W912CN-17-B-0002

0010965078

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. David Bacon Wage Determinaton HI170001 w ith Mod 1 dated 1/20/2017 is deleted and replaced w ith Davis Bacon Wager Determination HI170001w ith Mod 2 dated 2/24/2017.

b. Add information to General Information #21 Abbreviations used in the Unit Column: Linear Foot = Foot

c. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 28

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Feb-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912CN-17-B-0002

X 9B. DATED (SEE ITEM 11)

10-Feb-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Feb-2017

CODE

EXPEDITIONARY CONTRACTING COMMAND

413 CSB, RCO-HAWAII,

742 SANTOS DUMONT AVENUE

BLDG 108, 3RD FLOOR (WAAF)

SCHOFIELD BARRACKS HI 96857

W912CN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

GENERAL INFORMATION - REVISED

GENERAL INFORMATION

NOTICE TO BIDDERS:

1. TYPE OF SOLICITATION. This solicitation is being issued as an Invitation for Bid (IFB) in accordance with FAR 14 Sealed Bidding. This Solicitation is 100% Small Business Set-Aside. The NAICS is 238990 and the Size Standard is $15M. Bids from contractors that do not meet this size standard will be deemed non-responsive and ineligible to submit bid.

2. CONTRACT TYPE. Contract will be a firm-fixed price requirement type construction contract. Quantities are estimated and stated for information of the prospective contractors. The actual quantities orders may be more or less than the estimated quantities. Reference FAR 52.216-21. As a prerequisite of the Government hereunder, there must be (i) adequate and sufficient funds available to cover the order; and (ii) an administrative determination by the Government that the requirement exists.

3. PERIOD OF PERFORMANCE. The anticipated period of performance will be a 12-month base period and two (2) 12-month option periods as shown below:

Base Period 1 APR 2017 – 31 MAR 2018 Option 1 1 APR 2018 – 31 MAR 2019 Option 2 1 APR 2019 – 31 MAR 2020

4. AWARD. Award will be made to the lowest responsible bidder whose bid is responsive to the terms and conditions of the Invitation for Bid and is most advantageous to the Government.

5. DUE DATE. All bids must be received by the due date and time indicated in the solicitation, Block 13.

6. QUESTIONS. Questions may be submitted by email to Lisa Nakamoto, Contract Specialist, at lisa.k.nakamoto.civ@mail.mil to include the solicitation number W912CN-17-B-0002 in the subject line. Telephone and faxed inquires will not be accepted. In order to ensure a timely response, questions must be submitted no later than 10:00am, seven days after the date of issuance of this solicitation. Questions and responses will be issued on an amendment to the solicitation. Any questions received after the due date may not be answered.

7. BID OPENING DATE AND TIME. To attend the Bid Opening, notify Lisa Nakamoto by email at lisa.k.nakamoto.civ@mail.mil no later than four days prior to the Bid Opening date.

List all personnel attending (maximum of 3 personnel).

Bid opening will occur on 13 MAR 2017, 10:00am. Bid Opening will be located at:

413th Contracting Support Brigade Regional Contracting Office, Hawaii Bldg. 108, 3rd Floor 472 Santos Dumont Street Wheeler Army Airfield, HI 96854

SUBMISSION REQUIREMENT:

Bid Submission Requirement:

(a) Bid shall be submitted in sealed envelope or package and shall be addressed to the office specified below no later than the exact time set and date stated in Block 13. Include the solicitation number and the name and address of the bidder on the outside of the sealed envelope or package.

413th Contracting Support Brigade Regional Contracting Office, Hawaii ATTN: CCEC-PAH-C (Lisa Nakamoto) Bldg. 108, 3rd Floor 472 Santos Dumont Street Wheeler Army Airfield, HI 96854

Bids shall include the following:

1. Completed Standard Form 1442.

2. Completed Schedule of bids/prices. All unit price and estimated amount filled out.

3. Completed Attachment 1 (Bid Attachment)

4. Signed or other acknowledgement of all amendments.

5. Completed Representation and Certifications.

6. Bid Guarantee in accordance with FAR 52.228-1.

7. Copy of Bid (items 1-6) on CD in PDF format.

(b) Bidders shall furnish unit prices and extended total for all items listed on the schedule of bid items in Section 00010. In the event there is a difference between the unit price and the extended total, the unit price will be the intended bid. In the event the unit price and extended total are omitted for any item, the bid will be deemed nonresponsive.

(c) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in the paragraph above.

(d) Bid may be mailed or hand carried. If mailed, it shall be post marked before the date specified for receipt of bids.

(e) Bids received by facsimile or email will not be considered.

(f) Bids must be submitted by March 13, 2017, 10:00 am (Hawaii Standard Time)

NOTIFICATION TO BIDDERS - ACCESS TO ARMY INSTALLATIONS: All vehicle operators must be prepared to provide a valid driver's license, vehicle registration, certificate of insurance and current safety inspection to the security guard prior to entry to the installation at Lyman Gate on Schofield Barracks. Allow for delays at the gates.

Please ensure you plan sufficient time to locate our facility and adjust to gate and road closures/detours to ensure your bid is submitted in accordance with the terms and conditions of the Invitation for Bids

GENERAL INFORMATION:

1. Scope of Work: This is a requirements-type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform installation of new and repair/construct concrete sidewalks located at various Army Installations on the island of Oahu, Hawaii. This work does not include repair of sidewalks and assorted appurtenances that are an incidental part of a road repair project.

Line items indicated as "K" Work refers to "Repairs" to an existing construction element type of work. Requirements indicated as "L" Work refers to "New" construction type work to a non-existing element.

2. The contractor shall submit a safety plan within 30 days of award or 5 days prior to commencement of on-site work, whichever occurs first in accordance with the AR 385-10, Construction Safety, US Army Corps of Engineers "Safety and Health Requirements Manual (EM 385-1-1)" and Occupational Safety and Health Administration (OSHA) regulations.

3. To assure compliance with general construction trade practice, the contractor shall establish and maintain quality control for materials and work. The Government may perform inspections and conduct tests while the contractor's work is in process to assure compliance to performance standards.

4. Existing conditions or areas damaged or disturbed by the contractor's operation shall be restored to their original condition, or near original condition as possible, to the satisfaction of the Contracting Officer at no additional cost to the Government.

5. Prior to start of any excavation or trenching work, the contractor shall obtain clearance, in writing, from the appropriate communications agency and from the Directorate of Public Works.

6. Interruptions to existing utilities shall be held to a minimum. A schedule for any required power or water outages shall be submitted to the Contracting Officer a minimum of four weeks prior to the intended outage.

7. The contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area.

8. The Contractor’s normal working hours will be 7:00 a.m. – 4:00 p.m. Monday thru Friday.

The Contractor will not normally work on Saturdays, Sundays, or Federal Holidays. If the Contractor chooses to work outside the normal working hours, Contractor must submit an application to the Contracting Officer in writing one week prior to the requested work for approval.

9. Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.

10. The contractor shall provide, install, and maintain all necessary signs, lights, barricades, markers, cones, flagmen, and other protective facilities and shall take all necessary precautions for the protection and for the convenience and safety of military and public traffic (vehicular and pedestrian).

11. The amount of dust resulting from the contractor's work shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.

12. The contractor shall obtain the necessary hot work permit from the appropriate Fire Department prior to any welding, burning, and torching operations.

13. Daily Clean-up - During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, etc. or rubbish that constitutes a fire hazard. At the end of each days work, the Contractor shall remove all debris. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.

14. Storage Area - The Government may furnish a designated parcel of land for the contractor’s use at Fort Shafter and Schofield Barracks to house their on-site staff, if requested.

15. The Government will provide a reasonable amount of water and electricity required to accomplish subject project.

16. The Contractor shall be responsible to have a quality control program to ensure services are performed in accordance with the Scope of Work and commonly accepted commercial practices.

17. The Contractor is required to follow DPW’s Best Management Practice (BMP) of Storm Water Compliance. Copy will be provided at the pre-construction conference, if requested.

18. The work shall be constructed using best practices per industry standards.

19. All materials used under this project shall be Energy Star compliant. The following website lists all energy star compliant materials. www.energystar.gov

20. If a dumpster is provided for this contract, contractor shall include a sign on the dumpster with their name/address/phone and indicate the dumpster is only used for construction debris.

21. Abbreviations used in the Unit column: (use if applicable)

CY = Cubic Yard; LH = Labor Hours; SF = Square Foot; EA = Each; LF = Linear Foot; SY = Square Yard

Linear Foot = Foot

22. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes."

23. Identification of Contractor Employees.

a. Provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee’s name, contractor’s name, functional area of assignment, with recent color photograph of the employee.

a. All contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing above the waist except when safety or health reasons prohibit such placement.

24. ESTIMATED QUANTITIES: All quantities are estimated and are stated for the information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. (See clause at Section 00700 entitled “Requirements”). As a prerequisite the Government, there must be (i) adequate and sufficient funds available to cover the order, and

(ii) an administrative determination by the Government that the requirement exists.

25. CONTRACTOR MANPOWER REPORTING (CMR)

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Open-End Sidewalk via a secure data collection site. The contractor is required to fill in all required data fields completely using the following web address: http://www.ecmra.mil/, and then click on "Department of the Army CMRA" or the icon of the DoD organization that is receiving or benefitting from the contracted services.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), this runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on "Send an email" which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component's CMR website." Reporting is required for each task order issued, and shall be entered via the CMR website.

The following have been deleted:

GENERAL INFORMATION

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been added by full text:

DAVIS BACON WAGE DETERMINATION

General Decision Number: HI170001 02/24/2017 HI1

Superseded General Decision Number: HI20160001

State: Hawaii

Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential

Counties: Hawaii Statewide.

BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION

PROJECTS (consisting of single family homes and apartments up to and including 4 stories); HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS AND DREDGING

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/20/2017 2 02/24/2017

ASBE0132-001 08/29/2010

Rates Fringes

Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls...............$ 36.65 22.24

BOIL0627-005 01/01/2013

Rates Fringes

BOILERMAKER......................$ 35.20 27.35

BRHI0001-001 08/29/2016

Rates Fringes

BRICKLAYER

Bricklayers and Stonemasons.$ 46.62 19.60 Pointers, Caulkers and Weatherproofers.............$ 46.62 19.60

BRHI0001-002 08/29/2016

Rates Fringes

Tile, Marble & Terrazzo Worker Terrazzo Base Grinders......$ 43.54 21.92 Terrazzo Floor Grinders and Tenders.................$ 41.99 21.92 Tile, Marble and Terrazzo Workers.....................$ 45.35 21.92

CARP0745-001 08/29/2016

Rates Fringes

Carpenters:

Carpenters; Hardwood Floor Layers; Patent Scaffold Erectors (14 ft. and over); Piledrivers;

Pneumatic Nailers; Wood Shinglers and Transit and/or Layout Man...........$ 45.65 21.21 Millwrights and Machine Erectors....................$ 45.90 21.21 Power Saw Operators (2 h.p. and over)..............$ 45.80 21.21

CARP0745-002 08/29/2016

Rates Fringes

Drywall and Acoustical Workers and Lathers..............$ 45.90 21.21

ELEC1186-001 08/21/2016

Rates Fringes

Electricians:

Cable Splicers..............$ 50.49 27.78 Electricians................$ 45.90 26.55 Telecommunication worker....$ 26.30 11.58

ELEC1186-002 08/21/2016

Line Construction:

Cable Splicers..............$ 50.49 27.78 Groundmen/Truck Drivers.....$ 34.43 23.43 Heavy Equipment Operators...$ 41.31 25.30 Linemen.....................$ 45.90 26.55 Telecommunication worker....$ 26.30 11.58

* ELEV0126-001 01/01/2017

Rates Fringes

ELEVATOR MECHANIC................$ 55.61 31.59

a. VACATION: Employer contributes 8% of basic hourly rate for 5 years service and 6% of basic hourly rate for 6 months to 5 years service as vacation pay credit.

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

ENGI0003-002 08/29/2016

Rates Fringes

Diver (Aqua Lung) (Scuba)) Diver (Aqua Lung) (Scuba) (over a depth of 30 feet)...$ 63.75 28.56 Diver (Aqua Lung) (Scuba) (up to a depth of 30 feet)..$ 54.38 28.56 Stand-by Diver (Aqua Lung) (Scuba)....................$ 45.00 28.56 Diver (Other than Aqua Lung) Diver (Other than Aqua Lung).......................$ 63.75 28.56 Diver Tender (Other than Aqua Lung)..................$ 41.97 28.56 Stand-by Diver (Other than Aqua Lung)..................$ 45.00 28.56 Helicopter Work Airborne Hoist Operator for Helicopter..............$ 43.55 28.56 Co-Pilot of Helicopter......$ 43.69 28.56 Pilot of Helicopter.........$ 43.86 28.56 Power equipment operator -tunnel work

GROUP 1....................$ 39.99 28.56

GROUP 2....................$ 40.10 28.56

GROUP 3....................$ 40.27 28.56

GROUP 4....................$ 40.54 28.56

GROUP 5....................$ 40.85 28.56

GROUP 6....................$ 41.50 28.56

GROUP 7....................$ 41.82 28.56

GROUP 8....................$ 41.93 28.56

GROUP 9....................$ 42.04 28.56

GROUP 9A...................$ 42.27 28.56

GROUP 10....................$ 42.33 28.56

GROUP 10A...................$ 42.48 28.56

GROUP 11....................$ 42.63 28.56

GROUP 12....................$ 42.99 28.56

GROUP 12A...................$ 43.35 28.56

Power equipment operators:

GROUP 1....................$ 39.69 28.56

GROUP 2....................$ 39.80 28.56

GROUP 3....................$ 39.97 28.56

GROUP 4....................$ 40.24 28.56

GROUP 5....................$ 40.55 28.56

GROUP 6....................$ 41.20 28.56

GROUP 7....................$ 41.52 28.56

GROUP 8....................$ 41.63 28.56

GROUP 9....................$ 41.74 28.56

GROUP 9A...................$ 41.97 28.56

GROUP 10....................$ 42.03 28.56

GROUP 10A...................$ 42.18 28.56

GROUP 11....................$ 42.33 28.56

GROUP 12....................$ 42.69 28.56

GROUP 12A...................$ 43.05 28.56

GROUP 13....................$ 39.97 28.56

GROUP 13A...................$ 40.24 28.56

GROUP 13B...................$ 40.55 28.56

GROUP 13C...................$ 41.20 28.56

GROUP 13D...................$ 41.52 28.56

GROUP 13E...................$ 41.63 28.56

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Fork Lift (up to and including 10 tons); Partsman (heavy duty repair shop parts room when needed).

GROUP 2: Conveyor Operator (Handling building material);

Hydraulic Monitor; Mixer Box Operator (Concrete Plant).

GROUP 3: Brakeman; Deckhand; Fireman; Oiler;

Oiler/Gradechecker; Signalman; Switchman; Highline Cableway Signalman; Bargeman; Bunkerman; Concrete Curing Machine (self-propelled, automatically applied unit on streets, highways, airports and canals); Leveeman; Roller (5 tons and under); Tugger Hoist.

GROUP 4: Boom Truck or dual purpose "A" Frame Truck (5 tons or less); Concrete Placing Boom (Building Construction);

Dinky Operator; Elevator Operator; Hoist and/or Winch (one drum); Straddle Truck (Ross Carrier, Hyster and similar).

GROUP 5: Asphalt Plant Fireman; Compressors, Pumps, Generators and Welding Machines ("Bank" of 9 or more, individually or collectively); Concrete Pumps or Pumpcrete Guns; Lubrication and Service Engineer (Grease Rack);

Screedman.

GROUP 6: Boom Truck or Dual Purpose "A"Frame Truck (over 5 tons); Combination Loader/Backhoe (up to and including 3/4

cu. yd.); Concrete Batch Plants (wet or dry); Concrete Cutter, Groover and/or Grinder (self-propelled unit on streets, highways, airports, and canals); Conveyor or Concrete Pump (Truck or Equipment Mounted); Drilling Machinery (not to apply to waterliners, wagon drills or jack hammers); Fork Lift (over 10 tons); Loader (up to and including 3 and 1/2 cu. yds); Lull High Lift (under 40 feet); Lubrication and Service Engineer (Mobile); Maginnis Internal Full Slab Vibrator (on airports, highways, canals and warehouses); Man or Material Hoist; Mechanical Concrete Finisher (Large Clary, Johnson Bidwell, Bridge Deck and similar); Mobile Truck Crane Driver; Portable Shotblast Concrete Cleaning Machine; Portable Boring Machine (under streets, highways, etc.); Portable Crusher; Power Jumbo Operator (setting slip forms, etc., in tunnels); Rollers (over 5 tons); Self-propelled Compactor (single engine);

Self-propelled Pavement Breaker; Skidsteer Loader with attachments; Slip Form Pumps (Power driven by hydraulic, electric, air, gas, etc., lifting device for concrete forms); Small Rubber Tired Tractors; Trencher (up to and including 6 feet); Underbridge Personnel Aerial Platform (50 feet of platform or less).

GROUP 7: Crusher Plant Engineer, Dozer (D-4, Case 450, John Deere 450, and similar); Dual Drum Mixer, Extend Lift;

Hoist and/or Winch (2 drums); Loader (over 3 and 1/2 cu.

yds. up to and including 6 yards.); Mechanical Finisher or Spreader Machine (asphalt), (Barber Greene and similar) (Screedman required); Mine or Shaft Hoist; Mobile Concrete Mixer (over 5 tons); Pipe Bending Machine (pipelines only);

Pipe Cleaning Machine (tractor propelled and supported);

Pipe Wrapping Machine (tractor propelled and supported);

Roller Operator (Asphalt); Self-Propelled Elevating Grade Plane; Slusher Operator; Tractor (with boom) (D-6, or similar); Trencher (over 6 feet and less than 200 h.p.);

Water Tanker (pulled by Euclids, T-Pulls, DW-10, 20 or 21, or similar); Winchman (Stern Winch on Dredge).

GROUP 8: Asphalt Plant Operator; Barge Mate (Seagoing);

Cast-in-Place Pipe Laying Machine; Concrete Batch Plant (multiple units); Conveyor Operator (tunnel); Deckmate;

Dozer (D-6 and similar); Finishing Machine Operator (airports and highways); Gradesetter; Kolman Loader (and similar); Mucking Machine (Crawler-type); Mucking Machine (Conveyor-type); No-Joint Pipe Laying Machine; Portable Crushing and Screening Plant; Power Blade Operator (under 12); Saurman Type Dragline (up to and including 5 yds.);

Stationary Pipe Wrapping, Cleaning and Bending Machine;

Surface Heater and Planer Operator, Tractor (D-6 and similar); Tri-Batch Paver; Tunnel Badger; Tunnel Mole and/or Boring Machine Operator Underbridge Personnel Aerial Platform (over 50 feet of platform).

GROUP 9: Combination Mixer and Compressor (gunite); Do-Mor

Loaderand Adams Elegrader; Dozer (D-7 or equal); Wheel and/or Ladder Trencher (over 6 feet and 200 to 749 h.p.).

GROUP 9A: Dozer (D-8 and similar); Gradesetter (when required by the Contractor to work from drawings, plans or specifications without the direct supervision of a foreman or superintendent); Push Cat; Scrapers (up to and including 20 cu. yds); Self-propelled Compactor with Dozer;

Self-Propelled, Rubber-Tired Earthmoving Equipment (up to and including 20 cu. yds) (621 Band and similar); Sheep's Foot; Tractor (D-8 and similar); Tractors with boom (larger than D-6, and similar).

GROUP 10: Chicago Boom; Cold Planers; Heavy Duty Repairman or Welder; Hoist and/or Winch (3 drums); Hydraulic Skooper (Koehring and similar); Loader (over 6 cu. yds. up to and including 12 cu. yds.); Saurman type Dragline (over 5 cu.

yds.); Self-propelled, rubber-tired Earthmoving Equipment (over 20 cu. yds. up to and including 31 cu. yds.) (637D and similar); Soil Stabilizer (P & H or equal); Sub-Grader (Gurries or other automatic type); Tractors (D-9 or equivalent, all attachments); Tractor (Tandem Scraper);

Watch Engineer.

GROUP 10A: Boat Operator; Cable-operated Crawler Crane (up to and including 25 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (up to and including 1 cu.

yd.); Dozer D9-L; Dozer (D-10, HD41 and similar) (all attachments); Gradall (up to and including 1 cu. yd.);

Hydraulic Backhoe (over 3/4 cu. yds. up to and including 2

cu. yds.); Mobile Truck Crane Operator (up to and including 25 tons) (Mobile Truck Crane Driver Required);

Self-propelled Boom Type Lifting Device (Center Mount) (up to and including 25 tons) (Grove, Drott, P&H, Pettibone and similar; Trencher (over 6 feet and 750 h.p. or more); Watch Engineer (steam or electric).

GROUP 11: Automatic Slip Form Paver (concrete or asphalt);

Band Wagon (in conjunction with Wheel Excavator);

Cable-operated Crawler Cranes (over 25 tons but less than 50 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (over 1 cu. yd. up to 7 cu. yds.); Gradall (over 1 cu. yds. up to 7 cu. yds.); DW-10, 20, etc.

(Tandem); Earthmoving Machines (multiple propulsion power units and 2 or more Scrapers) (up to and including 35 cu.

yds.," struck" m.r.c.); Highline Cableway; Hydraulic Backhoe (over 2 cu. yds. up to and including 4 cu. yds.);

Leverman; Lift Slab Machine; Loader (over 12 cu. yds);

Master Boat Operator; Mobile Truck Crane Operator (over 25 tons but less than 50 tons); (Mobile Truck Crane Driver required); Pre-stress Wire Wrapping Machine; Self-propelled Boom-type Lifting Device (Center Mount) (over 25 tons m.r.c); Self-propelled Compactor (with multiple-propulsion power units); Single Engine Rubber Tired Earthmoving Machine (with Tandem Scraper); Tandem Cats; Trencher (pulling attached shield).

GROUP 12: Clamshell or Dipper Operator; Derricks; Drill Rigs;

Multi-Propulsion Earthmoving Machines (2 or more Scrapers) (over 35 cu. yds "struck"m.r.c.); Operators (Derricks, Piledrivers and Cranes); Power Shovels and Draglines (7 cu.

yds. m.r.c. and over); Self-propelled rubber-tired Earthmoving equipment (over 31 cu. yds.) (657B and similar); Wheel Excavator (up to and including 750 cu. yds.

per hour); Wheel Excavator (over 750 cu. yds. per hour).

GROUP 12A: Dozer (D-11 or similar or larger); Hydraulic Excavators (over 4 cu. yds.); Lifting cranes (50 tons and over); Pioneering Dozer/Backhoe (initial clearing and excavation for the purpose of providing access for other equipment where the terrain worked involves 1-to-1 slopes that are 50 feet in height or depth, the scope of this work does not include normal clearing and grubbing on usual hilly terrain nor the excavation work once the access is provided); Power Blade Operator (Cat 12 or equivalent or over); Straddle Lifts (over 50 tons); Tower Crane, Mobile;

Traveling Truss Cranes; Universal, Liebher, Linden, and similar types of Tower Cranes (in the erection, dismantling, and moving of equipment there shall be an additional Operating Engineer or Heavy Duty Repairman);

Yo-Yo Cat or Dozer.

GROUP 13: Truck Driver (Utility, Flatbed, etc.)

GROUP 13A: Dump Truck, 8 cu.yds. and under (water level);

Water Truck (up to and including 2,000 gallons).

GROUP 13B: Water Truck (over 2,000 gallons); Tandem Dump Truck, over 8 cu. yds. (water level).

GROUP 13C: Truck Driver (Semi-trailer. Rock Cans, Semi-Dump or Roll-Offs).

GROUP 13D: Truck Driver (Slip-In or Pup).

GROUP 13E: End Dumps, Unlicensed (Euclid, Mack, Caterpillar or similar); Tractor Trailer (Hauling Equipment); Tandem Trucks hooked up to Trailer (Hauling Equipment)

BOOMS AND/OR LEADS (HOURLY PREMIUMS):

The Operator of a crane (under 50 tons) with a boom of 80 feet or more (including jib), or of a crane (under 50 tons) with leads of 100 feet or more, shall receive a per hour premium for each hour worked on said crane (under 50 tons) in accordance with the following schedule:

Booms of 80 feet up to but not including 130 feet or Leads of 100 feet up to but not including 130 feet 0.50

Booms and/or Leads of 130 feet up to but not including 180 feet 0.75 Booms and/or Leads of 180 feet up to and including 250 feet 1.15 Booms and/or Leads over 250 feet 1.50

The Operator of a crane (50 tons and over) with a boom of 180 feet or more (including jib) shall receive a per hour premium for each hour worked on said crane (50 tons and over) in accordance with the following schedule:

Booms of 180 feet up to and including 250 feet 1.25 Booms over 250 feet 1.75

ENGI0003-004 08/29/2016

Rates Fringes

Dredging: (Boat Operators) Boat Deckhand...............$ 39.97 28.56 Boat Operator...............$ 42.18 28.56 Master Boat Operator........$ 42.33 28.56 Dredging: (Clamshell or Dipper Dredging)

GROUP 1.....................$ 42.69 28.56

GROUP 2.....................$ 42.03 28.56

GROUP 3.....................$ 41.63 28.56

GROUP 4.....................$ 39.97 28.56

Dredging: (Derricks)

GROUP 1.....................$ 42.69 28.56

GROUP 2.....................$ 42.03 28.56

GROUP 3.....................$ 41.63 28.56

GROUP 4.....................$ 39.97 28.56

Dredging: (Hydraulic Suction Dredges)

GROUP 1.....................$ 42.33 28.56

GROUP 2.....................$ 42.18 28.56

GROUP 3.....................$ 42.03 28.56

GROUP 4.....................$ 41.97 28.56

GROUP 5.....................$ 37.88 26.76

Group 5.....................$ 41.63 28.56

GROUP 6.....................$ 37.77 26.76

Group 6.....................$ 41.52 28.56

GROUP 7.....................$ 36.22 26.76

Group 7.....................$ 39.97 28.56

CLAMSHELL OR DIPPER DREDGING CLASSIFICATIONS

GROUP 1: Clamshell or Dipper Operator.

GROUP 2: Mechanic or Welder; Watch Engineer.

GROUP 3: Barge Mate; Deckmate.

GROUP 4: Bargeman; Deckhand; Fireman; Oiler.

HYDRAULIC SUCTION DREDGING CLASSIFICATIONS

GROUP 1: Leverman.

GROUP 2: Watch Engineer (steam or electric).

GROUP 3: Mechanic or Welder.

GROUP 4: Dozer Operator.

GROUP 5: Deckmate.

GROUP 6: Winchman (Stern Winch on Dredge) GROUP 7: Deckhand (can operate anchor scow under direction of Deckmate); Fireman; Leveeman; Oiler.

DERRICK CLASSIFICATIONS

GROUP 1: Operators (Derricks, Piledrivers and Cranes).

GROUP 2: Saurman Type Dragline (over 5 cubic yards).

GROUP 3: Deckmate; Saurman Type Dragline (up to and including 5 yards).

GROUP 4: Deckhand, Fireman, Oiler.

ENGI0003-044 08/29/2016

Rates Fringes

Power Equipment Operators

(PAVING)

(10) Cold Planer............$ 42.03 28.56 (10)Loader (2 1/2 cu. yds.

and under)..................$ 42.03 28.56 (10)Soil Stabilizer.........$ 42.03 28.56 (11)Loader (over 2 1/2 cu.

yds. to and including 5

cu. yds.)...................$ 42.33 28.56 (3)Roller Operator (five tons and under).............$ 39.97 28.56 (5)Screed Person............$ 40.55 28.56 (6)Combination Loader/Backhoe (up to 3/4 cu.yd.).....................$ 41.20 28.56 (6)Concrete Saws and/or Grinder (self-propelled unit on streets, highways, airports and canals)........$ 41.20 28.56 (6)Roller Operator (over five tons)..................$ 41.20 28.56 (7)Combination Loader/Backhoe (over 3/4 cu.yd.).....................$ 41.52 28.56

(8) Asphalt Plant Operator..$ 41.63 28.56 Asphalt Concrete Material Transfer....................$ 39.97 28.56 Asphalt Raker...............$ 39.69 28.56 Asphalt Spreader Operator...$ 40.24 28.56 Grader......................$ 40.55 28.56 Laborer, Hand Roller........$ 39.69 28.56

IRON0625-001 09/01/2014

Ironworkers:.....................$ 35.75 29.01

a. Employees will be paid $.50 per hour more while working in tunnels and coffer dams; $1.00 per hour more when required to work under or are covered with water (submerged) and when they are required to work on the summit of Mauna Kea, Mauna Loa or Haleakala.

LABO0368-001 08/29/2016

Rates Fringes

Laborers:

Driller.....................$ 36.35 18.41 Final Clean Up..............$ 26.75 14.29 Gunite/Shotcrete Operator and High Scaler.............$ 35.85 18.41 Laborer I...................$ 35.35 18.41 Laborer II..................$ 32.75 18.41 Mason Tender/Hod Carrier....$ 35.85 18.41 Powderman...................$ 36.35 18.41 Window Washer (bosun chair).$ 34.85 18.41

LABORERS CLASSIFICATIONS

Laborer I: Air Blasting run by electric or pneumatic compressor; Asphalt Laborer, Ironer, Raker, Luteman, and Handroller, and all types of Asphalt Spreader Boxes;

Asphalt Shoveler; Assembly and Installation of Multiplates, Liner Plates, Rings, Mesh, Mats; Batching Plant (portable and temporary); Boring Machine Operator (under streets and sidewalks); Buggymobile; Burning and Welding; Chainsaw, Faller, Logloader, and Bucker; Compactors (Jackson Jumping Jack and similar); Concrete Bucket Dumpman; Concrete Chipping; Concrete Chuteman/Hoseman (pouring concrete) (the handling of the chute from ready-mix trucks for such jobs as walls, slabs, decks, floors, foundations, footings, curbs, gutters, and sidewalks); Concrete Core Cutter (Walls, Floors, and Ceiling); Concrete Grinding or Sanding;

Concrete: Hooking on, signaling, dumping of concrete for treme work over water on caissons, pilings, abutments, etc.; Concrete: Mixing, handling, conveying, pouring, vibrating, otherwise placing of concrete or aggregates or by any other process; Concrete: Operation of motorized wheelbarrows or buggies or machines of similar character, whether run by gas, diesel, or electric power; Concrete Placement Machine Operator: operation of Somero Hammerhead, Copperheads, or similar machines; Concrete Pump Machine (laying, coupling, uncoupling of all connections and cleaning of equipment); Concrete and/or Asphalt Saw (Walking or Handtype) (cutting walls or flatwork) (scoring old or new concrete and/or asphalt) (cutting for expansion joints) (streets and ways for laying of pipe, cable or conduit for all purposes); Concrete Shovelers/Laborers (Wet or Dry); Concrete Screeding for Rough Strike-Off: Rodding or striking-off, by hand or mechanical means prior to finishing; Concrete Vibrator Operator; Coring Holes: Walls, footings, piers or other obstructions for passage of pipes or conduits for any purpose and the pouring of concrete to secure the hole; Cribbers, Shorer, Lagging, Sheeting, and Trench Jacking and Bracing, Hand-Guided Lagging Hammer Whaling Bracing; Curbing (Concrete and Asphalt); Curing of Concrete (impervious membrane and form oiler) mortar and other materials by any mode or method; Cut Granite Curb Setter (setting, leveling and grouting of all precast concrete or stone curbs); Cutting and Burning Torch (demolition); Dri Pak-It Machine; Environmental Abatement:

removal of asbestos, lead, and bio hazardous materials (EPA and/or OSHA certified); Falling, bucking, yarding, loading or burning of all trees or timber on construction site;

Forklift (9 ft. and under); Gas, Pneumatic, and Electric tools; Grating and Grill work for drains or other purposes;

Green Cutter of concrete or aggregate in any form, by hand, mechanical means, grindstone or air and/or water; Grout:

Spreading for any purpose; Guinea Chaser (Grade Checker) for general utility trenches, sitework, and excavation;

Headerboard Man (Asphalt or Concrete); Heat Welder of Plastic (Laborers' AGC certified workers) (when work involves waterproofing for waterponds, artificial lakes and reservoir) heat welding for sewer pipes and fusion of HDPE pipes; Heavy Highway Laborer (Rigging, signaling, handling, and installation of pre-cast catch basins, manholes, curbs and gutters); High Pressure Nozzleman - Hydraulic Monitor (over 100# pressure); Jackhammer Operator; Jacking of slip forms: All semi and unskilled work connected therewithin;

Laying of all multi-cell conduit or multi-purpose pipe;

Magnesite and Mastic Workers (Wet or Dry)(including mixer operator);Mortar Man; Mortar Mixer (Block, Brick, Masonry, and Plastering); Nozzleman (Sandblasting and/or Water Blasting): handling, placing and operation of nozzle;

Operation, Manual or Hydraulic jacking of shields and the use of such other mechanical equipment as may be necessary;

Pavement Breakers; Paving, curbing and surfacing of streets, ways, courts, under and overpasses, bridges, approaches, slope walls, and all other labor connected therewith; Pilecutters; Pipe Accessment in place, bolting and lining up of sectional metal or other pipe including corrugated pipe; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, HDPE, metallic or non-metallic, conduit, and any other stationary-type of tubular device used for conveying of any substance or element, whether water, sewage, solid, gas, air, or other product whatsoever and without regard to the nature of material from which tubular material is fabricated; No-joint pipe and stripping of same, Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, treating Creosote and similar-type materials (6-inch) pipe and over); Piping: resurfacing and paving of all ditches in preparation for laying of all pipes; Pipe laying of lateral sewer pipe from main or side sewer to buildings or structure (except Contactor may direct work be done under proper supervision); Pipe laying, leveling and marking of the joint used for main or side sewers and storm sewers; Laying of all clay, terra cotta, ironstone, vitrified concrete, HDPE or other pipe for drainage; Placing and setting of water mains, gas mains and all pipe including removal of skids; Plaster Mortar Mixer/Pump; Pneumatic Impact Wrench; Portable Sawmill Operation: Choker setters, off bearers, and lumber handlers connected with clearing; Posthole Digger (Hand Held, Gas, Air and Electric); Powderman's Tender; Power Broom Sweepers (Small); Preparation and Compaction of roadbeds for railroad track laying, highway construction, and the preparation of trenches, footings, etc., for cross-country transmission by pipelines, electrical transmission or underground lines or cables (by mechanical means); Raising of structure by manual or hydraulic jacks or other methods and resetting of structure in new locations, including all concrete work; Ramming or compaction; Rigging in connection with Laborers' work (except demolition), Signaling (including the use of walkie talkie) Choke Setting, tag line usage; Tagging and Signaling of building materials into high rise units; Riprap, Stonepaver, and Rock Slinger (includes placement of stacked concrete, wet or dry and loading, unloading, signaling, slinging and setting of other similar materials); Rotary Scarifier (including multiple head concrete chipping Scarifier); Salamander Heater, Drying of plaster, concrete mortar or other aggregate; Scaffold Erector Leadman; Scaffolds: (Swing and hanging) including maintenance thereof; Scaler; Septic Tank/Cesspool and Drain Fields Digger and Installer;

Shredder/Chipper (tree branches, brush, etc.); Stripping and Setting Forms; Stripping of Forms: Other than panel forms which are to be re-used in their original form, and stripping of forms on all flat arch work; Tampers (Barko, Wacker, and similar type); Tank Scaler and Cleaners;

Tarman; Tree Climbers and Trimmers; Trencher (includes hand-held, Davis T-66 and similar type); Trucks (flatbed up to and including 2 1/2 tons when used in connection with on-site Laborers'work; Trucks (Refuse and Garbage Disposal) (from job site to dump); Vibra-Screed (Bull Float in connection with Laborers' work); Well Points, Installation of or any other dewatering system.

Laborer II: Asphalt Plant Laborer; Boring Machine Tender;

Bridge Laborer; Burning of all debris (crates, boxes, packaging waste materials); Chainman, Rodmen, and Grade Markers; Cleaning, clearing, grading and/or removal for streets, highways, roadways, aprons, runways, sidewalks, parking areas, airports, approaches, and other similar installations; Cleaning or reconditioning of streets, ways, sewers and waterlines, all maintenance work and work of an unskilled and semi-skilled nature; Concrete Bucket Tender (Groundman) hooking and unhooking of bucket; Concrete

Forms; moving, cleaning, oiling and carrying to the next point of erection of all forms; Concrete Products Plant Laborers; Conveyor Tender (conveying of building materials); Crushed Stone Yards and Gravel and Sand Pit Laborers and all other similar plants; Demolition, Wrecking and Salvage Laborers: Wrecking and dismantling of buildings and all structures, with use of cutting or wrecking tools, breaking away, cleaning and removal of all fixtures, All hooking, unhooking, signaling of materials for salvage or scrap removed by crane or derrick; Digging under streets, roadways, aprons or other paved surfaces; Driller's Tender;

Chuck Tender, Outside Nipper; Dry-packing of concrete (plugging and filling of she-bolt holes); Fence and/or Guardrail Erector: Dismantling and/or re-installation of all fence; Finegrader; Firewatcher; Flagman (Coning, preparing, stablishing and removing portable roadway barricade devices); Signal Men on all construction work defined herein, including Traffic Control Signal Men at construction site; General Excavation; Backfilling, Grading and all other labor connected therewith; Digging of trenches, ditches and manholes and the leveling, grading and other preparation prior to laying pipe or conduit for any purpose; Excavations and foundations for buildings, piers, foundations and holes, and all other construction.

Preparation of street ways and bridges; General Laborer:

Cleaning and Clearing of all debris and surplus material.

Clean-up of right-of-way. Clearing and slashing of brush or trees by hand or mechanical cutting. General Clean up:

sweeping, cleaning, wash-down, wiping of construction facility and equipment (other than "Light Clean up (Janitorial) Laborer. Garbage and Debris Handlers and Cleaners. Appliance Handling (job site) (after delivery unlading in storage area); Ground and Soil Treatment Work (Pest Control); Gunite/Shotcrete Operator Tender; Junk Yard Laborers (same as Salvage Yard); Laser Beam "Target Man" in connection with Laborers' work; Layout Person for Plastic (when work involves waterproofing for waterponds, artificial lakes and reservoirs); Limbers, Brush Loaders, and Pilers; Loading, Unloading, carrying, distributing and handling of all rods and material for use in reinforcing concrete construction (except when a derrick or outrigger operated by other than hand power is used); Loading, unloading, sorting, stockpiling, handling and distribution of water mains, gas mains and all pipes; Loading and unloading of all materials, fixtures, furnishings and appliances from point of delivery to stockpile to point of installation; hooking and signaling from truck, conveyance or stockpile; Material Yard Laborers; Pipelayer Tender;

Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, Creosote, and similar-type materials (pipe under 6 inches); Plasterer Laborer; Preparation, construction and maintenance of roadbeds and sub-grade for all paving, including excavation, dumping, and spreading of sub-grade material; Prestressed or precast concrete slabs, walls, or sections: all loading, unloading, stockpiling, hooking on of such slabs, walls or sections; Quarry

Laborers; Railroad, Streetcar, and Rail Transit Maintenance and Repair; Roustabout; Rubbish Trucks in connection with Building Construction Projects (excluding clearing, grubbing, and excavating); Salvage Yard: All work connected with cutting, cleaning, storing, stockpiling or handling of materials, all cleanup, removal of debris, burning, back-filling and landscaping of the site; Sandblasting Tender (Pot Tender): Hoses and pots or markers; Scaffolds:

Erection, planking and removal of all scaffolds used for support for lathers, plasters, brick layers, masons, and other construction trades crafts; Scaffolds: (Specially designed by carpenters) laborers shall tend said carpenter on erection and dismantling thereof, preparation for foundation or mudsills, maintenance; Scraping of floors;

Screeds: Handling of all screeds to be reused; handling, dismantling and conveyance of screeds; Setting, leveling and securing or bracing of metal or other road forms and expansion joints; Sheeting Piling/trench shoring (handling and placing of skip sheet or wood plank trench shoring);

Ship Scalers; Shipwright Tender; Sign Erector (subdivision traffic, regulatory, and street-name signs); Sloper; Slurry Seal Crews (Mixer Operator, Applicator, Squeegee Man, Shuttle Man, Top Man); Snapping of wall ties and removal of tie rods; Soil Test operations of semi and unskilled labor such as filling sand bags; Striper (Asphalt, Concrete or other Paved Surfaces); Tool Room Attendant (Job Site);

Traffic Delineating Device Applicator; Underpinning, lagging, bracing, propping and shoring, loading, signaling, right-of-way clearance along the route of movement, The clearance of new site, excavation of foundation when moving a house or structure from old site to new site; Utilities employees; Water Man; Waterscape/Hardscape Laborers; Wire Mesh Pulling (all concrete pouring operations); Wrecking, stripping, dismantling and handling concrete forms an false work.

LABO0368-002 08/29/2016

Rates Fringes

Landscape & Irrigation Laborers

GROUP 1.....................$ 24.25 11.27

GROUP 2.....................$ 24.95 11.27

GROUP 3.....................$ 20.25 11.27

LABORERS CLASSIFICATIONS

GROUP 1: Installation of non-potable permanent or temporary irrigation water systems performed for the purposes of Landscaping and Irrigation architectural horticultural work; the installation of drinking fountains and permanent or temporary irrigation systems using potable water for Landscaping and Irrigation architectural horticultural purposes only. This work includes (a) the installation of all heads, risers, valves, valve boxes, vacuum breakers (pressure and non-pressure), low voltage electrical lines and, provided such work involves electrical wiring that will carry 24 volts or less, the installation of sensors, master control panels, display boards, junction boxes, conductors, including all other components for controllers,

(b) and metallic (copper, brass, galvanized, or similar) pipe, as well as PVC or other plastic pipe including all work incidental thereto, i.e., unloading, handling and distribution of all pipes fittings, tools, materials and equipment, (c) all soldering work in connection with the above whether done by torch, soldering iron, or other means; (d) tie-in to main lines, thrust blocks (both precast and poured in place), pipe hangers and supports incidental to installation of the entire irrigation system,

(e) making of pressure tests, start-up testing, flushing, purging, water balancing, placing into operation all irrigation equipment, fixtures and…