W912CN-26-B-A004 - Solicitation Amend 0002.pdf

PDF 3 MB Posted

Attached to
Open-End Repairs/Installation of Roofing and Related Work
Solicitation number
W912CN-26B-A004
Issued by

About this file

This document is a Solicitation for an Open-End Roofing Repair and Installation Contract issued by the U.S. Army Contracting Command for various military installations in Hawaii. The solicitation (W912CN-26-B-A004) is a firm fixed-price requirements-type construction contract with a base year and four one-year option periods from October 31, 2025 to October 30, 2030. It is an 8(a) set-aside limited to eligible 8(a) participants, with a small business size standard of $19 million and a NAICS code of 238160.

The contract covers comprehensive roofing services including replacement and repair of various roofing materials such as ceramic-coated shingles, roofing panels, metal flashing, gutters, downspouts, and structural lumber across multiple Army installations including Schofield Barracks, Fort Shafter, Wheeler Army Airfield, Helemano Military Reservation, Tripler Army Medical Center, Aliamanu Military Reservation, and Fort Derussy. The estimated contract value exceeds $10 million, with specific line items for different roofing components and services like asbestos abatement, lead-based paint removal, roof coatings, and insulation. The bid opening is scheduled for September 22, 2025 at 10:00 AM, with bids to be submitted to the Regional Contracting Office in Hawaii.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER

W912CN26BA0040002

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED

8/21/2025

PAGE OF PAGES

1 282

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

A031802

7. ISSUED BY CODE W912CN 8. ADDRESS OFFER TO

0413 AQ HQ RCO-HI

KO DIRECTORATE OF CONTRACTING, 536 PALM CIRCLE DR BLDG T 122

FORT SHAFTER, HI 96858-5025

UNITED STATES

JONATHAN CHONG, EMAIL: JONATHAN.J.CHONG.CIV@ARMY.MIL TELEPHONE:

(808) 787-8845

9. FOR

INFORMATION CALL:

a. NAME

JONATHAN CHONG

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

(808) 787-8845

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

PROJECT TITLE: OPEN END ROOFING

PROJECT LOCATION: HAWAII

THIS IS A FIRM FIXED PRICE REQUIREMENTS-TYPE CONSTRUCTION CONTRACT TO FURNISH ALL LABOR, MATERIALS, EQUIPMENT, MANAGEMENT, SUPERVISION, TOOLS, TRANSPORTATION AND OTHER INCIDENTAL ITEMS TO PERFORM OPEN-END ROOFING REPAIRS/INSTALLATION AND RELATED WORK LOCATED AT VARIOUS ARMY INSTALLATIONS (TO INCLUDE, BUT NOT LIMITED TO SCHOFIELD BARRACKS, FORT SHAFTER, WHEELER ARMY AIRFIELD, HELEMANO MILITARY RESERVATION, TRIPLER ARMY MEDICAL CENTER, ALIAMANU MILITARY RESERVATION, AND FORT DERUSSY, HAWAII.)

Magnitude of Construction: More than $10,000,000

SMALL BUSINESS SIZE STANDARD: $19M

NAICS: 238160

This requirement is an 8(a) set-aside and is limited to eligible 8(a) participants IAW FAR 52.219-18.

11. The contractor shall begin performance within 30 calendar days and complete it within 30 calendar days after receiving

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and 2 copies to perform the work required are due at the place specified in Item 8 by 10:00 AM (hour) local time 22 SEP 2025 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the bidder's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee X is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 12/2022)

award, notice to proceed. This performance period is mandatory negotiable. (See FAR 52.211-10 ).

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? 12b. CALENDAR DAYS (If "YES", indicate within how many calendar days after award in Item 12b.)

YES NO 14

mailto:JONATHAN.J.CHONG.CIV@ARMY.MIL

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

Created On:

21 Jul 2025, 17:06 PM Central Daylight Time

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF BIDDER (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The bidder agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the bidder accepts the minimum in Item 13d.)

18. The bidder agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The bidder acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

AMOUNTS

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

10 U.S.C. 3204(a) (

27. PAYMENT WILL BE MADE BY

) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY

Section 00 10 00 - Procurement and Contracting Requirements

OE Roofing

SUBMISSION REQUIREMENT

1. 100% SET-ASIDE FOR 8(A) COMPETITIVE FIRMS.

Bid shall be delivered/submitted in sealed envelope or package and shall be addressed to the office specified below no later than the exact time set and date set, the solicitation number and the name and address of the bidder. Electronic copies are required to be submitted by 1600 hrs (HST) and shall not be altered from original hard copy, of the IFB due date to facilitate evaluations.

No mail-in proposal shall be submitted.

413th Contracting Support Brigade Regional Contracting Office, Hawaii ATTN: CCEC-PAH-C (Jonathan Chong) Bldg 108, 3rd Floor 472 Santos Dumont Street Wheeler Army Airfield, HI 96854

2. CONTRACT TYPE: The Government intends to award a firm fixed price requirements-type construction contract. Split or multiple awards will not result from this acquisition.

3. PERIOD OF PERFORMANCE: The anticipated period of performance will be a base year and four (4) one- year option periods as shown below:

Base Year: 31 OCT 2025 – 30 OCT 2026

Option 1: 31 OCT 2026 – 30 OCT 2027 Option 2: 31 OCT 2027 – 30 OCT 2028 Option 3: 31 OCT 2028 – 30 OCT 2029 Option 4: 31 OCT 2029 – 30 OCT 2030 52.217-8 6 Months

4. QUESTIONS. Questions must be submitted by email to Jonathan Chong, email: jonathan.j.chong.civ@army.mil with CC to Mark Dahilig Mark.r.dahilig.civ@army.mil with the IFB number W912CN-26-B-A004 in the subject line. Telephone and faxed inquires will not be accepted. In order in ensure a timely response, questions must be submitted no later than 10:00am, seven (7) days after the date of IFB issuance as identified in Block 3 of the solicitation. Questions and responses will be issued on an amendment. Any questions received after the due date may not be answered.

5. AWARD. The basis of award is the responsible bidder whose bid is responsive to the terms and conditions of the invitation for Bid and is the lowest price.

6. BID OPENING DATE AND TIME. A face to face public bid opening will be conducted with a telephone conference option (see detail below). To attend the Bid Opening either in-person or via telephone, bidders must notify Jonathan Chong, email: Jonathan.j.chong.civ@army.mil and Mark Dahilig, email:

Mark.r.dahilig.civ@army.mil no later than seven days prior to the Bid Opening date. List the name, phone number, number of personnel attending and if joining in person or via teleconference. If you are attending, please ensure you plan ahead with Installation Gate Entry, ensuring you have a valid Driver’s license, proof of insurance and registration. If you will be joining via teleconference , the conference call number and password will be provided via email.

Date & Time: September 22, 2025 at 10:00am Location: Regional Contracting Office, Hawaii Bldg 108, 3rd Floor (Located on Wheeler Army Airfield (WAAF)) Schofield Barracks, HI 96857 Teleconference Number: Will be emailed upon notification.

INSTRUCTION TO BIDDERS

1. PROPOSAL SUBMITTAL.

Proposal Submission Requirement:

Proposals will be sealed and delivered to:

RCO-HI Attn: Jonathan Chong 742 Santos Dumont AVE.

Regional Contracting Office, Hawaii Bldg 108, 3rd Floor Schofield Barracks, HI 96857 mailto:%20jonathan.j.chong.civ@army.mil mailto:Mark.r.dahilig.civ@army.mil mailto:Jonathan.j.chong.civ@army.mil mailto:Mark.r.dahilig.civ@army.mil

SUBMISSION REQUIREMENT

Offers shall include the following:

1.Completed Standard Form 1442.

2.Completed Schedule of offer/bids/prices. All unit price and estimated amount filled out.

3. Completed Excel Attachment 1, Price Schedule.

4. Signed all amendments.

5. Completed Representation and Certifications.

6. Bid Guarantee in accordance with FAR 52.228-1.

2. Bidders shall furnish unit prices and extended total for all items listed on the schedule of bid items in Section 00 10 00. In the event there is a difference between the unit price and the extended total, the unit price will be the intended bid. In the event the unit price or extended total are omitted for any item, the bid will be deemed non-responsive.

3. Facsimile proposals/Bids will not be considered.

4. Telegraphic proposals/Bids will not be considered.

5. Proposals must be submitted by see box 13 on SF 1442.

GENERAL INFORMATION

1. Scope of Work: This is a firm fixed price requirement type construction contract to provide all labor, equipment, materials, and other services required to perform Reroofing, Roof Repairs, guarantee workmanship for all work described below and provide a warranty in strict accordance with these technical provisions. Equipment including telescoping boom lifts, articulating boom lifts, stairway scaffolding etc., shall be considered incidental to roofing. Costs for these items shall be included in bid items for shingles, roofing panels, BUR, flashing, gutters, lumber, etc. Tie-downs shall be installed in accordance with EM 385-1-1 and remain in place after roofing is complete. The scope of work covered by this Contract does not cover Reroofing and Roof Repair work which might arise as part of a Contract to repair or renovate a Building or group of Buildings. The work covered by this Contract does not include projects awarded by The U.S. Army Engineering District, Honolulu, excluding the Medical Facilities under Tripler (TAMC), to be designated by the Government during the contract period.

All CLINS listed below are in support of roofing and repair work for this contract and issued via task orders.

2. The contractor shall submit a safety plan within 30 days of award or 7 days prior to commencement of on-site work, whichever occurs first in accordance with the AR 385-10, Construction Safety, US Army Corps of Engineers "Safety and Health Requirements Manual (EM 385-1-1)" and Occupational Safety and Health Administration (OSHA) regulations.

3. To assure compliance with general construction trade practice, the contractor shall establish and maintain quality control for materials and work.

The Government may perform inspections and conduct tests while the contractor's work is in process to assure compliance to performance standards.

4. Existing conditions or areas damaged or disturbed by the contractor's operation shall be restored to their original condition, or near original condition as possible, to the satisfaction of the Contracting Officer at no additional cost to the Government.

5. Prior to start of any excavation or trenching work, the contractor shall obtain clearance, in writing, from the appropriate communications agency and from the Directorate of Public Works.

6. Interruptions to existing utilities shall be held to a minimum. A schedule for any required power or water outages shall be submitted to the Contracting Officer a minimum of four weeks prior to the intended outage.

7. The contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area.

8. The Contractor's normal working hours will be 7:30 a.m. - 4:30 p.m. Monday thru Friday. The Contractor will not normally work on Saturdays, Sundays, or Holidays. If the Contractor chooses to work outside the normal working hours, Contractor must submit an application to the Contracting Officer in writing one week prior to the requested work for approval.

9. Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.

10. The contractor shall provide, install, and maintain all necessary signs, lights, barricades, markers, cones, flagmen, and other protective facilities and shall take all necessary precautions for the protection and for the convenience and safety of military and public traffic (vehicular and pedestrian).

11. The amount of dust resulting from the contractor's work shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.

12. The contractor shall obtain the necessary hot work permit from the appropriate Fire Department prior to any welding, burning, and torching operations.

13. Daily Clean-up - During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, etc.

or rubbish that constitutes a fire hazard. At the end of each day's work, the Contractor shall remove all debris. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.

14. Storage area will not be provided.

15. When available, the Government may provide a reasonable amount of water and electricity. If not available or cannot be provided it shall be specified in the task order documents.

16. The Contractor shall be responsible to have a quality control program to ensure services are performed in accordance with the Scope of Work and commonly accepted commercial practices.

17. The Contractor is required to follow DPW's Best Management Practice (BMP) of Storm Water Compliance. Copy will be provided at the pre-construction conference, if requested.

18. The work shall be constructed using best practice per industry standards. The Contractor shall abide by all applicable regulations to include Federal, State, local requirements.

19. Progress of Work. Contractor shall submit all proposed work schedules to the Contracting Officer for review/approval within ten (10) calendar days after issuance of the Notice to Proceed (NTP) unless otherwise specified.

20. All materials used under this project must be Energy Star compliant. The following website lists all energy star compliant materials. www.

energystar.gov

21. If a dumpster is provided for this contract, contractor shall include a sign on the dumpster with their name/address/phone and indicate the dumpster is only used for construction debris.

22. Abbreviations used in the Unit column: CY = Cubic Yard; LH = Labor Hours; SF = Square Foot; EA = Each; LF = Linear Foot; SY = Square Yard

23. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and /or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes."

24. Identification of Contractor Employees.

a. Provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee's name, contractor's name, functional area of assignment, with recent color photograph of the employee.

b. All contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing above the waist except when safety or health reasons prohibit such placement.

25. ESTIMATED QUANTITIES: All quantities are estimated and are stated for the information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. (See clause at 52.216-21). As a prerequisite, there must be (i) adequate and sufficient funds available to cover the order, and (ii) an administrative determination by the Government that the requirement exists.

26. ISSUANCE OF TASK ORDERS.

a. The work to be accomplished under this contract will be performed via issuance of a task order. The Contractor shall coordinate all work with the Contracting Officer in order that there will be a minimum of interruption and inconvenience to the Government. Scheduling and programming of work shall be arranged during the pre-construction conference.

b. Survey of Unit Price Items: Unless deemed an emergency or priority requirement at least ten (10) workdays prior to the issuance of a task order, a joint inspection by the Contractor and the Contracting Officer Representative shall be made to determine the work to be accomplished therein. Survey will be conducted within two (2) workdays of notification by the COR. During the inspection and survey, both parties will jointly annotate on the order form to be prescribed by the Contracting Officer, the quantity for each unit price item that is to be utilized. The Contracting Officer will confirm the starting and completion date of work for each unit in the task order.

27. APPICABLE CODES AND REGULATIONS

27.1. The latest edition of the following Codes, regulations, guides, and criteria shall be used for all design and construction under this contract. If there is a conflict between these codes or regulations and these contract specifications the Unified Facility Criteria will override. The Contractor shall have a copy of each of these documents available for use during the term of this contract.

The Unified Facility Criteria (UFC) documents including, but not limited to:

UFC 3-410-01 Design: Heating, Ventilating, And Air Conditioning UFC 4-010-01 Dod Minimum Antiterrorism Standards For Buildings UFC 3-600-01 Design: Fire Protection Engineering For Facilities UFC 1-200-01 DoD Building Code (General Building Requirements

A complete listing can be obtained at http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4

27.2. The Unified Facility Guide Specifications are mandatory for all work required under this contract. The contractor is responsible for obtaining the Unified Facility Guide Specifications and for maintaining updates to the specifications. The specifications whether referenced or not (in whole or part), shall be considered to be a part of all task orders issued under this contract. Where two specifications are listed for a certain item of work the Army section as denoted by an "A" shall be used. When there is no Army designated spec use the Navy (denoted by "N") or in the absence of either use an industry standard specifications or others listed in the Construction Criteria Base CCB. A complete listing of the UFGS Division 01 - General Requirements can be obtained at https://wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs

27.3. The following are additional criteria, codes, regulations and guides which shall be incorporated into all designs and used for construction:

http://www/ http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 https://wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs

ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings EPACT 2005 Energy Policy Act of 2005, Public Law 109-58.

IBC, International Building Code IEEE C2, National Electrical Safety Code IESNA Illuminating Engineering Society of North America MIL HDBK 1190, Military Handbook for Facility Planning and Design Guide MIL HDBK 1191, Military Handbook for Medical and Dental Treatment Facilities, Design and Construction Criteria Guide

National Electrical Contractors Association (NECA)

National Electrical Installation Standards (NEIS)

TI 800-01, Design Criteria TI 800-03, Technical Requirements for Design-Build TM 5-811-3, Electrical Design: Lightning and Static Electricity Protection USDA - Rural Utility Service (RUS) RUS 1728F-310 Drawing Index 35.5 to 69 kV RUS 1728F-804 Drawing Index 12.5 & 7.2 kV RUS 1724D-101B System Planning Guide RUS 1724D-104 Econ Worksheet RUS 1724E-152 OH Dist. Line Conductors Mechanics RUS 1724E-153 Guys and Anchors RUS 1724E-154 Distribution Conductor Clearances and Span Limitations RUS 1724E-200 Design Manual HV Transmission Lines RUS 1724E-203 Upgrading RUS Transmission Lines RUS 1724E-204 Specs Steel Pole H Frame RUS 1724E-205 Embedment Depths RUS 1724E-214 Guide Specifications For Standard Class Steel Transmission Poles RUS 1724E-300 Rural Sub Station Design RUS 1724E-224 Specifications and Drawings for Steel Poles RUS 1728F-804 Specifications and Drawings for 12.47/7.2 kV Line Construction RUS 1728F-806 Specifications for Underground Distribution RUS 1728F-810 Specifications and Drawings for 34.5 to 69 kV RUS 1730B-121 Pole Inspection and Maintenance RUS 1751F-650 Aerial Plant Guying and Anchoring UEP-steel poles Guidelines for the Use Steel Distribution Poles Uniform Building Code Uniform Mechanical Code Uniform Plumbing Code Standard Building Code National Electrical Code (NEC) American National Standards Institute (ANSI) C-2, national Electrical Safety Code (QIESC) Life Safety Code, National Fire Protection Association (NFPA) 101 National Fire Protection Association (NFPA) MIL Handbook 1190

27.4. Workmanship shall be governed by the preceding documents and National Electrical Contractors Association

(NECA) listed below:

NECA 100-2006 - Electrical Symbols Set (c) 2006, NECA NECA 100-2006 - Symbols for Electrical Construction Drawings (ANSI) (c) 2006, NECA NECA 101-2006 - Standard for Installing Steel Conduit (Rigid, IMC, EMT) (ANSI) (c) 2006, NECA NECA 102-2004 - Standard for Installing Aluminum Rigid Metal Conduit (ANSI) (c) 2004, NEIS NECA 111-2003 - Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) (ANSI) (c) 2003, NECA NECA 1-2010 - Standard Practice of Good Workmanship in Electrical Construction (ANSI) (c) 2010, NECA NECA 120-2006 - Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC) (ANSI) (c) 2006, NECA NECA 121-2007 - Standard for Installing Nonmetallic-Sheathed Cable (Type NM) and Underground Feeder and Branch-Circuit Cable (Type UF) (ANSI) (c) 2007, NECA NECA 130-2010 - Standard for Installing and Maintaining Wiring Devices (c) 2010, NECA NECA 169 - Standard for Installing and Maintaining Arc-Fault Circuit Interrupters (c) 2010, NECA NECA 200-2010 - Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI) (c) 2010, NECA NECA 202-2006 - Standard for Installing and Maintaining Industrial Heat Tracing Systems (ANSI) (c) 2006, NECA NECA 230-2010 - Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers (ANSI) (c) 2010, NEIS

NECA 303-2005 - Standard for Installing Closed-Circuit Television Systems (CCTV) (ANSI) (c) 2005, NECA

NECA 305-2010 - Standard for Fire Alarm System Job Practices (ANSI) (c) 2010, NECA NECA 331-2009 - Standard for Building and Service Entrance Grounding and Bonding (ANSI) (c) 2009, NECA NECA 400-2007 - Standard for Installing and Maintaining Switchboards (ANSI) (c) 2007, NECA NECA 402-2007 - Standard for Installing and Maintaining Motor Control Centers (ANSI) (c) 2007, NECA

NECA 406-2003 - Standard for Installing Residential Generator Sets (ANSI) (c) 2003, NECA NECA 407-2009 - Recommended Practice for Installing and Maintaining Panelboards (ANSI) (c) 2009, NECA NECA 408-2009 - Standard for Installing and Maintaining Busways (ANSI) (c) 2009, NECA NECA 409 - 2009 - Standard for Installing and Maintaining Dry-Type Transformers (ANSI) (c) 2009, NECA NECA 410-2005 - Standard for Installing and Maintaining Liquid-Filled Transformers (ANSI) (c) 2005 NECA 411-2006 - Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS) (ANSI) (c) 2006 NECA 420-2007 - Standard for Fuse Applications (ANSI) (c) 2007, NECA NECA 430-2006 - Standard for Installing Medium-Voltage Metal-Clad Switchgear (ANSI) (c) 2006, NEIS NECA 503-2005 - Standard for Installing Fiber Optic Lighting Systems (c) 2005, NECA NECA 505 Standard for Installing and Maintaining High Mast, Roadway and Area Lighting (c) 2010, NECA NECA 700-2010 - Standard for Installing Overcurrent Protection to Achieve Selective Coordination (c) 2010, NECA NECA 90 Recommended Practice for Commissioning Building Electrical Systems (ANSI) (c) 2009, NECA NECA/AA 104-2006 - Standard for Installing Aluminum Building Wire and Cable (ANSI) (c) 2006, NEIS NECA/BICSI 568-2006 - Standard for Installing Building Telecommunications Cabling (ANSI) (c) 2006, NECA NECA/BICSI 607-2011 - Standard for Telecommunications Bonding and Grounding Planning and Installation Methods for Commercial Buildings (c) 2011, NECA/BICSI NECA/EGSA 404-2007 - Standard for Installing Generator Sets (ANSI) (c) 2007, NECA NECA/FOA 301-2009 - Standard for Installing and Testing Fiber Optics (ANSI) (c) 2009, NEIS NECA/IESNA 500-2006 - Standard for Installing Indoor Lighting Systems (ANSI) (c) 2006, NECA, NECA/IESNA 501-2006 - Standard for Installing Exterior Lighting Systems (ANSI) (c) 2006, NEIS NECA/IESNA 502-2006 - Standard for Installing Industrial Lighting Systems (ANSI) (c) 2006, NECA NECA/MACSCB 600-2003 - Recommended Practice for Installing and Maintaining Medium- Voltage Cable (ANSI) (c) 2003, NECA NECA/NEMA 105-2007 - Standard for Installing Metal Cable Tray Systems (ANSI) (c) 2007, NECA NECA/NEMA 605-2005 - Recommended Practice for Installing Underground Nonmetallic Utility (ANSI) (c) 2005, NECA EM 385-1-1 Corps of Engineers Manual, - Safety and Health Requirements Manual Additional publications and regulatory documents may be identified as required for individual task orders.

AWARD INFORMATION

1. Accepted and awarded as to Contract Line Item Numbers (CLINs) 0001 through 0056 Section 00 10 00. All terms and conditions specified in Solicitation W912CN-26-B-A004 are incorporated as part of this contract.

2. CONTRACT TYPE. The Government intends to award a firm-fixed-price requirement type construction contract.

Split or multiple awards will not result from this acquisition.

3. PERIOD OF PERFORMANCE. The anticipated period of performance will be a base year and four (4) one-year option periods as shown below:

Base Year: 31 October 2025 – 30 October 2026

Option 1: 31 October 2026 – 30 October 2027

Option 2: 31 October 2027 - 30 October 2028

Option 3: 31 October 2028 - 30 October 2029

Option 4: 31 October 2029 - 30 October 2030

52.217-8: 6 Months

4. This contract consists of the following:

1) Standard Form 1442, Solicitation, Offer and Award, SOW.

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

Additional Information/Notes

Item

Supplies/Service Estimated

Quantity

Unit

Unit Price

Amount

REPLACE CERAMIC COATED MINERAL

SURFACED SELF-SEALING Architectural SHINGLES, composed of a fiberglass mat base with ceramic-coated mineral granules tightly embedded in carefully refined, water-resistant asphalt. Two pieces of the shingle are firmly laminated together in a special tough asphaltic cement.

Includes Removal & Disposal of existing Strip Shingles, Roofing Felt Underlayment, Metal Drip Edge and Installation of new, Felt Underlayment & Metal Drip Edge.

Product Service Code: Z2AA Pricing Arrangement: Firm Fixed Price

75,000

Square Foot

ROOFING PANELS Removal and Disposal, Includes Preformed & Corrugated Aluminum Roofing Panels, Preformed, Corrugated, Ribbed & Standing Seam Galvanized, Zinc & Colored Sheet Metal; and Preformed, Corrugated & Ribbed Fiberglass Panels.

125,000

TRANSITE ROOFING PANELS, Removal and Disposal. Includes Asbestos Abatement Air Monitoring, Temporary Fence Barricades, Personnel, Waste and Decontamination Unit.

5,000

ALUMINUM ROOFING PANELS,

Installation of Preformed or Corrugated Panels.

STEEL SHEET METAL ROOFING PANELS,

Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted.

(22 Gage)

120,000

SHEET METAL FLASHING, Removal and Disposal. Includes Aluminum, Galvanized Steel, Copper, and Aluminum Fascia

60,000

SHEET METAL FLASHING, Installation of Aluminum Flashing of Aluminum Fascia

1,000 of Galvanized Steel Flashing

40,000 of Copper Flashing

12,000

VENT THRU ROOF FLASHING,

Installation, Includes Removal and Disposal. Aluminum Vent Flashing

Each

INSTALLATION, INCLUDES REMOVAL AND

DISPOSAL. Galvanized Vent Flashing

INSTALLATION, INCLUDES REMOVAL AND

DISPOSAL. Lead Vent Flashing

SHEET METAL GUTTERS & DOWNSPOUTS,

Removal and Disposal of existing Gutter and Downspouts

27,000

Foot

Installation of Aluminum Gutters and Downspouts, 5".

Installation of Aluminum Gutters and Downspouts, 7".

15,000

Installation of Galvanized Steel Gutters and Downspouts

2,000

Installation of Copper Gutters and Downspouts, k-style.

2,500

Installation of Copper Gutters and Downspouts. Half round style.

SPLASH BLOCKS, Installation of Concrete Splash Blocks

ROOF VENT PIPE EXTENSION,

Installation of Roof Vent Pipe Extension

SCUPPER DRAINS, Re-install Scupper drains

SCUPPER DRAINS, Install new Scupper drains

STRUCTRUAL LUMBER, Replacement of existing Deteriorated or Termite Damaged Lumber. Includes Removal & Disposal of existing Deteriorated or Termite damaged Structural Lumber, and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

30,000

Board Feet

ROOF SHEATHING, Replacement of existing Deteriorated Termite Damaged Sheathing Includes Removal & Disposal of e xisting Deteriorated or Termite damaged Sheathing and Incidental Painting of new Exposed Woodwork at Eaves, or as required.

(1-Primer and 2-finish coats to match adjacent existing surfaces).

7,000

METAL ROOF PURLINS, Replacement of existing Rusted or Damaged Purlins.

Includes Removal & Disposal of existing Rusted or Damaged Metal Purlins, and Incidental Painting of new Purlins as required. (1-Primer and 2- finish coats to match adjacent existing surfaces).

PITCH PANS, Replacement of existing Pitch Pans, Includes Removal and disposal.

CHEMCURB PITCH POCKET, Installation of CHEMCURB Pitch Pocket or approved equal. To include Removal, installation disposal and all required materials and equipment to complete work

ROOF DRAINS, Removal and Re-installation of existing Roof Drains, Includes cleaning, testing, and installing Modified Bitumen Sheet Flashing

ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Aluminum Roof Ventilators

Re-installation of existing Electrical Power Galvanized Roof Ventilators

REPLACE CLAY TILE ROOFING, Includes Removal & Disposal of existing Clay Tile Roofing, Roofing Felt Underlayment, and Installation of new Clay Tile Roofing, Felt Underlayment, and Flashing as required

CLAY TILE ROOF SEALER Installation of Low moisture absorption Clear drying penetrating water repellent barrier, Clay Tile Roof Sealer. To include Surface preparation and Installation of Roof Coating, clean-up and all required materials and equipment to complete work

ASBESTOS ABATEMENT, Bulk Sampling, Field

ASBESTOS ABATEMENT, Remove Asbestos Contaminated Metal Flashing, Base Flashing, and Mastic as required

ASBESTOS ABATEMENT, Total Demolition and Disposal of existing Built-Up Roofing System clear down to existing Roof Deck as required

90 LB. MINERAL SURFACE on Built-up Roofing, Removal and disposal.

Remove existing roofing down to existing substrate

90,000

Gravel on Built-up Roofing, Removal and disposal. Remove existing gravel roofing down to existing substrate

50,000

Built-up Roofing Installation of 2-Ply, Includes 90LB. SBS Mineral

0039 Surfaced Roll-Roofing Cap Sheet on SBS fiberglass Base Sheet

Product Service Code: Z2AA

125,000 Square Foot

Walkway Surface, Installation, Mineral Asphalt Plank

ROOFING INSULATION (without Fire Proofing Insulation), Removal & Disposal. Includes Tapered or Flat Insulation Boards

500,000

ROOFING INSULATION, Installation.

Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.

ROOFING INSULATION, Installation.

Tapered. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive

200,000

ROOF COATING, Installation of Hydro-Stop Elastomeric Roofing with 1/16" reinforcing or approved equal

Silicone Roof coating.

Equipment Rental of 25 ton Crane with Operator

Week

Equipment Hauling, round trip to include delivery to jobsite location and return to Rental Company

0048 REMOVE AND REINSTALL SOLAR PANELS

50 Each

Install RIDGE VENTS, Installation of Ridge Vents, for Composition Shingle Roofing. Includes creating new opening & installing preformed material, cap sheet and all incidental items required

SAMPLE ANALYSIS, Collection and Laboratory analysis to determine if paint contains Lead. To include all incidental items required

SAMPLE ANALYSIS, Collection and Laboratory analysis (TCLP) to determine if paint/demolition debris contains Lead Based Paint and resulting debris can be classified as hazardous waste To include all incidental items required

LEAD BASED PAINT ABATEMENT,

Removal/Disposal of lead containing (hazardous) materials to include all incidental items required

10,000

Ridge Vents for metal roofing (10" to 36"W X10'-0"L), Includes creating new opening & installing preformed material, flashing, and all incidental items required to provide a complete useable product.

Install Cant Strips, Installation of Cant Strips. To include all incidental items required. To include Removal, installation, disposal and all required materials and equipment to complete work

4,000

Plastic Sheeting, install plastic sheeting to protect furniture, equipment, supplies, etc. from dust.

Includes clean-up and removal.

20,000 Square Foot

Roof Hatch, Replacement of existing Rusted or Damaged Roof Hatch.

Includes Removal & Disposal of existing Rusted or Damaged Roof Hatch, and Incidental Painting of new Roof Hatch as required.

Option Line Item

REPLACE CERAMIC COATED MINERAL

SURFACED SELF-SEALING Architectural SHINGLES, composed of a fiberglass mat base with ceramic-coated mineral granules tightly embedded in carefully refined, water-resistant asphalt. Two pieces of the shingle are firmly laminated together in a special tough asphaltic cement.

Includes Removal & Disposal of existing Strip Shingles, Roofing Felt Underlayment, Metal Drip Edge and Installation of new, Felt Underlayment & Metal Drip Edge.

ROOFING PANELS Removal and Disposal, Includes Preformed & Corrugated Aluminum Roofing Panels, Preformed, Corrugated, Ribbed & Standing Seam Galvanized, Zinc & Colored Sheet Metal; and Preformed, Corrugated & Ribbed Fiberglass Panels.

TRANSITE ROOFING PANELS, Removal and Disposal. Includes Asbestos Abatement Air Monitoring, Temporary Fence Barricades, Personnel, Waste and Decontamination Unit.

ALUMINUM ROOFING PANELS,

Installation of Preformed or Corrugated Panels.

STEEL SHEET METAL ROOFING PANELS,

Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted.

(22 Gage)

SHEET METAL FLASHING, Removal and Disposal. Includes Aluminum, Galvanized Steel, Copper, and Aluminum Fascia of Aluminum Flashing of Aluminum Fascia of Galvanized Steel Flashing of Copper Flashing

VENT THRU ROOF FLASHING,

Installation, Includes Removal and Disposal. Aluminum Vent Flashing

VENT THRU ROOF FLASHING,

INSTALLATION, INCLUDES REMOVAL AND

DISPOSAL. Galvanized Vent Flashing

VENT THRU ROOF FLASHING,

INSTALLATION, INCLUDES REMOVAL AND

DISPOSAL. Lead Vent Flashing

SHEET METAL GUTTERS & DOWNSPOUTS,

Removal and Disposal of existing Gutter and Downspouts

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Aluminum Gutters and Downspouts, 5".

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Aluminum Gutters and Downspouts, 7".

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Galvanized Steel Gutters and Downspouts

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Copper Gutters and Downspouts, k-style.

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Copper Gutters and Downspouts. Half round style.

Concrete Splash Blocks

ROOF VENT PIPE EXTENSION,

Installation of Roof Vent Pipe Extension drains

STRUCTRUAL LUMBER, Replacement of existing Deteriorated or Termite Damaged Lumber. Includes Removal & Disposal of existing Deteriorated or Termite damaged Structural Lumber, and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

ROOF SHEATHING, Replacement of existing Deteriorated Termite Damaged Sheathing Includes Removal & Disposal of e xisting Deteriorated or Termite damaged Sheathing and Incidental Painting of new Exposed Woodwork at Eaves, or as required.

(1-Primer and 2-finish coats to match adjacent existing surfaces).

METAL ROOF PURLINS, Replacement of existing Rusted or Damaged Purlins.

Includes Removal & Disposal of existing Rusted or Damaged Metal Purlins, and Incidental Painting of new Purlins as required. (1-Primer and 2- finish coats to match adjacent existing surfaces).

PITCH PANS, Replacement of existing Pitch Pans, Includes Removal and disposal.

CHEMCURB PITCH POCKET, Installation of CHEMCURB Pitch Pocket or approved equal. To include Removal, installation disposal and all required materials and equipment to complete work

ROOF DRAINS, Removal and Re-installation of existing Roof Drains, Includes cleaning, testing, and installing Modified Bitumen Sheet Flashing

ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Aluminum Roof Ventilators

ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Galvanized Roof Ventilators

REPLACE CLAY TILE ROOFING, Includes Removal & Disposal of existing Clay Tile Roofing, Roofing Felt Underlayment, and Installation of new Clay Tile Roofing, Felt Underlayment, and Flashing as required

CLAY TILE ROOF SEALER Installation of Low moisture absorption Clear drying penetrating water repellent barrier, Clay Tile Roof Sealer. To include Surface preparation and Installation of Roof Coating, clean-up and all required materials and equipment to complete work

Field

ASBESTOS ABATEMENT, Remove Asbestos Contaminated Metal Flashing, Base Flashing, and Mastic as required

ASBESTOS ABATEMENT, Total Demolition and Disposal of existing Built-Up Roofing System clear down to existing Roof Deck as required

90 LB. MINERAL SURFACE on Built-up

Roofing, Removal and disposal.

Remove existing roofing down to existing substrate

Gravel on Built-up Roofing, Removal and disposal. Remove existing gravel roofing down to existing substrate

Built-up Roofing Installation of 2-Ply, Includes 90LB. SBS Mineral Surfaced Roll-Roofing Cap Sheet on SBS fiberglass Base Sheet

Mineral Asphalt Plank

ROOFING INSULATION (without Fire Proofing Insulation), Removal & Disposal. Includes Tapered or Flat Insulation Boards

ROOFING INSULATION, Installation.

Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.

ROOFING INSULATION, Installation.

Tapered. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive

ROOF COATING, Installation of Hydro-Stop Elastomeric Roofing with 1/16" reinforcing or approved equal

Silicone Roof coating.

with Operator

Equipment Hauling, round trip to include delivery to jobsite location and return to Rental Company

REMOVE AND REINSTALL SOLAR PANELS

Install RIDGE VENTS, Installation of Ridge Vents, for Composition Shingle Roofing. Includes creating new opening & installing preformed material, cap sheet and all incidental items required

SAMPLE ANALYSIS, Collection and Laboratory analysis to determine if paint contains Lead. To include all incidental items required

SAMPLE ANALYSIS, Collection and Laboratory analysis (TCLP) to determine if paint/demolition debris contains Lead Based Paint and resulting debris can be classified as hazardous waste To include all incidental items required

LEAD BASED PAINT ABATEMENT,

Removal/Disposal of lead containing (hazardous) materials to include all incidental items required

Ridge Vents for metal roofing (10" to 36"W X10'-0"L), Includes creating new opening & installing preformed material, flashing, and all incidental items required to provide a complete useable product.

Product Service Code: Z2AA

Install Cant Strips, Installation of Cant Strips. To include all incidental items required. To include Removal, installation, disposal and all required materials and equipment to complete work

Plastic Sheeting, install plastic sheeting to protect furniture, equipment, supplies, etc. from dust.

Includes clean-up and removal.

20,000

Roof Hatch, Replacement of existing Rusted or Damaged Roof Hatch.

Includes Removal & Disposal of existing Rusted or Damaged Roof Hatch, and Incidental Painting of new Roof Hatch as required.

REPLACE CERAMIC COATED MINERAL

SURFACED SELF-SEALING Architectural SHINGLES, composed of a fiberglass mat base with ceramic-coated mineral granules tightly embedded in carefully refined, water-resistant asphalt. Two pieces of the shingle are firmly laminated together in a special tough asphaltic cement.

Includes Removal & Disposal of existing Strip Shingles, Roofing Felt Underlayment, Metal Drip Edge and Installation of new, Felt Underlayment & Metal Drip Edge.

ROOFING PANELS Removal and Disposal, Includes Preformed & Corrugated Aluminum Roofing Panels, Preformed, Corrugated, Ribbed & Standing Seam Galvanized, Zinc & Colored Sheet Metal; and Preformed, Corrugated & Ribbed Fiberglass Panels.

TRANSITE ROOFING PANELS, Removal and Disposal. Includes Asbestos

Abatement Air Monitoring, Temporary Fence Barricades, Personnel, Waste and Decontamination Unit.

Product Service Code: Z2AA

5,000 Square Foot

ALUMINUM ROOFING PANELS,

Installation of Preformed or Corrugated Panels.

STEEL SHEET METAL ROOFING PANELS,

Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted.

(22 Gage)

SHEET METAL FLASHING, Removal and Disposal. Includes Aluminum, Galvanized Steel, Copper, and Aluminum Fascia

VENT THRU ROOF FLASHING,

Installation, Includes Removal and Disposal. Aluminum Vent Flashing

VENT THRU ROOF FLASHING,

INSTALLATION, INCLUDES REMOVAL AND

DISPOSAL. Galvanized Vent Flashing

VENT THRU ROOF FLASHING,

INSTALLATION, INCLUDES REMOVAL AND

DISPOSAL. Lead Vent Flashing

SHEET METAL GUTTERS & DOWNSPOUTS,

Removal and Disposal of existing Gutter and Downspouts

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Aluminum Gutters and Downspouts, 5".

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Aluminum Gutters and Downspouts, 7".

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Galvanized Steel Gutters and Downspouts

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Copper Gutters and Downspouts, k-style.

SHEET METAL GUTTERS & DOWNSPOUTS,

Installation of Copper Gutters and Downspouts. Half round style.

ROOF VENT PIPE EXTENSION,

Installation of Roof Vent Pipe Extension

Product Service Code: Z2AA

STRUCTRUAL LUMBER, Replacement of existing Deteriorated or Termite Damaged Lumber. Includes Removal & Disposal of existing Deteriorated or Termite damaged Structural Lumber, and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

ROOF SHEATHING, Replacement of existing Deteriorated Termite Damaged Sheathing Includes Removal & Disposal of e xisting Deteriorated or Termite damaged Sheathing and Incidental Painting of new Exposed Woodwork at Eaves, or as required.

(1-Primer and 2-finish coats to match adjacent existing surfaces).

METAL ROOF PURLINS, Replacement of existing Rusted or Damaged Purlins.

Includes Removal & Disposal of existing Rusted or Damaged Metal Purlins, and Incidental Painting of new Purlins as required. (1-Primer and 2- finish coats to match adjacent existing surfaces).

PITCH PANS, Replacement of existing Pitch Pans, Includes Removal and disposal.

CHEMCURB PITCH POCKET, Installation of CHEMCURB Pitch Pocket or approved equal. To include Removal, installation disposal and all required materials and equipment to complete work

ROOF DRAINS, Removal and Re-installation of existing Roof Drains, Includes cleaning, testing, and installing Modified Bitumen Sheet Flashing

ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Aluminum Roof Ventilators

ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Galvanized Roof Ventilators

REPLACE CLAY TILE ROOFING, Includes Removal & Disposal of existing Clay Tile Roofing, Roofing Felt Underlayment, and Installation of new Clay Tile Roofing, Felt Underlayment, and Flashing as required

CLAY TILE ROOF SEALER Installation of Low moisture absorption Clear drying penetrating water repellent barrier, Clay Tile Roof Sealer. To include Surface preparation and Installation of Roof Coating, clean-up and all required materials and equipment to complete work

ASBESTOS ABATEMENT, Remove Asbestos

Contaminated Metal Flashing, Base Flashing, and Mastic as required

Product Service Code: Z2AA

7,000 Square Foot

ASBESTOS ABATEMENT, Total Demolition and Disposal of existing Built-Up Roofing System clear down to existing Roof Deck as required

90 LB. MINERAL SURFACE on Built-up Roofing, Removal and disposal.

Remove existing roofing down to existing substrate

Gravel on Built-up Roofing, Removal and disposal. Remove existing gravel roofing down to existing substrate

Built-up Roofing Installation of 2-Ply, Includes 90LB. SBS Mineral Surfaced Roll-Roofing Cap Sheet on SBS fiberglass Base Sheet

ROOFING INSULATION (without Fire Proofing Insulation), Removal & Disposal. Includes Tapered or Flat Insulation Boards

ROOFING INSULATION, Installation.

Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.

ROOFING INSULATION, Installation.

Tapered. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive

ROOF COATING, Installation of Hydro-Stop Elastomeric Roofing with 1/16" reinforcing or approved equal

Equipment Hauling, round trip to include delivery to jobsite location and return to Rental Company

Install RIDGE VENTS, Installation of Ridge Vents, for Composition Shingle Roofing. Includes creating new opening & installing preformed material, cap sheet and all incidental items required

SAMPLE ANALYSIS, Collection and Laboratory analysis to determine if paint contains Lead. To include all incidental items required

SAMPLE ANALYSIS, Collection and Laboratory analysis (TCLP) to determine if paint/demolition debris contains Lead Based Paint and resulting debris can be classified as hazardous waste To include all incidental items required

LEAD BASED PAINT ABATEMENT,

Removal/Disposal of lead containing (hazardous) materials to include all incidental items required

Install RIDGE VENTS, Installation of Ridge Vents for metal roofing (10" to 36"W X10'-0"L), Includes creating new opening & installing preformed material, flashing, and all incidental items required to provide a complete useable product.

Install Cant Strips, Installation of Cant Strips. To include all incidental items required. To include Removal, installation, disposal and all required materials and equipment to complete work

Plastic Sheeting, install plastic sheeting to protect furniture, equipment, supplies, etc. from dust.

Includes clean-up and removal.

Roof Hatch, Replacement of existing Rusted or Damaged Roof Hatch.

Includes Removal & Disposal of existing Rusted or Damaged Roof Hatch, and Incidental Painting of new Roof Hatch as required.

REPLACE CERAMIC COATED MINERAL

SURFACED SELF-SEALING Architectural SHINGLES, composed of a fiberglass mat base with ceramic-coated mineral granules tightly embedded in carefully refined, water-resistant asphalt. Two pieces of the shingle are firmly laminated together in a special tough asphaltic cement.

Includes Removal & Disposal of existing Strip Shingles, Roofing Felt Underlayment, Metal Drip Edge and Installation of new, Felt Underlayment & Metal Drip Edge.

ROOFING PANELS Removal and Disposal, Includes Preformed & Corrugated Aluminum Roofing Panels, Preformed, Corrugated, Ribbed & Standing Seam Galvanized, Zinc & Colored Sheet Metal; and Preformed, Corrugated & Ribbed Fiberglass Panels.

TRANSITE ROOFING PANELS, Removal and Disposal. Includes Asbestos Abatement Air Monitoring, Temporary Fence Barricades, Personnel, Waste and Decontamination Unit.

ALUMINUM ROOFING PANELS,

Installation of Preformed or Corrugated Panels.

STEEL SHEET METAL ROOFING PANELS,

Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted.

(22 Gage)

SHEET METAL FLASHING, Removal and Disposal. Includes Aluminum, Galvanized Steel, Copper, and Aluminum Fascia

VENT THRU ROOF FLASHING,

Installation, Includes Removal and Disposal. Aluminum Vent Flashing

VENT THRU ROOF FLASHING,

INSTALLATION, INCLUDES REMOVAL AND

DISPOSAL. Galvanized Vent Flashing

VENT THRU ROOF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .