W912CN-22-B-0001 Solicitation - OE Roofing.pdf
PDF 3 MB Posted
- Solicitation number
- W912CN-22-B-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CN-22-B-0001 0002 Amendment SF 30.pdf | ||
| RFI Questions and Responses.pdf | ||
| 22-B-0001 Attachment 02 Excel Pricing Sheet.xlsx | XLSX spreadsheet | |
| 22-B-0001 0001 Conformed.pdf | ||
| 22-B-0001 0001 SF30.pdf | ||
| W912CN-22-B-0001 Solicitation - OE Roofing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011644646
Project Title: This is a firm fixed price requirements-type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform Open-End roofing repairs/installation and related w ork located at various Army installations (to include, but not limited to Schofield Barracks, Fort Shafter, Wheeler Army Airf ield, Helemano Military Reservation, Tripler Army Medical Center, Aliamanu Military Reservation, and Fort Derussy, Haw aii.)
NAICS: 238160
Magnitude of Construction: More than $10,000,000
X
BRONSON K ABRIGO 808.787-8846
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
18-Mar-2022
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________19 Apr 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
413 CSB
413TH CSB, RCO-HAWAII,
742 SANTOS DUMONT AVENUE
BLDG 108, 3RD FLOOR (WAAF)
SCHOFIELD BARRACKS HI 96857-5026
W912CN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912CN22B0001 518
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
SECTION 07 14 00 Page 3
Section 00 00 00 - Procurement and Contracting Requirements
GENERAL INFORMATION
This Invitation for Bid (IFB) is 8(a) Set-Aside. The NAICS is 238160 and the Size Standard is $16,500,000. Bids from contractors that do not meet this size standard will be deemed non-responsive and will receive no consideration for award.
1. CONTRACT TYPE. The Government intends to award a firm-fixed price requirement type construction contract. Split or multiple awards will not result from this acquisition.
2. PERIOD OF PERFORMANCE. The anticipated period of performance will be a base year and two (2) one-year option periods as shown below:
Base Year 1 June 2022 – 31 May 2023 Option 1 1 June 2023 – 31 May 2024 Option 2 1 June 2024 – 31 May 2025
3. QUESTIONS. Questions must be submitted by email to Bronson Abrigo Bronson.K.Abrigo.civ@army.mil with
CC to Mark Dahilig mark.r.dahilig.civ@army.mil with the IFB number W912CN-21-B-0003 in the subject line.
Telephone and faxed inquires will not be accepted. In order in ensure a timely response, questions must be submitted no later than 10:00am, seven days after the date of this IFB. Questions and responses will be issued on an amendment. Any questions received after the due date may not be answered.
4. AWARD. Award will be made to the responsible bidder whose bid is responsive to the terms and conditions of the IFB and is most advantageous to the Government, considering only price.
5. DUE DATE. All bids must be received by the due date indicated in the IFB.
6. BID OPENING DATE AND TIME. Due date and time is Hawaii Standard Time (HST). Due to the COVID-19 Pandemic face to face public bid opening will not be conducted. To attend telephone conference call Bid Opening, notify Bronson Abrigo by email at Bronson.K.Abrigo.civ@army.mil with CC to Mark Dahilig mark.r.dahilig.civ@army.mil no later than seven days prior to the Bid Opening date. List the name and phone number of personnel attending. The conference call number and password will be provided via email.
7. SUBMISSION REQUIREMENT. Bids shall be submitted electronically via email to
Bronson.K.Abrigo.civ@army.mil with CC to mark.r.dahilig.civ@army.mil and include the IFB number W912CN-21-B-0003 on the subject line no later than the time and date specified in block 13A of this IFB.
Bids shall include the following. Each Tab will be submitted as a separate attachment.
a. TAB 1 – Completed Standard Form 1442.
b. TAB 2 – Completed Schedule of bids/prices. All unit price and estimated amount filled out.
c. TAB 3 – Completed Attachment 01 Bid Attachment
d. TAB 4 – Signed or other acknowledgement of all amendments.
e. TAB 5 – Completed Representation and Certifications.
f. TAB 6 – Bid Guarantee in accordance with FAR 52.228-1.
g. TAB 8 – Completed Attachment 02 Excel Pricing Sheet.
8. Bidders shall furnish unit prices and extended total for all items listed on the schedule of bid items in Section 00 10 00. In the event there is a difference between a unit price and the extended total, the unit price will be the intended bid. In the event the unit price and extended total are omitted for any item, the bid will be deemed nonresponsive.
SECTION 07 14 00 Page 4
GENERAL INFORMATION
1. Scope of Work: This is a firm fixed price requirement type construction contract to provide all labor, equipment, materials, and other services required to perform Reroofing, Roof Repairs, guarantee workmanship for all work described below and provide a warranty in strict accordance with these technical provisions. Equipment including telescoping boom lifts, articulating boom lifts, stairway scaffolding etc., shall be considered incidental to roofing.
Costs for these items shall be included in bid items for shingles, roofing panels, BUR, flashing, gutters, lumber, etc.
Tie-downs shall be installed in accordance with EM 385-1-1 and remain in place after roofing is complete. The scope of work covered by this Contract does not cover Reroofing and Roof Repair work which might arise as part of a Contract to repair or renovate a Building or group of Buildings. The work covered by this Contract does not include projects awarded by The U.S. Army Engineering District, Honolulu, excluding the Medical Facilities under Tripler (TAMC), to be designated by the Government during the contract period.
All CLINS listed below are in support of roofing and repair work for this contract and issued via task orders.
2. The contractor shall submit a safety plan within 30 days of award or 7 days prior to commencement of on-site work, whichever occurs first in accordance with the AR 385-10, Construction Safety, US Army Corps of Engineers "Safety and Health Requirements Manual (EM 385-1-1)" and Occupational Safety and Health Administration (OSHA) regulations.
3. To assure compliance with general construction trade practice, the contractor shall establish and maintain quality control for materials and work. The Government may perform inspections and conduct tests while the contractor's work is in process to assure compliance to performance standards.
4. Existing conditions or areas damaged or disturbed by the contractor's operation shall be restored to their original condition, or near original condition as possible, to the satisfaction of the Contracting Officer at no additional cost to the Government.
5. Prior to start of any excavation or trenching work, the contractor shall obtain clearance, in writing, from the appropriate communications agency and from the Directorate of Public Works.
6. Interruptions to existing utilities shall be held to a minimum. A schedule for any required power or water outages shall be submitted to the Contracting Officer a minimum of four weeks prior to the intended outage.
7. The contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area.
8. The Contractor’s normal working hours will be 7:30 a.m. – 4:30 p.m. Monday thru Friday. The Contractor will not normally work on Saturdays, Sundays, or Holidays. If the Contractor chooses to work outside the normal working hours, Contractor must submit an application to the Contracting Officer in writing one week prior to the requested work for approval.
9. Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.
10. The contractor shall provide, install, and maintain all necessary signs, lights, barricades, markers, cones, flagmen, and other protective facilities and shall take all necessary precautions for the protection and for the convenience and safety of military and public traffic (vehicular and pedestrian).
11. The amount of dust resulting from the contractor's work shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.
12. The contractor shall obtain the necessary hot work permit from the appropriate Fire Department prior to any welding, burning, and torching operations.
SECTION 07 14 00 Page 5
13. Daily Clean-up - During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, etc. or rubbish that constitutes a fire hazard. At the end of each day’s work, the Contractor shall remove all debris. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.
14. Storage area will not be provided.
15. When available, the Government may provide a reasonable amount of water and electricity. If not available or cannot be provided it shall be specified in the task order documents.
16. The Contractor shall be responsible to have a quality control program to ensure services are performed in accordance with the Scope of Work and commonly accepted commercial practices.
17. The Contractor is required to follow DPW’s Best Management Practice (BMP) of Storm Water Compliance.
Copy will be provided at the pre-construction conference, if requested.
18. The work shall be constructed using best practice per industry standards. The Contractor shall abide by all applicable regulations to include Federal, State, local requirements.
19. Progress of Work. Contractor shall submit all proposed work schedules to the Contracting Officer for review/approval within ten (10) calendar days after issuance of the Notice to Proceed (NTP) unless otherwise specified.
20. All materials used under this project must be Energy Star compliant. The following website lists all energy star compliant materials. www.energystar.gov
21. If a dumpster is provided for this contract, contractor shall include a sign on the dumpster with their name/address/phone and indicate the dumpster is only used for construction debris.
22. Abbreviations used in the Unit column: CY = Cubic Yard; LH = Labor Hours; SF = Square Foot; EA = Each;
LF = Linear Foot; SY = Square Yard
23. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes."
24. Identification of Contractor Employees.
a. Provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee’s name, contractor’s name, functional area of assignment, with recent color photograph of the employee.
b. All contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing above the waist except when safety or health reasons prohibit such placement.
25. ESTIMATED QUANTITIES: All quantities are estimated and are stated for the information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. (See clause at 52.216-
SECTION 07 14 00 Page 6
21, Section 00 70 00 entitled “Requirements”). As a prerequisite, there must be (i) adequate and sufficient funds available to cover the order, and (ii) an administrative determination by the Government that the requirement exists.
26. ISSUANCE OF TASK ORDERS.
a. The work to be accomplished under this contract will be performed via issuance of a task order. The Contractor shall coordinate all work with the Contracting Officer in order that there will be a minimum of interruption and inconvenience to the Government. Scheduling and programming of work shall be arranged during the pre-construction conference.
b. Survey of Unit Price Items: Unless deemed an emergency or priority requirement at least ten (10) workdays prior to the issuance of a task order, a joint inspection by the Contractor and the Contracting Officer Representative shall be made to determine the work to be accomplished therein. Survey will be conducted within two (2) workdays of notification by the COR. During the inspection and survey, both parties will jointly annotate on the order form to be prescribed by the Contracting Officer, the quantity for each unit price item that is to be utilized. The Contracting Officer will confirm the starting and completion date of work for each unit in the task order.
27. APPICABLE CODES AND REGULATIONS
27.1. The latest edition of the following Codes, regulations, guides, and criteria shall be used for all design and construction under this contract. If there is a conflict between these codes or regulations and these contract specifications the Unified Facility Criteria will override. The Contractor shall have a copy of each of these documents available for use during the term of this contract.
The Unified Facility Criteria (UFC) documents including, but not limited to:
UFC 3-410-01 Design: Heating, Ventilating, And Air Conditioning UFC 4-010-01 Dod Minimum Antiterrorism Standards For Buildings UFC 3-600-01 Design: Fire Protection Engineering For Facilities UFC 1-200-01 DoD Building Code (General Building Requirements
A complete listing can be obtained at http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
27.2. The Unified Facility Guide Specifications are mandatory for all work required under this contract. The contractor is responsible for obtaining the Unified Facility Guide Specifications and for maintaining updates to the specifications. The specifications whether referenced or not (in whole or part), shall be considered to be a part of all task orders issued under this contract. Where two specifications are listed for a certain item of work the Army section as denoted by an “A” shall be used. When there is no Army designated spec use the Navy (denoted by “N”) or in the absence of either use an industry standard specifications or others listed in the Construction Criteria Base CCB. A complete listing of the UFGS Division 01 - General Requirements can be obtained at https://wbdg.org/ffc/dod/unified‐facilities‐guide‐specifications‐ufgs
27.3. The following are additional criteria, codes, regulations and guides which shall be incorporated into all designs and used for construction:
ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings EPACT 2005 Energy Policy Act of 2005, Public Law 109-58.
IBC, International Building Code IEEE C2, National Electrical Safety Code IESNA Illuminating Engineering Society of North America MIL HDBK 1190, Military Handbook for Facility Planning and Design Guide MIL HDBK 1191, Military Handbook for Medical and Dental Treatment Facilities, Design and Construction Criteria Guide National Electrical Contractors Association (NECA) National Electrical Installation Standards (NEIS)
SECTION 07 14 00 Page 7
TI 800-01, Design Criteria TI 800-03, Technical Requirements for Design-Build TM 5-811-3, Electrical Design: Lightning and Static Electricity Protection •USDA – Rural Utility Service (RUS) RUS 1728F-310 Drawing Index 35.5 to 69 kV RUS 1728F-804 Drawing Index 12.5 & 7.2 kV RUS 1724D-101B System Planning Guide RUS 1724D-104 Econ Worksheet RUS 1724E-152 OH Dist. Line Conductors Mechanics RUS 1724E-153 Guys and Anchors RUS 1724E-154 Distribution Conductor Clearances and Span Limitations RUS 1724E-200 Design Manual HV Transmission Lines RUS 1724E-203 Upgrading RUS Transmission Lines RUS 1724E-204 Specs Steel Pole H Frame RUS 1724E-205 Embedment Depths RUS 1724E-214 Guide Specifications For Standard Class Steel Transmission Poles RUS 1724E-300 Rural Sub Station Design RUS 1724E-224 Specifications and Drawings for Steel Poles RUS 1728F-804 Specifications and Drawings for 12.47/7.2 kV Line Construction RUS 1728F-806 Specifications for Underground Distribution RUS 1728F-810 Specifications and Drawings for 34.5 to 69 kV RUS 1730B-121 Pole Inspection and Maintenance RUS 1751F-650 Aerial Plant Guying and Anchoring UEP-steel poles Guidelines for the Use Steel Distribution Poles Uniform Building Code Uniform Mechanical Code Uniform Plumbing Code Standard Building Code National Electrical Code (NEC) American National Standards Institute (ANSI) C-2, national Electrical Safety Code (QIESC) Life Safety Code, National Fire Protection Association (NFPA) 101 National Fire Protection Association (NFPA) MIL Handbook 1190
27.4. Workmanship shall be governed by the preceding documents and National Electrical Contractors Association
(NECA) listed below:
NECA 100-2006 - Electrical Symbols Set © 2006, NECA NECA 100-2006 - Symbols for Electrical Construction Drawings (ANSI) © 2006, NECA NECA 101-2006 - Standard for Installing Steel Conduit (Rigid, IMC, EMT) (ANSI) © 2006, NECA NECA 102-2004 - Standard for Installing Aluminum Rigid Metal Conduit (ANSI) © 2004, NEIS NECA 111-2003 - Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) (ANSI) © 2003, NECA NECA 1-2010 - Standard Practice of Good Workmanship in Electrical Construction (ANSI) © 2010, NECA NECA 120-2006 - Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC) (ANSI) ©
2006, NECA
NECA 121-2007 - Standard for Installing Nonmetallic-Sheathed Cable (Type NM) and Underground Feeder and Branch-Circuit Cable (Type UF) (ANSI) © 2007, NECA NECA 130-2010 - Standard for Installing and Maintaining Wiring Devices © 2010, NECA NECA 169 - Standard for Installing and Maintaining Arc-Fault Circuit Interrupters © 2010, NECA NECA 200-2010 - Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI) © 2010, NECA NECA 202-2006 - Standard for Installing and Maintaining Industrial Heat Tracing Systems (ANSI) © 2006, NECA NECA 230-2010 - Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers
(ANSI) © 2010, NEIS
NECA 303-2005 - Standard for Installing Closed-Circuit Television Systems (CCTV) (ANSI) © 2005, NECA NECA 305-2010 - Standard for Fire Alarm System Job Practices (ANSI) © 2010, NECA
SECTION 07 14 00 Page 8
NECA 331-2009 - Standard for Building and Service Entrance Grounding and Bonding (ANSI) © 2009, NECA NECA 400-2007 - Standard for Installing and Maintaining Switchboards (ANSI) © 2007, NECA NECA 402-2007 - Standard for Installing and Maintaining Motor Control Centers (ANSI) © 2007, NECA NECA 406-2003 - Standard for Installing Residential Generator Sets (ANSI) © 2003, NECA NECA 407-2009 - Recommended Practice for Installing and Maintaining Panelboards (ANSI) © 2009, NECA NECA 408-2009 - Standard for Installing and Maintaining Busways (ANSI) © 2009, NECA NECA 409 – 2009 - Standard for Installing and Maintaining Dry-Type Transformers (ANSI) © 2009, NECA NECA 410-2005 - Standard for Installing and Maintaining Liquid-Filled Transformers (ANSI) © 2005 NECA 411-2006 - Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS) (ANSI) © 2006 NECA 420-2007 - Standard for Fuse Applications (ANSI) © 2007, NECA NECA 430-2006 - Standard for Installing Medium-Voltage Metal-Clad Switchgear (ANSI) © 2006, NEIS NECA 503-2005 - Standard for Installing Fiber Optic Lighting Systems © 2005, NECA NECA 505 Standard for Installing and Maintaining High Mast, Roadway and Area Lighting © 2010, NECA NECA 700-2010 - Standard for Installing Overcurrent Protection to Achieve Selective Coordination • © 2010, NECA NECA 90 Recommended Practice for Commissioning Building Electrical Systems (ANSI) © 2009, NECA NECA/AA 104-2006 - Standard for Installing Aluminum Building Wire and Cable (ANSI) © 2006, NEIS NECA/BICSI 568-2006 - Standard for Installing Building Telecommunications Cabling (ANSI) © 2006, NECA NECA/BICSI 607-2011 - Standard for Telecommunications Bonding and Grounding Planning and Installation Methods for Commercial Buildings © 2011, NECA/BICSI NECA/EGSA 404-2007 - Standard for Installing Generator Sets (ANSI) © 2007, NECA NECA/FOA 301-2009 - Standard for Installing and Testing Fiber Optics (ANSI) © 2009, NEIS NECA/IESNA 500-2006 - Standard for Installing Indoor Lighting Systems (ANSI) © 2006, NECA, NECA/IESNA 501-2006 - Standard for Installing Exterior Lighting Systems (ANSI) © 2006, NEIS NECA/IESNA 502-2006 - Standard for Installing Industrial Lighting Systems (ANSI) © 2006, NECA NECA/MACSCB 600-2003 - Recommended Practice for Installing and Maintaining Medium- Voltage Cable
(ANSI) © 2003, NECA
NECA/NEMA 105-2007 - Standard for Installing Metal Cable Tray Systems (ANSI) © 2007, NECA NECA/NEMA 605-2005 - Recommended Practice for Installing Underground Nonmetallic Utility (ANSI) © 2005, NECA
EM 385-1-1 Corps of Engineers Manual, - Safety and Health Requirements Manual Additional publications and regulatory documents may be identified as required for individual task orders.
SECTION 07 14 00 Page 9
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 100,000 Square Foot
Z2AA - REPAIR OR ALTERATION OF
FFP
REPLACE CERAMIC COATED MINERAL SURFACED SELF-SEALING
Architectural SHINGLES, composed of a fiberglass mat base with ceramic-coated mineral granules tightly embedded in carefully refined, water-resistant asphalt.
Two pieces of the shingle are firmly laminated together in a special tough asphaltic cement. Includes Removal & Disposal of existing Strip Shingles, Roofing Felt Underlayment, Metal Drip Edge and Installation of new, Felt Underlayment & Metal Drip Edge.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011644646
PSC CD: Z2AA
ESTIMATED
NET AMT
SECTION 07 14 00 Page 10
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 175,000 Square
ROOFING PANELS Removal and Disposal, Includes Preformed & Corrugated Aluminum Roofing Panels, Preformed, Corrugated, Ribbed & Standing Seam Galvanized, Zinc & Colored Sheet Metal; and Preformed, Corrugated & Ribbed Fiberglass Panels.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 8,000 Square
TRANSITE ROOFING PANELS, Removal and Disposal. Includes Asbestos Abatement Air Monitoring, Temporary Fence Barricades, Personnel, Waste and Decontamination Unit.
FOB: Destination
SECTION 07 14 00 Page 11
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 8,000 Square
ALUMINUM ROOFING PANELS, Installation of Preformed or Corrugated Panels.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0005 100,000 Square
STEEL SHEET METAL ROOFING PANELS, Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted. (24 Gage) FOB: Destination
SECTION 07 14 00 Page 12
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 100,000 Square
STEEL SHEET METAL ROOFING PANELS, Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted. (22 Gage) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0007 30,000 Square
SHEET METAL FLASHING, Removal and Disposal. Includes Aluminum, Galvanized Steel, Copper, and Aluminum Fascia.
FOB: Destination
SECTION 07 14 00 Page 13
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0008 5,000 Square
SHEET METAL FLASHING, Installation of Aluminum Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0009 1,000 Square
SHEET METAL FLASHING, Installation of Aluminum Fascia.
FOB: Destination
SECTION 07 14 00 Page 14
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0010 25,000 Square
SHEET METAL FLASHING, Installation of Galvanized Steel Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0011 10,000 Square
SHEET METAL FLASHING, Installation of Copper Flashing.
FOB: Destination
SECTION 07 14 00 Page 15
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0012 20 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
VENT THRU ROOF FLASHING, Installation, Includes Removal and Disposal.
Aluminum Vent Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0013 20 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES REMOVAL
AND DISPOSAL. Galvanized Vent Flashing.
FOB: Destination
SECTION 07 14 00 Page 16
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0014 300 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES REMOVAL
AND DISPOSAL. Lead Vent Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0015 25,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Removal and Disposal of existing Gutter and Downspouts.
FOB: Destination
SECTION 07 14 00 Page 17
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0016 7,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 5".
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0017 14,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 7".
FOB: Destination
SECTION 07 14 00 Page 18
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0018 2,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Galvanized Steel Gutters and Downspouts.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0019 7,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts, k-style.
FOB: Destination
SECTION 07 14 00 Page 19
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0020 2,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts. Half round style.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0021 250 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
SPLASH BLOCKS, Installation of Concrete Splash Blocks.
FOB: Destination
SECTION 07 14 00 Page 20
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0022 30 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
ROOF VENT PIPE EXTENSION, Installation of Roof Vent Pipe Extension.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0023 30 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
SCUPPER DRAINS, Re-install Scupper drains.
FOB: Destination
SECTION 07 14 00 Page 21
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0024 30 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
SCUPPER DRAINS, Install new Scupper drains.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0025 40,000 Board Feet
STRUCTURAL LUMBER, Replacement of existing Deteriorated or Termite Damaged Lumber. Includes Removal & Disposal of existing Deteriorated or Termite damaged Structural Lumber, and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).
FOB: Destination
SECTION 07 14 00 Page 22
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0026 8,000 Board
ROOF SHEATHING, Replacement of existing Deteriorated Termite Damaged Sheathing Includes Removal & Disposal of e xisting Deteriorated or Termite damaged Sheathing and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0027 5,000 Linear
METAL ROOF PURLINS, Replacement of existing Rusted or Damaged Purlins.
Includes Removal & Disposal of existing Rusted or Damaged Metal Purlins, and Incidental Painting of new Purlins as required. (1-Primer and 2- finish coats to match adjacent existing surfaces).
FOB: Destination
SECTION 07 14 00 Page 23
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0028 10 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
PITCH PANS, Replacement of existing Pitch Pans, Includes Removal and disposal.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0029 100 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
CHEMCURB PITCH POCKET, Installation of CHEMCURB Pitch Pocket or approved equal. To include Removal, installation disposal and all required materials and equipment to complete work.
FOB: Destination
SECTION 07 14 00 Page 24
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0030 25 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
ROOF DRAINS, Removal and Re-installation of existing Roof Drains, Includes cleaning, testing, and installing Modified Bitumen Sheet Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0031 25 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Aluminum Roof Ventilators.
FOB: Destination
SECTION 07 14 00 Page 25
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0032 100 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Galvanized Roof Ventilators.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0033 15,000 Square
REPLACE CLAY TILE ROOFING, Includes Removal & Disposal of existing Clay Tile Roofing, Roofing Felt Underlayment, and Installation of new Clay Tile Roofing, Felt Underlayment, and Flashing as required.
FOB: Destination
SECTION 07 14 00 Page 26
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0034 15,000 Square
CLAY TILE ROOF SEALER Installation of Low moisture absorption Clear drying penetrating water repellent barrier, Clay Tile Roof Sealer. To include Surface preparation and Installation of Roof Coating, clean-up and all required materials and equipment to complete work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0035 300 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
ASBESTOS ABATEMENT, Bulk Sampling, Field.
FOB: Destination
SECTION 07 14 00 Page 27
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0036 8,000 Square
ASBESTOS ABATEMENT, Remove Asbestos Contaminated Metal Flashing, Base Flashing, and Mastic as required.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0037 8,000 Square
ASBESTOS ABATEMENT, Total Demolition and Disposal of existing Built-Up Roofing System clear down to existing Roof Deck as required.
FOB: Destination
SECTION 07 14 00 Page 28
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0038 80,000 Square
90 LB. MINERAL SURFACE on Built-up Roofing, Removal and disposal.
Remove existing roofing down to existing substrate.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0039 50,000 Square
Gravel on Built-up Roofing, Removal and disposal. Remove existing gravel roofing down to existing substrate.
FOB: Destination
SECTION 07 14 00 Page 29
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0040 80,000 Square
Built-up Roofing Installation of 2-Ply, Includes 90LB. SBS Mineral Surfaced Roll- Roofing Cap Sheet on SBS fiberglass Base Sheet.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0041 1,000 Square
Walkway Surface, Installation, Mineral Asphalt Plank.
FOB: Destination
SECTION 07 14 00 Page 30
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0042 300,000 Board
ROOFING INSULATION (without Fire Proofing Insulation), Removal & Disposal. Includes Tapered or Flat Insulation Boards.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0043 300,000 Board
ROOFING INSULATION, Installation. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.
FOB: Destination
SECTION 07 14 00 Page 31
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0044 100,000 Board
ROOFING INSULATION, Installation. Tapered. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0045 150,000 Square
ROOF COATING, Installation of Hydro-Stop Elastomeric Roofing with 1/16" reinforcing or approved equal.
FOB: Destination
SECTION 07 14 00 Page 32
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0046 150,000 Square
ROOF COATING, Installation of Silicone Roof coating.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0047 40 Week
Z2AA - REPAIR OR ALTERATION OF
FFP
Equipment Rental of 25 ton Crane with Operator.
FOB: Destination
SECTION 07 14 00 Page 33
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0048 5 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
Equipment Hauling, round trip to include delivery to jobsite location and return to Rental Company.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0049 30 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
REMOVE AND REINSTALL SOLAR PANELS.
FOB: Destination
SECTION 07 14 00 Page 34
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0050 25 Linear
Install RIDGE VENTS, Installation of Ridge Vents, for Composition Shingle Roofing. Includes creating new opening & installing preformed material, cap sheet and all incidental items required.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0051 30 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
SAMPLE ANALYSIS, Collection and Laboratory analysis to determine if paint contains Lead. To include all incidental items required.
FOB: Destination
SECTION 07 14 00 Page 35
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0052 15 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
SAMPLE ANALYSIS, Collection and Laboratory analysis (TCLP) to determine if paint/demolition debris contains Lead Based Paint and resulting debris can be classified as hazardous waste To include all incidental items required.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0053 20,000 Square
LEAD BASED PAINT ABATEMENT, Removal/Disposal of lead containing (hazardous) materials to include all incidental items r equired.
FOB: Destination
SECTION 07 14 00 Page 36
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0054 50 Each
Z2AA - REPAIR OR ALTERATION OF
FFP
Install RIDGE VENTS, Installation of Ridge Vents for metal roofing (10" to 36"W X10'-0"L), Includes creating new opening & installing preformed material, flashing, and all incidental items required to provide a complete useable product.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0055 5,000 Linear
Install Cant Strips, Installation of Cant Strips. To include all incidental items required. To include Removal, instal lation, disposal and all required materials and equipment to complete work.
FOB: Destination
SECTION 07 14 00 Page 37
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0056 30,000 Square
Plastic Sheeting, install plastic sheeting to protect furniture, equipment, supplies, etc. from dust. Includes clean-up and removal.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 100,000 Square
OPTION Z2AA - REPAIR OR ALTERATION OF
REPLACE CERAMIC COATED MINERAL SURFACED SELF-SEALING
Architectural SHINGLES, composed of a fiberglass mat base with ce ramic-coated mineral granules tightly embedded in carefully refined, water-resistant asphalt. Two pieces of the shingle are firmly laminated together in a special tough asphaltic cement. Includes Removal & Disposal of existing Strip Shingles, Roofing Felt Underlayment, Metal Drip Edge and Installation of new, Felt Underlayment & Metal Drip Edge.
FOB: Destination
SECTION 07 14 00 Page 38
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 175,000 Square
ROOFING PANELS Removal and Disposal, Includes Preformed & Corrugated Aluminum Roofing Panels, Preformed, Corrugated, Ribbed & Standing Seam Galvanized, Zinc & Colored Sheet Metal; and Preformed, Corrugated & Ribbed Fiberglass Panels.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003 8,000 Square
TRANSITE ROOFING PANELS, Removal and Disposal. Includes Asbestos Abatement Air Monitoring, Temporary Fence Barricades, Personnel, Waste and Decontamination Unit.
FOB: Destination
SECTION 07 14 00 Page 39
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1004 8,000 Square
ALUMINUM ROOFING PANELS, Installation of Preformed or Corrugated Panels.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1005 100,000 Square
STEEL SHEET METAL ROOFING PANELS, Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted. (24 Gage) FOB: Destination
SECTION 07 14 00 Page 40
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1006 100,000 Square
STEEL SHEET METAL ROOFING PANELS, Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted. (22 Gage) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1007 30,000 Square
SHEET METAL FLASHING, Removal and Disposal. Includes Aluminum, Galvanized Steel, Copper, and Aluminum Fascia.
FOB: Destination
SECTION 07 14 00 Page 41
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1008 5,000 Square
SHEET METAL FLASHING, Installation of Aluminum Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1009 1,000 Square
SHEET METAL FLASHING, Installation of Aluminum Fascia.
FOB: Destination
SECTION 07 14 00 Page 42
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1010 25,000 Square
SHEET METAL FLASHING, Installation of Galvanized Steel Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1011 10,000 Square
SHEET METAL FLASHING, Installation of Copper Flashing.
FOB: Destination
SECTION 07 14 00 Page 43
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1012 20 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
VENT THRU ROOF FLASHING, Installation, Includes Removal and Disposal.
Aluminum Vent Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1013 20 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES REMOVAL
AND DISPOSAL. Galvanized Vent Flashing.
FOB: Destination
SECTION 07 14 00 Page 44
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1014 300 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES REMOVAL
AND DISPOSAL. Lead Vent Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1015 25,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Removal and Disposal of existing Gutter and Downspouts.
FOB: Destination
SECTION 07 14 00 Page 45
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1016 7,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 5".
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1017 14,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 7".
FOB: Destination
SECTION 07 14 00 Page 46
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1018 2,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Galvanized Steel Gutters and Downspouts.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1019 7,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts, k-style.
FOB: Destination
SECTION 07 14 00 Page 47
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1020 2,000 Linear
SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts. Half round style.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1021 250 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
SPLASH BLOCKS, Installation of Concrete Splash Blocks.
FOB: Destination
SECTION 07 14 00 Page 48
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1022 30 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
ROOF VENT PIPE EXTENSION, Installation of Roof Vent Pipe Extension.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1023 30 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
SCUPPER DRAINS, Re-install Scupper drains.
FOB: Destination
SECTION 07 14 00 Page 49
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1024 30 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
SCUPPER DRAINS, Install new Scupper drains.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1025 40,000 Board
STRUCTURAL LUMBER, Replacement of existing Deteriorated or Termite Damaged Lumber. Includes Removal & Disposal of existing Deteriorated or Termite damaged Structural Lumber, and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).
FOB: Destination
SECTION 07 14 00 Page 50
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1026 8,000 Board
ROOF SHEATHING, Replacement of existing Deteriorated Termite Damaged Sheathing Includes Removal & Disposal of e xisting Deteriorated or Termite damaged Sheathing and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1027 5,000 Linear
METAL ROOF PURLINS, Replacement of existing Rusted or Damaged Purlins.
Includes Removal & Disposal of existing Rusted or Damaged Metal Purlins, and Incidental Painting of new Purlins as required. (1-Primer and 2- finish coats to match adjacent existing surfaces).
FOB: Destination
SECTION 07 14 00 Page 51
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1028 10 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
PITCH PANS, Replacement of existing Pitch Pans, Includes Removal and disposal.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1029 100 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
CHEMCURB PITCH POCKET, Installation of CHEMCURB Pitch Pocket or approved equal. To include Removal, installation disposal and all required materials and equipment to complete work.
FOB: Destination
SECTION 07 14 00 Page 52
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1030 25 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
ROOF DRAINS, Removal and Re-installation of existing Roof Drains, Includes cleaning, testing, and installing Modified Bitumen Sheet Flashing.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1031 100 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Galvanized Roof Ventilators.
FOB: Destination
SECTION 07 14 00 Page 53
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1032 25 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Aluminum Roof Ventilators.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1033 15,000 Square
REPLACE CLAY TILE ROOFING, Includes Removal & Disposal of existing Clay Tile Roofing, Roofing Felt Underlayment, and Installation of new Clay Tile Roofing, Felt Underlayment, and Flashing as required.
FOB: Destination
SECTION 07 14 00 Page 54
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1034 15,000 Square
CLAY TILE ROOF SEALER Installation of Low moisture absorption Clear drying penetrating water repellent barrier, Clay Tile Roof Sealer. To include Surface preparation and Installation of Roof Coating, clean-up and all required materials and equipment to complete work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1035 300 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
ASBESTOS ABATEMENT, Bulk Sampling, Field.
FOB: Destination
SECTION 07 14 00 Page 55
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1036 8,000 Square
ASBESTOS ABATEMENT, Remove Asbestos Contaminated Metal Flashing, Base Flashing, and Mastic as required.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1037 8,000 Square
ASBESTOS ABATEMENT, Total Demolition and Disposal of existing Built-Up Roofing System clear down to existing Roof Deck as required.
FOB: Destination
SECTION 07 14 00 Page 56
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1038 80,000 Square
90 LB. MINERAL SURFACE on Built-up Roofing, Removal and disposal.
Remove existing roofing down to existing substrate.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1039 50,000 Square
Gravel on Built-up Roofing, Removal and disposal. Remove existing gravel roofing down to existing substrate.
FOB: Destination
SECTION 07 14 00 Page 57
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1040 80,000 Square
Built-up Roofing Installation of 2-Ply, Includes 90LB. SBS Mineral Surfaced Roll- Roofing Cap Sheet on SBS fiberglass Base Sheet.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1041 1,000 Square
Walkway Surface, Installation, Mineral Asphalt Plank.
FOB: Destination
SECTION 07 14 00 Page 58
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1042 300,000 Board
ROOFING INSULATION (without Fire Proofing Insulation), Removal & Disposal. Includes Tapered or Flat Insulation Boards.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1043 300,000 Board
ROOFING INSULATION, Installation. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.
FOB: Destination
SECTION 07 14 00 Page 59
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1044 100,000 Board
ROOFING INSULATION, Installation. Tapered. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1045 150,000 Square
ROOF COATING, Installation of Hydro-Stop Elastomeric Roofing with 1/16" reinforcing or approved equal.
FOB: Destination
SECTION 07 14 00 Page 60
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1046 150,000 Square
ROOF COATING, Installation of Silicone Roof coating.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1047 40 Week
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
Equipment Rental of 25 ton Crane with Operator.
FOB: Destination
SECTION 07 14 00 Page 61
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1048 5 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
Equipment Hauling, round trip to include delivery to jobsite location and return to Rental Company.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1049 30 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
REMOVE AND REINSTALL SOLAR PANELS.
FOB: Destination
SECTION 07 14 00 Page 62
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1050 25 Linear
Install RIDGE VENTS, Installation of Ridge Vents, for Composition Shingle Roofing. Includes creating new opening & installing preformed material, cap sheet and all incidental items required.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1051 30 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
SAMPLE ANALYSIS, Collection and Laboratory analysis to determine if paint contains Lead. To include all incidental items required.
FOB: Destination
SECTION 07 14 00 Page 63
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1052 15 Each
OPTION Z2AA - REPAIR OR ALTERATION OF
FFP
SAMPLE ANALYSIS, Collection and Laboratory analysis (TCLP) to determine if paint/demolition debris contains Lead Based Paint and resulting debris can be classified as hazardous waste To include all incidental items required.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1053 20,000 Square
LEAD BASED PAINT ABATEMENT, Removal/Disposal of lead containing (hazardous) materials to include all incidental items r equired.
FOB: Destination
SECTION 07 14 00 Page 64
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
1054 50 Each
OPTION…
This is the start of the file's text. The full file is on GovTribe.