MATERIAL LIST
| EXHIBIT 1: Primary Component Material List - All pricing will be annotated on the SF 1442 Bid Schedule by CLIN numbers. | |||||
| PARAGUAY FUEL STATION, solicitation W912CL-17-R-0008 | |||||
| Quantities presented in this table are approximate. It is contractor's responsibility to validate them to reflect actual site conditions, Statement Of Work, and Technical Exhibits. Contractor shall adjust quantities and add any missing items. This attachment is only a guide for the contractor. Submit this in EXCEL Format. | |||||
| CLIN 0001: FUEL STATION CONSTRUCTION | |||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL PRICE |
| 1 | Soil Study | LS | 1 | ||
| 2 | Design to include validation and as-builts | LS | 1 | ||
| 3 | Site survey and layout | LS | 1 | ||
| 4 | Required electrical, plumbing, density, water content, concrete, and other related tests | LS | 1 | ||
| 5 | Excavation and trenches for utilities connections (electrical, fuel pipes, and other required works) | SM | 100 | ||
| 6 | Demolition of structure and filling of existing tanks | LS | 1 | ||
| 7 | Leakage prevention pool | SM | 90 | ||
| 8 | Submersible pump system | LS | 3 | ||
| 9 | Automatic shut off valves | LS | 3 | ||
| 10 | Electrical (including outlets, switches, circuit breakers, ground system, lighting outdoor and anti-explosive rated to include protection system, outdoor/anti-explosive lights, conductors, transformer, distribution panel, registers boxes, and accessories) | LS | 1 | ||
| 11 | Dispenser pump system | EA | 3 | ||
| 12 | Fuel storage tank 2000 gallons (double wall) | EA | 1 | ||
| 13 | Fuel storage tank 1000 gallons (double wall) | EA | 2 | ||
| 14 | Venting system | LS | 1 | ||
| 15 | Piping and valves | LS | 1 | ||
| 16 | Pumps and meters | LS | 3 | ||
| 17 | Filter | LS | 3 | ||
| 18 | Fuel test kit | EA | 3 | ||
| 19 | Pump house | LS | 1 | ||
| 20 | Dispenser house | LS | 1 | ||
| 21 | Fuel Station Accessories | LS | 1 | ||
| 22 | Gravel roadway | SM | 250 | ||
| 23 | Concrete floor with foundation (Driveway and Fuel Station Pad) | SM | 90 | ||
| 24 | Paint for fuel system | SM | 160 | ||
| 25 | Paint for pool, pump house, and dispenser | SM | 100 | ||
| 26 | Roof panel and structure | LS | 1 | ||
| 27 | Perimeter fence with all gates | LS | 1 | ||
| 28 | Labor | LS | 1 | ||
| 29 | Profit | LS | 1 | ||
| 30 | Taxes | LS | 1 | ||
| IVA: _____% | |||||
| CLIN 0001 TOTAL PRICE: | |||||
| CLIN 0002: DBA INSURANCE | |||||
| 1 | DBA Insurance | CLIN 0002 TOTAL PRICE: | |||
| CLIN 0002: DBA Insurance - If you are pricing this line item, an insurance policy must be submitted to the Contracting Officer after award of this contract. |