W912CN-20-Q-0001 Q&A.docx
DOCX document 13 KB Posted
- Attached to
- Di-Electric Testing
- Solicitation number
- W912CN-20-Q-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912CN-20-Q-0001 0002.pdf | ||
| Amendment W912CN-20-Q-0001 0001.pdf | ||
| W912CN-20-Q-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Answer
| 1. Are you able to split the solicitation into segments? |
| The solicitation is currently one requirement. There is a possibility for the requirement to be split if the Government does not receive complete quotes. |
| 2. Type of test to be performed (i.e. ASTM American Society for Testing Materials; ISO International Organization for Standardization) |
| The current contract is ASNT-TC-1A certified (The American Society of Nondestructive Testing). However, this has not been listed as a requirement. |
| 3. If travel is necessary to perform tests, shall I mark the travel cost in the quotation separately or should the total amount of the quote include travel cost? |
| Travel costs should be included and not quoted separately. |
| 4. We might need to bring equipment to conduct tests. Will the Government issue a form to allow loading to the flight? |
| No |
File details come from the government source that posted it. Updated .