W912CN-23-B-0001 SF 1442.pdf

PDF 2 MB Posted

Attached to
Open-End Reroofing and Roof Repairs at Fort Wainwright, Alaska
Solicitation number
W912CN23B0001
Issued by

View the file

Other files

File Type Posted
IFB ATTACHMENT 1 BID ATTACHMENT.docx DOCX document
23-B-0001 Excel Bid Sheet Attachment.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011609684

PROJECT TITLE: This is a f irm f ixed price requirements- type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform Reroofing and Roof Repairs of Miscellaneous Buildings at Fort Wainw right, Alaska

NAICS: 238160

MAGNITUDE OF CONSTRUCTION: More than $10,000,000 to $25,000,000

X

MELODIE E CLARE (808) 787-8894

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

13-Dec-2022

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________17 Jan 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

0413 AQ HQ CONTRACT

KO DIRECTORATE OF CONTRACTING

536 PALM CIRCLE DR BLDG T 122

FORT SHAFTER HI 96858-5025

W912CN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

09:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912CN23B0001 719

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 10 00 - Solicitation

SUBMISSION REQUIREMENTS

1. This Solicitation is 100% Small Business Set-Aside. The NAICS is 238160 and the Size Standard is 16.5 Million. Bids from contractors that do not meet this size standard will be deemed non-responsive and ineligible to submit bid. Contractor shall provide a complete breakdown of their bid proposal

2. CONTRACT TYPE: The Government intends to award a firm fixed price requirements-type construction contract. Split or multiple awards will not result from this acquisition.

3. PERIOD OF PERFORMANCE: The anticipated period of performance will be a base year and two (2) one-year option periods as shown below:

Base Year: 31 MAR 2023 – 30 MAR 2024 Option 1: 31 MAR 2024 – 30 MAR 2025 Option 2: 31 MAR 2025 – 30 MAR 2026 52.517-8: 6 Months

4. QUESTIONS. Questions must be submitted by email to Chelsea Smith, chelsea.p.smith4.civ@army.mil, and Risha Walters, risha.o.walters.civ@army.mil with CC to Mark Dahilig, mark.r.dahilig.civ@army.mil, with the IFB number W912CN-23-B-0001 in the subject line. Telephone and faxed inquires will not be accepted. In order in ensure a timely response, questions must be submitted seven days after the date of IFB issuance. Questions and responses will be issued on an amendment. Any questions received after the due date may not be answered.

5. AWARD. Award will be made to the responsible bidder whose bid is responsive to the terms and conditions of the IFB and is most advantageous to the Government.

6. DUE DATE. All bids must be received by the due date indicated in the IFB.

7. BID OPENING DATE AND TIME. A teleconference bid opening will be conducted (see detail below) To attend the Bid Opening via telephone, offerors must notify Melodie Clare, melodie.e.clare.civ@army.mil with CC to Mark Dahilig, mark.r.dahilig@army.mil, no later than seven days prior to the Bid Opening date. List the name, phone number, number of personnel attending the teleconference. The conference call number and password will be provided via e-mail.

Date & Time: 17 January 2023, 1000AM HST Teleconference Number: Will be emailed upon notification.

INSTRUCTION TO OFFEROR

1. PROPOSAL SUBMITTAL. Contractor shall provide a complete breakdown of cost proposal. Contractor shall provide price line items for each CLIN listed on SF 1442 as the price schedule.

2. (a) Proposal Submission Requirement:

Bids shall be submitted by date and time specified in Block 13.A. of the SF 1442. Subject line of the email will read

– Solicitation W912CN-23-B-0001, short description. Bid shall be emailed to Melodie Clare, Contract Specialist, at melodie.e.clare.civ@army.mil and CC to Mark Dahilig, Contracting Officer, at mark.r.dahilig.civ@army.mil.

SUBMISSION REQUIREMENT

1. Offers shall include the following:

a. Completed Standard Form 1442.

b. Completed Schedule of offer/bids/prices. All unit price and estimated amount filled out.

c. Completed Attachment 1 Bid Attachment.

d. Signed or other acknowledgement of all amendments.

e. Completed Representation and Certifications.

f. Bid Guarantee in accordance with FAR 52.228-1.

2. Offerors shall furnish unit prices and extended total for all items listed on the schedule of bid items in

Section 00 10 00. In the event there is a difference between the unit price and the extended total, the unit price will be the intended bid. In the event the unit price or extended total are omitted for any item, the bid will be deemed non-responsive.

3. Facsimile proposals/Bids will not be considered.

4. Telegraphic proposals/Bids will not be considered.

5. Proposals /Bids must be submitted by date and time specified in Block 13 above.

GENERAL INFORMATION:

1. Scope of Work: This is a firm fixed price requirements-type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform Reroofing and Roof Repairs of Miscellaneous Buildings at Fort Wainwright, Alaska

2. The contractor shall submit a safety plan within 30 days of award or 7 days prior to commencement of on-site work, whichever occurs first in accordance with the AR 385-10, Construction Safety, US Army Corps of Engineers "Safety and Health Requirements Manual (EM 385-1-1)" and Occupational Safety and Health Administration (OSHA) regulations.

3. To assure compliance with general construction trade practice, the contractor shall establish and maintain quality control for materials and work. The Government may perform inspections and conduct tests while the contractor's work is in process to assure compliance to performance standards.

4. Existing conditions or areas damaged or disturbed by the contractor's operation shall be restored to their original condition, or near original condition as possible, to the satisfaction of the Contracting Officer at no additional cost to the Government.

5. Prior to start of any excavation or trenching work, the contractor shall obtain clearance, in writing, from the appropriate communications agency and from the Directorate of Public Works.

6. Interruptions to existing utilities shall be held to a minimum. A schedule for any required power or water outages shall be submitted to the Contracting Officer a minimum of four weeks prior to the intended outage.

7. The contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area.

8. The Contractor’s normal working hours will be 7:30 a.m. – 4:30 p.m. Monday thru Friday. The Contractor will not normally work on Saturdays, Sundays, or Holidays. If the Contractor chooses to work outside the normal working hours, Contractor must submit an application to the Contracting Officer in writing one week prior to the requested work for approval.

9. Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.

10. The contractor shall provide, install, and maintain all necessary signs, lights, barricades, markers, cones, flagmen, and other protective facilities and shall take all necessary precautions for the protection and for the convenience and safety of military and public traffic (vehicular and pedestrian).

11. The amount of dust resulting from the contractor's work shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.

12. The contractor shall obtain the necessary hot work permit from the appropriate Fire Department prior to any welding, burning, and torching operations.

13. Daily Clean-up - During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, etc. or rubbish that constitutes a fire hazard. At the end of each days work, the Contractor shall remove all debris. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.

14. Storage area will not be provided

15. When available, the Government may provide a reasonable amount of water and electricity. If not available or cannot be provided it shall be specified in the task order documents.

16. The Contractor shall be responsible to have a quality control program to ensure services are performed in accordance with the Scope of Work and commonly accepted commercial practices.

17. The Contractor is required to follow DPW’s Best Management Practice (BMP) of Storm Water Compliance.

Copy will be provided at the pre-construction conference, if requested.

18. The work shall be constructed using best practices per industry standards. The Contractor shall abide by all applicable regulations to include Federal, State, local requirements.

19. Progress of Work. Contractor shall submit all proposed work schedules to the Contracting Officer for review/approval within ten (10) calendar days after issuance of the Notice to Proceed (NTP) unless otherwise specified.

20. Contractor shall submit schedule of values as a material submittal within 30 days of contract award for projects at or above $250,000. Schedule of values will be sent with requested billings to the project inspector and CC the COR to justify billing requests.

21. If a dumpster is provided for this contract, contractor shall include a sign on the dumpster with their name/address/phone and indicate the dumpster is only used for construction debris.

22. Abbreviations used in the Unit column: (use if applicable)

CY = Cubic Yard; LH = Labor Hours; SF = Square Foot; EA = Each; LF = Linear Foot; SY = Square Yard

23. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes."

24. Identification of Contractor Employees.

a. Provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee’s name, contractor’s name, functional area of assignment, with recent color photograph of the employee.

b. All contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing above the waist except when safety or health reasons prohibit such placement.

25. Estimated Quantities: All quantities are estimated and are stated for the information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. (See clause at 52.216- 21, Section 00 70 00 entitled “Requirements”). As a prerequisite, there must be (i) adequate and sufficient funds available to cover the order, and (ii) an administrative determination by the Government that the requirement exists.

26. Issuance of Task Orders

(a) The work to be accomplished under this contract will be performed via issuance of a task order. The Contractor shall coordinate all work with the Contracting Officer in order that there will be a minimum of interruption and inconvenience to the Government. Scheduling and programming of work shall be arranged during the pre-construction conference.

(b) Survey of Unit Price Items: At least ten (10) workdays prior to the issuance of a task order, a joint inspection by the Contractor and the Contracting Officer Representative shall be made to determine the work to be accomplished therein. Survey will be conducted within two (2) workdays of notification by the COR. During the inspection and survey, both parties will jointly annotate on the order form to be prescribed by the Contracting Officer, the quantity for each unit price item that is to be utilized. The Contracting Officer will confirm the starting and completion date of work for each unit in the task order.

27. HARDWARE, PAINT and items on the mandatory procurement list are to be purchased from AbilityOne.

Please refer to FAR Clause 52.208-9. See website http://www.abilityone.com for ordering instructions.

28. Unless otherwise specified herein, the contractor shall furnish all supplies, material and equipment necessary for the performance of work under this contract. The contractor shall utilize products and materials made from biobased materials (e.g. biobased degreasers and biobased toilet bowl cleaner) to the maximum extent practical without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. The EPA’s Comprehensive Procurement Guidelines and product list can be found at http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm.

Upon request of the COR, the contractor shall submit a list indicating the name of the manufacturer, the brand name, and the intended use of each of the materials used in the performance of its work. The Contractor shall not use any materials, chemicals, or compound which the COR determines would be unsuitable for the intended purpose or harmful to the surfaces to which applied or, as might be the case for such items as paper or soap products, unsatisfactory for use by occupants. For biobased content products evaluation, all non-chemical products proposed for use under this contract must conform to the Department of Agriculture (USDA) Designated Biobased Products List (DBPL) whenever practicable.

29. APPLICABLE CODES AND REGULATIONS

29.1. The latest edition of the following Codes, regulations, guides, and criteria shall be used for all design and construction under this contract. If there is a conflict between these codes or regulations and these contract specifications the Unified Facility Criteria will override. The Contractor shall have a copy of each of these documents available for use during the term of this contract.

The Unified Facility Criteria (UFC) documents including, but not limited to:

UFC 3-410-01 Design: Heating, Ventilating, And Air Conditioning UFC 4-010-01 Dod Minimum Antiterrorism Standards For Buildings UFC 3-600-01 Design: Fire Protection Engineering For Facilities UFC 1-200-01 DoD Building Code (General Building Requirements

A complete listing can be obtained at http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4

29.2. The Unified Facility Guide Specifications are mandatory for all work required under this contract. The contractor is responsible for obtaining the Unified Facility Guide Specifications and for maintaining updates to the specifications. The specifications whether referenced or not (in whole or part), shall be considered to be a part of all task orders issued under this contract. Where two specifications are listed for a certain item of work the Army section as denoted by an “A” shall be used. When there is no Army designated spec use the Navy (denoted by “N”) or in the absence of either use an industry standard specifications or others listed in the Construction Criteria Base CCB. A complete listing of the UFGS Division 01 - General Requirements can be obtained at https://wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs

29.3. The following are additional criteria, codes, regulations and guides which shall be incorporated into all designs and used for construction:

ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings EPACT 2005 Energy Policy Act of 2005, Public Law 109-58.

IBC, International Building Code IEEE C2, National Electrical Safety Code IESNA Illuminating Engineering Society of North America MIL HDBK 1190, Military Handbook for Facility Planning and Design Guide MIL HDBK 1191, Military Handbook for Medical and Dental Treatment Facilities, Design and Construction Criteria Guide National Electrical Contractors Association (NECA) National Electrical Installation Standards (NEIS) TI 800-01, Design Criteria TI 800-03, Technical Requirements for Design-Build TM 5-811-3, Electrical Design: Lightning and Static Electricity Protection •USDA – Rural Utility Service (RUS) RUS 1728F-310 Drawing Index 35.5 to 69 kV RUS 1728F-804 Drawing Index 12.5 & 7.2 kV RUS 1724D-101B System Planning Guide RUS 1724D-104 Econ Worksheet RUS 1724E-152 OH Dist. Line Conductors Mechanics RUS 1724E-153 Guys and Anchors RUS 1724E-154 Distribution Conductor Clearances and Span Limitations RUS 1724E-200 Design Manual HV Transmission Lines RUS 1724E-203 Upgrading RUS Transmission Lines RUS 1724E-204 Specs Steel Pole H Frame RUS 1724E-205 Embedment Depths RUS 1724E-214 Guide Specifications For Standard Class Steel Transmission Poles RUS 1724E-300 Rural Sub Station Design RUS 1724E-224 Specifications and Drawings for Steel Poles RUS 1728F-804 Specifications and Drawings for 12.47/7.2 kV Line Construction RUS 1728F-806 Specifications for Underground Distribution RUS 1728F-810 Specifications and Drawings for 34.5 to 69 kV RUS 1730B-121 Pole Inspection and Maintenance

RUS 1751F-650 Aerial Plant Guying and Anchoring UEP-steel poles Guidelines for the Use Steel Distribution Poles Uniform Building Code Uniform Mechanical Code Uniform Plumbing Code Standard Building Code National Electrical Code (NEC) American National Standards Institute (ANSI) C-2, national Electrical Safety Code (QIESC) Life Safety Code, National Fire Protection Association (NFPA) 101 National Fire Protection Association (NFPA) 70 MIL Handbook 1190

Occupational safety and Health Administration (OSHA) Regulation www.OSHA.gov National Fire protection Association (NFPA) Regulations www.NFPA.org

29.4. Workmanship shall be governed by the preceding documents and National Electrical Contractors Association (NECA) listed below:

NECA 100-2006 - Electrical Symbols Set © 2006, NECA NECA 100-2006 - Symbols for Electrical Construction Drawings (ANSI) © 2006, NECA NECA 101-2006 - Standard for Installing Steel Conduit (Rigid, IMC, EMT) (ANSI) © 2006, NECA NECA 102-2004 - Standard for Installing Aluminum Rigid Metal Conduit (ANSI) © 2004, NEIS NECA 111-2003 - Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) (ANSI) © 2003, NECA NECA 1-2010 - Standard Practice of Good Workmanship in Electrical Construction (ANSI) © 2010, NECA NECA 120-2006 - Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC) (ANSI) ©

2006, NECA

NECA 121-2007 - Standard for Installing Nonmetallic-Sheathed Cable (Type NM) and Underground Feeder and Branch-Circuit Cable (Type UF) (ANSI) © 2007, NECA NECA 130-2010 - Standard for Installing and Maintaining Wiring Devices © 2010, NECA NECA 169 - Standard for Installing and Maintaining Arc-Fault Circuit Interrupters © 2010, NECA NECA 200-2010 - Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI) © 2010, NECA NECA 202-2006 - Standard for Installing and Maintaining Industrial Heat Tracing Systems (ANSI) © 2006, NECA NECA 230-2010 - Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers

(ANSI) © 2010, NEIS

NECA 303-2005 - Standard for Installing Closed-Circuit Television Systems (CCTV) (ANSI) © 2005, NECA NECA 305-2010 - Standard for Fire Alarm System Job Practices (ANSI) © 2010, NECA NECA 331-2009 - Standard for Building and Service Entrance Grounding and Bonding (ANSI) © 2009, NECA NECA 400-2007 - Standard for Installing and Maintaining Switchboards (ANSI) © 2007, NECA NECA 402-2007 - Standard for Installing and Maintaining Motor Control Centers (ANSI) © 2007, NECA NECA 406-2003 - Standard for Installing Residential Generator Sets (ANSI) © 2003, NECA NECA 407-2009 - Recommended Practice for Installing and Maintaining Panelboards (ANSI) © 2009, NECA NECA 408-2009 - Standard for Installing and Maintaining Busways (ANSI) © 2009, NECA NECA 409 – 2009 - Standard for Installing and Maintaining Dry-Type Transformers (ANSI) © 2009, NECA NECA 410-2005 - Standard for Installing and Maintaining Liquid-Filled Transformers (ANSI) © 2005 NECA 411-2006 - Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS) (ANSI) © 2006 NECA 420-2007 - Standard for Fuse Applications (ANSI) © 2007, NECA NECA 430-2006 - Standard for Installing Medium-Voltage Metal-Clad Switchgear (ANSI) © 2006, NEIS NECA 503-2005 - Standard for Installing Fiber Optic Lighting Systems © 2005, NECA NECA 505 Standard for Installing and Maintaining High Mast, Roadway and Area Lighting © 2010, NECA NECA 700-2010 - Standard for Installing Overcurrent Protection to Achieve Selective Coordination • © 2010, NECA NECA 90 Recommended Practice for Commissioning Building Electrical Systems (ANSI) © 2009, NECA NECA/AA 104-2006 - Standard for Installing Aluminum Building Wire and Cable (ANSI) © 2006, NEIS

NECA/BICSI 568-2006 - Standard for Installing Building Telecommunications Cabling (ANSI) © 2006, NECA NECA/BICSI 607-2011 - Standard for Telecommunications Bonding and Grounding Planning and Installation Methods for Commercial Buildings © 2011, NECA/BICSI NECA/EGSA 404-2007 - Standard for Installing Generator Sets (ANSI) © 2007, NECA NECA/FOA 301-2009 - Standard for Installing and Testing Fiber Optics (ANSI) © 2009, NEIS NECA/IESNA 500-2006 - Standard for Installing Indoor Lighting Systems (ANSI) © 2006, NECA, NECA/IESNA 501-2006 - Standard for Installing Exterior Lighting Systems (ANSI) © 2006, NEIS NECA/IESNA 502-2006 - Standard for Installing Industrial Lighting Systems (ANSI) © 2006, NECA NECA/MACSCB 600-2003 - Recommended Practice for Installing and Maintaining Medium- Voltage Cable

(ANSI) © 2003, NECA

NECA/NEMA 105-2007 - Standard for Installing Metal Cable Tray Systems (ANSI) © 2007, NECA NECA/NEMA 605-2005 - Recommended Practice for Installing Underground Nonmetallic Utility (ANSI) © 2005, NECA

EM 385-1-1 Corps of Engineers Manual, - Safety and Health Requirements Manual Additional publications and regulatory documents may be identified as required for individual task orders.

29.5. DPW requirements

a. Federal Fire. Electrical installation must be in accordance with NFPA 70E for electrical safety in the workplace.

b. Electrical. Power assessment as well as installation is to be done by a certified electrician/contractor, to determine existing power availability, assess whether existing infrastructure needs to be upgraded to accommodate those requirements and provide installation as required in compliance with NEC, NESC and UFC 3-520-01.

c. Environmental. Ensure all asbestos and lead paint are removed by a qualified and licensed contractor. Handling, storing and disposal of hazardous materials must be done in accordance with local, state and federal laws and regulations.

30. SF 1442 Attachment(s) Attachment 1: Excel Sheet Bid Attachment

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 10 CLIN0001 40# Scissor Platform Lift Daily

FFP

CLIN0001 40# Scissor Platform Lift Daily FOB: Destination

PURCHASE REQUEST NUMBER: 0011609684

PSC CD: Z2QA

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002 3 CLIN0002 40# Scissor Platform Lift Weekl

FFP

CLIN0002 40# Scissor Platform Lift Weekl FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0003 2 Months CLIN0003 40# Scissor Platform Lift Month

FFP

CLIN0003 40# Scissor Platform Lift Month FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0004 10 CLIN0004 500lb Telescopic Boom Daily

FFP

CLIN0004 500lb Telescopic Boom Daily FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0005 3 CLIN0005 500lb Telescopic Boom Weekly

FFP

CLIN0005 500lb Telescopic Boom Weekly FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0006 8 Months CLIN0006 500lb Telescopic Boom Monthly

FFP

CLIN0006 500lb Telescopic Boom Monthly FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0007 10 CLIN0007 60' Telescoping Boom Man Lift D

FFP

CLIN0007 60' Telescoping Boom Man Lift D FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0008 5 CLIN0008 60' Telescoping Boom Man Lift W

FFP

CLIN0008 60' Telescoping Boom Man Lift W FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0009 5 Months CLIN0009 60' Telescoping Boom Man Lift M

FFP

CLIN0009 60' Telescoping Boom Man Lift M FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0010 40 Each CLIN0010 40 CY Dumpster

FFP

CLIN0010 40 CY Dumpster FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0011 60 Each CLIN0011 Install Permanent fall protecti

FFP

CLIN0011 Install Permanent fall protecti FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0012 3 Square CLIN0012 20YR Non-Penal Sum EPDM Roof Wa

FFP

CLIN0012 20YR Non-Penal Sum EPDM Roof Wa FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0013 1 Job CLIN0013 25YR Non-Penal Sum Metal Roof W

FFP

CLIN0013 25YR Non-Penal Sum Metal Roof W FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0014 1,000 Square Foot

CLIN0014 Install Plastic Sheeting

FFP

CLIN0014 Install Plastic Sheeting FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0015 5 Each CLIN0015 (Bulk Point) PLM Test Asbestos

FFP

CLIN0015 (Bulk Point) PLM Test Asbestos FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0016 5 Each CLIN0016 (Bulk Point) TEM Test Asbestos

FFP

CLIN0016 (Bulk Point) TEM Test Asbestos FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0017 3 Each CLIN0017 (Air) PCM Test, Asbestos

FFP

CLIN0017 (Air) PCM Test, Asbestos FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0018 5 Each CLIN0018 (Air) TEM Test, Asbestos

FFP

CLIN0018 (Air) TEM Test, Asbestos FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0019 500 Square

CLIN0019 Asbestos Abatement Thermal Insu

CLIN0019 Asbestos Abatement Thermal Insu FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0020 500 Square

CLIN0020 Asbestos Abatement Tar & Felt R

CLIN0020 Asbestos Abatement Tar & Felt R FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0021 2 Each CLIN0021 TCLP Lead Test & Lab Fee

FFP

CLIN0021 TCLP Lead Test & Lab Fee FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0022 5 Each CLIN0022 Concrete Deck Cut Set Up

FFP

CLIN0022 Concrete Deck Cut Set Up FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0023 9 Square

CLIN0023 Remov & Disp Concrete Roof Deck

CLIN0023 Remov & Disp Concrete Roof Deck FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0024 200 Square

CLIN0024 Inst & Infil Concrete Roof Deck

CLIN0024 Inst & Infil Concrete Roof Deck FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0025 55 Job CLIN0025 24" Wide Steel Ladder

FFP

CLIN0025 24" Wide Steel Ladder FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0026 3 Each CLIN0026 24" Wide Steel Ladder Handrails

FFP

CLIN0026 24" Wide Steel Ladder Handrails FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0027 22 Job CLIN0027 Remov & Disp Vert Cage Ladder

FFP

CLIN0027 Remov & Disp Vert Cage Ladder FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0028 1,000 Square

CLIN0028 Demo Metal Roof Deck

CLIN0028 Demo Metal Roof Deck FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0029 500 Square

CLIN0029 Up To 2" Galvan Steel Deck

CLIN0029 Up To 2" Galvan Steel Deck FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0030 1,000 Square

CLIN0030 <2"-3" Galvan Steel Deck

CLIN0030 <2"-3" Galvan Steel Deck FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0031 100 Square CLIN0031 <3"-4-1/2" Galvan Steel Deck

FFP

CLIN0031 <3"-4-1/2" Galvan Steel Deck FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0032 100 Square CLIN0032 <4-1/2"-6" Galvan Steel Deck

FFP

CLIN0032 <4-1/2"-6" Galvan Steel Deck FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0033 300 Job CLIN0033 Metal Roof Purlins

FFP

CLIN0033 Metal Roof Purlins FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0034 20,000 Square

CLIN0034 5/8" CDX Plywood Roof Decking

CLIN0034 5/8" CDX Plywood Roof Decking FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0035 2,655 Square

CLIN0035 1/2" Int BC Plywood Sheathing

CLIN0035 1/2" Int BC Plywood Sheathing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0036 6,110 Job CLIN0036 Curb Wall Build up

FFP

CLIN0036 Curb Wall Build up FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0037 450 Square CLIN0037 Application of Primer

FFP

CLIN0037 Application of Primer FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0038 161 Square CLIN0038 Rem & Disp Vapor Barrier

FFP

CLIN0038 Rem & Disp Vapor Barrier FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0039 300 Square CLIN0039 40MIL Roofing Underlayment

FFP

CLIN0039 40MIL Roofing Underlayment FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0040 1,000 Square

CLIN0040 1" Molded Polystyrene Board

CLIN0040 1" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0041 1,000 Square

CLIN0041 2" Molded Polystyrene Board

CLIN0041 2" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0042 1,000 Square

CLIN0042 3" Molded Polystyrene Board

CLIN0042 3" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0043 1,000 Square

CLIN0043 4" Molded Polystyrene Board

CLIN0043 4" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0044 1,000 Square

CLIN0044 5" Molded Polystyrene Board

CLIN0044 5" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0045 1,000 Square

CLIN0045 6" Molded Polystyrene Board

CLIN0045 6" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0046 1,000 Square

CLIN0046 7" Molded Polystyrene Board

CLIN0046 7" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0047 1,000 Square

CLIN0047 8" Molded Polystyrene Board

CLIN0047 8" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0048 1,000 Square

CLIN0048 9" Molded Polystyrene Board

CLIN0048 9" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0049 1,000 Square

CLIN0049 10" Molded Polystyrene Board

CLIN0049 10" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0050 1,000 Square

CLIN0050 11" Molded Polystyrene Board

CLIN0050 11" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0051 20,000 Square

CLIN0051 12" Molded Polystyrene Board

CLIN0051 12" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0052 1,000 Square

CLIN0052 13" Molded Polystyrene Board

CLIN0052 13" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0053 1,000 Square

CLIN0053 14" Molded Polystyrene Board

CLIN0053 14" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0054 1,000 Square

CLIN0054 15" Molded Polystyrene Board

CLIN0054 15" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0055 1,000 Square

CLIN0055 16" Molded Polystyrene Board

CLIN0055 16" Molded Polystyrene Board FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0056 15,000 Square

CLIN0056 Sloped, Tapered EPS

CLIN0056 Sloped, Tapered EPS FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0057 4,900 Square

CLIN0057 Demo & Disp Rigid Insulation

CLIN0057 Demo & Disp Rigid Insulation FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0058 15,000 Square

CLIN0058 1/2" Fiberglass Gypsum Roof Boa

CLIN0058 1/2" Fiberglass Gypsum Roof Boa FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0059 5,868 Square

CLIN0059 7/16" OSB

CLIN0059 7/16" OSB

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0060 30 Square CLIN0060 Ceramic Coated Shingles

FFP

CLIN0060 Ceramic Coated Shingles FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0061 100 Square CLIN0061 Rem & Disp 30lb Roofing Felt

FFP

CLIN0061 Rem & Disp 30lb Roofing Felt FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0062 100 Square CLIN0062 Install 30lb Roofing Felt

FFP

CLIN0062 Install 30lb Roofing Felt FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0063 2,500 Square

CLIN0063 Rem & Disp Metal Roof Panel

CLIN0063 Rem & Disp Metal Roof Panel FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0064 100 Square

CLIN0064 2", 24 Gauge Metal Roof Panel

CLIN0064 2", 24 Gauge Metal Roof Panel FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0065 100 Square

CLIN0065 2-1/2", 24 Gauge Metal Roof Pan

CLIN0065 2-1/2", 24 Gauge Metal Roof Pan FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0066 100 Square

CLIN0066 3", 24 Gauge Metal Roof Pan

CLIN0066 3", 24 Gauge Metal Roof Pan FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0067 100 Square

CLIN0067 4", 24 Gauge Metal Roof Pan

CLIN0067 4", 24 Gauge Metal Roof Pan FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0068 100 Square

CLIN0068 5", 24 Gauge Metal Roof Pan

CLIN0068 5", 24 Gauge Metal Roof Pan FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0069 100 Square

CLIN0069 6", 24 Gauge Metal Roof Pan

CLIN0069 6", 24 Gauge Metal Roof Pan FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0070 15,000 Square

CLIN0070 Rem & Disp Roofing Panels

CLIN0070 Rem & Disp Roofing Panels FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0071 2,500 Square

CLIN0071 Steel Sheet Metal Roofing Panel

CLIN0071 Steel Sheet Metal Roofing Panel FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0072 2,000 Square

CLIN0072 Aluminum Roofing Panels

CLIN0072 Aluminum Roofing Panels FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0073 100 Square CLIN0073 Copper Roof Shingles

FFP

CLIN0073 Copper Roof Shingles FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0074 300 Square CLIN0074 Aluminum Roof Shingles

FFP

CLIN0074 Aluminum Roof Shingles FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0075 250 Square CLIN0075 Steel Roof Shingles

FFP

CLIN0075 Steel Roof Shingles FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0076 50 Job CLIN0076 Ridge Vents

FFP

CLIN0076 Ridge Vents FOB: Destination

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0077 125 Square CLIN0077 Rem & Disp 90lb Mineral Surface

FFP

CLIN0077 Rem & Disp 90lb Mineral Surface FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0078 49 Square CLIN0078 Rem & Disp Gravel on Built-up R

FFP

CLIN0078 Rem & Disp Gravel on Built-up R FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0079 187 Square CLIN0079 Rem & Disp EPDM Roofing System

FFP

CLIN0079 Rem & Disp EPDM Roofing System FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0080 82 Square CLIN0080 60MIL 1-60 EPDM Roofing Membran

FFP

CLIN0080 60MIL 1-60 EPDM Roofing Membran FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0081 59 Square CLIN0081 60MIL 1-90 EPDM Roofing Membran

FFP

CLIN0081 60MIL 1-90 EPDM Roofing Membran FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0082 20 Square CLIN0082 90MIL 1-60 EPDM Roofing Membran

FFP

CLIN0082 90MIL 1-60 EPDM Roofing Membran FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0083 20 Square CLIN0083 90MIL 1-90 EPDM Roofing Membran

FFP

CLIN0083 90MIL 1-90 EPDM Roofing Membran FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0084 200 Job CLIN0084 30" EPDM Walkway Protection Pad

FFP

CLIN0084 30" EPDM Walkway Protection Pad FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0085 80 Job CLIN0085 30" EPDM Walkwy Protect Pad Sup

FFP

CLIN0085 30" EPDM Walkwy Protect Pad Sup FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0086 1,206 Square CLIN0086 EPDM Membrane Base Flashing

FFP

CLIN0086 EPDM Membrane Base Flashing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0087 19 Each CLIN0087 4" EPDM Pipe Cone/Boot

FFP

CLIN0087 4" EPDM Pipe Cone/Boot FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0088 28 Each CLIN0088 4"-8" EPDM Pipe Cone/Boot

FFP

CLIN0088 4"-8" EPDM Pipe Cone/Boot FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0089 19 Each CLIN0089 8"-13" EPDM Pipe Cone/Boot

FFP

CLIN0089 8"-13" EPDM Pipe Cone/Boot FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0090 1,000 Square

CLIN0090 Rem & Disp Sheet Metal Flashing

CLIN0090 Rem & Disp Sheet Metal Flashing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0091 1,000 Square

CLIN0091 Aluminum Flashing

CLIN0091 Aluminum Flashing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0092 1,000 Square

CLIN0092 Galvanized Steel Flashing

CLIN0092 Galvanized Steel Flashing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0093 500 Square

CLIN0093 Copper Flashing

CLIN0093 Copper Flashing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0094 1,500 Job CLIN0094 Rem & Disp Gutter & Downspouts

FFP

CLIN0094 Rem & Disp Gutter & Downspouts FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0095 1,500 Job CLIN0095 Aluminum Gutter & Downspouts

FFP

CLIN0095 Aluminum Gutter & Downspouts FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0096 200 Job CLIN0096 Galvanized Steel Gutter & Downs

FFP

CLIN0096 Galvanized Steel Gutter & Downs FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0097 2,000 Job CLIN0097 Copper Gutter & Downspouts

FFP

CLIN0097 Copper Gutter & Downspouts FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0098 500 Job CLIN0098 Ridge Flashing

FFP

CLIN0098 Ridge Flashing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0099 100 Job CLIN0099 Eave Flashing

FFP

CLIN0099 Eave Flashing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0100 350 Job CLIN0100 Valley Flashing

FFP

CLIN0100 Valley Flashing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0101 500 Job CLIN0101 Hip Flashing

FFP

CLIN0101 Hip Flashing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0102 200 Job CLIN0102 5"-9" Metal Drip Edge

FFP

CLIN0102 5"-9" Metal Drip Edge FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0103 200 Job CLIN0103 10"-14" Coping System

FFP

CLIN0103 10"-14" Coping System FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0104 200 Job CLIN0104 14"-16" Coping System

FFP

CLIN0104 14"-16" Coping System FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0105 200 Job CLIN0105 16"-22" Coping System

FFP

CLIN0105 16"-22" Coping System FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0106 1,000 Job CLIN0106 22"-30" Coping System

FFP

CLIN0106 22"-30" Coping System FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0107 1,000 Square

CLIN0107 24 Gauge Concealed Fast Roofing

CLIN0107 24 Gauge Concealed Fast Roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0108 1,000 Square

CLIN0108 22 Gauge Concealed Fast Roofing

CLIN0108 22 Gauge Concealed Fast Roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0109 500 Square

CLIN0109 Rem & Disp Zinc/Copper Roofing

CLIN0109 Rem & Disp Zinc/Copper Roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0110 3,258 Job CLIN0110 5"-9" Metal Drip Edge

FFP

CLIN0110 5"-9" Metal Drip Edge FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0111 3,258 Job CLIN0111 Rem & Disp Snow Guards

FFP

CLIN0111 Rem & Disp Snow Guards FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0112 250 Job CLIN0112 Snow Guards

FFP

CLIN0112 Snow Guards FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0113 10,000 Each CLIN0113 Polycarbonate Snow Guards

FFP

CLIN0113 Polycarbonate Snow Guards FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0114 50 Job CLIN0114 Ridge Vents

FFP

CLIN0114 Ridge Vents FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0115 300 Job CLIN0115 Cant Strips

FFP

CLIN0115 Cant Strips FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0116 11 Each CLIN0116 Scupper Drains

FFP

CLIN0116 Scupper Drains FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0117 100 Square CLIN0117 Demo & Rem Roofing Pavers

FFP

CLIN0117 Demo & Rem Roofing Pavers FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0118 100 Square CLIN0118 Demo & Rem PVC Roofing

FFP

CLIN0118 Demo & Rem PVC Roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0119 1,000 Square

CLIN0119 Roof Repair, Built-Up Roofing

CLIN0119 Roof Repair, Built-Up Roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0120 500 Square

CLIN0120 Roof Repair, Membrane Roofing

CLIN0120 Roof Repair, Membrane Roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0121 100 Square

CLIN0121 Roof Repair, Shingle Roofing

CLIN0121 Roof Repair, Shingle Roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0122 300 Square

CLIN0122 Roof Repair, Standing Seam

CLIN0122 Roof Repair, Standing Seam FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0123 100 Square

CLIN0123 Seam/Hole Repair Strip-In

CLIN0123 Seam/Hole Repair Strip-In FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0124 100 Job CLIN0124 Missing Lap Seal/Caulking

FFP

CLIN0124 Missing Lap Seal/Caulking FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0125 25 Each CLIN0125 Repair Inside/Outside Corner

FFP

CLIN0125 Repair Inside/Outside Corner FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0126 250 Square

CLIN0126 EIFS Wall Repair

CLIN0126 EIFS Wall Repair FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0127 3 Each CLIN0127 3ƒ?? X 6ƒ??8ƒ??-7'2" Metal Door Frame

FFP

CLIN0127 3ƒ?? X 6ƒ??8ƒ??-7'2" Metal Door Frame FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0128 5 Each CLIN0128 6ƒ?? X >7'2" Metal Door Frame

FFP

CLIN0128 6ƒ?? X >7'2" Metal Door Frame FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0129 5 Each CLIN0129 3ƒ?? X 6ƒ??8ƒ?? X 1-3/4" Metal Door

FFP

CLIN0129 3ƒ?? X 6ƒ??8ƒ?? X 1-3/4" Metal Door FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0130 7.50 Pair CLIN0130 4" X 4" Standard Duty Hinge

FFP

CLIN0130 4" X 4" Standard Duty Hinge FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0131 5 Each CLIN0131 8" X 32" Kick Plate

FFP

CLIN0131 8" X 32" Kick Plate FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0132 5 Each CLIN0132 Lever Trim (230L) with Cylinder

FFP

CLIN0132 Lever Trim (230L) with Cylinder FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0133 5 Each CLIN0133 36" X 36" Roof Hatch

FFP

CLIN0133 36" X 36" Roof Hatch FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0134 24 Each CLIN0134 Rem & Disp Cast Iron Roof Drain

FFP

CLIN0134 Rem & Disp Cast Iron Roof Drain FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0135 24 Each CLIN0135 Cast Iron Roof Drain/w 3" Dome

FFP

CLIN0135 Cast Iron Roof Drain/w 3" Dome FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0136 10 Each CLIN0136 Cast Iron Roof Drain/w 4" Dome

FFP

CLIN0136 Cast Iron Roof Drain/w 4" Dome FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0137 6 Each CLIN0137 Cast Iron Roof Drain/w 6" Dome

FFP

CLIN0137 Cast Iron Roof Drain/w 6" Dome FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0138 7 Each CLIN0138 3" Roof Drain Downspout Nozzle

FFP

CLIN0138 3" Roof Drain Downspout Nozzle FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0139 5 Each CLIN0139 4" Roof Drain Downspout Nozzle

FFP

CLIN0139 4" Roof Drain Downspout Nozzle FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0140 10 Each CLIN0140 6" Roof Drain Downspout Nozzle

FFP

CLIN0140 6" Roof Drain Downspout Nozzle FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0141 19 Each CLIN0141 3"-4" Roof Vent Pipe Extension

FFP

CLIN0141 3"-4" Roof Vent Pipe Extension FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0142 19 Each CLIN0142 4"-6" Roof Vent Pipe Extension

FFP

CLIN0142 4"-6" Roof Vent Pipe Extension FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0143 19 Each CLIN0143 6"-8" Roof Vent Pipe Extension

FFP

CLIN0143 6"-8" Roof Vent Pipe Extension FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0144 90 Job CLIN0144 Sheet Metal Ductwork

FFP

CLIN0144 Sheet Metal Ductwork FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0145 26 Each CLIN0145 Auto Gutter Ice Melting Control

FFP

CLIN0145 Auto Gutter Ice Melting Control FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0146 29 Each CLIN0146 Self Regulating Heating Cable

FFP

CLIN0146 Self Regulating Heating Cable FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0147 3,000 Job CLIN0147 Self Regulating Low Temp Cable

FFP

CLIN0147 Self Regulating Low Temp Cable FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0148 9 Each CLIN0148 Equip Protection Circuit Breake

FFP

CLIN0148 Equip Protection Circuit Breake FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0149 34 Linear

CLIN0149 3/4" Conduit Assembly

CLIN0149 3/4" Conduit Assembly FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0150 8 Each CLIN0150 3/4" 90 Degree Elbow

FFP

CLIN0150 3/4" 90 Degree Elbow FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0151 28 Each CLIN0151 3-1/2" Depth, 4" Square Box

FFP

CLIN0151 3-1/2" Depth, 4" Square Box FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0152 20 Each CLIN0152 Flat 4" Square Exposed Work Cov

FFP

CLIN0152 Flat 4" Square Exposed Work Cov FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0153 26 Each CLIN0153 4ƒ??x 4ƒ?? x 4ƒ?? Screw Cover

FFP

CLIN0153 4ƒ??x 4ƒ?? x 4ƒ?? Screw Cover FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0154 40 Job CLIN0154 3"-4" Diameter Pipe

FFP

CLIN0154 3"-4" Diameter Pipe FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0155 22 Job CLIN0155 4"-6" Diameter Pipe

FFP

CLIN0155 4"-6" Diameter Pipe FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0156 40 Job CLIN0156 6"-8" Diameter Pipe

FFP

CLIN0156 6"-8" Diameter Pipe FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0157 447 Square

CLIN0157 0.010ƒ?? Aluminum Insulation Jack

CLIN0157 0.010ƒ?? Aluminum Insulation Jack FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0158 15 Each CLIN0158 >12ƒ?? to 24ƒ?? Tree Removal

FFP

CLIN0158 >12ƒ?? to 24ƒ?? Tree Removal FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0159 20 Each CLIN0159 >12ƒ?? to 24ƒ?? Stump Removal

FFP

CLIN0159 >12ƒ?? to 24ƒ?? Stump Removal FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0160 20 Each CLIN0160 Rep Missing/Broken Drain Screen

FFP

CLIN0160 Rep Missing/Broken Drain Screen FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0161 2 Each CLIN0161 Rem & Re-Inst Exhaust Fan

FFP

CLIN0161 Rem & Re-Inst Exhaust Fan FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0162 34 Each CLIN0162 Pre-cast Concrete Splash Blocks

FFP

CLIN0162 Pre-cast Concrete Splash Blocks FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0163 1 Job CLIN0163 Misc Items Not Defined

FFP

CLIN0163 Misc Items Not Defined FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0164 3 CLIN0164 500,000 BTU/HR Space Heater

FFP

CLIN0164 500,000 BTU/HR Space Heater FOB: Destination

UNIT UNIT PRICE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .