W912CH25Q0089.pdf

PDF 129 KB Posted

Attached to
Solicitation, Mount, Alignment Device, NSN 1025-01-071-0633
Solicitation number
W912CH25Q0089_
Issued by

About this file

This is a Request for Quotation (RFQ) issued by the U.S. Army Contracting Command Detroit Arsenal for Mount, Alignment Device components (NSN 1025-01-071-0633) used on the M109 Howitzer system. The solicitation W912CH-25-Q-0089 is structured as a Total Small Business Set-Aside under NAICS code 332994 (Power, Distribution and Specialty Transformer Manufacturing) with a size standard of 1,000 employees. The procurement includes a base quantity of 2 each alignment devices (CLIN 0001AA) with a 100% unexercised option for an additional 2 each (CLIN 0002AA), both deliverable within 210 days after contract award to DLA Distribution Anniston, Alabama.

The solicitation requires a firm-fixed price contract and includes several data requirements such as Engineering Change Proposals, Request for Variance documentation, and OPSEC/TARP training certificates. A Technical Data Package (TDP) with Distribution Statement D restrictions is available through SAM.gov, requiring DD Form 2345 certification for access. Offerors must submit proposals electronically via email to the Contract Specialist by the closing date of August 28, 2025, with a minimum 90-day acceptance period. The procurement includes standard military packaging requirements (Level B preservation), unique item identification marking, and various security and export control provisions. Award will be made to the lowest-priced technically acceptable offeror meeting all responsibility criteria and solicitation requirements.

View the file

Other files

File Type Posted
W912CH25Q0089 Solicitation AMD-0002.pdf PDF
W912CH25Q0089 Solicitation AMD 0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of

(This is NOT an Order)

1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating

See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)

See Schedule

7. Delivery

FOB Other Destination

5B. For Information Call: (Name and telephone no.) (No collect calls)

8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)

See Schedule

10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.

Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. Schedule (Include applicable Federal, State, and local taxes)

Item Number (a)

Supplies/Services (b)

Quantity (c)

Unit (d)

Unit Price (e)

Amount (f)

(See Schedule)

12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage

NOTE: Additional provisions and representations are are not attached.

13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation

16. Signer

a. Name (Type or Print) b. Telephone

Area Code

c. Title (Type or Print) Number

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)

X

W912CH-25-Q-0089 2025JUL29 DOA4

W912CHACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

CHRISTINA SMITH (520)717-3741

CCTA-APN-A

EMAIL: CHRISTINA.D.SMITH49.CIV@ARMY.MIL

X

2025AUG28

1 48

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: CHRISTINA SMITH

Buyer Office Symbol/Telephone Number: CCTA-APN-A/(520)717-3741

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Howitzer,heavy,fulltracked,SP,105MM,M109

*** End of Narrative A0000 ***

A.1 DESCRIPTION OF THE ACTION

A.1.1 This solicitation is intended to result in the award of a single, firm-fixed price (FFP) contract for the supplies specified with

100% option.

A.1.2 This solicitation is a Total Small Business Set-Aside in accordance with FAR 19.502-2.

A.1.3 There is a Technical Data Package (TDP) associated with this procurement. The TDP is Distribution Statement D which limits access to the Department of Defense (DoD) and U.S. DoD contractors only. Please refer to Section C for additional information.

A.2 SOLICITATION STRUCTURE

The Government will utilize North American Industry Classification System (NAICS) code 332994 (Power, Distribution and Specialty

Transformer Manufacturing).

A.3 SYSTEM FOR AWARD MANAGEMENT (SAM), SIZE STANDARDS, AND NAICS CODES

Failure to register in SAM for the corresponding NAICS code identified in paragraph A.2 prior to submitting a proposal against this solicitation may preclude an award being made to your company. Offerors should be aware of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) Part 19, and 13 CFR 121, Small Business Size

Regulations. Offerors are advised to review 13 CFR 121.103, "How does SBA Determine Affiliation".

A.4 ELECTRONIC CONTRACTING

A.4.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website

(https://www.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

A.4.2 Interested offerors shall submit a proposal via email to the Contract Specialist (christina.d.smith49.civ@army.mil) and cc the corresponding Contracting Officer (amy.m.dombrowski.civ@army.mil) with the subject header: Proposal Submission W912CH-25-Q-0089 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.

A.4.3 Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, to be received by the Government office designated in the solicitation by the time specified.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

A.4.4 Solicitations may remain posted on www.SAM.gov after the solicitation closing date.

A.4.5 Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the

Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

A.4.6 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

2 48

W912CH-25-Q-0089

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

A.5 ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.6 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson.

(Best viewed using Google Chrome or Microsoft Edge)

A.7 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

A.7.1 This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title

22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

A.7.2 To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily

Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's

Section C Technical Data Package instructions.

A.7.3 Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

A.7.4 Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the

TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.8 ALL OR NONE

Offers in response to this solicitation must be submitted for the total quantity of items identified in the solicitation.

A.8.1 ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

A.8.2 OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.

*** END OF NARRATIVE A0001 ***

3 48

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 MOUNT,ALIGNMENT DEV

NSN: 1025-01-071-0633

Mfr CAGE: 19200

Mfr Part Number: 11747246

0001AA PRODUCTION QUANTITY 2 EA $ $ ____________________ ______________ __________________

COMMODITY NAME: MOUNT,ALIGNMENT DEV

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH4C0718EH PRON AMD: 01

AMS CD: SM2B1100000

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W52H094122023V W562RP J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 2 0210

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

0002 MOUNT, ALIGNMENT DEVICE

0002AA UNEXERCISED OPTION QUANTITY 2 EA $ $ ___________________________ ______________ __________________

COMMODITY NAME: MOUNT, ALIGNMENT DEVICE

CLIN CONTRACT TYPE:

Firm Fixed Price

OPTION QUANTITY: PURSUANT TO THE CLAUSE ENTITLED

OPTION FOR INCREASED QUANTITY-- SEPERATELY PRICED

LINE ITEM (52.217-7).

4 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

The quantity stated for the option CLIN does NOT form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause at the discretion of the Government.

The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award accordingly.

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 11747246

REVISION: A

DATE: 21-MAY-2024

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 2 0210

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

5 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

9000 CONTRACT DATA REQUIREMENTS LIST _______________________________

The Exhibit Line Item Numbers (ELINs) below are associated with specific contract requirements.

Please refer to the citations listed within each ELIN for additional information.

(End of narrative A001)

A001 DATA ITEM NOT PRICED -- DD 250 NOT REQUIRED 1 LO $ ** NSP ** ___________________________________________ __________________

SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A002 DATA ITEM NOT PRICED -- DD 250 NOT REQUIRED 1 LO $ ** NSP ** ___________________________________________ __________________

SERVICE REQUESTED: REQUEST FOR VARIANCE

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A003 DATA ITEM NOT PRICED -- DD 250 NOT REQUIRED 1 LO $ ** NSP ** ___________________________________________ __________________

SERVICE REQUESTED: NOTICE OF REVISION

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

6 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A004 DATA ITEM NOT PRICED -- DD 250 NOT 1 LO $ ** NSP ** __________________________________ __________________

SERVICE REQUESTED: OPSEC AWARENESS TRAINING

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A005 DATA ITEM NOT PRICED -- DD 250 NOT REQUIRED 1 LO $ ** NSP ** ___________________________________________ __________________

SERVICE REQUESTED: TARP CERTIFICATE

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

7 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 TECHNICAL DATA PACKAGE INFORMATION

C.1.1 The following Xd item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number: W912CH-25-Q-0089

To access the data through SAM:

a. Log on to the SAM web site: HYPERLINK "https://SAM.gov"https://SAM.gov.

b. Search for the solicitation number.

c. Click on the attachment you would like to view.

d. If the attachment is restricted, request access to the document.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense

Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

C.1.2 If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract

Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download

TDP items.

C.1.3 If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/. The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

C.1.4 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-

Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.

C.2 CONFIGURATION MANAGEMENT DOCUMENTATION

The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

C.2.1 The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense

Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

C.2.2 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

C.2.3 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

C.2.4 All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

8 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.2.5 For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

C.2.5.1 for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

C.2.5.2 for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

C.2.5.3 for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

C.2.6 The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

C.2.7 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).

C.2.8 The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

C.3 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN

C.3.1 The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government

OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

C.3.2 The contractor will receive a copy of the SOP/Plan at time of award in Attachment 0002. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC

Officers.

C.3.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

OPSEC Level I.

C.4 OPSEC TRAINING REQUIREMENT

C.4.1 Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm. The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officers Representative (COR) or Procuring Contracting Officer (PCO) upon request.

C.4.2 The contractor is not required to produce an OPSEC Plan. U.S. contractors with access to CUI (e.g. technical information, information marked with a distribution statement or CUI or classified information shall be required to follow an OPSEC Plan. The contract may choose to follow the TACOM OPSEC plan in lieu of developing a new OPSEC plan. Personnel who have taken the approved OPSEC training within the last 12 months shall be considered compliant.

C.5 THREAT AWARENESS REPORTING PROGRAM

C.5.1 All contractor employees with security clearances working on any Army contract must receive annual TARP training by a

Counterintelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and Reporting Program (TARP). The in-person training is the preferred method, and is available by contacting the local CI Office to arrange for the conduct of training.

C.5.2 The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. the Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officers Representative (COR) or

Procuring Contracting Officer (PCO) upon request.

C.5.3 The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management

9 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

System (ALMS) at: HYPERLINK "http://www.lms.army.mil"www.lms.army.mil.

C.6 DRAWING LIMITATIONS

C.6.1 The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:

C.6.1.1 depict the completed (item(s), and

C.6.1.2 serve as the basis for inspection of the completed item(s).

C.6.2 These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.

C.6.3 The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

C.6.4 The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.

C.6.5 Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the

Government and no delivery schedule extension.

C.7 ENGINEERING EXCEPTIONS

There is an engineering exception for the MOUNT, ALIGNMENT DEVICE, NSN: 1025-01-071-0633. Please refer to C.1 Technical Data Package

Information for directions on accessing the TDP/engineering exceptions.

C.8 ADDITIONAL GUIDELINES FOR CONTROLLED UNCLASSIFIED INFORMATION

C.8.1 General: There are types of information that are not classified but that require application of access and distribution controls and protective measures for a variety of reasons. This information is known as controlled unclassified information (CUI). The types of information considered CUI are U.S. Government technical information and information listed at the CUI registry(https://www.archives.gov/cui/registry/category-list). When handling CUI material, all personnel are to comply with these requirements and follow their company policy and/or applicable Non-Disclosure Agreement (NDA) concerning the protection of proprietary information in situations not clearly stated herein.

C.8.2 Technical Information Description: Any recorded information related to experimental, developmental, or engineering works that can be used to define an engineering or manufacturing process, or can be used to design, procure, produce, support, maintain, operate, repair, or overhaul program material. The data may be graphic or pictorial delineations in media (e.g., computer software, drawings, or photographs), text in specifications, related performance or design documents, or computer printouts. Examples of technical information include research and engineering data, engineering drawings, and associated lists, specifications, standards, process sheets, manuals, technical reports, catalog-item identifications, and related information, and computer software documentation.

C.8.3 CUI Information Description: Unclassified Information that requires safeguarding or dissemination controls pursuant to and consistent with applicable law, regulations, and government-wide or LRGWP policies but is not classified under EO 13526, (Classified

National Security Information).

C.8.4 CUI Markings: All documents containing CUI will carry the CUI markings in accordance with DoDI 5200.48. Discontinue all use of legacy or other markings not permitted or included in either the CUI Registry or DoDI 5200.48. Marking of Technical Information will include the statement provided in the Security Classification Guide. If the contents of the technical document require more than one

Distribution Statement, apply the most restrictive statement. This does not preclude additional mandated markings as may be required by the contract.

C.8.5 Protection of CUI Information

C.8.5.1 Access: In accordance with (IAW) DoDI 5200.48, Controlled Unclassified Information (CUI), 6 MAR 2020, all contractors supporting this contract who receive, store, or generate CUI are required to take the DoD Mandatory CUI training available on the Security

Awareness Hub at: https://securityawareness.usalearning.gov/cui/index.html . Per DoDI 5200.48 and pursuant to all contractual requirements, DoD contractors require initial CUI training and annual CUI refresher training. CUI may be released only to an individual

10 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

who has a valid need for such access in connection with the accomplishment of a lawful and authorized Government purpose. Further dissemination of such information will be at the discretion of the Government Security Manager. All personnel supporting this contract shall sign a CUI Non-disclosure Agreement prior to gaining access to the information. Personnel no longer requiring access to CUI must dispose (see Disposal below) or surrender any in their possession and terminate future access to it.

C.8.5.2 Storing/Handling: During working hours, take reasonable steps to minimize risk of access to CUI by unauthorized personnel. After working hours, when not in physical possession of the owner, all CUI (whether hardcopy or optical media (e.g., DVDs, CDs) that contain

CUI) must be afforded a reasonable degree of physical protection to prevent theft of program information (e.g., store CUI information in locked desks or file cabinets, locked rooms, cable lock laptops, storing in a trunk, storing out of site or similar means). Do not display CUI in public places (e.g., airports, airplanes, restaurants). Electronic storing and processing of CUI shall be in accordance with DFARS 252.204-7012 Safeguarding Controlled Defense Information and Cyber Incident Reporting. Do not process CUI on public computers

(e.g., those available for use by the general public in kiosks, hotel business centers), public wireless networks or computers that do not have access control. Personally owned computers and personally owned devices are not authorized to process CUI. Portable electronic devices (e.g., smartphones, laptop computers, tablets), nonportable computers, and removable media (e.g., external hard drives, flash drives, USB drives; not including optical media) must be physically and electronically protected as described in this instruction, DFARS

252.204-7012 and DoDI 8582.01.

C.8.5.3 Dissemination: CUI printed documents and material may be transmitted through mail channels, commercial carrier or hand-carried without formal courier orders. CUI information may be disseminated to DoD personnel and DoD contractors to conduct official business for the program. If dissemination is required outside of DoD personnel or DoD contractors, contact the Government Security Manager for approval. Technical information will follow the release instructions identified in the Distribution Statement. Use secure communications whenever possible; however, land-line telephones are more secure than cellular telephones and should be used whenever available for the program. If dissemination is required outside of DoD personnel or DoD contractors, contact the Government Security Manager for approval.

Technical information will follow the release instructions identified in the Distribution Statement. Use secure communications whenever possible; however, land-line telephones are more secure than cellular telephones and should be used whenever available for discussions involving CUI. Transmit voice and facsimile transmissions only when you have a reasonable assurance that only authorized recipients will have access to the transmission. Digital transmission shall comply with the below:

C.8.5.3.1 All transmission and/or dissemination of CUI (i.e., email and file transfers) must use NIST/NIAP-approved cryptographic products/algorithms, e.g., DoD-approved Public Key Infrastructure Certification or DoD Safe Exchange at https://safe.apps.mil/. These are available at http://iase.disa.mil/pki/eca or http://csrc.nist.gov/groups/STM/cmvp/documents/140-1/140val-all.htm. This encryption requirement includes communications that contain passcodes to teleconferences or web conferences where there is a reasonable expectation that CUI may be discussed. When encryption is not available, a government collaborative suite (aka Integrated Digital Environment [IDE]) must be used to transmit CUI.

C.8.5.3.2 Contractor-hosted collaborative suites may be used for digital transmission and/or dissemination of CUI by personnel not located on a government backbone (e.g., NIPRNET), provided the following conditions apply: 1) Use only NIST/NIAP-approved cryptographic products/algorithms. The latest validation lists may be obtained at http://iase.disa.mil/pki/eca or http://csrc.nist.gov/groups/STM/cmvp/documents/140-1/140val-all.htm ; and, 2) Use an internally hosted service that does not use a third party collaborative suite service provider.

C.8.5.3.3 Do not post CUI to web pages that are publicly available or have access limited only by domain/IP restrictions. As permitted by other contract provisions, CUI may be posted to web pages that control access through the use of a DoD approved Public Key

Infrastructure Certification and that provide protection via use of secure sockets, or other equivalent technologies. These are available at http://iase.disa.mil/pki/eca.As new technologies become available in the electronics arena, care should be given to providing a reasonable degree of protection from known vulnerabilities.

C.8.5.3.4 The Internet is Public Access. CUI must be reviewed and officially approved by the TACOM Public Affairs Officer for public release before placing on the Internet. This is not applicable when the Internet is used for e-mail transmissions and encryption is used as noted above.

C.8.5.4 Disposal: The contractor shall ensure any covered defense information provided by the Government under this contract is destroyed or sanitized from contractor-owned media and reported in accordance with (IAW) National Institute of Standards and Technology

(NIST) Special Publication (SP) 800-88, Revision 1: Guidelines for Media Sanitization (December 2014) (NIST SP 800-88, rev 1), destruction methods, or any destruction method approved for Classified National Security Information (32 CFR 2001.47) unless the CUI category's authority mandates other destruction methods (CUI Specified categories). Agencies must also use destruction methods specifically required by law, regulation, or Government-wide policy for CUI Specified categories. Destroy CUI documents in a manner that makes it unreadable, indecipherable, and irrecoverable (32 CFR 2002.14(f)(2)). For paper documents, Reference CUI Notice 2019-03:

Destroying of Controlled Unclassified Information (CUI) in paper form.

C.8.5.5 Report of Loss of CUI: Report any loss of CUI to the Government Security Manager. Initial reports shall be made as expeditiously as possible in all cases within 72 hours of discovery. If additional information is required after submission and review of the initial report, guidance will be provided at that time. Initial report content shall include the following information as available.

C.8.5.5.1 Applicable dates, including dates of compromise and dates of discovery.

11 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.8.5.5.2 Threat methodology, including all known resources used (e.g. IP addresses, domain names, software tools).

C.8.5.5.3 Account of what actions the threat(s) may have taken on victim system/network. What information may have been compromised or lost, and its potential impact on government programs.

C.8.5.5.4 What information may have been compromised or lost, and its potential impact on government programs

*** END OF NARRATIVE C0001 ***

PACKAGING AND MARKING

D.1 SPECIAL PACKAGING INSTRUCTIONS

D.1.1 Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.

D.1.1.1 LEVEL OF PRESERVATION: Military

D.1.1.2 LEVEL OF PACKING: B

D.1.1.3 QUANTITY PER UNIT PACKAGE: 001

D.1.1.4 SPECIAL PACKAGING INSTRUCTION NUMBER. 11747246

D.1.1.4.1 REVISION: REV A

D.1.1.4.2 DATE OF REVISION: 21 MAY 2024

D.1.1.4.3 THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A

D.1.2 Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

D.1.3 Marking:

D.1.3.1 In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

D.1.3.2 When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included

12 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

in this solicitation/contract.

D.1.4 Heat Treatment and Marking of Wood Packaging Materials (WPM):

D.1.4.1 In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.

D.1.4.2 Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

D.1.4.3 Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The

ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organization's compliance program.

D.1.5 Hazardous Materials (As applicable):

D.1.5.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

D.1.5.2 Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

D.1.5.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

D.1.6 This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the

SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

D.1.7 SUPPLEMENTAL INSTRUCTIONS: N/A

13 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE D0001 ***

INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2015 (21 Oct 2015) or equivalent

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.1 USE OF MIL-STD 1916

E.1.1 The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of

Product. The Verification Level (VL) shall be VL VL for major characteristics and VL II for minor characteristics.

E.1.2 MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.

E.2 INSPECTION AND ACCEPTANCE POINTS: ORIGIN

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

E.3 REWORK AND REPAIR OF NONCONFORMING MATERIAL

14 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

E.3.1 Rework and Repair are defined as follows:

E.3.1.1 Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

E.3.1.2 Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

E.3.2 Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the

Government Representative for review and approval prior to implementation. Rework procedures are subject to the Government's disapproval.

E.3.3 Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting

Officer for review and written Government approval prior to implementation.

E.3.4 Whenever the Contractor submits a repair or rework procedure for Government review and approval, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

E.3.5 The Government approved rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

*** END OF NARRATIVE E0001 ***

DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

4 52.242-15 STOP-WORK ORDER AUG/1989

5 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

6 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

7 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE

CLIN QUANTITY WITHIN DAYS AFTER DATE OF CONTRACT AWARD

CLIN 0001AA 2 EA 210 DAYS

CLIN 0002AA 2 EA 210 DAYS

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no

15 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

other delivery schedule, the required delivery schedule above will apply.

(2) OFFEROR'S PROPOSED DELIVERY SCHEDULE

CLIN…