This document is a Performance Work Statement (PWS) for the installation of 26 NIPR drops with 2 CAT 6 Green cables per drop in Buildings 1575, 1585, and 1587 at Ft Shafter Flats.

The contractor will provide all necessary personnel, management, tools, equipment, parts, materials, transportation, and other items and services to complete the installation. They must label all drops and equipment according to the NEC Standardized Labeling Program and abide by TIA standards for telecommunications installation. The work includes installing power poles, data cables, and conduit in the specified buildings. A new Cisco 9300 POE switch and 48-port patch panel will also be installed in Building 1575. The contractor must coordinate access to the facilities and provide all reports, plans, and other deliverables in the required formats. The service performance is summarized, and no government-furnished property, equipment, or services are provided. A site visit is scheduled for July 18, 2024, and the last day for submission of questions is July 25, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFOMANCE WORK STATEMENT

FOR THE INSTALLATION OF TWENTY-SIX (26) NIPR

NIPR DROPS FOR BUILDINGS 1575, 1585, AND 1587 FT SHAFTER FLATS

DESCRIPTION OF SERVICES. Contractor will provide personnel, management, tools, equipment, parts and materials, transportation and other items and services necessary to install 26 NIPR drops with 2ea CAT 6 Green cables per drop. Contractor shall label all drops and equipment according to the NEC Standardized Labeling Program. Contractor shall abide by all TIA standards for Telecommunication installation.

1.1. INSTALLATION

1.2. Contractor will complete the following requirement(s) as stated below:

FS FLATS Bldg. 1585

1. 1585 Install 5-20 FT Steel power poles in a roofed maintenance warehouse to provide NIPR connectivity to existing Toolbox workstations. Warehouse is considered exterior, therefore conduit must be used. Recommend Surge Protectors be utilized at each toolbox location.

2. Install 10 CAT-6 Green Data Cables- 4 per pole, with face plates originating from an available port on the existing Cisco Switch located in TR Office inside Manager's office. Each Toolbox location has a support beam and 11 OV AC power cables installed above head approximately 5 ft off ground. Each CAT-6 Faceplate will be located about 4-6ft from floor on the pole because the floor is rinsed with water to clean. Each toolbox location has pre-drilled cable entrance holes to insert jumper from jack to Laptop.

3. Install 2-2 in EMT Conduits that will break out of the office and attach to existing supports on the warehouse roof with the necessary support attachments to run cable to each pole providing network connectivity. There are several options for running the conduit, stated TCE standards must be utilized, and each drop tested for connectivity.

FLATS Bldg. 1587

Install I- 2 CAT 6 originating from Team office, to the maintenance cage and small arms room. The room is located approximately 60 feet east of switch and it will be necessary to break out of the office ceiling and route cables using conduit following the steel support beam route. There is an existing 2-inch unused conduit, stubbed in the office that can be utilized. It was installed for Network usage but never used.

BLDG 1575

1. Install a new Cisco 9300 POE Switch with necessary modules and mount to existing wall rack. Switch will be turned into the warehouse, then sent to the NOC using a Service Now Ticket. Once it has been configured by the NOC.

Install a 48-port patch panel to support additional cabling. Currently, there is one 4-inch sleeve breaking cable out to the facility Install another 4-inch sleeve to break out new cables aerially to the warehouse locations, and offices and cages.

2. A total of 12 runs 4 in maintenance, 1 in TR Office (RM R-103) 2 in Rm R- 105, 1 in cages: R CAGED, E,F,G,H,I. Each Run will have 2-CAT 6 Cables, terminated to Face Plates Labeled approximately 2 ft from floor. Customer will be provided on 5 ft CAT-6 Jumper Cable from Faceplate jack to workstation.

1.3. ACCESS. Contractor shall coordinate access to facilities with the point of contact of the building. Contractor shall notify the COR if unable to coordinate access.

1.4. REPORTS. The contractor shall provide all reports, plans, and any other narrative deliverable in hard copy (2) and CD Rom (2) us.ing the following software:

Text: Microsoft Word Spreadsheet: Microsoft Excel Drawings: Micro Station format or Auto CAD. Power point will be acceptable for this proposal and costing only.

1.5. BUSINESS RELATIONS. Contractor shall partner with the Government to resolve all issues and conflicts in a timely and expeditious manner.

2. SERVICE PERFORMANCE SUMMARY: The service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

3. GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES. N/A