Questions_&_Answers.pdf

PDF 117 KB Posted

Attached to
Construct School, San Isidro, Belize Federal contract opportunity
Solicitation number
W912CL-18-R-0007
Issued by
Department of the Army Cyber Command

About this file

Solicitation Questions and Answers

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers San Isidro School Construction

1. Drawing “Classroom block Layout” indicates two doors for classroom No.1 entrances. Front

Elevation indicates only one door. Please Clarify.

Answer: Two doors for classroom No. 1 as shown in Technical Exhibit 2 front view and 1 door in the rear view for classroom 1. Refer to revised Technical Exhibit 2 classroom layout plan.

2. Please clarify if the contractor will be responsible for the overhead primary electrical extension (if needed), pole mounted transformers and secondary electrical connection to the new project. If so will contractor will be responsible for any payment?

Answer: Refer to section 5.15.2 Service and Distribution. 5.15.2.1 Exterior Distribution.

Electrical connection to the main grid is end user responsibility.

3. The section 5.12.5 indicates Floor Finishes to be concrete sealer and ceramic tile, but it does not specify the room areas to be installed. Please indicate on which areas will be installed ceramic tile and which areas will have concrete sealer.

Answer: Ceramic tiles shall be used on classroom, restrooms, and kitchen. Only walkway shall have concrete sealer.

4. The section 5.12.6 indicates Ceiling Finishes to be suspended ceiling and gypsum board, but it does not specify the areas to be installed. Please indicate if rooms will have exposed structure or some type of ceiling.

Answer: Suspended ceiling shall be used in all classrooms. Gypsum board shall be used on the exterior, restrooms, and kitchen.

5. Please clarify where will the New Perimeter Fence will be installed, it will only be around of the New classroom Building or around the entire facility?

Answer: Refer to revised Technical Exhibit 2. Behind restroom and kitchen. The idea is to provide an enclosed area for the kindergarten classroom 1.

6. The quantity of fixtures on Drawing “Classroom Block Layout” does not match with the quantity indicated on Section 5.13.2 Fixtures. Please clarify.

Answer: Paragraph 5.13.2 see paragraph with the required fixtures quantities.

7. In reference to the Plumbing Design, it is necessary to know the quantity of total users or the water demand per capita.

Answer: Potential contractor is responsible for obtain this information, see paragraphs 5.1.2.3,

5.13.1 and part 6 of SOW.

8. Where is located the Main Water Supply connection for the new building?

Answer: Potential contractor is responsible for obtain this information, see paragraph 5.1.2.3 and part 6 of SOW.

9. Drawings include a septic tank, leach field and absorption well, please indicate the location of system. Has an infiltration test been done to validate this proposal? If not is contractor responsible of validating this system?

Answer: Contractor shall validate the provided information and designs, see paragraph 5.1.2 of

SOW.

10. Section 5.14 requires eight (8) Ventilation Fans. Please clarify the room areas to be installed.

Answer: Only 2 fans are needed (i.e. one at each end of the building), paragraph 5.14 has been updated.