W912CN-19-Q-DD04-0001

1. Can you provide the serial number of the UPS?

Answer:

APC Symmetra PX 250/500kW IO

SN: QD1530121846

2. Do the batteries need to be delivered to the final location where they will be installed, or do they just need to be delivered to a traditional loading dock? If no loading dock, will they need a truck with a lift gate?

Answer: Yes batteries need to be delivered to the final location where they will be installed in the basement of building 1500, room 109. There is a loading dock at this building.

3. If the batteries will need to be transported by the contractor to the final location, can that be done using a power or hand pallet jack or will they need to be transported by hand truck? Any stairs, or elevators, or freight elevators required? Any small doors, or small corridors in the route?

Answer: The batteries will need to be transported by the contractor to the final location. That be done using a power or hand pallet jack. They can also use a hand truck if they prefer. There is an elevator for use. The room door is the standard door size.