This document is an Amendment of Solicitation for a U.S. Army contract (Solicitation Number W912CH-25-R-0080) issued by the Army Contracting Command - Detroit Arsenal. The amendment (Number 0001) modifies Section L of the original solicitation, specifically removing language related to Days With FAT (First Article Test), which previously stated that proposed Days With FAT would be 90 additional days from the proposed schedule for Days Without FAT. The solicitation is for a firm fixed-price supply contract, with an expected minimum proposal acceptance period of 180 calendar days. Proposals must be electronically submitted via email to the Contract Specialist Christina Herbig, with a maximum email size of 10 megabytes and specific formatting requirements. Offerors are limited to submitting one proposal addressing two primary evaluation factors: Delivery Schedule and Price.
Key submission details include: proposals must be in English and US dollars, use Microsoft Office 2013 or PDF formats, and follow specific electronic file naming conventions. The solicitation notes the Army Contracting Enterprise is transitioning contract writing systems, and offers guidance for potential system-related document variations. Proposals will be evaluated based on delivery schedule (either matching, improving upon, or within 45 days of the government's solicited delivery schedule) and pricing. The contract is being administered by the Army Contracting Command - Detroit Arsenal (ACC-DTA), located in Detroit Arsenal, Michigan, with a solicitation closing date of October 23, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CH25R0080-0003.pdf | ||
| Q and A 25R0080.docx | DOCX document | |
| W912CH25R0080-0002.pdf | ||
| W912CH25R0080_SOL_SAM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2025NOV04
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
CHRISTINA HERBIG
EMAIL: CHRISTINA.A.HERBIG.CIV@ARMY.MIL
W912CH-25-R-0080
2025OCT23
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 8
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: CHRISTINA HERBIG
Buyer Office Symbol/Telephone Number: CCTA-APN-B/(571)588-8863
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Solicitation: W912CH-25-R-0080
Amendment: 0001
1. The purpose of this amendment is to:
Section L:
Remove from L.3.1.1 "The proposed Days With FAT will be 90 additional days from the proposed schedule for Days Without FAT. The Offeror may not propose an alternate quantity or an alternate schedule for Days With FAT."
2. All other terms and conditions, except for those addressed above, remain unchanged and are in full force and affect.
*** END OF NARRATIVE A0002 ***
2 8
W912CH-25-R-0080
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 GENERAL PROPOSAL INFORMATION
L.1.1 The proposal, subject to the Submission, Modification, Revision, and Withdrawal paragraph of Instructions to Offeror(s)Competitive
Acquisitions (FAR Provision 52.215-1) contained in Section L of the solicitation, shall be submitted in the format and quantities set forth below. All information necessary for the review and evaluation of a proposal is to be contained in the proposal. Section M of the solicitation sets forth the evaluation criteria and delineates the Factors to be evaluated and their relative order of importance. The offeror's proposal, as required by this section, will be evaluated as set forth in Section M of this solicitation. The Government will not assume the offeror possesses any capability, understanding, or commitment not specified in its proposal. It is an offeror's responsibility to submit a well-written proposal, with adequately detailed information, which clearly demonstrates an understanding of and the ability to comply with the solicitation requirements to allow for a meaningful evaluation. The Government does not assume the duty to search for data to cure problems it finds in proposals.
L.1.2 Minimum Acceptance Period.
This provision supersedes any language pertaining to the acceptance period that may appear elsewhere in this solicitation (e.g. SF 33
Box 12).
ACCEPTANCE PERIOD means the number of calendar days available to the Government for awarding a contract from the date specified in this solicitation for receipt of offers.
L.1.2.1. The Government specified minimum acceptance period is 180 calendar days.
L.1.2.2. The offeror shall clearly state in its proposal the acceptance period. Offerors may specify a longer acceptance period than the
Government's minimum acceptance period stated above.
L.1.2.3. An offer allowing less than the Government's minimum acceptance period, or fails to provide a proposal acceptance period, may be rejected.
L.2 PROPOSAL CONTENT, FORMAT, AND INSTRUCTIONS
L.2.1 Proposal Content
L.2.1.1 All proposals shall be in English (American Standard) and shall be in US dollars. Proposals not in English (American Standard) or in US Dollars may be rejected. The proposal shall include all information specified and shall address all requirements outlined in
Section L.
L.2.1.2 A Proposal Executive Summary or transmittal letter is optional. It will neither be considered as part of the proposal, nor will it be evaluated. If a Proposal Executive Summary is submitted, it should be no more than five pages in length.
L.2.2 Proposal Method of Submission, Format, and Instructions
L.2.2.1 The proposal shall be electronically submitted via E-mail to the Contract Specialist, Christina Herbig, and cc the corresponding
Contracting Officer at the following e-mail address(s) with the subject header:
Proposal Submission - W912CH-25-R-0080 (company name):
Contract Specialist: christina.a.herbig.civ@army.mil
Contracting Officer: scott.l.follen2.civ@army.mil
Fax, hardcopy, and DVD/CD-ROM proposals will NOT be accepted. Hand-carried offers, whether hardcopy or electronic, will NOT be accepted.
Maximum size of each e-mail shall be 10 megabytes. The offeror may use multiple e-mail messages for each submission; however, it should annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.
Note: There is no "expected" or "target" length of time for proposal submission via email; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
L.2.2.1.1 Each submitted File shall be labeled so it is easily identifiable for which information it pertains.
L.2.2.1.2 Acceptable File Formats. All electronic information provided in response to the solicitation must be provided in Microsoft
(MS) Office 2013 compatible or Adobe Portable Document Format (PDF) format or except as noted in the proposal instructions below. For files in PDF format, scanners should be set to 200 dots per inch. The proposal shall not contain citations for, or active links to live
Internet sites or pages. All linked information shall be contained within the electronic proposal. Any linked information that is not contained in the proposal will not be accepted.
L.2.2.1.3 Electronic Files. The proposal electronic file name should not exceed 50 characters in length (not including the file extension). Ensure the file name does not contain any periods, does not contain spaces, and does not contain special characters, which
3 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
should limit Government virus scanners rejecting the email as unscannable.
L.2.2.1.4 Unless otherwise specified, it is recommended that the proposal be formatted for 8.5 inch x 11 inch paper with a minimum font size of 10 pt. and with a minimum of 0.5 margins. Schedules, drawings and other documents more appropriate to larger size should be formatted for no larger than 8.5 inch x 14 inch dimensions.
L.2.2.1.5 If providing spreadsheets, include all formulas, function, macros, computations, or equations used to compute the proposed amounts. For each workbook, all Rows, Columns, Cells, and Worksheets are to be visible. Do not include Zero height and zero width rows and columns in Worksheets. Do not format Worksheet cells with the font color equal to the fill color. If Workbooks or Worksheets are password protected, then the passwords must be provided. Do not submit Print image files or pictures or files containing only values.
L.2.2.1.6 The offeror shall make every effort to ensure that the proposal is virus-free. Proposals (or portions thereof) submitted which indicate the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as
"unreadable" as described in FAR 15.207(c).
L.2.2.2 Submission Due Date
The offeror must ensure its proposal, in its entirety, reaches the required destination before the date and time set for closing of the solicitation set forth in Block 9 on the SF 33, front page of the solicitation.
L.2.2.2.1 Lateness
The lateness rules for submitted proposals are outlined in FAR 52.215-1 "Instructions to Offerors-Competitive Acquisition and are incorporated into this solicitation.
L.2.3 Single Proposal Submission
Offerors are limited to submitting one proposal with one approach to meeting the requirements of this solicitation.
L.2.3.1 All or None
Offers in response to this solicitation must be submitted for all the requirements identified in the solicitation. Offers submitted for less than all the requirements called for by this solicitation may be rejected or ineligible for award. Proposals that contain alternative terms and conditions may be considered as taking exception to the requirements of the solicitation. See Section M.2.
L.3 EVALUATION FACTORS
Offeror proposals shall address the following Factors:
a. Delivery Schedule Factor
b. Price Factor
L.3.1 Delivery Schedule Factor
The following applies to all Delivery Schedule Subfactors, unless otherwise noted below. \par
The Government has no set delivery schedule as to the number of deliveries per month. The only requirement is that all must be delivered within the days specified in Narrative F.2, DELIVERY SCHEDULE FOR DELIVERY ORDERS. An offeror is not to propose a delivery rate; this makes the proposal unawardable regardless of what is proposed.
L.3.1.1 Offerors shall submit the following:
The Offeror shall submit a filled-in Section F of the RFP with its proposal if it proposes an alternative delivery schedule as allowed by this Factor. The offeror may propose an alternate delivery schedule For CLINS 0011, 0012, 0013, 0014, and 0015, expressed in terms of
"after date of delivery order award" by filling in its proposed schedule for days after delivery order award schedule for days without
FAT by filling in the Offerors Proposed Delivery Schedule in Narrative F.2, DELIVERY SCHEDULE FOR DELIVERY ORDERS.
If the offeror does NOT propose an alternative schedule for CLINS 0011, 0012, 0013, 0014, and 0015 within Section F, Narrative F.2, DELIVERY SCHEDULE FOR DELIVERY ORDERS, then the offerors proposed delivery date(s) is the same as the Government Solicited Delivery
Schedule set forth in F.2, DELIVERY SCHEDULE FOR DELIVERY ORDERS.
L.3.1.1.1 In order to be considered for award, a proposal must provide a delivery date expressed in terms of after date of contract award that is either
1) sooner than the solicited schedule of the respective CLIN identified in F.2, DELIVERY SCHEDULE FOR DELIVERY ORDERS; or
2) equal to the solicited schedule of the respective CLIN identified in FAR F.2, DELIVERY SCHEDULE FOR DELIVERY ORDERS; or
3) within 45 days after delivery order award or less than the solicited schedule of the respective CLIN identified in F.2, DELIVERY
4 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SCHEDULE FOR DELIVERY ORDERS.
L.3.1.1.2 Proposals that provide a delivery schedule that is later than 45 days after the solicited schedule of the respective CLIN identified in F.2, DELIVERY SCHEDULE FOR DELIVERY ORDERS will constitute a failure to meet a stated requirement of the solicitation
(deficiency) and be un-awardable.
L.3.1.2 If selected for award, the offerors proposed delivery date will be incorporated and become the requirement in any resulting contract.
L.3.2 Price Factor
L.3.2.1 In accordance with FAR 15.403-5(a)(1), certified cost or pricing data is not required for initial proposal submission. However, after initial proposal submission, if only one offer is received, the Government reserves the right to request certified cost or pricing data in accordance with DFARS 252.215-7008. In the event certified cost or pricing data is required, the offeror may submit a written request for exception based on the applicable clauses contained herein.
For initial proposal submission, the offeror shall provide its proposed prices by providing a filled in Section B of the RFP.
L.3.2.2 The Government reserves the right to request additional or more detailed cost or price information to support its evaluation.
L.4 PROVIDE THE FOLLOWING INFORMATION:
L.4.1 Signature Actions/offeror Fill-Ins. Provide a scanned image of a signed copy of the SF33 cover page, a copy of all completed fillins for Sections A through K, and (if applicable) a signed copy of all Amendments to the solicitation. System for Award Management
(SAM) certifications need not be separately submitted; however, all offerors must be successfully registered and valid in SAM prior to award.
L.4.1.1 The offerors proposal acceptance period in terms of calendar days from the date for receipt of offers specified in the RFP. (See
Section L.1.2)
L.4.3 Statement of Acknowledgement. A statement specifying the extent of agreement with all terms, conditions, and provisions of the
RFP, and a statement of agreement to furnish and deliver the items or perform services set forth in the RFP in consideration for offerors proposed price(s) set opposite each item. Any exceptions taken to the attachments, exhibits, enclosures, or other solicitation terms, conditions, or documents may be determined to be a Deficiency or grounds for the Government to reject the proposal from further consideration in the source selection process (Reference M.2.1).
L.4.4 Assumptions. The offeror shall consolidate and identify all offeror's generated "assumptions" contained anywhere in the proposal.
The offeror shall include a statement that none of the "assumptions" contradict or take exception to any terms, conditions, or requirements of the solicitation. Any exceptions taken to the attachments, exhibits, enclosures, or other solicitation terms, conditions, or documents may be determined to be a Deficiency or grounds for the Government to reject the proposal from further consideration in the source selection process (Reference M.2.1).
L.5 SOURCE NOTES ON DRAWINGS: CONFORMANCE TO MILITARY TECHNICAL DATA REQUIREMENTS
Notwithstanding the fact that ordnance drawings furnished with this solicitation may list particular manufacturer part numbers as approved sources, or as being the same as, or equivalent to, the ordnance part described on the drawing, the item to be supplied under this solicitation must conform to all specific technical requirements expressed on such drawing(s). To the extent that there may be any inconsistency between a manufacturer's part number and specific technical requirements expressed on an ordnance drawing which references the manufacturer's part number, the specific technical requirements shall control and take precedence. Bidders shall bear the responsibility of verifying that the approved part as supplied will conform to all such specific technical requirements.
L.6 PROVISION FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL
L.6.1 The requirement entitled FIRST ARTICLE APPROVAL (52.209-3 or 52.209-4) in Section E of this solicitation may be waived by the
Government, provided that the offeror meets the conditions outlined below.
L.6.1.1 Offerors who intend to request a waiver or partial waiver, IAW Attachment 0003, of the First Article Test must provide sufficient information in order for the Government to determine whether the request is to be approved. If the offeror intends to request a waiver, a First Article Waiver Worksheet must be completed and submitted to the Government along with any supporting documentation.
The worksheet can be found in Section J Attachments of this solicitation. The offerors request will not be considered if the worksheet and any supporting documentation is not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable). To substantiate or clarify information provided by the offeror, the Government may request additional information. Incomplete worksheets can result in the waiver request being denied; Offerors should contact the Contract Specialist listed on the face page of this solicitation for assistance in filling out the worksheet completely.
L.6.1.2 Offerors should not assume that the FAT waiver request will be granted even if the completed worksheet and any supporting
5 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
information is submitted to the Government.
L.6.1.3 The worksheet and any additional supporting documentation is part of your quote/offer and must be submitted as part of the response to this solicitation on Company letterhead and signed by an agent of the Company.
L.6.1.4 The offeror may request a waiver for only a portion of the First Article Test, such as a vibration test or a saltwater spray test, or the test on a component or subassembly of the procured item.
L.6.1.5 The offeror shall list specifically on the worksheet, by technical data package reference, that portion of the test requested to be waived. The references shall include but may not be limited to the following as applicable:
(i) Identification of the specification or standard along with the specific specification or standard paragraph(s)
(ii) Identification of the drawing with specific references to the drawing notes.
(iii) Identification of the Quality Assurance Provision (QAP), or Quality Assurance Requirement (QAR) or Supplemental Quality Assurance
Provision (SQAP) with specific references to the specific paragraph.
L.6.1.6 Supporting documentation.
(i) The request for waiver must be accompanied by documentation in support of the request. The documentation may include information such as the following; (1) Copy of the Administrative Contracting Officers (ACOs) or Procuring Contracting Officers (PCO) letter approving a First Article Test report on a recent contract for the same or similar item. (2) Copy of a First Article Test report for the same or a similar item as that herein solicited. (3) Copy of an ACO or PCO letter approving a prior waiver request. (4) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.
(ii) If a copy of a First Article Test report is submitted in support of a request for waiver under this solicitation, the test report must have been approved and signed by an authorized representative of the Government.
(iii) The FAT report and all supporting documentation should be submitted by electronic media and should accompany the offerors proposal. If the FAT report and supporting documentation cannot be transmitted by electronic media, the offeror shall contact the PCO for further instruction.
(b) Note that if a waiver is granted to the successful offeror, an accelerated delivery schedule will apply. See Section F.
(c) Note: Cost considerations shall apply for approving a waiver or a portion thereof of a First Article Test.
L.7 OFFERS DELIVERED BY THIRD PARTY EXPRESS SERVICES (NON-US POSTAL SERVICE MAIL)
L.7.1 Unless specifically authorized elsewhere in this solicitation, paper offers will not be accepted. Preference for offers is to be submitted in response to solicitations via SAM.gov. Alternatively offers may be mailed following these procedures.
L.7.2 Offers, including disks or other electronic media, shall be addressed to:
U.S. Army Contracting Command - Warren
Bid Room, Bldg 231, Mail Stop 303
6501 East 11 Mile Road
Detroit Arsenal, MI 48397-5000
L.7.3 Offers shall not be addressed to an individual buyer. All offers must be addressed to the Offer Receipt Office at the above address.
L.7.4 The external delivery envelope or wrapper must be marked with the solicitation number and the date and time of the solicitation closing. Each envelope should contain only one offer.
L.7.5 Offerors must ensure that the commercial carrier they use has a tracking system that can provide documentation of the date and time of delivery to the Government.
L.8 HQ-AMC LEVEL PROTEST PROCEDURES
Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/
An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.
L.9 PROVISION FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL
arNOTE: For this Solicitation, Partial FAT Waivers are not being solicitated or considered.
6 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.9.1 The requirement entitled FIRST ARTICLE APPROVAL (52.209-3 or 52.209-4) in Section E of this solicitation may be waived by the
Government, provided that the offeror meets the conditions outlined below.
L.9.1.1 Offerors who intend to request a waiver of the First Article Test must provide sufficient information in order for the
Government to determine whether the request is to be approved. If the offeror intends to request a waiver, a First Article Waiver
Worksheet must be completed and submitted to the Government along with any supporting documentation. The worksheet can be found in
Section J Attachments of this solicitation. The offerors request will not be considered if the worksheet and any supporting documentation is not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable). To substantiate or clarify information provided by the offeror, the Government may request additional information. Incomplete worksheets can result in the waiver request being denied; Offerors should contact the
Contract Specialist listed on the face page of this solicitation for assistance in filling out the worksheet completely.
L.9.1.2 Offerors should not assume that the FAT waiver request will be granted even if the completed worksheet and any supporting information is submitted to the Government.
L.9.1.3 The worksheet and any additional supporting documentation is part of your quote/offer and must be submitted as part of the response to this solicitation on Company letterhead and signed by an agent of the Company.
L.9.1.4 Supporting documentation.
(i) The request for waiver must be accompanied by documentation in support of the request. The documentation may include information such as the following; (1) Copy of the Administrative Contracting Officers (ACOs) or Procuring Contracting Officers (PCO) letter approving a First Article Test report on a recent contract for the same or similar item. (2) Copy of a First Article Test report for the same or a similar item as that herein solicited. (3) Copy of an ACO or PCO letter approving a prior waiver request. (4) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.
(ii) If a copy of a First Article Test report is submitted in support of a request for waiver under this solicitation, the test report must have been approved and signed by an authorized representative of the Government.
(iii) The FAT report and all supporting documentation should be submitted by electronic media and should accompany the offerors proposal. If the FAT report and supporting documentation cannot be transmitted by electronic media, the offeror shall contact the PCO for further instruction.
L.9.1.4.1 Note that if a waiver is granted to the successful offeror, an accelerated delivery schedule will apply. See Section F.
L.9.1.4.2 Note: Cost considerations shall apply for approving a waiver or a portion thereof of a First Article Test.
L. 10 Army Contract Writing System (ACWS) Transition Information for Offerors
L.10.1 The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation.
L.10.2 During this transition period, Offerors are hereby advised:
L.10.2.1 The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation (e.g. solicitation amendments and awards, if any). Due to this:
i. This solicitation may contain different offer submission instructions than other solicitations released by the same Contracting
Office (e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail). Offerors should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or Contracting
Officer.
ii. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected.
iii. A change between contract writing systems may cause important information concerning solicitation response (amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract Specialist or Contracting
Officer.
L.10.2.2 The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new
7 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
contract writing software, you, as the Offeror, may still be the first to spot such errors. Therefore, Offerors shall:
i. Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award.
ii. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the Contracting
Office throughout the Solicitation and Award process.
iii. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances.
L.10.2.3 The Contracting Officer will correct problems affecting award documents (if any) via bilateral modification, at no cost to the
Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g. the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms.
L.10.2.4 In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer:
i. May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties.
ii. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved.
riii. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement.
iv. Will issue a complete, properly-formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.