermediates assemblies) to determine whether they conform to contract requirements.
Invoice – A contractor’s bill or written request for payment under the contract for supplies delivered or services performed.
Key Personnel – Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. The prime contractor is responsible for performance of all subcontractors.
Maintenance, Repair and Replacement - Maintenance, repair and replacement are on existing elevators, lifts and platforms and included in the contract scope of services. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations.
Non-Personal Services – The personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the government and its employees.
Non-personal service contracts are authorized by the government in accordance with FAR 37.012, under general contracting authority, and do not require specific statutory authorization.
Physical Security – Actions that prevent the loss or damage of Government property.
Quality Assurance (QA) – The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
February 2017 26
Quality Assurance Surveillance Plan (QASP) – An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control (QC) – All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor – One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
Wide Area Work Flow (WAWF) – A secure web-based system for electronic invoicing, receipt, and acceptance. WAWF allows government vendors to submit and track invoices and receipt/acceptance documents over the web and allows government personnel to process those invoices in a real-time, paperless environment.
Appendix 8-2: Acronyms
Acronym ACOR Alternate Contracting Officer's Representative
ACM Asbestos Containing Material
AFARS Army Federal Acquisition Regulation Supplement
AFB Air Force Base
ANSI American National Standards Institute
AR Army Regulation
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
AWS American Welding Society
CAP Contractor Acquired Property
CCE Contracting Center of Excellence
CFR Code of Federal Regulations
CLIN Contract Line Item Number
CMR Contractor Management Reporting
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer’s Representative
COTR Contracting Officer's Technical Representative
COTS Commercial-Off-The-Shelf
February 2017 27
DA Department of the Army
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Form 254 (Contract Security Requirement List)
DFARS Defense Federal Acquisition Regulation Supplement
DFAS Defense Finance Accounting Service
DMDC Defense Manpower Data Center
DoD Department of Defense
DTA Donnelly Training Area
EAFB Eielson Air Force Base
FAR Federal Acquisition Regulation
FGA Fort Greely Alaska
FWA Fort Wainwright Alaska
GFE Government Furnished Equipment
GFP Government Furnished Property
HIPAA Health Insurance Portability and Accountability Act of 1996
IAW In Accordance With
ICS Industrial Controls and Systems
KO Contracting Officer
KS Contracting Specialist
MCP Maintenance Control Program
MSDS Material Safety Data Sheets
NEC National Electrical Code
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
NLT No Later Than/Not Less Than
OCI Organizational Conflict of Interest
OCONUS Outside Continental United States (includes Alaska and Hawaii)
ODC Other Direct Costs
PA Property Manager
PACM Presumed Asbestos Containing Material
February 2017 28
PIPO Phase In/Phase Out
POC Point of Contact
POP Period Of Performance
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
QEI Qualified Elevator Inspector
TE Technical Exhibit
UFC Unified Facilities Criteria
WAWF Wide Area Work Flow
| Performance Standard |