Response to Questions for W912CL‐Q‐22‐0001 #1
1. Have you carried out a soil study?
Answer: No soil study has been conducted for the purpose of this solicitation.
2. Do you have the calculation of the volumes of work?
Answer: No. We expect the contractor to calculate based on provided dimensions and requirements.
3. Do you have the final design of the dimension?
Answer: Yes, drawings provided with SOW.
4. Do we need to know if it has a design dimension?
Answer: Compaction standards requirements included in the SOW. Gravel pads will accommodate vehicular traffic and static loads between 15,000 Kg and 25,000 kg.
5. Do you have an estimate of how many trees to cut down?
No. We expect the contractor to do a site visit and determine the work load.
6. Do you have a license or permits to cut down the trees?
Answer: Coordinate license/permits with local authorities.