Solicitation - W912CH27RA030.pdf

PDF 5 MB Posted

Attached to
Cocking Handle Assembly LT WT
Solicitation number
W912CH-27-R-A030
Issued by

About this file

This is a Request for Proposal (RFP) for a two-year firm-fixed-price requirement contract for Cocking Handle Assembly components. The contract is a 100% small business set-aside, issued by the Army Contracting Command Detroit Arsenal (W912CH), with solicitation number W912CH27RA030, issued November 18, 2026, with a closing date of November 23, 2026 at 1:00 PM local time (Warren, Michigan). Proposals must be submitted electronically via email to the Contract Specialist Richard G. Hall (Richard.G.Hall64.civ@army.mil) and copied to Contracting Officer Elizabeth L. Levinewelhouse (Elizabeth.L.Levinewelhouse.civ@army.mil), with a subject line identifying the submission. The minimum proposal acceptance period is 120 calendar days.

The procurement includes three line items: Item 0001 is a First Article Test (FAT) consisting of one lot of five units requiring delivery within 180 calendar days after award; Item 0002 specifies 1,973 units for Year 1 delivery within 150 calendar days; and Item 0003 specifies 1,973 units for Year 2 delivery within 100 calendar days. All items are priced firm-fixed-price with Product Service Code 1005. Offerors must submit proposals for all requirements. The evaluation will be based on two factors in the following order of importance: delivery schedule (significantly more important) and price. Delivery schedules are rated Outstanding (30+ days sooner), Good (29 or fewer days sooner), Acceptable (equal to required schedule), Marginal (45 days or less later), or Unacceptable (more than 45 days late). Price reasonableness and unbalanced pricing will be evaluated. Proposals must be in English, in US dollars, and comply with all solicitation requirements; exceptions to terms may render proposals ineligible. The contract requires heavy phosphate coating per MIL-DTL-16232 with detailed specifications, CIAR and OPSEC training for contractor personnel, demilitarization and trade security controls compliance, and submission of Contract Data Requirements Lists including Engineering Change Proposals, Requests for Variance, First Article Test Reports, and other technical documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Section A - Solicitation/Contract Form

Cocking Handle AssemblyInstrument Name:

Product Service Code : 1005

A.1 DESCRIPTION OF THE ACTION

A.1.1 This solicitation is intended to result in the award of a single Two-Year Requirement, Firm- Fixed Price (FFP) Contract for Cocking Handle Assembly, LT WT, National Stock Number (NSN):

1005-01-547-2610; Part Number (PN): 13013732.

A.1.2 This solicitation is a 100% set aside for small businesses in accordance with (IAW) Federal Acquisition Regulation (FAR) 52.219-6.

A.1.3 There is a Technical Data Package (TDP) associated with this procurement. The TDP distribution code is D which limits access to U.S. Government agencies and its contractors. Please refer to Section C.1 for additional information.

A.1.4 Offerors shall follow Section L for Instructions, Conditions, and Notices to Offerors for proposal submission and Section M for Evaluation Factors.

A.2 SOLICITATION STRUCTURE

A.2.1 The Government will utilize North American Industry Classification System (NAICS) code 332994 Small Arms, Ordnance, and Ordnance Accessories Manufacturing Industry for this procurement. This NAICS code will also be assgned to any subsequently awarded delivery orders for the resulting contract.

A.2.2 Failure to register in the System for Award Management (SAM) for the corresponding NAICS code identified in paragraph A.2.1 prior to submitting a proposal for this solicitation may preclude an award made to your company. Offerors should be award of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) part 219, and 13 CFR 121 Small Business Size Regulations. Offerors are advised to review 13 CFR 121.103 How does SBA determine affiliation, if applicable to this solicitation.

A.2.3 All proposals received in response to this solicitation shall remain valid for a minimum of 120 calendar days.

A.3 ELECTRONIC CONTRACTING

W912CH27RA030

A.3.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website (https://www.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

A.3.2 Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

A.3.3 Interested offerors shall submit a proposal via email to the Contract Specialist Richard Hall:

Richard.G.Hall64.civ@army.mil and cc the corresponding Contracting Officer Elizabeth Levine Welhouse: Elizabeth.L.Levinewehouse.civ@army.mil with the subject header: Proposal Submission W912CH-27-R-A030 (Company Name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.

A.3.4 Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, to be received by the Government office designated in the solicitation by the time specified.

A.3.5 Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

A.3.6 Solicitation may remain posted on www.SAM.gov after the solicitation closing date.

A.3.7 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. All questions regarding the requirements of this solicitation and applicable attachments must be submitted no later than 15 calendar days after the solicitation has been posted to Contract Specialist Richard.G.Hall64.civ@army.mil. and back up Contract Specialist Ryan.D.Nawrocki.civ@army.mil. The Government will review all questions received, but is not obligated to answer questions submitted. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://ww.aptac-us.org/ to locate a reginal center.

A.4 ACKNOWLEDGEMENT OF AMENDMENTS

A.4.1 Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.5 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

A.5.1 This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

A.5.2 To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products /LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C Technical Data Package instructions.

A.5.3 Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

A.5.4 Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.6 ORDERING PERIODS

A.6.1 There will be Two- One Year ordering periods beginning the date of contract award. See SECTION B for more details

A.7 DELIVERY ORDERS

A.7.1 Future deliver order will be placed In Accordance With (IAW) Federal Acquisition Regulation (FAR) clauses 52.216-18 "Ordering", 52.216-19 "Order Limitations", and 52.216-21 "Requirements"

A.8 ARMY CONTRACTING COMMAND DETROIT ARSENAL OMBUSPERSON

A.8.1 Information regarding the Ombudsperson for this contract is located at the following website:

https://www.tacom.army.mil/ombudsperson . (Best viewed using Google Chrome or Microsoft Edge)

A.9 ALL OR NONE

A.9.1 Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

A.9.1.1 ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

A.9.2 OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN

THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.

*** END OF NARRATIVE 1 ***

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

The following definitions apply to the entire solicitation and resulting contract:

First ordering year of the contract is the date of the award plus 364 days.

Second ordering year of the contract is 365 days through 729 days after the contract award.

The price applicable to an individual order is the price for the ordering year in which order is issued. The delivery date does not determine the ordering year.

NOTE: EACH ORDERING YEAR QUANTITY IS ESTIMATE.

*** END OF NARRATIVE 1 ***

Item Supplies/Service Quanti ty

Unit Unit Price Amount

0001 FIRST ARTICLE TEST: 1 LOT

equals 5 units that shall be tested.

Product Service Code: 1005

Pricing Arrangement: Firm Fixed Price

1 Lot

Additional Descriptive Data:

A First Article Test Report is required in accordance with the clause entitled "FIRST

ARTICLE APPROAL CONTRACTOR TESTING, "FAR 52.209-3".

See SECTION E.2, E.5

0002 Year 1- Cocking Handle Assembly Lt Wt

Product Service Code: 1005

1,973 Each

Pricing Arrangement: Firm Fixed Price

0003 Year 2- Cocking Handle Assembly Lt Wt

Product Service Code: 1005

Pricing Arrangement: Firm Fixed Price

1,973 Each

9000 Contract Data Requirement Lists

(CDRLS) A001-A006

Product Service Code: H110

Pricing Arrangement: Firm Fixed Price

1 Lot

Section C - Description/Specifications/Statement of Work

C.1 TECHNICAL DATA PACKAGE INFORMATION

The following "X"d item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:

W912CH-27-R-A030

To access the data through SAM:

a. Log on to the SAM web site: https://SAM.gov.

b. Search for the solicitation number.

c. Click on the attachment you would like to view.

d. If the attachment is restricted, request access to the document.

C.1.2 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code).

C.1.3 Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

C.1.4 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and

DD 2345.

C.1.5 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

C.1.5.1 If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

W912CH27RA030

https://www.dla.mil/Portals/104/Documents/J3LogisticOperations/FIC/JCP/J3_DDForm2345Instructions(Oct2022)_221005.pdf?ver=dLEK75KpKWRfj3e5wMI8BQ%3d%3d https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2345.pdf https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2345.pdf

C.1.5.2 If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.

gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in

SAM.

C.1.5.3 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.

C.2 Counterintelligence Awareness and Reporting (CIAR); formerly known as Threat Awareness Reporting Program

(TARP):

C.2.1 Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete "Counterintelligence Awareness and Reporting for DoD Employees" - CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements.

C.2.2 In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI Special Agent or a CI-experienced person in addition to the annual training requirement:

C.2.3 DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special CIAR briefing prior to the travel and will be debriefed upon return. AR 381-12 13 June 2025 11.

C.2.4 DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.

C.2.5 DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.

C.2.6 DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.

C.2.7 Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.

C.2.8 Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.

C.2.9 Personnel with access to Sensitive Compartmented Information and Special Access Programs.

C.2.10 Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD

3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.

C.2.11 Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.

C.2.12 Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.

C.2.13 Professional and educational exchange programs with foreign governments.

C.2.14 These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent. Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.

C.3 OPSEC TRAINING REQUIREMENT

C.3.1 Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training.

OPSEC awareness training is available at: https://securityawareness.dcsa.mil/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer's Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).

C.4 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE

/PLAN

C.4.1 The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan, or other approved U.S. Government OPSEC plan, per AR 530-1, Operations Security. This Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

C.4.2 The contractor will receive a copy of the Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC Officers.

C.4.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.

W912CH27RA030

https://securityawareness.dcsa.mil/opsec/index.htm

C.5 HEAVY PHOSPHATE COATING REQUIREMENT

C.5.1 The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL-16232. All baseline testing, validation, and quality requirements mandated by MIL-DTL-16232 remain fully applicable and mandatory. Except where modified herein, all testing criteria, execution methods, and process verification frequencies shall conform to MIL-DTL-16232 and all other referenced or applicable specifications.

C.5.2 Written procedures developed in accordance with MIL-DTL-16232 "Preproduction Inspection" shall be submitted in accordance with Contract Data Requirements List (CDRL A004). The active contract number shall be cited on all procedures submitted for review and approval. All processes, equipment, control ranges, testing, and test frequencies used for phosphating and the application of supplemental finishes shall be described in detail. In addition to the baseline specification requirements of MIL-DTL-16232, the Contractor shall document, define, and incorporate the following elements within the submitted procedure:

C.5.3 Product name and manufacturer of all chemicals and materials used in the phosphate coating and supplemental finishing processes, including any supplemental dry film lubricant and CARC paint (primer/topcoat), with clear traceability to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at https://qpd.dla.

mil/.

C.5.4 Bath Materials and Controls in accordance with MIL-DTL-16232, detailing the methods used to monitor and control the chemical content of the phosphate coating solutions, to include the determination methods and control ranges for free acid, total acid, and ferrous iron.

C.5.5 Non-Chrome Sealer Rinse application and control, in accordance with the manufacturer's recommendations and MIL-DTL-16232, including how ongoing control and verification of this step is performed.

C.5.6 The minimum and maximum dry film thickness range for all applied supplemental finishes, including how thickness is measured and recorded.

C.5.7 The adhesion testing methodology utilized for supplemental finishes, including ASTM D2510 for dry film lubricant or ASTM D3359, Method B for CARC paint.

C.5.8 Process and curing parameters for dry film lubricants, specifying either a heatcure cycle (air drying for 1.0 hour or flash drying at 155-175 F for 10-30 minutes, followed by a heat cure at 375-425 F for 55-65 minutes) or an aircure cycle (air drying at room temperature for a minimum of 24 hours), in accordance with MILPRF46010 and any applicable product manufacturer's instructions.

C.5.9 Salt spray testing of parts or representative specimens/coupons with phosphate and a specified primer/topcoat system, performed in accordance with ASTM B117, TTC490, and any other applicable coating specifications, identifying the required exposure duration, test frequency, and performance criteria.

C.5.10 Color verification parameters for CARC paint, citing the specified color number or chip number in accordance with SAE AMS-STD-595.

C.5.11 Cure verification parameters for CARC paint utilizing the solvent wipe method, including the manufacturer of the acetone or methyl ethyl ketone (MEK) solvent utilized.

W912CH27RA030

https://qpd.dla.mil/ https://qpd.dla.mil/

C.5.12 Test and verification frequencies shall be clearly identified in the written procedures and supporting work instructions. Test frequencies shall be in accordance with MILDTL16232 and any other applicable specifications unless specifically modified or supplemented below. Where a test frequency is stated both in MIL-DTL-16232 and this narrative, the frequency requiring the greater number of tests within the defined unit of production or time shall apply.

Failure of any test shall result in rejection of the entire lot back to the last passing test.

C.5.13 Weight per unit area of phosphate coating shall be tested per lot, at a minimum of once every eight hours of continuous production.

C.5.14 Nonchrome sealer rinse concentration shall be verified in accordance with the sealer manufacturer's recommendations prior to starting production and at least once every eight hours of continuous operation.

C.5.15 Final chromic acid rinse shall be verified prior to starting production and at least once every eight hours of continuous operation.

C.5.16 Accelerated corrosion resistance (salt spray) of phosphate coatings, shall be tested in accordance with ASTM B117 per lot, at a minimum of once every eight hours of continuous production.

C.5.17 Thickness of supplemental finishes, including dry film lubricants and CARC paint (primer/topcoat), shall be measured at least once per production day.

C.5.18 Adhesion of supplemental finishes shall be tested at least once per production day, utilizing ASTM D2510 for dry film lubricants and ASTM D3359, Method B, for CARC coatings.

C.5.19 Topcoat cure verification shall be performed at least once per production day by solvent wipe in accordance with MILDTL53072.

C.6 CONFIGURATION MANAGEMENT DOCUMENTATION

C.6.1 The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

C.6.2 The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

C.6.3 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

C.6.4 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

C.6.5 All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

C.6.6 For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

C.6.6.1 for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

C.6.6.2 for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

C.6.6.3 for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

C.6.7 The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

C.6.8 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).

C.6.9 The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

*** END OF NARRATIVE 1 ***

Requirements Two-Year Requirement, Firm-Fixed Price for the procurement of the Cocking Handle Assembly Lt Wt

Section D - Packaging and Marking

D.1 Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the

TDP.

PRESERVATION: MILITARY

LEVEL OF PACKING: -B--

QUANTITY PER UNIT PACKAGE: -001-

SPI NUMBER - 13013732, DATED - 03 JUN 25, REV A

D.2 Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

D.3 Marking: In addition to any special markings called out on the SPI;

D.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211- 7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers' Passive RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.

D.4 Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

D.5 This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

D.6 Hazardous Materials (as applicable):

D.6.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

D.6.1.2 Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:

International Air Transport Association (IATA) Dangerous Goods Regulations

International Maritime Dangerous Goods Code (IMDG)

Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

Joint Service Regulation AFMAN24-604/TM38-250/NAVSUPPUB 505/MCO

P4030.19/DLAM 4145.3 (for military air shipments).

D.6.1.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the

Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

D.6.1.4 When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

SUPPLEMENTAL INSTRUCTIONS: SEE SECTION C FOR CHANGES/UPDATES TO SPI.

*** END OF NARRATIVE 1 ***

Section E - Inspection and Acceptance

E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN

E.1.2 The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: ORIGIN

a. NAME:

b. CAGE:

c. ADDRESS, CITY, STATE, ZIP

ACCEPTANCE POINT: ORIGIN

a. NAME:

b. CAGE:

c. ADDRESS, CITY, STATE, ZIP

E.2 FIRST ARTICLE TEST REPORT (FATR) ACCEPTANCE: DESTINATION

E.2.1 The Government's acceptance of the First Article Test Report offered under this order shall take place at DESTINATION.

E.3 REWORK AND REPAIR OF NONCONFORMING MATERIAL

E.3.1 Rework and Repair are defined as follows:

E.3.1.1 Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

E.3.1.2 Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

E.3.1.3 Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

E.3.1.4 Repair procedures shall be documented by the Contractor and submitted on a Request for Variance, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

E.3.1.5 Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

E.3.1.6 The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

E.4 ACCEPTANCE INSPECTION EQUIPMENT (AIE)

E.4.1 The contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.

E.4.2 The contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements.

E.4.3 AIE shall be available for use on the First Article (FA) submission, if FA is required, or prior to use for acceptance of production material on this contract.

E.4.4 Contractor furnished AIE shall be made (i) to the AIE designs specified in Section C, or (ii) to any other design provided the contractor's proposed AIE design is approved by the Government.

Contractor's proposed AIE design for inspection of characteristics listed as "Critical, Special or Major" shall be submitted to the Government for review and approval as directed on the Contract Data Requirements List, DD Form 1423. Government approval of AIE design shall not be considered to modify the contract requirements.

E.4.5 When the contractor submits its proposed AIE on commercial off the shelf equipment, the contractor shall include the manufacturer's name and model number, and sufficient information to show capability of the proposed AIE to perform the inspection required. When submitting proposed AIE design documentation on commercial computer controlled test and measuring equipment include information on (1) test program listing (2) flowcharts showing accept and reject limits and computer generated test stimuli (3) calibration program listing (4) sample of the printout of an actual test and calibration (5) test plan to verify accuracy of inspection and correctness of accept or reject decision (6) identification of the equipment by model name and number.

E.4.6 Resubmission of the contractor's proposed AIE design for Government approval on a follow on Government contract is not required, provided the inspection characteristic parameters specified in the technical data package and the previously Government approved AIE designs have not changed. In this situation, the contractor shall provide written correspondence in the place of the AIE designs that indicates the prior Government approval and states that no changes have occurred.

E.4.7 The Government reserves the right to disapprove, at any time during the performance of this contract, any AIE that is not accomplishing its intended use in verifying an inspection or test characteristic.

E.4.8 If the contractor changes the design after the initial approval, the modified design must be submitted for approval prior to use.

E.5 FIRST ARTICLE TEST (CONTRACTOR TESTING)

E.5.1 The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

E.5.2 The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

E.5.3 The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

E.5.3.1 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

E.5.3.2 Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

E.5.3.3 Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.

E.5.3.4 Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

E.5.3.5 Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.

E.5.4 Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

E.5.5 A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing /specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to USARMY RIA CCDC AC Mailbox RDAR-QEP: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil.

E.5.6 Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the Contractor.

E.6 USE OF MIL-STD 1916

E.6.1 The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The Verification Level (VL) shall be:

VL III for major characteristics and

VL II for minor characteristics.

E.6.2 MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed- Price.

1996-08

52.246-15 Certificate of Conformance. 1984-04

52.246-16 Responsibility for Supplies. 1984-04

FAR Clauses Incorporated by Full Text

Number Title Effective Alternate Variation

Date Deviation Effective Date

52.246-11 Higher-Level Contract Quality Requirement.

2014-12

Higher-Level Contract Quality Requirement (Dec 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Tailored by excluding paragraph(s) 8.3[Contracting Officer insert the title, number (if any), date, and tailoring (if any) of the higher-level quality standards.]

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

Section F - Deliveries or Performance

F.1 TIME OF DELIVERY

F.1.1 The Government requires delivery to be made according to the following schedule:

CLIN ESTIMATED QTY CALENDAR DAYS AFTER AWARD

0001 FAT 1 LO 180

0002 1,973 EA 150

0003 1,973 EA 100

F.1.2 The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offer that propose delivery that will not clearly fall within the applicable required delivery period specified above, may be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

CLIN ESTIMATED QTY CALENDAR DAYS AFTER AWARD

0001 FAT 1 LO

0002 1,973 EA

0003 1,973 EA

F.1.3 Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails.

However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

F.1.4, Only upon approval from Contracting Officer, an accelerated delivery schedule may be acceptable at no additional cost to the Government.

0001 1 LotQuantity

Address and POC

Special Handling/Notes FoB Details

Party to Pay Transportation Cost: Contractor

Point Type: Destination

0002 1,973 EachQuantity

Address and POC

Special Handling/Notes FoB Details

Party to Pay Transportation Cost: Contractor

Point Type: Destination

0003 1,973 EachQuantity

Address and POC

Special Handling/Notes FoB Details

Party to Pay Transportation Cost: Contractor

Point Type: Destination

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.242-15 Stop-Work Order. 1989-08

52.242-17 Government Delay of Work. 1984-04

52.247-34 F.o.b. Destination. 1991-01

Secti…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .