W912CN23R0020 40FT.pdf

PDF 982 KB Posted

Attached to
Rent 40ft Articulating Boom Lift
Solicitation number
W912CN23R0020
Issued by

View the file

Other files

File Type Posted
T.E # 1 JLG_TOUCAN_T20E_T26E_T32E_2015.pdf PDF
Salient Characteristics Boom Lift 40ft.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912CN23R0020 12-Apr-2023

b. TELEPHONE NUMBER

808-656-0939

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 01 May 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912CN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TRAVIS C. TONINI

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011937151

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

413 CSB

413TH CSB, RCO-HAWAII,

742 SANTOS DUMONT AVENUE

BLDG 108, 3RD FLOOR (WAAF)

SCHOFIELD BARRACKS HI 96857-5026

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE WX3JN3 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

US ARMY GARRISON HI DIR OF PUB WKS DPW

JONATHAN LOSPOC

BLDG 104 947 WRIGHT AVE WAAF SERVICE CO

SCHOFIELD BARRACKS HI 96857-5013

TEL: 808-655-51411 FAX: 808-656-7771

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$40,000,000

NAICS:

532412

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF56

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

ADDITIONAL INSTRUCTIONS & INFO

Additional Instructions and Information

1. Quote Submission Instructions.

a. This solicitation is a Request for Quote (RFQ). This solicitation will be posted on the System for Award Management (SAM) website. The SAM website is https://sam.gov/. Once the solicitation is posted, it is the responsibility of the contractor to monitor the website for any issued amendments, until the closing date.

Quotes shall be submitted electronically via E-mail to the contract specialist identified below. Faxed quotes will NOT be accepted.

Contract Specialist Name: Travis Tonini E-mail Address: travis.c.tonini.civ@army.mil

b. Quotes must be received by the contracting office on or before the solicitation’s closing date and time stated in Block 8 of the Standard Form (SF) 1449 form. Local time is Hawaii Standard Time (HST). It is the responsibility of the contractor to ensure quotes are received and acknowledged by the contract specialist on or before the closing date.

c. Minimum Quote Acceptance Period. By submittal of a quote, the contractor agrees to firmly hold the prices in its quote for 90 calendar days.

d. The Government may reject any or all responses, if such actions are in the public interest and/or waive informalities and minor irregularities in the submitted quotes.

The Government reserves the right to cancel this RFQ and make no award. By responding to this RFQ and submitting a quote in response to the RFQ, the contractor understands that the Government shall not be liable for any costs incurred by the contractor in response to this RFQ.

2. Solicitation Questions. Questions regarding this solicitation shall be submitted in writing via

E-mail to Travis Tonini (contract specialist) between April 14 – April 28, 2023. The Government reserves the right not to respond to questions concerning this solicitation received after April 28, 2022 at 12:00 PM HST. A summary of questions received and Government responses will be provided by amendment and posted to the SAM website.

3. Quote/Content Requirements. Interested parties shall complete and submit the items identified below with their quote.

a. RFQ SF 1449 Solicitation/Contract/Order for Commercial Items with Blocks 12, 17a, 30a, 30b, and 30c completed and signed by an authorized representative/official of the company/firm.

b. RFQ “Section SF 1449 – Continuation Sheet.” Submit pricing for all contract line item numbers (CLINs).

c. Completed FAR Clause 52.212-3 Offeror Representation and Certifications – Commercial Items (if not entered into System for Award Management).

Note: Prospective offerors must have a System for Award Management (SAM) account, if they submit a quote.

d. Completed the FAR Clauses listed below, in the solicitation.

FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

FAR 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

FAR 52.204-26 Covered Telecommunications Equipment or Services- Representation

PERFORMANCE WORK STATEMENT

Performance Work Statement (PWS)

Rent an Articulated Boom Lift at Schofield Barracks, United States Army Garrison, ISLAND OF OAHU, HAWAII

03/14/2023

Version 1.0

W912CN23R0020

Performance Work Statement (PWS)

Rent an Articulated Boom Lifts at Schofield Barracks, United States Army Garrison, ISLAND OF OAHU, HAWAII

Vision Statement Provide services to support and improve the quality of Hawaii’s Military community and enhance War Fighter readiness and well-being.

1. Scope The Contractor shall provide all labor, management, supplies, material, equipment and transportation necessary to rent an Articulated Boom Lifts or similar equipment with Two (2) level booms. The rental contract shall include delivery, pick up, and servicing of a properly operating articulated Boom Lift on a brand name or equal basis to the JLG T32E (see T.E. # 1) Platform Height: 40 feet. Work shall be performed in accordance with the manufacturer’s standards, commercial practices, and applicable Federal and State Codes.

2 General Requirements This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.

2.1 Non-Personal Services

The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer (KO) immediately.

2.2 Business Relations

The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The Contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

2.3 Contract Administration and Management

The following subsections specify requirements for contract, management, and personnel administration.

2.3.1 Contract Management

The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The Contractor must maintain continuity between the support operations at the Directorate of Public Works (DPW) Service Contract Branch and the Contractor's corporate offices.

2.3.2 Contract Administration

The Contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The Contractor shall respond to Government requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The Contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

2.3.3 Personnel Administration

The Contractor shall provide the following management and support as required. The Contractor shall provide for employees during designated Government non-work days or other periods where Government offices are closed due to weather or security conditions. The Contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. The Contractor shall make necessary travel arrangements for employees. The Contractor shall provide necessary infrastructure to support contract tasks. The Contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs).

2.4 Subcontract Management

The Contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime Contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Contracting Officer Representative (COR).

Cross teaming may or may not be permitted.

2.5 Contractor Personnel, Disciplines, and Specialties

The Contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.

2.6 Location and Hours of Work

Accomplishment of the results contained in this PWS requires delivery and pick up of equipment at Schofield Barracks, DPW Central Team shop, building 2623, Island of Oahu, Hawaii to be performed during Government’s normal working hours, 7:30 a.m. – 4:00 p.m., Monday through Friday, excluding Federal Holidays. In no event shall the Contractor perform work outside the normal working hours without obtaining written approval from the Contracting Officer (KO).

3 Performance Requirements The following section specifies the Performance Objectives and Performance Elements for the contract.

3.1 Rental of One (1) Articulated Boom Lifts

The Contractor shall provide all labor, management, supplies, material, equipment and transportation necessary to rent an Articulated Boom Lift. Articulated Boom Lift or similar equipment both with Two (2) level booms. The rental contract shall include delivery, pick up, and servicing of a properly operating articulated Boom Lifts on a brand name or equal basis to JLG T32E (see T.E. # 1) Platform Height: 40 feet. Work shall be performed in accordance with the manufacturer’s standards, commercial practices, and applicable Federal and State Codes.

Performance Standards

a) STD: Properly operating articulated Boom Lifts with a Platform Height of 40 feet

AQL: Required to be accomplished 95% of the time

4 Special Requirements

4.1 Government Furnished Materials

Water and electricity required for the performance of the work covered by this contract will be furnished to the Contractor at no additional cost.

4.2 Terms of Rental

The rental contractor shall provide one (1) operating 40 foot articulated Boom Lift vehicle to the Government for a rental period from May 15 to September 29, 2023. The Government will pay the contractor in monthly installments during the term of the rental period.

4.3 Initial Delivery and Final Pick-up.

The rental period shall commence on the date of delivery of the equipment to the government’s location at Building 791- CDC Schofield Barracks, Island of Oahu, Hawaii and shall terminate on the date of return delivery of the equipment to the rental contractors’s unloading point.

4.4 The Government shall completely inspect the equipment

The Government shall completely inspect the equipment within one (1) day of delivery and make any claim for defects; otherwise, the equipment is acknowledged to be in good working order.

The Government shall notify the rental Contractor in writing within a reasonable time after such one (1) day period. The rental Contractor shall replace any defective parts at its expense.

4.5 Maintenance and Repair

The rental Contractor shall include the performance of preventative maintenance and repair work covered by warranty in accordance with industry procedure and standard to maintain each piece of rental equipment in good operating condition. The Government will provide repair costs attributed to normal wear and tear, such as flat tires. The Government shall ensure equipment is not subjected to careless or needlessly rough usage.

5 Deliverables

5.1 Service Contract Reporting (SCR) in the System for Award Management (SAM)

Effective in FY20, the Department of Army will no longer require contractors to report into the ECMRA. Contractors will begin reporting manpower data relating to the performance for service/construction contracts into SAM, consistent with existing service/construction contract reporting requirements under FAR Subpart 4.17.

SCR is a business process that has been approved by the Army as a means for collecting information on contracts that provide services to the Department of the Army. SAM portal to SCR will allow industry to report all manpower data into a single Federal-wide portal, removing duplicative requirements, one for DoD and another for the rest of the Federal Government, which requires the same data elements to be reported for service/construction contracts performed for both DoD and Federal civilian agencies that essentially perform the same function. The outcome will be a process that is less burdensome on both industry and Government while improving data integrity and accuracy.

The reporting period for contractors in SAM generally is open from mid-October to mid- December for reporting against the prior government fiscal year. SAM will only enable reporting for entities with contracts that meet the SCR thresholds

Contractors must have an entity registered in SAM, an individual SAM user account with the Entity Administrator, Entity Registration Representative or Reporter roles for that entity and one or more contracts awarded to that entity, which meet the SCR reporting thresholds. For further information go to http://sam.gov

Detailed descriptions of Reporting Thresholds are available in the Service Contracting Reporting guidebook located at: https://dodprocurementtoolbox.com/site-pages/service-contract-report-sci

The Federal schedule for FY2020 for Contractor Service Reporting in SAM can be found in “Deploying Contractor Service Contract Reporting Memorandum” located in the procurement toolbox: https://dodprocurementtoolbox.com/site-pages/service-contract-report-sci

5.2 Performance Requirement Summary (PRS)

Statements Standards/AQLs Incentive/Remedy

3.1 Rental of an Articulated

Boom Lifts

STD: a) STD: Properly operating articulated Boom Lifts with a Platform Height of 40 feet AQL: Required to be accomplished 95% of the time

Trends of less than acceptable performance could result in reduction in pay and/or the replacement of equipment and parts at no additional cost to the government.

6.0 OTHER INFORMATION

6.1 GENERAL ENVIRONMENTAL STANDARDS

(a) While performing work on any US Army Garrison, Hawaii (USAG-HI) installations, the contractor will comply with Executive Orders 13423 “Strengthening Federal Environmental, Energy, and Transportation Management” signed by the President on 24 Jan 2007 and 13514, “Federal Leadership in Environmental, Energy, and Economic Performance” signed by the President on 8 Oct 2009 requiring the acquisition of environmentally preferable goods and services, use of sustainable environmental practices, purchase of bio based, energy efficient and recycled content products. More specifically, the Contractor will strive to improve upon their sustainability performance by taking actions to:

(1) Reduce energy consumption

(2) Reduce greenhouse gas emissions

(3) Conserve and protect water resources

(4) Eliminate waste, recycle, and prevent pollution

(5) Adopt sustainable technologies

(6) Procure environmentally preferable materials, products and services

(7) Maintain sustainable buildings

(8) Strengthen livability of the local community

(9) Inform and involve personnel in the achievement of these goals.

(b) The contractor will comply with the Government directives, permit conditions, installation policies and plans as administered by the Government. The Contractor will be held liable to pay for any environmental fines resulting from his operations, waste generated or other operational environmental requirements. As applicable, the Contractor will obtain environmental permits required for wastewater pretreatment, underground tanks, hazardous waste identification numbers, and air pollution permit for temporary sources, storm water permits or other pertinent environmental permits.

(c) The contractor will review and comply with applicable policies, program documents and regulatory requirements as stipulated under each environmental program media below.

(1) Environmental program documents include, but are not limited to; the Installation Hazardous Waste Management Plan – USAG-HI Regulation 200-4, Asbestos Management Plan, Lead-based Paint Management Plan, Installation Spill Prevention, Control, and Countermeasures (SPCC) Plan, Integrated Natural Resources Management Plan, Integrated Cultural Resources Management Plan, Pollution Prevention Plan, and the Storm Water Pollution Prevention Plan available at the DPW Environmental Division. Environmental program documents can be downloaded from the installation sustainability and environmental management website at:

http://www.garrison.hawaii.army.mil/sustainability/Environmental.aspx.

(2) Installation policies include, but are not limited to; the Environmental Compliance and Protection Program Policy Memorandum USAG-HI-4; Environmental Policy Memorandum USAG-HI-10; Authorized Use List Policy Memorandum USAG-HI-19, Waste Reduction and Recycling Policy Memorandum USAG-HI-25; Open Burn Policy Memorandum USAG-HI-51;

Generator Control Policy Memorandum USAG-HI-55; Illicit Discharge Detection and Elimination Policy Memorandum USAG-HI-59; and the Joint USARPAC and IMCOM-Pacific Energy Conservation Policy Guidance. Installation Policy Memorandums are available for download at: http://www.garrison.hawaii.army.mil/command/documents.htm

(3) The contractor is also encouraged to view the online A to Z sustainability and environmental management guide for instructions on managing common environmental issues. The A to Z sustainability and environmental management guide is available at:

http://www.garrison.hawaii.army.mil/sustainability/AtoZ.aspx.

(d) The Contractor shall at all times keep the work area, including storage areas used by him, free from accumulations of waste material or rubbish and prior to completion of the work remove any rubbish from the premises and all tools, scaffolding, equipment and materials not the property of the Government. Upon completion of the work, the Contractor shall leave the work and premises in a clean, neat and workmanlike condition satisfactory to the Contracting Officer.

If debris is not disposed of properly or the site is not left clean, the Government will clean the site at the expense of the contractor. The Contractor will also be held liable for damages done to the environment as a result of disposal and/or cleanup.

(e) The Contractor may be subject to unannounced Environmental Compliance Inspections by the DPW Environmental Division.

(f) Environmental and Safety Noncompliance Fees. The Contractor shall be solely responsible for remedying all Federal, State and local environmental and safety violations or noncompliance and any payment of fines, penalties and fees levied as a result of the violations or noncompliance. The Government reserves the right to withhold payment in the amount of the fines, penalties and fees levied if not paid by the contractor.

6.2 EMERGENCY PLANNING COMMUNITY RIGHT TO KNOW ACT (EPCRA)

HAZARDOUS SUBSTANCES (HS)

(a) Contractors using EPCRA HS in the performance of any work while on USAG-HI installations are responsible for complying with the provisions of EPCRA regulations and submitting applicable reports (TIER II/TRI) to Federal and State regulatory agencies as applicable.

(b) Copies of reports for substances used in connection with work performed on USAG-HI installations shall be provided to the DPW Environmental Division, Attention: EPCRA Program Manager, STOP 253, 3rd Floor, 948 Santos Dumont Ave., Wheeler Army Airfield, phone 656- 2878.

(c) Chemicals regulated under EPCRA HS are defined in EPA document EPA 550-B-98-017, Title III List of List, Consolidated List of Chemicals Subject to the Emergency Planning and Community Right to Know Act and Section 112(r) of the Clean Air Act Amended.

(d) The Contractor is responsible for knowing which chemicals it uses or transports that are contained on the list. For convenience, the Contractor may review a copy of the EPA document at the Directorate of Public Works (DPW) Environmental Division. The document can also be downloaded from the U.S. Environmental Protection Agency (EPA) at:

http://www.epa.gov/oppt/pubs/genpub.htm.

(e) The Contractor must maintain copies of Material Safety Data Sheets (MSDS’s) of all chemicals used in the performance of any work while on USAG-HI installations. MSDSs must be readily available at the site location where the work is being performed.

(f) The Contractor can request the list and locations of EPCRA HS currently utilized on USAG- HI installations by contacting the DPW Environmental Division EPCRA Program Manager. The Contractor must provide name, company, contract number, date the contract was awarded and provide a description of the contract. A database of locations of chemicals will then be forwarded upon review and approval of request. Contractors working on USAG-HI installations are encouraged to review this database, which will provide information where potentially hazardous chemicals are stored.

(g) All spills of substances containing EPCRA HS will be immediately reported to the Directorate of Public Works Spill Response line at 656-1111 and the USAG-HI, Public Affairs Office at 656-3160 or 542-9489 (after hours). The Contracting Officer must be notified during the first business hour immediately after. All waste generated from EPCRA HS being utilized will be immediately reported to the DPW Environmental Office, phone: 656-2878.

(h) All Contractors utilizing substances containing EPCRA HS will perform the following prior to contract start.

(1) Review the Installation Spill Prevention, Control, and Countermeasures (SPCC) Plan and the Installation Hazardous Waste Management Plan – USAG-HI Regulation 200-4 available at the DPW Environmental Division or from the from the installation sustainability and environmental management website at:

http://www.garrison.hawaii.army.mil/sustainability/Environmental.aspx. Upon review, the contractor or designated responsible employee shall sign a certification statement that they have reviewed and understand the contents of these documents.

(2) Provide a listing and MSDS copies of oil and Hazardous Substance (HS) products projected to be utilized in the performance of any work while on USAG-HI installations to the DPW Environmental Division. The estimated average and maximum quantities of each material anticipated to be on-site at any given time shall also be provided to the DPW Environmental Division EPCRA Program Manager, STOP 253, 3rd Floor, 948 Santos Dumont Ave., Wheeler Army Airfield, phone 656-2878 and to building 6040 East Range for material to be bar-coded.

The contractor must ensure the product listing is current and updated as frequently as necessary and/or at a minimum, on an annual basis by 1 January of each year.

(3) Provide the name, office phone number, and cellular phone number of a company spill response point of contact. The point of contact must be trained in spill response.

(4) Provide a copy of an agreement with a hazardous materials spill response company in the event of a spill.

(5) Provide copies of employees training certificates on environmental and spill response training.

(6) Appoint a primary and alternate Environmental Compliance Officer in writing.

(7) Develop a notification procedure in the event of a spill to include phone numbers of response personnel, support agencies, National Response Center, State Hazard Evaluation Emergency Response Office and Civil Defense.

(8) Accomplish all spill notifications as required by the U.S. Environmental Protection Agency and State of Hawaii to the Hazard Evaluation Emergency Response Office, Local Emergency Response Commission and National Response Center. Copies of written spill notifications shall be provided to the DPW Environmental Division.

(9) All spills caused by the contractor will be cleaned up under supervision of the contractor and a qualified hazardous materials spill response company, at no cost to the government, in accordance with all applicable laws and regulations and to the satisfaction of the DPW Environmental Division.

(10) The contractor shall pay for disposal cost of all contaminated materials to include but not limited to soil, sorbent materials, disposable equipment and other materials contaminated by the spill. Ensure all disposals are in accordance with all applicable laws and regulations at authorized disposal facilities.

6.3 SPILLS OF PETROLEUM/OIL/LUBRICANTS OR HAZARDOUS

MATERIALS/HAZARDOUS WASTE

(a) The Contractor will prepare and maintain a site-specific spill plan, including notification procedures for spills/releases. The spill plan will include phone numbers of response personnel, support agencies, National Response Center, State Hazard Evaluation Emergency Response Office and Civil Defense. The Contractor will provide a copy of the spill plan to DPW Environmental Division upon request.

(b) The Contractor shall provide immediate response to stop, contain, and clean-up all spills of oil and other hazardous substances that result from his performance under this contract.

(c) The Contractor must report all spills immediately to the DPW Spill Response line at (808) 656-1111 in accordance with the Installation SPCC Plan. Additionally, the Contractor shall notify the COR of the incident during normal business hour or the first business hour following the incident.

(d) The Contractor will accomplish all spill notifications and written spill reports as required by the U.S. Environmental Protection Agency, State of Hawaii Hazardous Evaluation Response Office, Local Emergency Planning Commission and National Response Center, in accordance with applicable laws and regulations.

(e) The Contractor will provide a copy of spill notifications and written reports to the DPW Environmental Division.

(f) All spills caused by the Contractor will be cleaned up under the supervision of the Contractor and/or a qualified hazardous waste/materials spill response company, at no cost to the USAG-HI, in accordance with all applicable laws and regulations and to the satisfaction of the DPW Environmental Division. If cleanup is not accomplished in a timely fashion, or to the satisfaction of the DPW Environmental Division, the Government will assist with the final cleanup, and the Contractor will provide appropriate reimbursement of cleanup costs.

(g) The Contractor will pay for all clean up, management, and disposal cost of all contaminated materials to include but not limited to soil, sorbent materials, disposable equipment and other materials contaminated by the spill. The Contractor will ensure waste disposal is accomplished in accordance with all applicable laws and regulations and at an authorized/permitted treatment and disposal facilities.

(h) The Contractor will pay any fines or penalty charges associated with a citation issued by federal, state or local officials as a result of the accident.

(i) Contractors handling bulk fuel must be trained to do so, and mobile fuel operations must be approved by the DPW Environmental Division.

(j) Off-Post Spills. The Contractor shall be responsible for and pay for cleanup of off-post spills in accordance with directions received from appropriate local authorities (e.g., Honolulu Fire Department, State Civil Defense, etc.). Off-post spills in connection with work performed under this contract shall also be reported to the DPW Spill Response line at (808) 656-1111 and the

COR.

(k) Discovery of other than Contractor-caused spills. The Contractor shall report any spills of hazardous materials to the DPW Spill Response line at (808) 656-1111 and the COR upon discovery.

6.4 HAZARDOUS WASTE (HW) and NON-REGULATED WASTE (NRW).

(a) The Contractor will comply with the Environmental Compliance and Protection Program Policy Memorandum USAG-HI-4.

(b) The Contractor will determine, based on generation of hazardous waste(s) resulting from their operation/activities their respective hazardous waste generator status. The Contractor is responsible to manage HW and NRW generated on-site from inception to disposal in accordance with all applicable, federal, state, and local regulations. All costs associated with disposal are borne by the Contractor.

6.5 RECYCLING PROGRAM

(a) The Contractor will comply with USAG-HI Policy Memorandum 25, Waste Reduction and Recycling, requiring diversion of solid waste to the fullest possible. More information can be found on the installation sustainability and environmental management website at:

http://www.garrison.hawaii.army.mil/sustainability/Recycling.aspx

(b) Identify a recycling POC to DPW Environmental Division to include name, phone number and email address.

(c) Report quantities of refuse disposed and recycled to DPW Environmental Division as part of the work performed under this contract as applicable.

6.6 NATURAL AND CULTURAL RESOURCES PROGRAM

(a) The Contractor will comply with USAG-HI Range Standard Operating Procedures (SOPs).

All personnel who use the ranges must complete a mandatory pre-brief covering issues associated with Natural and Cultural Resources.

(b) The Contractor must be cognizant of the potential environmental impact and liability their actions could have, if specified procedures are not followed on Army lands. The Contractor must be aware that USAG-HI manages more than 100 threatened and endangered species including plants, snails, birds, bats, insects and their critical habitat and over 1,300 prehistoric archaeological sites, including temple structures, stone markers, fishing shrines, habitation sites, caves, rock shelters, mounds, burial platforms, earth ovens, stone walls and enclosures, agricultural terraces, irrigation canals, petroglyphs and trails.

(c) The Contractor shall take every precaution to prevent starting wildfires at training areas and must put them out if they do occur. The Contractor must report all wildfires to range control immediately at 808-655-1434.

(d) The Contractor must be familiar with the policy and restrictions regarding the types of ammunition that can be used under the different Burn Indices (BI) and on the different ranges.

(e) The Contractor must comply with the non-smoking policy at training areas and only allow smoking in designated areas.

(f) The Contractor must comply with the range best management practices to prevent the spread of invasive plant species from one training area to another by always washing vehicles, gears and equipment before starting new training activities.

(g) The Contractor will stay out of areas marked with Seibert Stakes. Seibert stakes are placed along roads and within vegetated areas to advise personnel of unsafe or hazardous range or training conditions and/or environmentally sensitive off-limit areas.

(h) The Contractor will refer to the installation sustainability and environmental management website at: http://www.garrison.hawaii.army.mil/sustainability/NaturalResources.aspx and http://www.garrison.hawaii.army.mil/sustainability/CulturalResources.aspx for additional information.

6.7 NATIONAL ENVIRONMENTAL POLICY ACT (NEPA)

As applicable, and upon request by the Government, the Contractor will comply with the NEPA process, notify the DPW Environmental Division and complete a Record of Environmental Consideration (REC) for actions such as, but not limited to:

(1) Actions that could impact historic structures, cultural and natural resources

(2) Minor renovation or new construction

(3) Actions that introduce new training vehicles, maneuvers, and weapons

(4) Replacing or removing floor tiles, ceiling tiles, sound proofing material, lighting fixtures, carpet, serving line equipment, natural gas unit

(5) Installing interior doors, windows, partitions, security cameras, rerouting ductwork

6.8 SUSTAINABLE ENVIRONMENTAL MANAGEMENT (SEM) SYSTEM

(a) The Contractor will be familiar with and comply with the installation’s Environmental Policy Memorandum USAG-HI-10 and all 18 components of the installation SEM system manual in conformance with the ISO 14001 standard. The SEM system manual is available for download at: http://www.garrison.hawaii.army.mil/sustainability/SEM.aspx

(b) In accordance with OPORD IMPC-HI-ZA 02-09, the Contractor will train all personnel in SEM awareness provided by DPW Environmental Division upon contract award. Refer to the installation Sustainable and Environmental Management website at http://www.garrison.hawaii.army.mil/sustainability/Training.aspx for information about the online training logging and access procedure.

(c) The Contractor will support, as applicable, USAG-HI in achieving the reduction and environmental improvement goals identified in the installation Strategic and Sustainability Plan, as well as Executive Order 13514. The Contractor will strive to accomplish these goals by implementing and promoting green practices to help reduce their environmental footprint, fostering an ethic that takes the Army beyond environmental compliance to sustainability.

(d) Appoint a SEM point of contact to DPW Environmental Division to include Name, phone number and email address upon request by the Government.

6.9 ENERGY AND WATER CONSERVATION

(a) Upon request by the Government, the Contractor will appoint a Unit Energy Conservation Officer (UECO) and Building Energy Monitor (BEM) and fully participate in the Garrison's energy and water conservation program.

(b) Appointed BEM and UECO must attend the training class provided by the DPW Engineering Branch.

(c) The appointed UECOs and BEMs are responsible for ensuring energy-saving measures are being enforced in each building and to provide regular reports to DPW Engineering Branch showing how well the contractor is doing at conserving energy.

(d) More information can be found on the installation sustainability and environmental management website at: http://www.garrison.hawaii.army.mil/sustainability/Energy.aspx

6.10 PRECAUTIONS FOR THE PROTECTION OF EXISTING UTILITIES (INCLUDES

COMMUNICATIONS) AND FACILITIES.

(a) Contractors are required to ensure necessary precautions and obtain required permits to protect government utilities and facilities. Contracts involving dredging, excavating, blasting and grading operations, demolition of structure and the moving of heavy and/or bulky equipment shall be subject to the following procedures and conditions:

(1) The Contractor shall obtain a written concurrence of the existing conditions and locations of utilities for his operations from the COR prior to beginning work and request the best information available on the location of Engineer facilities. Contractor shall verify locations of all utilities identified by the Government which affect his work.

(2) The Contractor shall be required to obtain a written clearance for his operations prior to beginning work and shall have locations of signal underground facilities staked out in the field from the 30th Signal Battalion/Network Enterprise Center-Hawaii (NEC-HI), EMC, IMG (Army Telephone, Data/LAN): Bldg. 600, Room 157, 148 Curtis Loop, Wheeler Army Air Field. Mr.

Eugene Brown, (Primary AO) (808) 656-6656; Marion F. Robinson, Jr., (808) 656-1765 (Alt AO). Business Hours: Mon - Fri. 0830-1700.

(3) If any cable/conduit is uncovered or damaged during excavation process, immediately contact:

(i) the JHITS trouble desk, (808) 659-1444

(ii) the NEC-HI RNOSC, (808) 655-2999, with detailed information on situation, and

(iii) the NEC-HI POCs (above) with reported dates, times and details.

(4) The Contractor shall also obtain a written clearance for gas line for this operations from The Gas Company (Tel: 594-5575) prior to beginning work and shall have locations for underground facilities staked out in the field by Gas Company personnel.

(5) Additional Digging Information: At least five days prior to digging please call the number below. Government Agency and Contact Person: Hawaii One Call Center Phone Number: 1- 866-423-7287.

(b) The Contractor shall be liable for damages resulting from his failure to comply with (1), (2),

(3) or (4) above.

6.11 AMC-LEVEL PROTEST PROGRAM

(a) If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer. However, you can also protest to Headquarters, AMC.

(b) The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO.

(c) The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the Contracting Officer) to:

Headquarters U.S. Army Materiel Command Office of Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000

Fax: (256)450-8840

(d) The AMC-level protest procedures are found at:

http://www.amc.army.mil/amc/commandcounsel.html. If Internet access is not available, contact the Contracting Officer or HQ, AMC, to obtain the AMC-Level Protest Procedures.

ACCESS TO ARMY INSTALLATIONS – PERSONNEL AND VEHICLES.

The Government recognizes the important roles companies like you play in our day-to-day operations. That is why USAG-Hawaii is enhancing the current access control solution called the Automated Installation Entry (AIE) Program. This program supports the security requirements while offering a streamlined access procedure for vendors, contractors, sub-contractors, suppliers and service providers. This program is available to new and existing personnel who require access to USAG-Hawaii and are not authorized to receive a Department of Defense CAC and desire a streamlined entry into the installation. Sponsorship and participation at each USAG-Hawaii location (e.g., Schofield Barracks, Wheeler Army Airfield, Fort Shafter, Tripler Army Medical Center, Pililaau Army Recreation Center and Pohakuloa Training Area) is required.

AIE Credential holders may access the installation through any of the USAG-Hawaii Gates that size allows and will only be subject to random inspections.

Companies that choose not to participate in the AIE Program will have limited access through the Schofield Barracks Lyman gate, Fort Shafter’s Buckner Gate and Tripler Army Medical Center Main Gate. All employees will be required to go through the inspection area and will be subject to the standard access control procedures, security screenings, and/or vehicle inspections.

Key Dates*

Effective 26 December 2021, RAPIDGate badges will no longer be authorized for long term access.

Effective 26 December 2021, the only long-term contractor credential available for access is the AIE Credential. The only other valid pass available for access is a seven (7) day pass.

*Access control changes can occur at any time due to security requirements

Companies that service USAG-Hawaii facilities may initiate enrollment in the AIE Program by contacting the Contracting Officer’s Representative (COR).

If you have questions regarding the AIE Program at USAG-Hawaii, please contact Security Branch Operations, at 808-656-0232.

AIE Program Enrollment Process for Background Check and Process to obtain AIE Badge

Enroll your company by contacting the COR who will be the Sponsor. The COR will provide the excel spreadsheet for the list of contractor employee information. The following information is required from the contractor: last name, first name, date of birth, status, social security number, company name, and contract number. The COR will complete the Sponsor information and provide the list to the Directorate of Emergency Services (DES) Access Control Division.

The DES will conduct the background check to vet personnel prior to arrival to pick up their AIE Badge, and will ensure a more efficient process while saving time.

The AIE Program performs background screening and credentialing.

DES will contact the COR (Sponsor) once the background checks have been validated to schedule a time for the contractor employees to go to one of the registration locations and complete the process to obtain the AIE Badge.

Contractor employees should bring an acceptable form of identification (see List A and List B) to the appointment. Upon arrival, a photo will be taken to complete the process. Employees will be issued their AIE Badge, which they will use for access to the installation.

Forms of Acceptable Identification for picking up your credential:

List A - One (1) needed U.S. Passport (unexpired) Permanent Resident Card or Alien Registration Receipt Card (Form I-551) Unexpired foreign passport, with I-551 stamp or attached Form I-94 indicating unexpired employment authorization Unexpired Employment Authorization Document that contains a photograph (Form I-766, I- 688, I688A, I-688B)

List B – Two (2) needed Driver’s license or ID card issued by a state ID Card issued by federal, state or local government agencies or entities School ID card with a photograph Voter’s registration card U.S. Military card or draft record Military Dependent’s ID card

U.S. Coast Guard Merchant Mariner Card Native American tribal document Driver’s license issued by a Canadian government authority U.S. Social Security card issued by the Social Security Administration Certification of Birth Abroad issued by the Department of State (Form FS-545 or Form DS- 1350) Original or certified copy of a birth certificate issued by a state, county, municipal authority or outlying possession of the United States bearing an official seal U.S. Citizen ID Card (Form I-197) ID Card for use of Resident Citizen in the United States (Form I-179)

Unexpired employment authorization document issued by DHS (other than those listed under List A)

6.13 ANTITERRORISM (AT) STANDARDS

Pursuant to Department of Defense Instruction Number 2000, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each contractor employee requiring access to a Federally-controlled installation, facility and/or Federally-controlled information system(s) shall complete Level I AT Awareness Training on an annual basis and receive a certificate of completion.

Standard Contract Language Provision/Contract Clause Applicability and/or additional SOW language. Detailed information on each of these items are stated below. Applicable items to this contract action are indicated below.

___X__1. AT level I Training (general) __ X__ 2. Access and general protection policy and procedures.

______2a. For contractor requiring Common Access Card (CAC) __X__ 2b. For contractor not eligible for CAC, bur requires access to DoD facility or installation _____ 3. AT Awareness training for US Based contractor personnel traveling overseas.

__X__ 4. iWatch training _____ 5. Army Training Certificate Tracking System (ACTS) registration for contractors.

_____ 6. For contracts that require a formal OPSEC program ___X_ 7. Requirement for OPSEC training _____ 8. Information assurance/information technology training _____ 9. Information assurance/information technology certification _____ 10. Contract authorized to accompany the force clause _____ 11. Contract requiring performance or delivery in a foreign county.

_____ 12. Handling/Access to classified information.

_____ 13. Threat Awareness Reporting Program

1. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 7 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable.

The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within five calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

2. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

2a. For Contractors requiring CAC access to a DoD facility or installation.

2b. For Contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations

3. AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language required US based Contractor employees and associated sub-contractor employees to make available and to receive Government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

4. IWATCH Training. This standard language is for Contractor employees with an area of performance within an Army controlled installation, facility or area.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .