Attachment_Primary_Component_Material_List.xls

XLS spreadsheet 91 KB Posted

Attached to
TRAINING VILLAGE - URUGUAY Federal contract opportunity
Solicitation number
W912CL-17-R-0011
Issued by
Department of the Army Cyber Command

About this file

Attachment - Primary Component Material List

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment - Primary Component Material List - All pricing will be annotated on the SF 1442 Bid Schedule by CLIN numbers
Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, Statmeent Of Work, and Technical Exhibits. Contractor shall adjust quantities and add any missing items. This attachment is only a guide for the contractor. Submit this in EXCEL Format.
CLIN 0001 - Construct Training Village (AREA I)
ItemDescriptionQtyUnitUnit CostExtended Cost
1Earth Work1
1.1Surveying1LS2,048.00
1.2Clearing and Grubbing4545m20.05
1.3Soil studies and test for concrete1LS3,000.00
2Building Type 11
2.1CMU block116m2100.00
2.2Foundation (excavation)14m330.00
2.3Foundation (compaction, formwork, concrete)11m3300.00
2.4Floor slab5m3300.00
2.5Reinforcement rebar, 83400kg/m0.70
2.6Reinforcement rebar, 12600kg/m1.30
2.7Reinforcement mesh0ea83.00
2.8Columns2m3180.00
2.9Beams3m3180.00
2.10Roof (Wood Trusses, Type 2 Wood and Corrugatged Metal, 16 Ga.)1LS1,500.00
2.11Doors5ea141.00
2.12Windows6ea141.00
2.13Lintels11m50.00
3Building Type 21
3.1CMU block180m2100.00
3.2Foundation (excavation)8m330.00
3.3Foundation (compaction, formwork, concrete)7m3300.00
3.4Floor slab3m3300.00
3.5Reinforcement rebar, 83500kg/m0.70
3.6Reinforcement rebar, 12600kg/m1.30
3.7Columns2m3180.00
3.8Beams3m3180.00
3.9Slab 2-Story2m3400.00
3.10Doors5ea141.00
3.11Windows6ea141.00
3.12Lintels11m50.00
3.13Stairs2ea1,500.00
3.14Catwalks1ea2,000.00
4Building Type 32
4.1CMU block191m2100.00
4.2Foundation (excavation)14m330.00
4.3Foundation (compaction, formwork, concrete)10m3300.00
4.4Floor slab9m3300.00
4.5Reinforcement rebar, 87000kg/m0.70
4.6Reinforcement rebar, 12900kg/m1.30
4.7Reinforcement mesh0ea83.00
4.8Columns4m3180.00
4.9Beams5m3180.00
4.10Slab 2-Story3m3400.00
4.11Doors4ea141.00
4.12Windows5ea141.00
4.13Lintels9m50.00
4.14Stairs1ea1,500.00
5Building Type 41
5.1CMU block116m2100.00
5.2Foundation (excavation)14m330.00
5.3Foundation (compaction, formwork, concrete)11m3300.00
5.4Floor slab5m3300.00
5.5Reinforcement rebar, 83450kg/m0.70
5.6Reinforcement rebar, 12650kg/m1.30
5.7Reinforcement mesh0ea83.00
5.8Columns2m3180.00
5.9Beams2m3180.00
5.10Doors5ea141.00
5.11Windows6ea141.00
5.12Lintels11m50.00
9Sidewalk1
9.1Sidewalk14m3300.00
10Road1
10.1Clearing and Grubbing2800m20.10
10.2Geotextile2800m210.00
10.3Gravel and compaction431m335.00
11Traffic Signs1
11.1Signs including sign, pole, and installation10ea100.00
12Tunnels1
12.1Excavation56m32.95
12.2Backfill and compaction56m33.00
12.3Concrete culvert12m61.16
13Street Lights with Poles1
13.1Street lights with poles including installation10ea1,000.00
14Solar Panels for street lights1
14.1Solar panel for street lights with batteries, accessories, lightning protection, grounding, and cabinet with lock10ea800.00
15Building Signs1
15.1Building signs including signs and installation20ea75.00
TOTAL:
Labor
Profit
IVA ( %):
TOTAL PRICE FOR CLIN 0001:
CLIN 0002 - Optional Observation Tower
ItemDescriptionQtyUnitUnit Cost
16Tower1
16.1Foundation1LS
16.2Tower1LS
TOTAL:
Labor
Profit
IVA (__%):
TOTAL PRICE FOR CLIN 0002:
CLIN 0003 - Construct Training Village (AREA II)
ItemDescriptionQtyUnitUnit Cost
1Earth Work1
1.1Surveying1LS
1.2Clearing and Grubbing1390m2
2Building Type 11
2.1CMU block116m2
2.2Foundation (excavation)14m3
2.3Foundation (compaction, formwork, concrete)11m3
2.4Floor slab5m3
2.5Reinforcement rebar, 83400kg/m
2.6Reinforcement rebar, 12600kg/m
2.7Reinforcement mesh0ea
2.8Columns2m3
2.9Beams3m3
2.10Roof (Wood Trusses, Type 2 Wood and Corrugatged Metal, 16 Ga.)1LS
2.11Doors5ea
2.12Windows6ea
2.13Lintels11m
3Building Type 21
3.1CMU block180m2
3.2Foundation (excavation)8m3
3.3Foundation (compaction, formwork, concrete)7m3
3.4Floor slab3m3
3.5Reinforcement rebar, 83500kg/m
3.6Reinforcement rebar, 12600kg/m
3.7Columns2m3
3.8Beams3m3
3.9Slab 2-Story2m3
3.10Doors5ea
3.11Windows6ea
3.12Lintels11m
3.13Stairs2ea
3.14Catwalks1ea
4Building Type 41
4.1CMU block116m2
4.2Foundation (excavation)14m3
4.3Foundation (compaction, formwork, concrete)11m3
4.4Floor slab5m3
4.5Reinforcement rebar, 83450kg/m
4.6Reinforcement rebar, 12650kg/m
4.7Reinforcement mesh0ea
4.8Columns2m3
4.9Beams2m3
4.10Doors5ea
4.11Windows6ea
4.12Lintels11m
5Building Type 51
5.1CMU block300m2
5.2Foundation (excavation)21m3
5.3Foundation (compaction, formwork, concrete)16m3
5.4Floor slab13m3
5.5Reinforcement rebar, 815000kg/m
5.6Reinforcement rebar, 121400kg/m
5.7Reinforcement mesh0ea
5.8Columns6m3
5.9Beams6m3
5.10Slab 2-Story7m3
5.11Doors8ea
5.12Windows6ea
5.13Lintels22m
5.14Stairs2ea
5.15Catwalks2ea
5Sidewalk1
5.1Sidewalk10m3
6Walls1
6.11.5 m walls with foundation105m2
6.22.0 m walls with foundation34m2
7Street Lights with Poles1
7.1Street lights with poles including installation4ea
8Solar Panels for street lights1
8.1Solar panel for street lights with batteries, accessories, lightning protection, grounding, and cabinet with lock4ea
9Building Signs1
9.1Building signs including signs and installation5ea
TOTAL:
Labor
Profit
IVA (____%):
TOTAL ESTIMATED PRICE FOR CLIN 0003 WITH IVA:
CLIN 0004 - Optional Type 1 Building (AREA II)
ItemDescriptionQtyUnit
1Building Type 11
1.1CMU block116m2
1.2Foundation (excavation)14m3
1.3Foundation (compaction, formwork, concrete)11m3
1.4Floor slab5m3
1.5Reinforcement rebar, 83400kg/m
1.6Reinforcement rebar, 12600kg/m
1.7Reinforcement mesh0ea
1.8Columns2m3
1.9Beams3m3
1.10Roof (Wood Trusses, Type 2 Wood and Corrugatged Metal, 16 Ga.)1LS
1.11Doors5ea
1.12Windows6ea
1.13Lintels11m
TOTAL:
Labor
Profit
IVA (__%):
TOTAL PRICE FOR CLIN 0004:
CLIN 0005 DBA Insurance - If you are pricing this line item, it is expected an insurance policy to be submitted to the Contracting Officer after award of this contract. COST _______________
SUMMARY
CLIN 0001
CLIN 0003:
TOTAL FOR CLINS 0001 and 0003:
CLIN 0002 (Optional):
CLIN 0004 (Optional):
TOTAL OPTIONAL CLINS 0002 and 0004:
TOTAL PRICE FOR CLINS 0001 THROUGH 0005:

Sheet2

Sheet3

Sheet4

File details come from the government source that posted it. Updated .