This document is an amendment to a solicitation for cesspools, septic tanks, and aerobic treatment unit (ATU) pumping and disposal services on Oahu, Hawaii. The amendment modifies solicitation W912CN-22-R-0015 by changing references in the performance work statement from paragraph 3 to paragraph 8 in all contract line item numbers for base year and four option years. It also adds usage breakdown details to several CLINs based on a modified Technical Exhibit 1, which provides updated information on septic tanks, ATUs, and holding tanks at U.S. Army installations on Oahu. Quotes are due by September 1, 2022 to the Department of the Army Contracting Command for these services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONFORMAMEND000222R0015.pdf | ||
| ConformAmend000122R0015.pdf | ||
| Amend000122R0015.pdf | ||
| 22R0015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation cited in block 9a is amended as follow :
1-Change the PWS paragraph references in the Extended Description of CLINs X001-X003 for base plus all options;
2-Add Information to CLIN X002 in the Extended Description for base plus all options the quantity usage breakdow n; and 3-See Summary of Changes for Detail.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912CN22R0015
X 9B. DATED (SEE ITEM 11)
09-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Aug-2022
CODE
413 CSB
413TH CSB, RCO-HAWAII,
742 SANTOS DUMONT AVENUE
BLDG 108, 3RD FLOOR (WAAF)
SCHOFIELD BARRACKS HI 96857-5026
W912CN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912CN22R0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- CLIN 4003
The IDC type has changed from Requirements to N/A.
CLIN 0001
The CLIN extended description has changed from:
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS Paragraph 3.1**Contractor shall invoice ONLY for services rendered. The quantities identified are only an estimate
(EST).**
To:
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS Paragraph 8.1**Contractor shall invoice ONLY for services rendered.**
CLIN 0002
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.2, 3.3 and 3.4**Contractor shall invoice ONLY for services rendered. The quantities identified are only an estimate (EST).**
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 8.2, 8.3 and 8.4Usage break down based on Technical Exhibit #1for CLIN 0002:Site # 1Makua Military Reservation: Pumping is every six months twice(2) a year or when/as needed.Site #2 Field Station Kunia: Is as needed, but temporary closed. Site # 3Schofield Barracks East Range Bldg #8502 Lightning Academy: Septic tank pumping is three (3) times per week x 4 weeks= 12 times per month x 12months=Total 144 pumping per year Site # 4Site 4A Schofield Barracks East Range Bldg. 8026 Lightning Academy: Septic tank pumping four (4) times per year. Site 4b Schofield Barracks East Range Bldg. 8026 Lightning Academy: Septic tank pumping four (4) times per year. Site 4c Schofield Barracks East Range Bldg.
8026 Lightning Academy: Septic tank pumping four (4) times per year. Site # 5 Kahuku Training Area: Septic tank pumping is four (4) time per year To complete the pumping according to the Technical Exhibit #1, there are 162 quantity that will be used above and 38 quantities remaining are excess quantities that will be used if more pumping /cleaning is needed. Total 200**Contractor shall invoice ONLY for services rendered.**
CLIN 0003
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.5**Contractor shall invoice ONLY for services rendered. The
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 8.5**Contractor shall invoice ONLY for services rendered.**
CLIN 1001
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS Paragraph 3.1**Contractor shall invoice ONLY for services rendered. The quantities identified are only an estimate
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS
CLIN 1002
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.2, 3.3 and 3.4**Contractor shall invoice ONLY for services rendered. The
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 8.2, 8.3 and 8.4Usage break down based on Technical Exhibit #1for CLIN 1002:Site # 1Makua Military Reservation: Pumping is every six months twice(2) a year or when/as needed.Site #2 Field Station Kunia: Is as needed, but temporary closed. Site # 3Schofield Barracks East Range Bldg #8502 Lightning Academy: Septic tank pumping is three (3) times per week x 4 weeks= 12 times per month x 12months=Total 144 pumping per year Site # 4Site 4A Schofield Barracks East Range Bldg. 8026 Lightning Academy: Septic tank pumping four (4) times per year. Site 4b Schofield Barracks East Range Bldg. 8026 Lightning Academy: Septic tank pumping four (4) times per year. Site 4c Schofield Barracks East Range Bldg.
8026 Lightning Academy: Septic tank pumping four (4) times per year. Site # 5 Kahuku Training Area: Septic tank pumping is four (4) time per year To complete the pumping according to the Technical Exhibit #1, there are
162 quantity that will be used above and 38 quantities remaining are excess quantities that will be used if more
CLIN 1003
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.5**Contractor shall invoice ONLY for services rendered. The
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit
CLIN 2001
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS Paragraph 3.1**Contractor shall invoice ONLY for services rendered. The quantities identified are only an estimate
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS
CLIN 2002
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.2, 3.3 and 3.4**Contractor shall invoice ONLY for services rendered. The
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 8.2, 8.3 and 8.4Usage break down based on Technical Exhibit #1for CLIN 2002:Site # 1Makua Military Reservation: Pumping is every six months twice(2) a year or when/as needed.Site #2 Field Station Kunia: Is as needed, but temporary closed. Site # 3Schofield Barracks East Range Bldg #8502 Lightning Academy: Septic tank pumping is three (3) times per week x 4 weeks= 12 times per month x 12months=Total 144 pumping per year Site # 4Site 4A Schofield Barracks East Range Bldg. 8026 Lightning Academy: Septic tank pumping four (4) times per year. Site 4b Schofield Barracks East Range Bldg. 8026
Lightning Academy: Septic tank pumping four (4) times per year. Site 4c Schofield Barracks East Range Bldg.
8026 Lightning Academy: Septic tank pumping four (4) times per year. Site # 5 Kahuku Training Area: Septic tank pumping is four (4) time per year To complete the pumping according to the Technical Exhibit #1, there are 162 quantity that will be used above and 38 quantities remaining are excess quantities that will be used if more
CLIN 2003
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.5**Contractor shall invoice ONLY for services rendered. The
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit
CLIN 3001
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS Paragraph 3.1**Contractor shall invoice ONLY for services rendered. The quantities identified are only an estimate
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS
CLIN 3002
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.2, 3.3 and 3.4**Contractor shall invoice ONLY for services rendered. The
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 8.2, 8.3 and 8.4Usage break down based on Technical Exhibit #1for CLIN 3002:Site # 1Makua Military Reservation: Pumping is every six months twice(2) a year or when/as needed.Site #2 Field Station Kunia: Is as needed, but temporary closed. Site # 3Schofield Barracks East Range Bldg #8502
Lightning Academy: Septic tank pumping is three (3) times per week x 4 weeks= 12 times per month x 12months=Total 144 pumping per year Site # 4Site 4A Schofield Barracks East Range Bldg. 8026 Lightning Academy: Septic tank pumping four (4) times per year. Site 4b Schofield Barracks East Range Bldg. 8026 Lightning Academy: Septic tank pumping four (4) times per year. Site 4c Schofield Barracks East Range Bldg.
8026 Lightning Academy: Septic tank pumping four (4) times per year. Site # 5 Kahuku Training Area: Septic tank pumping is four (4) time per year To complete the pumping according to the Technical Exhibit #1, there are 162 quantity that will be used above and 38 quantities remaining are excess quantities that will be used if more
CLIN 3003
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.5**Contractor shall invoice ONLY for services rendered. The
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit
CLIN 4001
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS Paragraph 3.1**Contractor shall invoice ONLY for services rendered. The quantities identified are only an estimate
Inspection of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS
CLIN 4002
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.2, 3.3 and 3.4**Contractor shall invoice ONLY for services rendered. The
Pumping, Cleaning and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 8.2, 8.3 and 8.4Usage break down based on Technical Exhibit #1for CLIN 4002:Site # 1Makua Military Reservation: Pumping is every six months twice(2) a year or when/as needed.Site #2 Field Station Kunia: Is as needed, but temporary closed. Site # 3Schofield Barracks East Range Bldg #8502 Lightning Academy: Septic tank pumping is three (3) times per week x 4 weeks= 12 times per month x 12months=Total 144 pumping per year Site # 4Site 4A Schofield Barracks East Range Bldg. 8026 Lightning Academy: Septic tank pumping four (4) times per year. Site 4b Schofield Barracks East Range Bldg. 8026 Lightning Academy: Septic tank pumping four (4) times per year. Site 4c Schofield Barracks East Range Bldg.
8026 Lightning Academy: Septic tank pumping four (4) times per year. Site # 5 Kahuku Training Area: Septic tank pumping is four (4) time per year To complete the pumping according to the Technical Exhibit #1, there are 162 quantity that will be used above and 38 quantities remaining are excess quantities that will be used if more
CLIN 4003
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) in accordance with PWS paragraph 3.5**Contractor shall invoice ONLY for services rendered. The
Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit
The following have been modified:
TECHNICAL EXHIBIT #1
TECHNICAL EXHIBIT I (Updated on 3 March 2022) Septic Tanks, Aerobic Treatment Unit (ATU) and Holding Tank at USAG-HI Installations on Oahu
Installation Bldg Number / Description System Type
#1. Makua Military Reservation
Range Control Office next to the Old Control Tower
Aerobic Treatment Unit (approx 11 ft X 6 ft X 6ft; 1700 Gallons), ATU System Capacity: 1000 GPD Leach field (16ft X 40ft)
#2. Field Station Kunia
P39 Holding Tank (approx 12 ft X 6 ft;
approx 1200 gal)
#3. Schofield Barracks East Range
Bldg 8502 ER Lightning Academy (Behind Bldg 8502 next to the water tank)
1 Septic Tank (6ft X 11ft-6in;
Liquid Capacity: 1250 Gallon) Leach field (15ft X 35ft)
#4. Schofield Barracks East Range 4A- Bldg 8026 Septic Tank 4B- Bldg 8026 Septic Tank 4C- Bldg 8026 Septic Tank
Location of Septic Tanks and leach field are near Bldg 8026.
Note: Septic Tank located at Bldg 8005 is service by Aqua ENG.
3 Septic Tanks (Each 6ft X 9ft-4 in;
Liquid Capacity: Each 1000 Gallons) Leach field (45ft X 50 ft)
#5. Kahuku Training Area
Kahuku Wash Rack (Manhole next to Electrical/Mechanical Bldg)
1 Septic Tank (approx 5 ft X 8 ft) Leach Field (approx 28 ft X 45 ft)
Other systems may be converted to Aerobic Treatment Unit (ATU)
(End of Summary of Changes)