This is a Solicitation, Offer, and Award (Standard Form 33) for a sole-source contract to Marvin Land Systems (MLS) for Direct Drive Auxiliary Power Units (DDAPU). The solicitation is for a three-year requirements contract with an estimated 87-88 units per year, using North American Industry Classification System (NAICS) code 335312 for Motor and Generator Manufacturing. The contract will be firm-fixed-price with delivery to the SR W0LX Army General Supply Central Receiving Point in Anniston, AL, with deliveries beginning 420 days after contract award and continuing at a rate of 24 units every 30 calendar days.
The solicitation includes specific requirements for configuration management, technical data package (TDP) with Distribution Statement D, OPSEC procedures, and reporting. The contract involves pretreatments and chemical agent resistant coatings, with various data deliverables such as Engineering Change Proposals, Requests for Variance, and Test Procedures. The Technical Data Package is available through the System for Award Management (SAM) and has restrictions limiting access to Department of Defense and U.S. DoD contractors. Proposals are to be submitted electronically to the Contract Specialist and Contracting Officer by December 5, 2025, with a minimum acceptance period of 120 calendar days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CH-25-R-0097 Amendment 0003.pdf | ||
| W912CH-25-R-0097 Amendment 0002.pdf | ||
| W912CH-25-R-0097 Amendment 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W912CH-25-R-0097
X
2025NOV05
2025DEC0505:00pm
DOA5
2025NOV05 SEE SCHEDULE
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
ANGELO WILSON
(586)282-1234
CCTA-HCP-B
ANGELO.B.WILSON.CIV@ARMY.MIL
X 1 25
1 76
X 1
X 5 X 11
X 14 X 16 X 20
X 26
X 28
X 50
X 51
X 63
X 76
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ANGELO WILSON
Buyer Office Symbol/Telephone Number: CCTA-HCP-B/(586)282-1234
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.1 BACKGROUND/DESCRIPTION OF THE ACTION
A.1.1 Under the authority of FAR 6.302-1, Only One Responsible Source, the Government intends to award a sole source contract to Marvin
Land Systems (MLS) for the Direct Drive Auxiliary Power Unit (DDAPU), National Stock Number (NSN) 6115-01-706-8649. This solicitation is intended to result in a three-year Requirements contract under FAR 16.503, Requirements contracts, for the estimated supplies specified.
The resulting contract will establish pricing to be utilized through the issuance of delivery orders for discrete quantities for the period stated in the schedule. The Government bears no responsibility to issue an initial minimum order upon base contract award. For further guidance related to a Requirements type contract, see FAR clause 52.216-21, Requirements.
A.1.2 There is a Technical Data Package (TDP) associated with this procurement. The TDP is Distribution Statement D, which limits access to the Department of Defense (DoD) and U.S. DoD contractors only. Please refer to Section C for additional information.
A.2 SOLICITATION STRUCTURE
A.2.1 The Government will utilize North American Industry Classification System (NAICS) code 335312 - Motor and Generator Manufacturing.
A.2.2 System for Award Management (SAM), Size Standards, and NAICS Codes
Failure to register in SAM for the corresponding NAICS code identified in paragraph A.3 prior to submitting a proposal against this solicitation may preclude an award being made to your company. Offerors should be aware of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) Part 19, and 13 CFR 121, Small Business Size
Regulations. Offerors are advised to review 13 CFR 121.103, "How does SBA Determine Affiliation".
A.3 ORDERING PERIOD
A.3.1 There will be three, one-year ordering periods beginning the date of contract award.
A.4 DELIVERY ORDER AWARDS
A.4.1 Future delivery orders will be awarded IAW FAR clause 52.216-19, Order Limitations, FAR clause 52.216-21, Requirements, and
Section B. All contained within this solicitation and resulting contract.
A.5 ELECTRONIC CONTRACTING
A.5.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://ww w. sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
A.5.2 Interested Offerors shall submit a proposal via email to the Contract Specialist (angelo.b.wilson.civ@army.mil) and cc the corresponding Contracting Officer (erika.j.dennison2.civ@army.mil) with the subject header: Proposal Submission W912CH-25-R-0097
(company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
A.5.3 Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission, however, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3. Bids can be submitted can be submitted using any of the following electronic formats:
A.5.3.1 Microsoft Office Products; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
A.3.3.2 Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
A.5.3.3 Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.
A.5.3.4 Other electronic formats are not acceptable.
2 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A.5.3.5 Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.
A.5.3.6 Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
A.5.3.7 It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
A.5.3.8 Solicitations may remain posted on www.sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
A.5.3.9 Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the
Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
A.5.3.10 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.6 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
A.6.1 Information regarding the Ombudsperson for this contract is located at the following website:
https://www.tacom.army.mil/ombudsperson . (Best viewed using Google Chrome or Microsoft Edge)
A.7 Deadline for Submission of Questions
A.7.1 All questions regarding the requirements of this solicitation and applicable attachments must be submitted by December 12, 2025, 12:00 PM EST to angelo.b.wilson.civ@army.mil. The Government shall review all questions received but is not obligated to answer questions submitted after the date noted above prior to the solicitation close date.
A.8 ALL OR NONE
A.8.1 Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
A.9 ACKNOWLEDGEMENT OF AMENDMENTS
A.9.1 Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
3 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0001 ***
4 76
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
The following four digit Contract Line Item
Numbers(CLINs) utilize the numbering system below:
The first three digits signify item and the fourth
(last) digit signifies the applicable contract year, i.e., CLIN0011 is for the first item - first ordering year, CLIN 0012 is for the first item -second ordering year, CLIN 0013 is for the first item -third ordering year, etc.
The following definitions apply to the entire solicitation and resulting contract:
First ordering year of the contract is the date of award plus 364 days.
Second ordering year of the contract is 365 days through 729 days after contract award.
Third ordering year of the contract is 730 days through 1,094 days after contract award.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL Order is the price for the ordering year in which the order is issued. The delivery date does not determine the contract year.
(End of narrative A001)
0011 FIRST ORDERING YEAR EST 87 EA $ $ ___________________ ______________ __________________
NSN: 6115-01-706-8649
COMMODITY NAME: DD AUXILIARY POWER UNITS
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE SECTION D PACKAGING INSTRUCTIONS
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
5 76
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
CENTRAL RECEIVING POINT
7 FRANKFORD AVE BLDG 362
ANNISTON,AL,36201-4199
6 76
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0012 SECOND ORDERING YEAR EST 88 EA $ $ ____________________ ______________ __________________
NSN: 6115-01-706-8649
COMMODITY NAME: DD AUXILIARY POWER UNITS
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE SECTION D PACKAGING INSTRUCTIONS
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
CENTRAL RECEIVING POINT
7 FRANKFORD AVE BLDG 362
ANNISTON,AL,36201-4199
7 76
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0013 THIRD ORDERING YEAR EST 88 EA $ $ ___________________ ______________ __________________
NSN: 6115-01-706-8649
COMMODITY NAME: DD AUXILIARY POWER UNITS
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE SECTION D PACKAGING INSTRUCTIONS
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
CENTRAL RECEIVING POINT
7 FRANKFORD AVE BLDG 362
ANNISTON,AL,36201-4199
8 76
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
9000 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________
A001 SERVICE DATA ITEM - NOT PRICED 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 SERVICE DATA ITEM - NOT PRICED 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: REQUEST FOR VARIANCE
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 SERVICE DATA ITEM - NOT PRICED 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: NOTICE OF REVISION
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A004 SERVICE DATA ITEM - NOT PRICED 1 LO $ ** NSP ** ______________________________ __________________
9 76
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: TEST PROCEDURE
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A005 SERVICE DATA ITEM - NOT PRICED 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: TEST REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A006 SERVICE DATA ITEM - NOT PRICED 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: INVENTORY REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
10 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION
The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X ] 2. The TDP (Attachment 0001)for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov ) associated with this solicitation number:
W912CH-25-R-0097
To access the data through SAM:
C.1.1 Log on to the SAM web site: https://SAM.gov .
C.1.2 Search for the solicitation number.
C.1.3 Click on the attachment you would like to view.
C.1.4 If the attachment is restricted, request access to the document.
C.1.4.1 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United
States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).
C.1.4.2 Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution
Statement markings, and U.S. export control laws . This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
C.1.4.3 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense
Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
C.1.4.4 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
C.1.5 If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract
Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download
TDP items.
C.1.6 If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
C.1.7 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-
Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
C.2 CONFIGURATION MANAGEMENT DOCUMENTATION
C.2.1 The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
\ql
C.2.1.1 The Configuration Change Management section of SAE EIA-649-1 (current revision) Configuration Management Requirement for Defense
Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); and the second sentence of paragraph 3.3.1.8.1(1).
C.2.1.2 Furnished item(s) shall conform to the approved configuration requirements/revision unless an RFV is processed and approved as provided by Paragraph e. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
C.2.1.3 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1
(current revision) and should be referred to Section I Clause 52.248-1 VALUE ENGINEERING.
11 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.2.1.4 All ECPs submitted will be deemed routine. The Contractor must include justification for an ECP it considers "emergency" or
"urgent" in the submittal and include all supporting documentation.
C.2.1.5 For ECPs, RFVs, and NORs, the Contractor must submit the documentation listed in sub-paragraphs (i) through (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
C.2.1.6 The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in C.2.1.5 (i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
C.2.1.7 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO), copy to the Administrative Contracting Officer (ACO).
C.2.1.8 The submission of an ECP/RFV/NOR does not affect the required delivery date of the contract.
C.3 CONTROLLED UNCLASSIFIED INFORMATION (CUI) GUIDELINES
C.3.1 The contractor shall comply with the requirements outlined in Attachment 0004 CUI Guidelines, which provides detailed information on the handling, protection, and dissemination of CUI.
C.4 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
C.4.1 The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
C.4.2 The contractor will receive a copy of the Attachment A0005 TACOM OPSEC Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
C.4.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I.
C.5 OPSEC TRAINING REQUIREMENT
C.5.1 Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm. The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.
C.6 THREAT AWARENESS REPORTING PROGRAM
C.6.1 All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter
Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and
Reporting Program (TARP). The in-person training is the preferred method, and is available by contacting the local CI Office to arrange for the conduct of training.
C.6.2 The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete, the Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting
Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.
C.6.3 The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not
12 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management
System (ALMS) at: HYPERLINK "http://www.lms.army.mil"www.lms.army.mil.
C.7 DRAWING LIMITATIONS
C.7.1 The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
C.7.1.1 depict the completed (item(s), and
C.7.1.2 serve as the basis for inspection of the completed item(s).
C.7.2 These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
C.7.3 The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
C.7.4 The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
C.7.5 Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the
Government and no delivery schedule extension.
C.8 ACQUISITION OF SOURCE-CONTROLLED PART NUMBER
C.8.1 Acquisition under this contract is restricted to:
C.8.1.1 The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package; and
C.8.1.2 Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the Technical Data Package; provided the nonlisted part numbers have been furnished to one of the approved manufacturers listed in the Technical Data Package and that manufacturer has substituted the nonlisted part with one of the approved part numbers, without making any changes in the characteristics or properties of the part.
C.9 PROPERTY ACCOUNTABILITY AND SHIPMENT DISCREPANCY REPORTING
C.9.1 The contractor shall forward information on assets received from the Government and adjustments to inventory IAW CDRL A006 Report of Receipts and Inventory Adjustment Reports.
*** END OF NARRATIVE C0001 ***
13 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
D.1.1 Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
D.1.1.1 LEVEL OF PRESERVATION: Military
D.1.1.2 LEVEL OF PACKING: B
D.1.1.3 QUANTITY PER UNIT PACKAGE: 001
D.1.1.4 SPECIAL PACKAGING INSTRUCTION NUMBER: AK17068649
D.1.1.4.1 REVISION: A
D.1.1.4.2 DATE OF REVISION: 13 FEB 2023
D.1.1.4.3 THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A SEE ATTACHMENT 0002
D.1.2 Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
D.1.3 Marking:
D.1.3.1 In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
D.1.3.2 When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
D.1.4 Heat Treatment and Marking of Wood Packaging Materials (WPM):
D.1.4.1 In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
D.1.4.2 Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
D.1.4.3 Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The
ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.
14 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
D.1.5 Hazardous Materials (As applicable):
D.1.5.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
D.1.5.2 Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
D.1.5.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
D.1.6 This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the
SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
D.1.7 SUPPLEMENTAL INSTRUCTIONS: N/A
*** END OF NARRATIVE D0001 ***
15 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015 or equivalent
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2 USE OF MIL-STD 1916
E.2.1 The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of
Product. The Verification Level (VL) shall be VL VL for major characteristics and VL II for minor characteristics.
E.2.2 MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
E.3 REQUIREMENTS FOR PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS DTA - PAINTED MATERIEL
E.3.1 Scope
16 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.3.1.1 This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical
Agent Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.
E.3.1.2 Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.
E.3.2 Definitions
E.3.2.1 The "contracting agency," "appropriate agency," "procuring authority," "engineering authority," "procuring agency," and
"procuring activity" is the PCO or designee.
E.3.2.2 The "prime contractor" is the company awarded this contract, and the "subcontractors" comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.
E.3.3 General Requirements Clarifications
E.3.3.1 The government retains the right for onsite verification of the prime contractors' and its subcontractors' products, processes, procedures, and test reports.
E.3.3.2 The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports. This information shall be available upon government request.
E.3.3.3 The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.
E.3.3.4 When a substrate is cleaned using multiple methods, each cleaning method shall be treated as a separate step in the process documentation.
E.3.3.5 The Gage Repeatability and Reproducibility (Gage R&R) error shall be less than 30 percent for all process and product measurement systems.
E.3.3.6 Products with hexavalent chromium and cadmium, including but not limited to certain fastener finishes, shall not be used.
E.3.3.7 CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.
E.3.3.8 If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in MIL-DTL-53072.
E.3.3.9 Neutral salt spray (NSS) testing shall not be used to validate compliance with materiel life cycle requirements; NSS is a production quality test and does not predict field performance.
E.3.4 Pre-Production Approval Clarifications
E.3.4.1 Pre-production testing shall include:
(i) Thickness of each layer of the coating system;
(ii) Coating system adhesion;
(iii) Salt spray performance;
(iv) For phosphate pretreatments, the phosphate coating weight, crystal size and shape, and scanning electron microscope photos of the phosphate coatings at 500x and 1000x magnification.
E.3.4.2 Pre-production test samples shall be from the material used for production parts, pieces cut from production representative parts, or production representative parts. Standardized test coupons shall not be used except when the coupons are of the same substrate material as the production parts.
E.3.4.3 Nine samples shall be produced for the required testing and shall include: three cleaned and pretreated test samples, three samples with the complete paint system and three samples with pretreatment plus primer.
E.3.4.4 One or more ISO 17025 laboratories shall conduct pre-production testing on the nine test samples in accordance with (IAW) the
17 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
applicable test method accreditations. The applicable ISO 17025 test method accreditations include ASTM B117 Salt Spray, GMW 14872
Cyclic Corrosion, ASTM B244 Thickness of Non-Conductive Coatings on Non-Magnetic Metals, ASTM B487 Measurement of Metal and Oxide
Coating Thickness, ASTM B499 Thickness of Non-Conductive Coatings on Magnetic Metals, and ASTM D3359 Measuring Adhesion by Tape Test.
E.3.4.5 Unless required elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel, and aluminum and its alloys, shall meet a minimum of 1000 hours neutral salt spray resistance IAW ASTM B117.
E.3.4.6 Test procedures shall be submitted IAW the CDRL A004 Test Procedures Pretreatments and CARC.
E.3.4.7 Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and CARC testing specified in paragraph
E.3.4.4 of this clause IAW CDRL A005 Test Report Pretreatments and CARC.
E.3.5 Production Testing Clarifications
E.3.5.1 At a minimum, ongoing production quality tests shall conducted and recorded daily for coating adhesion and coating thickness, and monthly for salt spray testing. Use of ISO accredited laboratories is optional for these ongoing tests of production parts.
E.3.5.2 Production parts or pieces cut from production parts shall be used for ongoing production quality testing. Standardized test coupons shall not be used.
E.3.5.3 Unless specified elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel, and aluminum and its alloys shall meet a minimum of 1000 hours neutral salt spray resistance IAW ASTM B117.
E.4 RESERVED
E.5 RESERVED
E.6 ROUTING OF SPECIAL PROCESS APPROVALS
E.6.1 The Technical Data Package for this contract contains one or more of the following specifications:
MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base
TT-C-490 Chemical Conversion Coatings and Pretreatment for Ferrous Surfaces (Base for Organic Coatings)
MIL-W-12332 Welding Resistance, Spot: Weldable Aluminum Alloys
MIL-W-45210 Welding Resistance, Spot: Weldable Aluminum Alloys
* Drawing 12479550 - Ground Combat Vehicle Welding Code - Steel
* MIL-STD-3057 - Ground Combat Vehicle Welding Code - Aluminum
* Drawings will be found in Section J Attachments (if applicable).
E.6.2 The specifications listed in paragraph 1 may require approval from the Government prior to production for one or more special processes involved in producing the item. The following shall apply, unless stated elsewhere in the contract:
E.6.2.1 The contractor shall prepare the written procedures as the specification requires.
E.6.2.2 Procedures requiring Government approval shall be routed to the Administrative Contracting Officer (ACO) for review and approval. If the ACO is unable to perform a review, the ACO shall forward the procedure to the Procuring Contracting Officer (PCO) for assistance in the review and approval process. The correct address for the PCO is on the face page of this contract.
E.6.2.3 Cite (i) the contract number and (ii) the governing specification or standard on all procedures submitted for approval.
E.6.2.4 The DCMA will provide a copy of their approval/rejection notices to the PCO.
E.6.2.5 DCMA is required to qualify the processes of the major coating subcontractors used by the prime contractors.
E.7 TECHNICAL DATA FOR INSPECTION
18 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.7.1 When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications, and any applicable
Engineering Exceptions associated to the technical data, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
E.7.2 If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor technical data is available for review to support the Government's inspection requirements.
*** END OF NARRATIVE E0001 ***
19 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-15 STOP-WORK ORDER AUG/1989
F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-4 52.247-34 F.O.B. DESTINATION (JAN 1991) FEB/2006
F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
F-6 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
SOLICITED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER CONTRACT AWARD
CLIN 0011 EST 87 EA* 420 DAYS
CLIN 0012…