Technical_Exhibit_3_Elevated_observation_tower.pdf

PDF 858 KB Posted

Attached to
Construct Latrine, Concrete Pads, Firing Range Improvements and Water Pressure Improvements
Solicitation number
W912CL18R0006
Issued by

About this file

DRAFT Technical Exhibit 3 Observation Tower

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GPOI URBAN OPERATIONS TRAINING FACILITIES MB11EJ88

THESE DRAWINGS ARE PROVIDED FOR INFORMATION. THE CONTRACTOR SHALL ADAPT THE DESIGN AS NECESSARY TO FULFILL THE PROJECT REQUIREMENTS.

rosa.l.santoni Rectangle rosa.l.santoni Rectangle

THESE DRAWINGS ARE PROVIDED FOR INFORMATION. THE CONTRACTOR SHALL ADAPT THE DESIGN AS NECESSARY TO FULFILL THE PROJECT REQUIREMENTS.

THESE DRAWINGS ARE PROVIDED FOR INFORMATION. THE CONTRACTOR SHALL ADAPT THE DESIGN AS NECESSARY TO FULFILL THE PROJECT REQUIREMENTS.

THESE DRAWINGS ARE PROVIDED FOR INFORMATION. THE CONTRACTOR SHALL ADAPT THE DESIGN AS NECESSARY TO FULFILL THE PROJECT REQUIREMENTS.

THESE DRAWINGS ARE PROVIDED FOR INFORMATION. THE CONTRACTOR SHALL ADAPT THE DESIGN AS NECESSARY TO FULFILL THE PROJECT REQUIREMENTS.

THESE DRAWINGS ARE PROVIDED FOR INFORMATION. THE CONTRACTOR SHALL ADAPT THE DESIGN AS NECESSARY TO FULFILL THE PROJECT REQUIREMENTS.

THESE DRAWINGS ARE PROVIDED FOR INFORMATION. THE CONTRACTOR SHALL ADAPT THE DESIGN AS NECESSARY TO FULFILL THE PROJECT REQUIREMENTS.

File details come from the government source that posted it.