W912CH25Q0063.pdf
PDF 149 KB Posted
- Solicitation number
- W912CH-25-Q-0063
- Issued by
-
Department of the Army
About this file
This is a Request for Quotation (RFQ) for a Mount, Telescope (Part Number 12599175) issued by the Army Contracting Command - Detroit Arsenal (ACC-DTA). The solicitation is a 100% small business set-aside for a three-year, firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an estimated minimum quantity of 10 units and maximum quantity of 78 units. The contract will have one initial delivery at contract award, followed by three ordering years, with delivery orders placed as government needs arise.
Key details include a North American Industry Classification System (NAICS) code of 333310 for Commercial and Service Industry Machinery Manufacturing, with a small business size standard of 1,000 employees. Contractors must be registered in the System for Award Management (SAM) and comply with configuration management requirements. The solicitation includes provisions for First Article Testing, with potential for waiver, and requires military preservation, packaging, and marking in accordance with MIL-STD-2073-1. Proposals must be submitted electronically by email to the Contract Specialist Colin Creagh by the specified closing date, with evaluation based on lowest price technically acceptable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| First-Article-Waiver-Worksheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of
(This is NOT an Order)
1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating
See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)
See Schedule
7. Delivery
FOB Other Destination
5B. For Information Call: (Name and telephone no.) (No collect calls)
8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)
See Schedule
10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.
Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. Schedule (Include applicable Federal, State, and local taxes)
Item Number (a)
Supplies/Services (b)
Quantity (c)
Unit (d)
Unit Price (e)
Amount (f)
(See Schedule)
12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage
NOTE: Additional provisions and representations are are not attached.
13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation
16. Signer
a. Name (Type or Print) b. Telephone
Area Code
c. Title (Type or Print) Number
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)
X
W912CH-25-Q-0063 2026JAN13 DOA4
W912CHACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
COLIN T. CREAGH (571)644-4380
CCTA-APN-A
EMAIL: COLIN.T.CREAGH.CIV@ARMY.MIL
X
2026FEB12
1 60
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: COLIN T. CREAGH
Buyer Office Symbol/Telephone Number: CCTA-APN-A/(571)644-4380
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.1 QUESTION AND ANSWER
All questions regarding the requirements of this solicitation and applicable attachments must be submitted by January 27, 2025, 5:00 PM
EST to contract specialist, Colin Creagh, colin.t.creagh.civ@army.mil. The Government shall review all questions received but is not obligated to answer questions submitted after the date noted above prior to the solicitation close date.
A.2 DESCRIPTION OF THE ACTION
A.2.1 This solicitation is issued as a 100% Small Business Set-Aside in accordance with (IAW) FAR 19.502-2 and FAR 52.219-6 and is intended to result in the award of a three-year, firm-fixed price, Indefinite Delivery/Indefinite Quantity (IDIQ) type contract with first delivery order under FAR 16.504, Indefinite-Quantity Contracts, for the supplies specified. The resulting contract will establish pricing that remains in effect for the period identified in the Schedule. Delivery orders will be placed as Government needs arise.
A.2.2 For further guidance related to an IDIQ type contract, refer to FAR Subpart 16.5 Indefinite-Delivery Contracts.
A.2.3 The quantities listed in CLINs 0011-0013 of this solicitation and the resulting contract are estimates only and not a representation that they will be ordered, nor is it a representation that conditions affecting Government needs will be stable.
A.2.4 As further detailed in Section B, the resulting contract will consist of one initial delivery, to be executed at contract award, plus three ordering years (OYs).
A.2.5 Delivery orders will be awarded in accordance with FAR clause 52.216-18, Ordering; FAR clause 52.216-19, Order Limitations; FAR clause 52.216-22, Indefinite Quantity; and Section B of this solicitation.
A.2.6 There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution code A, which provides for unlimited distribution.
A.2.7 Military preservation, packing and marking are required and shall be accomplished in accordance with Section D and all applicable requirements of MIL-STD-2073-1.
A.3 UNIQUE ASPECTS OF THIS SOLICITATION
A.3.1 Under an IDIQ contract, the U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) guarantees to buy only the minimum quantity.
Once the minimum guaranteed amount has been met, the Government is under no obligation to order additional quantities under the resulting contract. Additional quantities above the minimum order may be placed up to the maximum quantity for the three-year IDIQ contract, if the Government requires them. Specified minimum and maximum quantities will apply to the entire three-year contract and the cumulative total for all delivery orders will not exceed the maximum quantities for each CLIN in the contract.
Minimum Guaranteed Contract Quantity: 10 EA
Maximum Quantity: 78 EA
A.4 SOLICITATION STRUCTURE AND ADDITIONAL REQUIREMENTS
A.4.1 The Government will utilize North American Industry Classification (NAICS) Code 333310 (Commercial and Service Industry Machinery
Manufacturing). This NAICS code will also be assigned to all subsequently awarded delivery orders.
A.4.2 Failure to register in the System for Award Management (SAM) for the corresponding NAICS code identified in paragraph A.4.1 prior to submitting a proposal against this solicitation may preclude an award from being made to your company. Offerors should be aware of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) Part 19, and
13 CFR 121, Small Business Size Regulations. Offerors are advised to review 13 CFR 121.103, "How does SBA Determine Affiliation."
A.4.3 Any and all amendments to this solicitation shall be acknowledged in the space provided under Section A.6.
A.4.4 This solicitation contains provisions and clauses that require you, the offeror, to complete fill-ins and/or representations.
Failure to complete all such items may determine your proposal ineligible for award.
2 60
W912CH-25-Q-0063
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A.5 EVALUATION FACTORS FOR AWARD
Offerors are encouraged to review Section M of this solicitation for evaluation factors and basis for award.
A.6 ELECTRONIC CONTRACTING
A.6.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://www.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
A.6.2 Interested offerors shall submit a proposal via email to the Contract Specialist (kelli.a.kavanagh2.civ@army.mil) and cc the corresponding Contracting Officer (erika.j.dennison2.civ@army.mil) with the subject header: Proposal Submission W912CH-25-Q-0063
(company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
A.6.3 Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, to be received by the Government office designated in the solicitation by the time specified.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
A.6.4 Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, any received proposals will not be evaluated nor considered for award.
A.6.5 Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government's intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
A.6.6 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.6.7 All questions regarding the requirements of this solicitation and applicable attachments must be submitted by DATE, 12:00 PM EST to colin.t.creagh.civ@army.mil. The Government shall review all questions received but is not obligated to answer questions submitted after the date noted above prior to the solicitation close date.
A.7 ALL OR NONE
A.7.1 Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
A.7.1.1 ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
A.7.1.2 OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
A.8 ACKNOWLEDGEMENT OF AMENDMENTS
A.8.1 Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.9 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
3 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
https://www.tacom.army.mil/ombudsperson. (Best viewed using Google Chrome or Microsoft Edge).
*** END OF NARRATIVE A0001 ***
4 60
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
IN THE FOUR DIGIT ITEM NUMBERS (CLINS) THAT FOLLOW,
THE NUMBERING SYSTEM THAT IS USED IS AS FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY ITEM AND THE FOURTH
(LAST) DIGIT SIGNIFIES The APPLICABLE CONTRACT YEAR, i.e., CLIN 0011 IS FOR THE FIRST ITEM FIRST ORDERING
YEAR, CLIN 0012 IS FOR THE FIRST ITEM - SECOND
ORDERING YEAR, CLIN 0013 IS FOR THE FIRST ITEM -
THIRD ORDERING YEAR, ETC.
THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE
SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE OF
AWARD PLUS 364 DAYS.
SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS
THROUGH 729 DAYS AFTER CONTRACT AWARD.
THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS
THROUGH 1,094 DAYS AFTER CONTRACT AWARD.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER IS
THE PRICE FOR THE ORDERING YEAR IN WHICH THE ORDER IS
ISSUED. THE DELIVERY DATE DOES NOT DETERMINE THE
ORDERING YEAR.
The information presented below applies to Item No.
0011 Through 0013:
Minimum 3-Year Quantity: 10 EACH (This will be ordered at the time of the basic contract award).
Maximum 3 Year Quantity: 78 EACH (Inclusive of Option
Years, if applicable)
ONLY THE MINIMUM 3 YEAR QUANTITY IS GUARANTEED.
(End of narrative A001)
0011 FIRST ORDERING YEAR EST 26 EA $ $ ___________________ ______________ __________________
NSN: 1240-01-277-0473
COMMODITY NAME: MOUNT, TELESCOPE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19200
Mfr Part Number: 12599175
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12599175
REVISION: D
5 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DATE: 06-MAY-2019
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
6 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0012 SECOND ORDERING YEAR EST 26 EA $ $ ____________________ ______________ __________________
NSN: 1240-01-277-0473
COMMODITY NAME: MOUNT, TELESCOPE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19200
Mfr Part Number: 12599175
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12599175
REVISION: D
DATE: 06-MAY-2019
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
7 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0013 THIRD ORDERING YEAR EST 26 EA $ $ ___________________ ______________ __________________
NSN: 1240-01-277-0473
COMMODITY NAME: MOUNT, TELESCOPE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19200
Mfr Part Number: 12599175
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12599175
REVISION: D
DATE: 06-MAY-2019
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
8 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0014 FIRST ARTICLE TEST REPORT (FATR) 1 LO $ ________________________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TEST
CLIN CONTRACT TYPE:
Firm Fixed Price
First Article Test (FAT), pursuant to the requirements listed in:
SECTION E:
-E.2 Supplemental Requirements to First Article
Approval (Contractor Testing)
SECTION I:
- FAR 52.209-3, First Article Approval Contractor
Testing.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
9 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
9000 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________
The Exhibit Line Item Numbers
(ELINs) below are associated with specific contract requirements. Please refer to the citations listed within each ELIN for additional information.
(End of narrative A001)
A001 DATA ITEM NOT PRICED--DD 250 NOT REQUIRED 1 LO $ ** NSP ** _________________________________________ __________________
SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL
CLIN CONTRACT TYPE:
Firm Fixed Price
Engineering Change Proposal (ECP) for Mount, Telescope in accordance with:
- Section C.5: Configuration Management
Documentation; and
- Exhibit A: Contract Data Requirements List - DD
Form 1423, A001.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 DATA ITEM NOT PRICED--DD 250 NOT REQUIRED 1 LO $ ** NSP ** __________________________________________ __________________
SERVICE REQUESTED: REQUEST FOR VARIANCE
CLIN CONTRACT TYPE:
Firm Fixed Price
Request for Variance (RFV) for Mount, Telescope in accordance with:
- Section C.5: Configuration Management
Documentation; and
10 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
- Exhibit A: Contract Data Requirements List - DD
Form 1423, A002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 DATA ITEM NOT PRICED--DD 250 NOT REQUIRED 1 LO $ ** NSP ** _________________________________________ __________________
SERVICE REQUESTED: NOTICE OF REVISION
CLIN CONTRACT TYPE:
Firm Fixed Price
Notice of Revision (NOR) for Mount, Telescope in accordance with:
- Section C.5: Configuration Management
Documentation; and
- Exhibit A: Contract Data Requirements List - DD
Form 1423, A003.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A004 TEST PROCEDURE-- HEAVY PHOSPHATE COATING 1 LO $ ** NSP ** ________________________________________ __________________
SERVICE REQUESTED: PRE-PRODUCTION PROCEDURE
CLIN CONTRACT TYPE:
Firm Fixed Price
11 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
12 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION
The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:
W912CH-25-Q-0063
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov.
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States
Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).
(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution
Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense
Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
C.1.2 If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract
Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download
TDP items.
C.1.3 If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
C.1.4 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-
Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
C.2 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
C.2.1 The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
C.2.2 The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
C.2.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I.
C.3 OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting
13 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm. The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.
C.4 THREAT AWARENESS REPORTING PROGRAM
C.4.1 All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter
Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and
Reporting Program (TARP). The in-person training is the preferred method and is available by contacting the local CI Office to arrange for the conduct of training.
C.4.2 The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete the Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's
Representative (COR) or Procuring Contracting Officer (PCO) upon request.
C.4.3 The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management
System (ALMS) at: www.lms.army.mil.
C.5 CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
C.5.1 The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense
Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
C.5.2 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
C.5.3 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
C.5.4 All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
C.5.5 For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs C.5.5.1 through C.5.5.3. Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
C.5.5.1 for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
C.5.5.2 for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
C.5.5.3 for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
C.5.6 The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in C.5.5.1-C.5.5.3 above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the
Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
C.5.7 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).
C.5.8 The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
C.6 HEAVY PHOSPHATE COATING REQUIREMENT
14 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.6.1 The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL-16232.
C.6.2 Paragraph 3.1 of MIL-DTL-16232 refers to "Preproduction Inspection." The procedure shall be submitted in accordance with the
Contract Data Requirements List (CDRL) contained in the contract. The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.
C.6.3 Paragraph 3.2.5-c of MIL-DTL-16232 refers to the "Chromic acid rinse, (Classes 1, 2 and 3)." The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."
C.6.4 Paragraph 4.7.3 of MIL-DTL-16232 refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."
C.6.5 Paragraph 4.7.5 of MIL-DTL-16232 refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."
C.6.6 The "product name" along with the manufacturer of the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at
Assist Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word "Qualification".
C.6.6.1 To obtain MIL Specs, MIL Standards, QPL and QPD products see <https://assist.dla.mil/online/start />.
C.6.6.2 To obtain MIL Specs, MIL Standards, QPD products see <https://assist.dla.mil/online/start/>.
C.6.7 A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.
C.6.8 Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping/spraying or flash dried at 155-
175 degrees F for 10-30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.4.2.2 of MIL-
PRF-46010.
C.6.9 Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.
C.6.10 Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or CARC paint per ASTM D3359, method B along with the frequency for testing. A daily frequency is required.
C.6.11 Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM B117 for
336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM D610, no more than
5 blisters per 4" x 6" area with none larger than 3/64 inch in diameter. Under film attack at the scribe shall not exceed 1/8 inch.
C.6.12 Topcoat color shall be visual/equipment checked against the specified chip no. of SAE AMS-STD-595 per paint batch. The procedure shall include the specified color chip number.
C.6.13 Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL-53072. The manufacturer of the MEK solvent shall be stated in the procedure.
*** END OF NARRATIVE C0001 ***
15 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
D.1.1 Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIAL PACKAGING INSTRUCTION NUMBER. 12599175
(a) REVISION C
(b) DATE OF REVISION 14 July 2022
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobe's website (http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging
Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
D.1.2 Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
D.1.3 Marking:
D.1.3.1 In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers' Passive
RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
D.1.4 Heat Treatment and Marking of Wood Packaging Materials (WPM):
D.1.4.1 All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of
30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two-foot intervals.
D.1.4.2 This SPI has been validated, and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of
16 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
D.1.4.3 Hazardous Materials (as applicable): Hazardous Materials is defined as a substance, or waste which has been determined by the
Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
D.1.4.3.1 Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
D.1.5 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
D.1.6 When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
D.1.7 SUPPLEMENTAL INSTRUCTIONS: N/A
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2 INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL)
E.2.1 The Government's acceptance of the First Article Test Report offered under this contract shall take place at DESTINATION.
E.3. FIRST ARTICLE TESTING
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to
17 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
this contract:
E.3.1 FIRST ARTICLE APPROVAL CONTRACTOR TESTING
E.3.1.1 First Article Approval-Contractor Testing shall be performed in accordance with the terms of the contract, including FAR 52.209-
3. In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
E.3.1.2 The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
E.3.1.3 The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
E.3.1.3.1 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed within the last year and the results, with the Certificates of Conformance, are submitted with the First Article Test Report.
E.3.1.3.2 Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
E.3.1.3.3 Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
E.3.1.3.4 Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
E.3.1.3.5 Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
E.3.1.4 Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
E.3.1.5 A First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The
FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated
Government representative to determine that the First Article Test was successfully completed. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to USARMY RIA CCDC AC Mailbox RDAR-QEP: HYPERLINK
"mailto:usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil"usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil.
E.3.1.6 Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
E.3.1.6.1 When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
E.3.1.6.2 Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
18 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.4 REWORK AND REPAIR OF NONCONFORMING MATERIAL
E.4.1 Rework and Repair are defined as follows:
E.4.1.1 Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
E.4.1.2 Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
E.4.2 Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Representative for review and approval prior to implementation. Rework procedures are subject to the Government's disapproval.
E.4.3 Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting
Officer for review and written Government approval prior to implementation.
E.4.4 Whenever the Contractor submits a repair or rework procedure for Government review and approval, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
E.4.5 The Government approved rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
*** END OF NARRATIVE E0001 ***
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015 (21 Oct 2015) or equivalent
Tailored by excluding paragraph(s) 8.3
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
19 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(End of clause)
DELIVERIES OR PERFORMANCE
F.1 LONG TERM CONTRACTS - FOB DESTINATION
For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentages, if listed: 100% to Anniston, AL.
*** END OF NARRATIVE F0001 ***
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .