W912CN-24-Q-0016-03_SF30.pdf
PDF 661 KB Posted
- Solicitation number
- W912CN-24-Q-0016-03
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract related to solicitation W912CN-24-Q-0016 for the repair of the air conditioning (A/C) chiller plant aboard the USAV SSGT Robert T. Kuroda (LSV-7) vessel. The amendment revises the period of performance, deletes a contract line item, and updates point of contact information. The solicitation is seeking firm fixed-price quotes for inspection services (CLIN 0001) and repair services (CLIN 0002). Past performance information on relevant projects completed within the last 5 years is required, and the Government reserves the right to negotiate the repair price. Offerors must acknowledge the amendment and submit quotes via email by the due date. Award will be made to the responsible offeror submitting the lowest priced, technically acceptable offer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CN-24-Q-0016 03_Conf.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
413 CSB
413TH CSB, RCO-HAWAII,
742 SANTOS DUMONT AVENUE
BLDG 108, 3RD FLOOR (WAAF)
SCHOFIELD BARRACKS HI 96857-5026
0012083041-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 03 to W912CN-24-Q-0016 is to:
1) insert addenda to clauses 52.212-1 and 52.212-2
2) Revise Period of Performance to align w ith closing date of solicitation
3) Delete CLIN 0003 by changing to informational vice priced CLIN - Service Contract Reporting is not required for the proposed contract;
Reference in PWS paragraph 5.3.1 deleted
4) POC information in 252.232-7006 WAWF Instructions updated
1. CONTRACT ID CODE PAGE OF PAGES
J 1 27
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Apr-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912CN24Q0016
X 9B. DATED (SEE ITEM 11)
15-Mar-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Apr-2024
CODE
413 CSB
413TH CSB, RCO-HAWAII,
742 SANTOS DUMONT AVENUE
BLDG 108, 3RD FLOOR (WAAF)
SCHOFIELD BARRACKS HI 96857-5026
W912CN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
FACILITY CODECODE
EMAIL:TEL:
W912CN24Q0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
ADDENDUM TO 52.212-1
52.212-1 – Instruction to Offerors (Addendum)
1. Quote Submission Instructions.
1. The request for quotations (RFQ) and evaluation of quotes will be conducted in accordance with FAR Part 12, Acquisition of Commercial Items, and FAR Part 13, Simplified Acquisition Procedures. Each interested contractor shall complete and submit the following forms, clauses, and statements with their quote. Failure to do so may cause a quote to be considered unacceptable.
a. Standard Form 1449, signed and dated (Block 30) with responses to the fillable clauses.
b. The Government intends to obtain a firm fixed price quote as a result of the inspection performed during services aligned to CLIN 0001. After quote submission, the Government may adjust the pricing associated with CLIN 0002. The Government reserves the right to negotiate the repair price (CLIN 0002) as necessary to arrive at a fair and reasonable price. Contractor is requested to submit data necessary to substantiate their quoted price for repairs.
c. Past Performance Information. See paragraph 3 below and the Addendum to FAR 52.212-2 for more information.
2. Submission of quotes will only be received by email to the Contract Specialist, Emeline Ching at emeline.y.ching.civ@army.mil or Contracting Officer, Angela McColor, at angela.u.mccolor.civ@army.mil. Quotes submitted via other transmission methods such as regular mail, facsimile will not be accepted.
a. Solicitation and Amendments. Issued solicitation packages will be posted at the GPE website, https://sam.gov/. Once posted, interested contractors are responsible to monitor the website until the closing date for any issued amendments. Recommended minimum IT capabilities for contractor systems are 56K modems for website downloads and uploads, and 2MB email capacity.
b. Acceptance of quotes received will be in accordance with FAR 52.212-1(c), and it is the responsibility of the contractor to ensure quotations are received and acknowledged by the Contract Specialist or Contracting Officer on or before the offer due date and time (see Block 8, SF 1449).
3. The offeror shall provide a summary of the offeror’s past performance providing services relevant to the subject requirement and having been completed or performed in the last five years preceding the issuance date of this Request for Quote (RFQ). The summaries of relevant projects performed in the last five years shall include:
1) Project name, contract and/or task order number;
2) Contract dollar value;
3) Period of performance;
4) Customer point of contact (including name, work number, cell number, and email address);
5) Detailed description of work performed;
6) Roles and responsibilities;
7) The results achieved; and
8) A narrative that addresses how the work performed is similar in scope and complexity. Customers may be Federal, State, or Local Government, or corporate customers.
The summary submission for this factor shall be in Microsoft Word or PDF, and is not to exceed four, 8.5 x 11 pages (single sided). Contractor’s shall submit no more than two references.
4. Minimum Quote Acceptance Period. FAR 52.212-1(c) is amended to 60 calendar days minimum acceptance period. By submittal of a quote, the contractor agrees to hold the prices in its quote firm for 60 calendar days.
5. Solicitation Questions
Questions regarding this solicitation shall be submitted in writing via e-mail to the Contract Specialist and Contracting Officer within 5 days after the date specified in Block 6 of the SF1449. of questions.
ADDENDUM TO 52.212-2
52.212-2 Evaluation – Commercial Products and Services (Addendum)
The Government will evaluate but not rate past performance. References will be reviewed to determine the degree to which past performance contains a relevant project at a size and scope similar to this effort. Past performance information will be utilized only to determine the quality of the offeror’s past experience(s) as it relates to the probability of success of the required effort.
The award will be a firm, fixed-price service contract. The Government will evaluate the total price to determine if it is fair and reasonable:
CLIN 0001 for the inspection services shall include all applicable taxes, labor, and equipment/materials costs.
CLIN 0002 for repair services shall be a total of labor hours, repair parts, supplies, and other project-related costs.
The following have been modified:
ADDENDUM TO 52.237-1
OPTIONAL SITE VISIT :
An optional site visit is recommended and may be arranged upon request no later than 19 April by contacting the contract specialist via email to Emeline Ching at emeline.y.ching.civ@army.mil Please contact the Pass & ID office at 808-449-0865, Mon - Friday 6:00AM to 6:00 PM HST, to confirm required documents if a base pass to access Joint Base Pearl Harbor-Hickam is needed to attend a site visit. The Pass & ID office located at 1250 South Drive, Honolulu, HI 96818. If a pass cannot be obtained, contact the Contract Specialist, Emeline Ching at emeline.y.ching.civ@army.mil or (808) 787-3654.
52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation and the lowest price technically acceptable.
(b) n/a
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.
(End of provision)
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0003
The CLIN type priced has been deleted.
The CLIN extended description has changed from:
System for Award Management (SAM) Service Contract Reporting (SCR): Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the inspection and repair of air conditioning equipment aboard the LSV-7, via a secure data collection site. The Contractor is required to completely fill in all required data fields through the following web address:
www.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.(PWS paragraph 5.3.1)
To:
System for Award Management (SAM) Service Contract Reporting (SCR): NOT required for this contract as it is under the reporting threshold The pricing detail quantity 1.00 has been deleted.
The unit of issue Each has been deleted.
The FOB Destination has been deleted.
The PSC code J041 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
The NAICS code 238220 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-APR-2024 TO
16-AUG-2024
N/A 545TH TRANSPORTATION COMPANY
CW2 TEMPLE, AUSTIN W.
A-5 PIERS
JBPHH HI 96818
831-224-4066 FOB: Destination
W90TYS
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 17-MAY-2024 TO
27-SEP-2024
N/A 545TH TRANSPORTATION COMPANY
CW2 TEMPLE, AUSTIN W.
A-5 PIERS
JBPHH HI 96818
831-224-4066
The following Delivery Schedule item for CLIN 0002 has been changed from:
CAGE
POP 01-APR-2024 TO
16-AUG-2024
N/A 545TH TRANSPORTATION COMPANY
CW2 TEMPLE, AUSTIN W.
A-5 PIERS
JBPHH HI 96818
831-224-4066
CAGE
POP 17-MAY-2024 TO
27-SEP-2024
N/A 545TH TRANSPORTATION COMPANY
CW2 TEMPLE, AUSTIN W.
A-5 PIERS
JBPHH HI 96818
831-224-4066
The following Delivery Schedule for CLIN 0003 has been deleted:
CAGE
31-OCT-2024 1 545TH TRANSPORTATION COMPANY
CW2 TEMPLE, AUSTIN W.
A-5 PIERS
JBPHH HI 96818
831-224-4066
INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0003 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A N/A
The Technical Office for CLIN 0003 has been deleted.
The following have been modified:
PWS
PERFORMANCE WORK STATEMENT (PWS)
for
U.S. Army Logistical Support Vessel USAV SSGT Robert T Kuroda (LSV-7) Air Conditioning (A/C) Chiller Plant Inspection and Repair Services
1. GENERAL: This is a non-personal service contract under which personnel rendering the services(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal, firm, fixed-price service contract to provide background and scope of work for the repair/replacement of the LSV-7’s A/C Chiller Plants. The required work consists of thorough technical inspection of all major components and refrigerant lines, which includes all piping, valves, and fittings, and repair/replacement of any leaks and/or faulty components.
1.2 Background: The 411th Transportation Detachment provides cargo logistics support in the INDOPACOM area of operation. The main A/C plants provide cooling for the entire ship, to include navigation equipment, mechanical sections, and maintains the environment of the personnel areas within the skin of the ship. The LSV-7 has redundant chiller systems; both have leaks and are not operational.
1.3 Scope: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the Performance Work Statement (PWS) and associated contract documents, except for those items specified in Part 3 Government-Furnished Property and Services. The contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.
1.4 Objectives: The objective of this contract is to provide inspection and repair services to bring the air conditioning systems aboard the LSV-7 back to Fully Mission-Capable status for upcoming missions.
1.5 General Information: Vessel Data: Model: LSV-7 Class
National Stock Number: 1915-01-495-0036 Length, Overall: 314 Ft Beam: 60 Ft Draft Light: 6 Ft Draft Loaded: 12 Ft Goss Tons: 4,809
Chiller Plants: Manufacturer/Model Purchased/installed: 2012
Carrier Transcold 90RMC-065 Seahorse R404a Condensing Units
1.5.1 Quality Control Plan (QCP): The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to ensure all contract requirements are met, and to identify, and ensure prevention of defective services.
The contractor’s quality control program is the means by which the Contractor assures work complies with the requirements of the contract. The QCP shall include but not be limited to: specification(s) of the method of identifying and preventing deficiencies in the required services, the types, methods, and frequency of all inspections conducted by the contractor, corrective action(s) and preventive action plan, for when deficiencies are found. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.5.2 Quality Assurance: The government will evaluate the contractor's performance under this agreement in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the government must do to ensure the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable quality levels (performance thresholds) and/or defect rates.
1.5.3 Recognized Holidays: Work shall be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day (January 1) Labor Day (1st Monday in September)
Martin Luther King’s Birthday (3rd Monday in January) Columbus Day (2nd Monday in October) Washington’s Birthday (3rd Monday in February) Veterans’ Day (November 11) Memorial Day (last Monday in May) Thanksgiving Day (4th Thursday in November) Juneteenth National Independence Day (June 19) Christmas Day (December 25) Independence Day (July 4)
1.5.4 Operating Hours: The contractor is responsible for conducting business, between the hours of 0900-1700 Monday thru Friday except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential as well as ensuring access to a government installation.
1.5.5 Training Holidays: USARPAC has historically granted military personnel training holidays as compensation for time that they spent in the field training. These are typically combined with regular holiday leave schedules. Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity or unrestricted access to facilities and areas. The contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
1.5.6 Place of Performance: The work to be performed under this contract will be performed onboard the LSV-7, currently located at A5 pier on Joint Base Pearl Harbor-Hickam, Hawai’i (JBPHH).
1.6 Security Requirements: There are no known requirements to handle classified data in any aspect of fulfilling this contract. All work performed relative to the tasking identified in the PWS is unclassified or carries a Privacy Act Classification.
1.6.1 - 1.6.2 – RESERVED
1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas.
The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.6.3.1 to 1.6.3.4 RESERVED
1.6.3.5 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
1.6.3.5.1 Lost/Duplicate Keys: In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
1.6.3.5.2 Key Use: The Contractor shall prohibit the use of Government-issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.6.3.5.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
These procedures shall be included in the Contractor’s Quality Control Plan
1.6.4 - RESERVED
1.6.5 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.6.6.1 International Traffic in Arms Regulation (ITARS): The Contractor shall maintain a system compliant with ITARs requirements (22 CFR §§ 120, et seq.). This shall include a requirement to ensure that military information is not exported to non-U.S. sources, unless an appropriate license has been obtained.
1.7 Combating Trafficking in Persons (CTIP): In accordance with FAR 52.222-50, the KO will be notified immediately of any information from any source that alleges a Contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons. Trafficking in Persons, also referred to as human trafficking, is the use of force, fraud, or coercion to compel a person to provide labor, services, or commercial sex. Any minor (under 18 years of age) involved in commercial sex is a victim of human trafficking.
1.7.1 Trafficking in Persons includes elements of recruiting, harboring, transporting, providing, or obtaining a person for the purpose of exploitation. The United States Government has adopted a policy prohibiting trafficking in persons – CTIP. All contractors shall follow all the requirements stated in FAR clause 52.222-50 – Combatting Trafficking in Persons.
1.7.2 CTIP compliance is a contractual requirement that contractors shall follow. The authority for KOs/QASs/CORs to surveil the contract and perform CTIP inspections lies in the clause 52.222-50 Combating Trafficking in Persons. Additionally, contractors are required to fully cooperate with the Government in our surveillance of CTIP compliance. Contracting Officers may inspect any contract regardless of if a formal CTIP plan is required.
1.8 Post-Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.9 Contracting Officer Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work.
The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The following personnel are considered key personnel by the Government: The Contractor shall designate in writing a Program Manager/Contract Manager for this contract, and a supervisor, who must be fluent in understanding, speaking, reading and writing the English Language. The Program Manager shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be submitted in writing to the Contracting Officer and COR. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
The Contractor shall ensure at least one contract representative is physically present during any activity associated with the contract. Contractor representatives shall receive at a minimum of 24 hours’ advance notice of any necessary meeting with Government personnel. The Contractor shall ensure all employees, and subcontracted employees have prior craft/trade experience comparable to duties required under this contract. The Contractor shall ensure all craftsmanship meets current industry standards, codes and/or regulations applicable to the contracted work ordered.
1.11 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. The Contractor shall ensure that all personnel display the badge on the outermost garment at all times when performing work under this contract. This requirement shall apply to all subcontractor employees.
1.12 RESERVED
1.13 Contractor Travel: All repairs can be done pier-side or aboard the docked vessel. No travel aboard the LSV-7 is required to complete the required inspections and repairs.
1.14 - 1.18 RESERVED
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 RESERVED
1.21 Safety: The Contractor shall comply with all Federal, State, and applicable occupational/industry codes governing on-site safety and health protection.
1.2.1.1 The Contractor shall provide medical services for the contractor's personnel. All injuries or illnesses shall be reported immediately to the Contracting Officer and COR. The Government is permitted to provide emergency medical care to all on-site contractors; however, IAW DFARS 252.2257040 (c) (2) (i)- (ii), the Contractor shall be responsible to reimburse the Government for such care.
1.2.1.1.1 All examinations and tests required to be performed by the Contractor shall be subject to the surveillance of the Contracting Officer’s Representative (COR). Prior to the commencement of any such examinations or tests, the Contractor shall give a written two (2) hour notice to the Contracting Officer’s Representative (COR) of the date, time and place where said examinations and tests will be conducted.
1.2.1.1.2 Any notice furnished to the Contracting Officer’s Representative (COR) less than two (2) hours prior to the end of the work day will be conducted on the next scheduled work day of the Contracting Officer’s Representative (COR). Unless otherwise specifically identified and set out in the schedule, the original work item price shall include all the cost and expenses of all examinations and tests required to be performed by the Contractor Medical Service
1.2.1.2 When the Government provides medical treatment or transportation of Contractor personnel to a selected civilian facility, the Contractor shall ensure that the Government is reimbursed for any costs associated with such treatment or transportation (DFARS 252.225-7040 (c)(2)(ii). Contractors shall be responsible for all other support, including routine medical and dental care, required for its personnel engaged in the designated operational area under this contract.
1.22 Environmental Compliance: The Contractor shall ensure that all of its operations and activities conform to U.S. Army and Joint Base Pearl Harbor-Hickam (JBPH-H) environmental policy requirements. The
Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor-controlled activities on JBPH-H are conducted in accordance with the installation’s Spill Prevention and Response Plan, Solid Waste Policy, and applicable State of Hawaiʻi environmental laws/standards.
If contract requires the use of hazardous materials/substances, the Contractor shall, prior to mobilization, inform the Contracting Officer (KO)/Contracting Officer Representative (COR) of the types and amount of hazardous materials needed to be brought onto the installation in order to fulfill their contractual requirements. Contractor shall also provide the Safety Data Sheets, storage requirements and proposed storage locations for the hazardous material. The KO/COR shall provide a copy of this information to the office designated for compliance oversight.
Prior to contract completion, the Contractor shall clean up, remove, and dispose of all hazardous materials and waste generated during the performance of the required work. Any hazardous substance spills must be reported to the 545th Harbor Master Division and JBPH-H Fire Department.
1.23 Required Training
1.23.1 Anti-Terrorism (AT) Level I Training
All Contractor employees, including subcontractor employees who are employed under the contract, shall complete AT Level I Training within five (5) working days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 10 calendar days after employment of new personnel.
Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR within three (3) working days after completion of this training by all employees and subcontractor personnel (Deliverable #1). AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within three (3) working days after completion of the training).
1.23.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 5 working days of employment under this contract. Verification of the training shall be provided to the COR within three (3) working days after completion of the training. OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months. Verification of the training shall be provided to the COR within three (3) working days after completion of the training (Deliverable #2).
If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within three (3) working days after completion of the training.
1.23.3 i-WATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within five (5) working days after the contract is awarded and within 10 calendar days after new employees commence contract performance, with the results reported to the COR within three (3) working days after new employees commence contract performance.
Verification of the training shall be provided to the COR within three (3) working days after completion of the training (Deliverable #3). Training slides can be found on the Army OneSource we site:
http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx
1.23.4 - 1.23.5 RESERVED
1.23.6 Sexual Assault and Sexual Harassment Policy: The Department of Defense has adopted a policy to prevent sexual assault and sexual harassment.
1.23.6.1 Definitions:
1.23.6.1.1 Sexual Assault: A crime defined as intentional sexual contact, characterized by use of force, physical threat or abuse of authority or when the victim does not or cannot consent. Sexual assault includes rape, nonconsensual sodomy (oral or anal sex), indecent assault (unwanted, inappropriate sexual contact or fondling), or attempts to commit these acts. Sexual assault can occur without regard to gender or spousal relationship or age of victim. “Consent” will not be deemed or construed to mean the failure by the victim to offer physical resistance. Consent is not given when a person uses force, threat of force, or coercion or when the victim is asleep, incapacitated, or unconscious.
1.23.6.1.2 Sexual Harassment: Gender discrimination that involves unwelcomed sexual advances, requests for sexual favors and other verbal or physical conduct of a sexual nature between the same or opposite sex genders when such conduct has the purpose or effect of unreasonably interfering with an individual’s work performance or creates an intimidating, hostile, or offensive working environment. Categories of sexual harassment are:
1.23.6.1.2.1: Verbal – Examples include telling sexual jokes; using sexually explicit profanity, threats, sexually oriented cadences, or sexual comments; whistling in a sexually suggestive manner; and describing certain attributes of one’s physical appearance in a sexual manner.
1.23.6.1.2.2: Nonverbal – Examples include staring at someone, blowing kisses, winking, or licking one’s lips in a suggestive manner. The term may also include printed material (for example, displaying sexually oriented pictures or cartoons); using sexually oriented screen savers on one’s computer; or sending sexually oriented notes, letters, faxes or email.
1.23.6.1.2.3: Physical Contact – Examples include touching, patting, pinching, bumping, grabbing, cornering, or blocking a passageway; kissing; and providing unsolicited back or neck rubs.
1.23.6.2: Policy:
1.23.6.4 Sexual Harassment Policy Compliance: The Contractor shall ensure all employees comply with the Sexual Assault and Sexual Harassment Policy outlined below. The Contractor shall certify that all employees performing work under this contract have been fully trained per the requirements below. The COR shall be provided with the following information at a minimum: employee’s name, civil identification number and date trained. Proof of Sexual Harassment Policy Compliance is due within five (5) days after initial contract award and within 48 hours after arrival of new personnel on site (Deliverable #4). Each employee shall be in compliance with the training requirement and shall be reported to the Contracting Officer Representative prior to the employee being allowed access to the worksite.
1.23.6.5 The Contractor shall conduct training of all employees annually to prevent sexual assault and sexual harassment. This training must, at a minimum, ensure that all the Contractor employees understand the definitions and policy outlined below. Contractors and contractor employees in the U.S. Army Pacific Command (USARPAC) Area of Responsibility (AOR) shall not –
1.24 - 1.28 RESERVED
PART 2 - DEFINITIONS & ACRONYMS / INITIALISMS
2. DEFINITIONS & ACRONYMS / INITIALISMS
2.1 DEFINITIONS
BN MAINTENANCE OFFICER - A representative from the command responsible for the vessels, to perform surveillance and to act as liaison to the contractor.
CALL ORDER - Stand-alone, legally binding contracts between government and vendor. A sample call order number is 0115 (this four-digit number would follow the CONTRACT number, e.g., W912CN- 15A-0006-0015).
CHIEF ENGINEER OFFICER - A representative from the specific vessel responsible for the individual vessel, to perform surveillance and to act as liaison to the BN Maintenance Officer.
CONTRACTOR - A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
CONTRACTING OFFICER (KO) - A person with the authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note:
The only individual who can legally bind the Government.
CONTRACTING OFFICER'S REPRESENTATIVE (COR) - An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
DASH ITEM: A dash item is an item of work and/or material which is necessary to complete an original item of work in the contract or delivery/task order. Contractor will receive profit on both subcontractor labor and G&A markup on subcontractor labor. Although contractor will receive G&A markup on materials, no profit is allowed on materials of a dash item. Profit and G&A Rate must be separately shown in Section J. Failure to indicate a profit figure or G&A Rate in Section J can result in denial of:
(1) G&A and profit on subcontractor labor; and, (2) G&A markup for materials on dash items.
DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
DEFINITE ITEM: Known work that shall be diligently prosecuted upon issuance of task order.
DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
EXCHANGE: Replacement of an item with a like item.
GOVERNMENT ACCOUNT MANAGER - This person has rights to accept invoices in WAWF, and can give credentials to others to do the same
FURNISH: The Contractor shall provide what is needed at the Contractor's expense, as part of the work item price. All parts shall be new, unless the specification allows for a reconditioned item.
HAND TOOL CLEAN: Clean surfaces to SSPC-SP2, Swedish St 2 standard, free of all loose paint, scale, rust and debris, utilizing hand tools.
INCLUDES: Includes, but not limited to:
INDEFINITE ITEM: Work to be accomplished only upon the written approval of the Contracting Officer. Activation of an indefinite item does not entitle the Contractor to an extension of the performance period.
INSPECTION POINTS: Within the contract there are mandatory points where the Contracting Officer’s Representative (COR) is to inspect the Contractor’s work in order to signify Government acceptance of the work. These inspection points are indicated within the specifications with words such as “in the presence of the Contracting Officer’s Representative (COR)” or “test in the presence of the Contracting Officer’s Representative (COR).” A minimum of two hours written notice shall be given by the Contractor for these inspection points, and all inspections must be scheduled within the Contracting Officer’s Representative (COR)’s normal workday. Any inspection requested at the end of the work day will be performed at the commencement of the next work day.
KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluating factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
NEW ITEM: A new item is an item of work and/or material which is found during the period of performance and is required in order to deliver a seaworthy vessel. Contractor will receive G&A on subcontractor labor and material. Contractor will receive profit on subcontractor labor, subcontractor G&A, material and G&A on material. Profit and G&A Rate must be separately shown in Section J.
Failure to indicate a profit figure or G&A Rate in Section J can result in denial of: (1) G&A and profit on subcontractor labor; and, (2) G&A markup for materials and subcontractor labor.
OVERHAUL: The Contractor shall remove an item from its installed location to a work area suitable for type of equipment, disassemble all parts, clean all parts, inspect and/or test all parts, and submit a condition report on all parts. Upon completion of Government determination of which parts can be reused and which parts must be renewed, the Contractor shall recondition those parts designated for reuse, replace parts designated for renewal with new parts, reassemble items, reinstall items, and test items. New parts required by the Government not enumerated in the technical specifications shall be furnished by the Contractor, and the Contractor will be compensated in accordance with subparagraph C.0.2.27.3 entitled: "Approval of Additional Replacement Parts and Materials."
PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
POWER TOOL CLEAN: Clean surfaces to SSPC-SP3, Swedish St 3 standard, free of all loose paint, scale, rust and debris, utilizing power tools or to SSPC-SP11 to “near white” surfaces when indicated in the specification.
QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
QUALIFIED MANUFACTURER’S REPAIR TECHNICIAN: A person who has received training and has a current certification by the manufacturer enabling the individual to properly inspect, troubleshoot, diagnose, adjust and perform repairs to that specific equipment/component.
RECONDITION: The elimination and/or correction of those defects and/or conditions that, determined by the item manufacturer's standards, would adversely affect a used item in its continued service, by work on that item, resulting in a serviceable finished item with all tolerances and dimensions remaining within the manufacturers allowable wear limits and/or variance for the intended service.
REINSTALL: To place back in designed position, remount and reconnect.
RENEW: Put in a new item, unit or part as required by technical specifications. The Contractor will be compensated at cost for the item, unit or part to be renewed.
REPAIR: To restore an item or system to a sound condition by the performance of work on that item or system. REPLACE: To supply an equivalent new item for the item to be replaced, to furnish and install.
RUST: All forms of ferric oxide. All terminology in this specification indicating the removal of rust shall be defined as requiring total removal of all visible and accessible rust, including loose and hard scale, to bare metal. Additionally, unless a method is specified, the Contractor shall determine and use any method of rust removal necessary to accomplish the task, and all bare metal surfaces exposed by the de-rusting process shall be properly and adequately primed.
SSPC: Steel Structures Painting Council standards.
SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privacy of contract with the subcontractor.
RANDOM SAMPLING: A sampling method in which each service output in a lot has an equal chance of being selected.
SAMPLE: A sample consists of one or more service outputs drawn from a lot. The number of outputs in the sample is the sample size.
SURFACE CLEANLINESS: SSPC standards for surface cleanliness is the condition of the substrate after cleaning has removed partial or total residues of chloride, soluble ferrous salts and sulfate contamination. The acceptable standard of cleanliness in this specification is SC-2.
SURFACE PROFILE: All abrasive blasted, water jet cleaned, power tool cleaned or hand tool cleaned surfaces shall have a measurable surface profile upon completion of cleaning. The actual measured profile readings shall be included in the Test and Inspection sheets for the surface areas cleaned and painted. The surface profile shall meet the SSPC standards for surface profile before application of primer paints.
FULLY MISSION CAPABLE. Systems and equipment that are safe and have all mission-essential subsystems installed and operating as designated by applicable Army regulation. An FMC vehicle or system has no faults that are listed in the “not fully mission capable ready if” columns of the TM/ETM XX–10 and XX–20 series PMCS tables and AR 385–10 provisions that apply to the vehicle and/or system or its sub-system required by AR 700–138. The terms ready and/or available and FMC refer to the same status: equipment is on hand and able to perform its combat missions. MODIFICATION: A change to the call order (to add or decrease funding, change POCs, change requirement, etc.)
NOT MISSION CAPABLE. A materiel condition indicating that equipment cannot perform any one of its combat missions. An NMC vehicle or system has faults that are listed in the “not fully mission capable ready if” columns of the TM/ETM XX–10 and XX–20 series PMCS tables and AR 385–10 provisions that apply to the vehicle and/or system or its sub- system required by AR 700–138.
EMERGENCY REPAIR.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .