This is an Invitation for Bids (IFB) for a firm-fixed-price contract with a 100% option to procure an Electrical Parts Kit (NSN: 6115-01-563-7966, Part Number: 12423864-001). The Army Contracting Command – Detroit Arsenal is soliciting bids for CLIN 0001 (First Article Test Report due within 90 days of award), CLIN 0002 (393 kits due within 270 days after First Article Test acceptance), and CLIN 0003 (up to 393 kits as an unexercised option, delivery at minimum 40 kits within 360 days of award, then 30 kits every 30 days thereafter). The contract is full-and-open competition, FOB Origin with the Government paying transportation costs. All bids must be submitted electronically by January 5, 2027, at 1:00 PM local time (Warren, Michigan) to the Contract Specialists Nikhil Patel and Lauren DeRoche. Bid opening will be conducted virtually via Microsoft Teams.
Bidders must meet several mandatory requirements to avoid disqualification: (1) provide commitment letters confirming procurement of all qualified parts from approved sources (Nord-Lock and C.E. Niehoff components specified); (2) access and comply with the Technical Data Package (TDP) marked distribution code "C" via SAM.gov, requiring current DD Form 2345 certification from the Joint Certification Program; (3) obtain ISO 9001:2015 or equivalent certification; (4) acknowledge receipt of all IFB amendments; and (5) complete all representations and certifications in Standard Form 33, including Place of Manufacture and tax certifications. The contract includes requirements for CARC (Chemical Agent Resistant Coating) processes per AOPN 12585018, OPSEC training and coordination, TARP (Threat Awareness and Reporting Program) training for employees with security clearances, configuration management per SAE EIA-649-1, and military-grade packaging and preservation per MIL-STD-2073-1E. The Government will evaluate bids without discussions and retain the right to award based on either the Government's or Contractor's proposed delivery schedule. All bids must remain valid for a minimum of 180 calendar days after bid opening.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A001-A003 CDRLs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Section A - Solicitation/Contract Form
Electrical Parts Kit IFBInstrument Name:
Product Service Code : 6115
A.1. DESCRIPTION OF ACTION
(a) This Invitation for Bids (IFB) is intended to result in the award of a firm-fixed-price (FFP) contract with 100% option for the Electrical Parts Kit, National Stock Number (NSN): 6115-01-563- 7966, Part Number: 12423864-001.
(b) This IFB is for full-and-open competition and is FOB Origin.
(c) There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution code "C", which limits access to Department of War (DoW) and U.S. DoW contractors only. Please see Section C.6. TECHNICAL DATA PACKAGE INFORMATION for instructions on how to access this data. BIDDERS MUST ACCESS THE TDP PRIOR TO SUBMITTING A BID OR
THE BID SUBMISSION WILL BE REJECTED.
(d) There is a Qualified Parts list required for certain specifications within the TDP. Offerors are required to provide a commitment letter providing evidence that all parts required in the Qualified Parts List will be procured from the qualified sources within their proposal. OFFERORS WHO DO
NOT PROVIDE THIS COMMITMENT LETTER IN THEIR BID SUBMISSION WILL BE
DISQUALIFIED FROM AWARD.
i.) 12422608 / NL12/ NORD-LOCK / 1PUD1/ 05MAR2024 ii.) 12422608 / NL10/ NORD-LOCK / 1PUD1 / 05MAR2024 iii.) 12423713 /N1224-1 / C.E. NIEHOFF/ 76761 / 05MAR2024
(e) Bidders are advised to carefully read and understand this entire IFB, including Sections L and M, prior to submitting a bid for evaluation. The Government will evaluate bids without discussions /negotiations and does not assume the duty to search for data to cure problems it finds in any bid.
Therefore, all information necessary for the review and evaluation of a bid is to be contained within the bid submission.
(f) Federal Acquisition Regulation (FAR) Clause 52.246-11 Higher Level Contract Quality System is required. Contractor must be ISO 9001:2015 or equivalent.
(g) Bidders must complete all necessary fill-ins and representations throughout this IFB, including but not limited to:
W912CH27BA005
(1) STANDARD FORM 33 (IFB COVER PAGE): Blocks 13 through 18;
(2) SECTION B: The unit prices and dollar amounts requested for CLIN 0001: First Article Test Report, CLIN 0002: Production Quantity, and CLIN 0003: Unexercised Option Quantity;
(3) SECTION E: E.1 Inspection and Acceptance Points - Origin;
(4) SECTION F: F.1 TIME OF DELIVERY
(5) SECTION F: F.2 FOB Point;
(6) SECTION F: F.3 TRANSPORTATION DATA FOR FOB ORIGIN OFFERS
(7) SECTION K: RFO FAR 52.209-13 - Violation of Arms Control Treaties or Agreements - Certification;
(8) SECTION K: RFO FAR 52.225-18 - Place of Manufacture; and
(9) SECTION K: RFO FAR 52.229-11 - Tax on Certain Foreign Procurements - Notice and Representation
Failure to complete all required fill-ins and representations may result in the rejection of a bid.
(f) Bidders shall acknowledge receipt of all IFB amendments by the date and time indicated for receipt of bids. If this IFB is amended, all terms and conditions not modified remain unchanged.
Please see Section A.5. Acknowledgement of Amendments and RFO 52.214-3: Amendments to IFBs for additional information.
(g) Bid opening will be held with all Bidders and shall commence on 5 January 2027 at 1 PM local time (Warren, MI). Due to security protocols at the Detroit Arsenal, bid opening will be held virtually. Bidder attendance at this event is not required. The Government will provide a Microsoft Teams link, teleconference number, and passcode prior to bid opening. Please contact the following personnel via email to receive this information:
Nikhil Patel
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: nikhil.a.patel2.civ@army.mil
-and-
Lauren DeRoche
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: lauren.r.deroche.civ@army.mil
A.2. IFB STRUCTURE
(a) NAICS. The Government will utilize North American Industry Classification System (NAICS) code 336320 (Motor Vehicle Electrical and Electronic Equipment Manufacturing) for this procurement. Failure to register via the System for Award Management (SAM) website for this NAICS, prior to submitting a bid in response to this IFB, may preclude your firm from receiving an award. Bidders should be aware of how U.S. small business concerns are defined in RFO Part 19, RFO DFARS Part 219, and 13 CFR 121 Small Business Size Regulations. Bidders are advised to review 13 CFR 121.103, "How does SBA determine affiliation?", if applicable to this IFB.
(b) All bids received in response to this IFB shall be valid for a minimum of 180 calendar days after bid opening on 5 January 2027. Please see RFO 52.214-16: Minimum Bid Acceptance Period for additional information.
W912CH27BA005
mailto:nikhil.a.patel2.civ@army.mil mailto:lauren.r.deroche.civ@army.mil
A.3. ELECTRONIC CONTRACTING
(a) All Army Contracting Command - Detroit Arsenal IFBs will be publicized on the SAM website:
https://www.SAM.gov
Any additional attachments, including the TDP(s) when available electronically, will be separate attachments or links embedded in the IFB.
(b) Interested Bidders shall submit a completed IFB, including the Standard Form 33, via email with the subject line "IFB Submission - W912CH-27-B-A005 (Contractor Name)" to the following personnel:
Nikhil Patel
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: nikhil.a.patel2.civ@army.mil
-and-
Lauren DeRoche
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: lauren.r.deroche.civ@army.mil
Once a bid is received, the Contract Specialist will reply to the respective Bidder indicating receipt of the submission. NOTE: FAX, HARDCOPY (PAPER), AND DVD/CD-ROM BIDS WILL NOT BE
ACCEPTED. HAND-CARRIED BIDS, WHETHER HARDCOPY OR ELECTRONIC, WILL ALSO
NOT BE ACCEPTED.
(c) Please pay close attention to the Issued By block on the cover page of this IFB for a closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with RFO 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, Bidders are responsible for submitting bids, and any revisions/modifications, so as to be received by the Government office designated in the IFB by the date and time specified.
(d) It is the Bidder's responsibility to ensure the bid is received by the date and time specified on the cover page of this IFB. In accordance with RFO 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, if the bid was not received at the initial point of entry to the Government infrastructure (in this case, received via email) by the exact date and time specified on the cover page of this IFB, it will be determined late. Bid is defined to mean ALL volumes or parts required by the IFB are included in the electronic submission.
NOTE: There is no "expected" or "target" length of time for bid submission; size and content may be factors, therefore Bidders are strongly cautioned when submitting bids to allow adequate time for submission.
(e) IFBs may remain posted on SAM.gov after the IFB closing date. If the response deadline has passed for the IFB, vendors will no longer be able to submit electronic responses.
(f) Any award issued as a result of this IFB will be distributed electronically. In the event of a Freedom of Information Act (FOIA) request for a copy of any award issued as a result of this IFB, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price(s). This is the notice required by Executive Order 12600 (June 23, 1987) of the Government's intention to release unit prices in response to any request under FOIA, 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include cost or pricing data /information. If a Bidder objects to such release in the base contract or contract modifications, the Bidder must notify the Contracting Officer in writing prior to the closing date identified in this IFB and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on the rationale given.
(g) All questions pertaining to this IFB shall be submitted via email to the following personnel by 26 December 2026 at 5 PM local time (Warren, MI):
Nikhil Patel
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: nikhil.a.patel2.civ@army.mil
-and-
Lauren DeRoche
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: lauren.r.deroche.civ@army.mil
Responses will be furnished via a Q&A log posting to SAM.gov or as an IFB amendment, if the information is necessary in submitting bids or if the lack thereof would be prejudicial to other prospective Bidders. Please see RFO 52.214-6: Explanation to Prospective Bidders for additional information. The Government will review all questions received but is not obligated to answer questions submitted after the date/time noted above, prior to IFB close.
(h) For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website to locate a regional center at:
http://www.aptac-us.org
A.4. ALL OR NONE - NON-COMMERCIAL ITEM ACQUISITION - SEALED BIDDING
(a) This provision serves as notice that all bid submissions must offer to provide the total quantity of all items identified in this solicitation.
(b) Only one award will be made as a result of this solicitation. Bids submitted for less than the total quantity of all items identified in this solicitation will not be considered for award.
(c) Note: This provision supersedes any other solicitation language that pertains to or references multiple awards.
A.5 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.6 ARMY CONTRACTING COMMAND - DETROIT ARSENAL (DTA)
OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
(Best viewed using Google Chrome or Microsoft Edge). https://tacom.army.mil/ombudsman
A.7 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA
PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, "Militarily Critical Technical Data Agreement" certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products
W912CH27BA005
https://tacom.army.mil/ombudsman
/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C "Technical Data Package" instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
*** END OF NARRATIVE 1 ***
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quanti ty
Unit Unit Price Amount
0001 First Article Test Report
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.
Product Service Code: R425
North American Industry Classification System (NAICS):
336320
Pricing Arrangement: Firm Fixed Price
1 Lot
0002 FAT Asset for Destructive Testing
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.
Product Service Code: R425
Pricing Arrangement: Firm Fixed Price
1 Lot
0003 Electrical Parts Kit (Production Quantity)
Manufacturer's Part Number:
12423864-001
National Stock Number:
6115015637966
Manufacturer's CAGE: 19207
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W25G1U618700JJ
Product Service Code: 6115
North American Industry Classification System (NAICS):
336320
Bill to Party: W25G1U
Pricing Arrangement: Firm Fixed Price
393 Kit
Option Line Item
Electrical Parts Kit (Option)
Manufacturer's Part Number:
12423864-001
National Stock Number:
6115015637966
Manufacturer's CAGE: 19207
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W25G1U618700JJ
Product Service Code: 6115
393 Kit
North American Industry Classification System (NAICS):
336320
Bill to Party: W25G1U
Pricing Arrangement: Firm Fixed Price
Section C - Description/Specifications/Statement of Work
C.1 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I
C.2 OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm.
The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.
C.3 THREAT AWARENESS REPORTING PROGRAM
(a) All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and Reporting Program (TARP). The in-person training is the preferred method and is available by contacting the local CI Office to arrange for the conduct of training.
(b) The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete, the Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.
(c) The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session.
Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army www.lms.army.mil.Learning Management System (ALMS) at:
C.4 DRAWING LIMITATIONS
(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated and specifications and drawings. The contractor is responsible for having all drawings specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date. (e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
C.5 ACQUISITION OF SOURCE-CONTROLLED PART NUMBER
Acquisition under this contract is restricted to:
(1) The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package; and
(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the Technical Data Package;
provided the non-listed part numbers have been furnished to one of the approved manufacturers listed in the Technical Data Package and that manufacturer has substituted the non-listed part with one of the approved part numbers, without making any changes in the characteristics or properties of the part.
C.6 TECHNICAL DATA PACKAGE INFORMATION
The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:
W912CH-27-B-A005
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov.
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).
(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted.
Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
C.7 CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent;
that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
f. The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-
(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
C.8 USE OF CLASS I and CLASS II OZONE DEPLETING SUBSTANCES
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at:
https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.
(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
*** END OF NARRATIVE 1 ***
Requirements
PARTS KIT,ELECTRICAL
W912CH27BA005
https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm
Section D - Packaging and Marking
D.1 PACKAGING REQUIREMENTS (SPECIFICATIONS/STANDARDS)
(a) The preservation, packing, and marking requirements for this contract/order shall be accomplished in accordance with the requirements in the specification/standard defined below.
(b) The following requirements shall apply:
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: A
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIFICATION/STANDARD: 52.211-4514
(c) The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO.
The government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.
(d) Marking:
In addition to any special markings called out by the specification/standard above, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.
Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. NOTE: When an item has Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the UII clause cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) When applicable, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I) /DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(g) SUPPLEMENTAL INSTRUCTIONS: Package IAW MIL-STD-2073 1E, Appendix D.
*** END OF NARRATIVE 1 ***
Section E - Inspection and Acceptance
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION
POINT: ______________________________________________________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2 REQUIREMENTS FOR PRETREATMENTS AND CHEMICAL AGENT RESISTANT
COATINGS LOCAL WARREN - PAINTED MATERIEL
(a) Scope
(1) This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical Agent Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.
(2) Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.
(b) Definitions
(1) The "contracting agency," "appropriate agency," "procuring authority," "engineering authority," "procuring agency," and "procuring activity" is the PCO or designee.
(2) The "prime contractor" is the company awarded this contract, and the "subcontractors" comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.
(c) General Requirements Clarifications
(1) The government retains the right for onsite verification of the prime contractors' and its subcontractors' products, processes, procedures, and test reports.
(2) The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports. This information shall be available upon government request.
(3) The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.
(4) All painting operations, to include production validation, process quality control, and application activities shall be carried out in accordance with the requirements of AOPN 12585018 - Chemical Agent Resistant Coating Systems for Exterior and Interior Army Materiel and the additional clarifications within this clause.
(5) When a substrate is cleaned using multiple methods, each cleaning method shall be treated as a separate step in the process documentation.
(6) CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.
(7) If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in MIL-DTL-53072.
(d) Pre-Production Approval Clarifications
(1) Test procedures shall be submitted IAW the Contract Data Requirements List (CDRL) DI-NDTI- 80603 documenting Pretreatment and Chemical Agent Resistant Coating procedures when this CDRL is included in the contract.
(2) Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and Chemical Agent Resistant Coating testing IAW the Contract Data Requirements List (CDRL) DI- NDTI-80809 when this CDRL is included in the contract.
(e) Production Testing Clarifications
(1) At a minimum, ongoing production quality tests shall be conducted and recorded daily for coating adhesion and coating thickness, and monthly for salt spray testing. Use of ISO accredited laboratories is optional for these ongoing tests of production parts.
E.3 NOTICE REGARDING FIRST ARTICLE
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
E.4 NOTICE REGARDING FIRST ARTICLE TEST SAMPLE
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of -1- that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price.
A quantity of -2- that successfully passes all specified tests, less the destructive tests, if any, -3-serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) an aid in identifying any process changes, or 3) the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
E.5 TECHNICAL DATA FOR INSPECTION
(a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications, and any applicable Engineering Exceptions associated to the technical data, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor technical data is available for review to support the Government's inspection requirements.
E.6 ROUTING OF SPECIAL PROCESS APPROVALS
(a) The Technical Data Package for this contract contains one or more of the following specifications:
MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base
TT-C-490 Chemical Conversion Coatings and Pretreatment for Ferrous Surfaces (Base for Organic Coatings)
MIL-W-12332 Welding Resistance, Spot: Weldable Aluminum Alloys
MIL-W-45210 Welding Resistance, Spot: Weldable Aluminum Alloys
* MIL-STD-3057 - Ground Combat Vehicle Welding Code - Aluminum
(b) The specifications listed in paragraph 1 may require approval from the Government prior to production for one or more special processes involved in producing the item. The following shall apply, unless stated elsewhere in the contract:
(1) The contractor shall prepare the written procedures as the specification requires.
(2) Procedures requiring Government approval shall be routed to the Administrative Contracting Officer (ACO) for review and approval. If the ACO is unable to perform a review, the ACO shall forward the procedure to the Procuring Contracting Officer (PCO) for assistance in the review and approval process. The correct address for the PCO is on the face page of this contract.
(3) Cite (i) the contract number and (ii) the governing specification or standard on all procedures submitted for approval.
(4) The DCMA will provide a copy of their approval/rejection notices to the PCO.
(5) DCMA is required to qualify the processes of the major coating subcontractors used by the prime contractors.
*** END OF NARRATIVE 1 ***
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.246-2 Inspection of Supplies-Fixed- Price.
1996-08
52.246-16 Responsibility for Supplies. 1984-04
Overall Contract Inspection/Acceptance Locations
0003 Inspection and Acceptance Location
Both Source Instructions: DoDDAC W912CH is a placeholder until award. The DoDDAC for Inspection/Acceptance will be changed to reflect the DCMA office that is assigned to the awardee.
DoDAAC: W912CH CountryCode: USA
W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING, 6501 EAST 11 MILE ROAD
WARREN, MI 48397-5000
UNITED STATES
Option Line Item
Inspection and Acceptance Location
Both Source Instructions: DoDDAC W912CH is a placeholder until award. The DoDDAC for Inspection/Acceptance will be changed to reflect the DCMA office that is assigned to the awardee.
DoDAAC: W912CH CountryCode: USA
W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING, 6501 EAST 11 MILE ROAD
WARREN, MI 48397-5000
UNITED STATES
Section F - Deliveries or Performance
F.1 TIME OF DELIVERY
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER CONTRACT AWARD
CLIN 0001 1 FAT 90 DAYS
CLIN 0002 393 KT 270 DAYS AFTER FAT ACCEPTANCE
CLIN 0003 UP TO 393 KT 180 DAYS
* Delivery Rate: Deliveries shall begin at a quantity of at least 40 KT within 360 calendar days after date of contract award and continue at a rate of at least 30 KT every 30 calendar days until the contract is fulfilled. The required quantity of 10 EA, every 30 calendar days, is firm and shall not vary.
The Government reserves the right to award under either the solicited delivery schedule or the proposed delivery schedule when an offeror offers a delivery schedule other than identified above.
If the offeror proposes no other delivery schedule, the identified delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER CONTRACT AWARD
CLIN 0001 1 FAT ______________________________
CLIN 0002 393 KT ______________________________
CLIN 0003 UP TO 393 KT ______________________________
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails.
However, the Government will evaluate an offer that proposes delivery based on the Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(c) Only upon approval from the Contracting Officer, an accelerated delivery schedule may be acceptable at no additional cost to the Government.
F.2 FOB POINT
Delivery on F.O.B. origin offers will be F.O.B. Carrier's equipment, wharf, or freight station, at the Government's option, at or near:
(1) Contractor's Plant:
(City) (State) (ZIP) (County)
(2) Subcontractor's Plant:
(City) (State) (ZIP) (County)
F.3 TRANSPORTATION DATA FOR FOB ORIGIN OFFERS
(a) Provide the following information for the USG to use in selecting the most favorable mode of shipment. The USG will also use this information in our evaluation of transportation costs.
Offeror represents that:
(1) Facilities for shipping by rail
[ ] are
[ ] are not available at the F.O.B. point(s) stated in this solicitation.
(2)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .