This document is a set of Questions and Answers related to a federal contract opportunity for a NIPR drop installation project at Bldg 200, Fort Shafter, Hawaii.

The key details are:

  • The data pole required is from the Herman Miller brand to match existing furniture
  • There is no incumbent for this contract
  • Cabling must be CAT6 and dark green in color
  • The installation will be in a dropped ceiling with the cables run from the ceiling into data poles and furniture
  • The walls are drywall, the ceiling height is 10 feet, and the existing telecom room has proper grounding and bonding
  • Connectors must be RJ45, and the contractor will use the existing rack space
  • The contractor is not responsible for providing any switches
  • Trash disposal is the contractor's responsibility, and no core drilling is required
  • The space will be occupied during the installation
  • Approximately 5 boxes of 1000 feet of CAT6 cable are estimated to be needed.

View the file

Other files

File Type Posted
PWS for FS Bldg. 200 (REVISION).pdf PDF
SB 200 drop drawing (REVISION).pdf PDF
New furniture diagram 200.pdf PDF
PWS for FS Bldg 200.pdf PDF
SB 200 drop drawing.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANWERS

1. Please provide a model number or a brief descrip on of the data pole that is required for this project.

A. Data pole will be from the Herman miller brand to match the current furniture in place.

2. Is there an incumbent for this contract?

A. No

3. Is there a specific brand of cabling that is required?

A. The only thing specific for the cable is that is its dark green and CAT6

4. Are Ceilings Suspended? Or Hard Lid? Will it be wall drops or ceiling drops? sheetrock, li out le, 2x4 or 2x2, etc?

A. Drop ceiling, we would like to run the drops from the ceiling into the data pole and into the furniture with a faceplate at the desk.

5. What type of walls are in the perimeter areas?

A. Interior office and TR areas are dry wall

6. What's the height of the ceiling?

A. 10’

7. What is the preferred method for grounding and bonding Cat6 cables for electrical safety?

A. The current TR room is up to standard for grounding and bonding.

8.Can you provide informa on on the type of connectors (RJ45, Keystone, etc.) that should be used for

Cat6 termina on?

A. Connectors are RJ45

9. Does the customer supply rack space, or is it the vendor's responsibility to install a rack? In the event that the vendor is responsible for rack installa on, could you kindly provide specifica ons regarding the necessary requirements for the rack?

A. Using exis ng rack

10. Please confirm that the contractor is not responsible for providing any switches.

A. No switches needed using exis ng.

11. Is there a designated area for trash disposal in rela on to this project?

A. Trash disposal is on the contractors responsibility.

12. Is there any core drilling that needs to be done through concrete or block?

A. No core drilling needed.

13. Will the space be occupied during the installa on?

A. Yes

14. What is the required cable length to reach the patch panel?

A. Es mated 5 boxes of CAT 6 which comes in 1000 feet per box.