Solicitation - Air Breathing Hose Assembly
Solicitation number
W912CH25Q0055
Issued by

About this file

This is a Request for Quotation (RFQ) issued by the Army Contracting Command Detroit Arsenal for the supply of Hose Assembly, Air Breathing (NSN 4240-01-663-6235, Part Number 602108). The solicitation number is W912CH-25-Q-0055, issued on March 23, 2026, with proposals due by April 22, 2026. This is a total small business set-aside using NAICS code 339113 (Surgical Appliance and Supplies Manufacturing) with a firm-fixed price contract type. The Government plans to award a single contract based on price as the sole evaluation factor. Offerors must submit proposals via email to Contract Specialist Danielle Campbell at danielle.r.campbell9.civ@army.mil with subject header "Proposal Submission W912CH-25-Q-0055 (company name)," with a maximum email size of 10 megabytes and proposals in Microsoft Office 2013 compatible or PDF format.

The RFQ requires delivery of 24 units of production quantity hose assemblies (CLIN 0001AA) within 75 days after contract award or First Article Test (FAT) approval, whichever is later, with delivery to Blue Grass Army Depot in Richmond, Kentucky. An additional unexercised option quantity of 24 units (CLIN 0002AA) is available at 45 days after award. A First Article Test Report (CLIN 0001AB) must be submitted within 45 days of award to DCMA Boston. The solicitation includes comprehensive technical requirements including ISO 9001:2015 quality management system certification, production lot testing in accordance with MIL-STD 1916, military preservation and packing per MIL-STD-2073-1, shelf life markings with 60-month inspection/test dates, and various contract data requirements including Engineering Change Proposals, Requests for Variance, and First Article Test Reports. Offerors may request waiver of First Article Approval requirements if they provide supporting documentation demonstrating prior approval of similar items. The Government reserves the right to deduct the FAT cost from evaluated price if a waiver is granted, and proposals must demonstrate receipt of the current Technical Data Package by providing a copy of Drawing 602108 with original date.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of

(This is NOT an Order)

1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating

See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)

See Schedule

7. Delivery

FOB Other Destination

5B. For Information Call: (Name and telephone no.) (No collect calls)

8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)

See Schedule

10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.

Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. Schedule (Include applicable Federal, State, and local taxes)

Item Number (a)

Supplies/Services (b)

Quantity (c)

Unit (d)

Unit Price (e)

Amount (f)

(See Schedule)

12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage

NOTE: Additional provisions and representations are are not attached.

13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation

16. Signer

a. Name (Type or Print) b. Telephone

Area Code

c. Title (Type or Print) Number

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)

X

W912CH-25-Q-0055 2026MAR23 DOA4

W912CHACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

DANIELLE CAMPBELL (571)588-1532

CCTA-APS-A

EMAIL: DANIELLE.R.CAMPBELL9.CIV@ARMY.MIL

X

2026APR22

1 50

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: DANIELLE CAMPBELL

Buyer Office Symbol/Telephone Number: CCTA-APS-A/(571)588-1532

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Gas Masks

*** End of Narrative A0000 ***

A.1 DESCRIPTION OF THE ACTION

A.1.1 This solicitation is intended to result in the award of a single, firm-fixed price (FFP) contract for the supply of the Hose

Assembly, Air Breathing.

A.1.2 This solicitation is a total small business set-aside in accordance with (IAW) FAR 19.502-2.

A.1.3 There is a Technical Data Package (TDP) associated with this procurement. The TDP is Distribution Statement C which limits access to the Department of Defense (DoD) and U.S. DoD contractors only. Please refer to Section C for additional information.

A.2 SYSTEM FOR AWARD MANAGEMENT (SAM), SIZE STANDARDS, AND NAICS CODES

A.2.1 The Government will utilize North American Industry Classification System (NAICS) code 339113 (Surgical Appliance and Supplies

Manufacturing).

A.2.2 Failure to register in SAM and certify to the same or smaller size standard of the corresponding NAICS code identified in paragraph A.2.1 prior to submitting a proposal against this solicitation may preclude an award being made to your company. Ensure that your firm fits the definition including not limited to any affiliations (domestic or foreign).

A.2.3 Offerors should be aware of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition

Regulation Supplement (DFARS) Part 19, and 13 CFR 121, Small Business Size Regulations. The Small Business Administration (SBA) has a specific set of rules that explain when another person, business or entity is considered an affiliate for size standard purposes. The

SBA determines whether an entity qualifies as a small business concern by counting its receipts, employees, or other measures including those of all its domestic and foreign affiliates. SBA's rules on affiliation for its programs (except for Small Business Innovation

Research and Small Business Technology Transfer programs) are found at 13 C.F.R 121.103.

A.3 EVALUATION FACTORS FOR AWARD

Offerors are encouraged to review Section M of this solicitation for evaluation factors and basis for award.

A.4 ELECTRONIC CONTRACTING

A.4.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website

(https://www.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

A.4.2 Interested offerors shall submit a proposal via email to the Contract Specialist (danielle.r.campbell9.civ@army.mil) with the subject header: Proposal Submission W912CH-25-Q-0055 (company name). Once a proposal is received, the Contract Specialist/Contracting

Officer will reply with the respective Offeror stating receipt of proposal submission.

A.4.3 Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, to be received by the Government office designated in the solicitation by the time specified.

A.4.4 It is the responsibility of the offeror to ensure any proposal, modification, or revision/amendment is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208(b), if any proposal, modification, or revision/amendment was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal, modification, or revision/amendment is defined to mean ALL volumes or parts required in the solicitation and included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

2 50

W912CH-25-Q-0055

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A.4.5 Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, offerors will no longer be able to submit electronic responses.

A.4.6 Any award issued as a result of this solicitation will be distributed electronically. In the event of a Freedom of Information Act

(FOIA) request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. In addition, in accordance with Executive Order 12600

(June 23, 1987), please be advised it is the Government's intention to also release the unit price(s) in response to any request under

FOIA. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract. Unit price does

NOT refer to, nor does it include, Cost or Pricing Data or Information. If an Offeror objects to such release in the base contract or contract modifications in the event of a FOIA request, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made in accordance with FOIA based on rationale given.

A.4.7 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the APEX

(formerly Procurement Technical Assistance Center (PTAC)) website at http://www.miapex.org/ to locate a regional center.

A.4.8 All questions regarding the requirements of this solicitation and applicable attachments must be submitted by 06 April 2026, 12:00

PM Local Warren, MI time to danielle.r.campbell9.civ@army.mil. The Government shall review all questions received but is not obligated to answer questions submitted after the date noted above prior to the solicitation close date.

A.5 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

A.5.1 This solicitation and resulting contract contains technical data, or incorporates attachments containing technical data, whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of

2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Further dissemination of the export control data must be in accordance with provisions of DoD Directive 5230.25, DoDI

5230.24, its Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the export controlled data to all SUBCONTRACTORS at every level.

A.5.2 To be eligible to gain access to attachments containing export controlled data (via SAM.gov) an offeror must have a current DD

2345, Militarily Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplica ions/JCP.aspx

Processing time is estimated at six (6)to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C Technical Data Package instructions.

A.5.3 Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

A.5.4 Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the

TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.6 ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.7 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website: HYPERLINK

"https://www.tacom.army.mil/ombudsperson"https://www.tacom.army.mil/ombudsperson.

(Best viewed using Google Chrome or Microsoft Edge)

A.8 ALL OR NONE

3 50

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A.8.1 Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

A.8.1.1 ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

A.8.1.2 OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.

*** END OF NARRATIVE A0001 ***

4 50

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 HOSE ASSEMBLY, AIR BREATHING

NSN: 4240-01-663-6235

Mfr CAGE: 1LEW5

Mfr Part Number: 602108

0001AA PRODUCTION QUANTITY 24 EA $ $ _____________________________ ______________ __________________

COMMODITY NAME: HOSE ASSEMBLY, AIR BREATHING

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH4C0292EH PRON AMD: 07

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS; SECTION D

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W58HZ14032V023 W22PVJ J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 24 0075

FOB POINT: Destination

SHIP TO:

(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT

XU GEN SUP STORAGE PT CRP WHSE 211

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

0001AB FIRST ARTICLE TEST REPORT 1 LO $ $ _________________________ ______________ __________________

SERVICE REQUESTED: HOSE ASSEMBLY, AIR BREATHING

CLIN CONTRACT TYPE:

Firm Fixed Price

Packaging and Marking _____________________

Inspection and Acceptance _________________________

5 50

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

INSPECTION: Destination ACCEPTANCE: Destination

Government Approval/Disapproval Days: 30

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0045

FOB POINT: Destination

SHIP TO:

(S2206A) DCMA BOSTON

495 SUMMER ST

PH 617 753 4111

BOSTON,MA,02210-2138

0002 HOSE ASSEMBLY, AIR BREATHING

NSN: 4240-01-663-6235

Mfr CAGE: 1WEL5

Mfr Part Number: 602108

0002AA UNEXERCISED OPTION QUANTITY 24 EA $ $ _____________________________ ______________ __________________

COMMODITY NAME: HOSE ASSEMBLY, AIR BREATHING

CLIN CONTRACT TYPE:

Firm Fixed Price

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS; SECTION D

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 24 0045

FOB POINT: Destination

SHIP TO:

6 50

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT

XU GEN SUP STORAGE PT CRP WHSE 211

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

9000 CONTRACT DATA REQUIREMENTS LIST _______________________________

A001 DATA ITEM - NOT SEPARATELY PRICED 1 LO $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: CDRL A001 - ECP

CLIN CONTRACT TYPE:

Firm Fixed Price

Engineering Change Proposal (ECP), in accordance with:

- Section C.2: Configuration Management

Documentation; and

- Exhibit A: Contract Data Requirements List, DD Form

1423, A001.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A002 DATA ITEM - NOT SEPARATELY PRICED 1 LO $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: CDRL A002 - RFV

CLIN CONTRACT TYPE:

Firm Fixed Price

Request for Variance (RFV), in accordance with:

- Section C.2: Configuration Management

Documentation; and

- Exhibit A: Contract Data Requirements List, DD Form

1423, A002.

7 50

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A003 DATA ITEM - NOT SEPARATELY PRICED 1 LO $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: CDRL A003 - NOR

CLIN CONTRACT TYPE:

Firm Fixed Price

Notice of Revision (NOR), in accordance with:

- Section C.2: Configuration Management

Documentation; and

- Exhibit A: Contract Data Requirements List, DD Form

1423, A003.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A004 DATA ITEM - NOT SEPARATELY PRICED 1 LO $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: CDRL A004 - FATR

CLIN CONTRACT TYPE:

Firm Fixed Price

First Article Test Report (FATR) Contractor, in accordance with:

- Section E.2: Inspection and Acceptance (First

Article Approval);

- Section E.3: First Article Testing;

- Section E.8: Inclusion of Testing Costs;

8 50

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

- Section E.9: Lab Performance Certification

Requirements;

- Section E.10: Destructive Testing;

- FAR 52.209-3: First Article Approval; and

- Exhibit A: Contract Data Requirements List, DD Form

1423, A004.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A005 DATA ITEM - NOT SEPARATELY PRICED 1 LO $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: CDRL A005 - PLT

CLIN CONTRACT TYPE:

Firm Fixed Price

Production Lot Acceptance Report (Contractor), in accordance with:

- Section E. 7: Production Lot Testing (Conformance

Inspection Contractor);

- Section E.8: Inclusion of Testing Costs;

- Section E.9: Lab Performance Certification

Requirements; and

- Exhibit A: Contract Data Requirements List, DD Form

1423, A005.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A006 DATA ITEM - NOT SEPARATELY PRICED 1 LO $ ** NSP ** _________________________________ __________________

9 50

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: CDRL A006 - COC

CLIN CONTRACT TYPE:

Firm Fixed Price

Certificate of Compliance (CoC) (Blocks 3 through 19 of Form 010), in accordance with:

- Exhibit A: Contract Data Requirements List, DD Form

1423, A006.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A007 DATA ITEM - NOT SEPARATELY PRICED 1 LO $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: CDRL A007 - OPSEC

CLIN CONTRACT TYPE:

Firm Fixed Price

OPSEC Awareness (Level 1) Training Report, in accordance with:

- Section C.6: Requirement for an OPSEC Standing

Operating Procedure/Plan;

- Section C.7: OPSEC Training Requirement; and

- Exhibit A: Contract Data Requirements List, DD Form

1423, A007.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A008 DATA ITEM - NOT SEPARATELY PRICED 1 LO $ ** NSP ** _________________________________ __________________

10 50

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: CDRL A008 - TARP

CLIN CONTRACT TYPE:

Firm Fixed Price

Threat Awareness Reporting Program (TARP) Training, in accordance with:

- Section C.8: Counterintelligence Awareness and

Reporting (CIAR); Formerly Known as Threat Awareness

Reporting Program (TARP); and

- Exhibit A: Contract Data Requirements List, DD Form

1423, A008.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

11 50

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 TECHNICAL DATA PACKAGE INFORMATION

C.1.1 The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:

W912CH-25-Q-0055

C.1.2 To access the data through SAM:

C.1.2.1 Log on to the SAM web site: https://SAM.gov.

C.1.2.2 Search for the solicitation number.

C.1.2.3 Click on the attachment you would like to view.

C.1.2.4 If the attachment is restricted, request access to the document.

C.1.2.5 If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract

Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download

TDP items.

C.1.2.6 If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

C.1.2.7 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and

Non-Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.

C.1.3 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United

States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).

C.1.3.1 Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution

Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

C.1.3.2 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense

Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.

C.1.4 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

C.2 CONFIGURATION MANAGEMENT DOCUMENTATION

C.2.1 The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

C.2.1.1 The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense

Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

C.2.1.2 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

C.2.1.3 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

C.2.1.4 All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

C.2.1.5 For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs C.2.1.5.1 through C.2.1.5.3.

12 50

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

C.2.1.5.1 for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

C.2.1.5.2 for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

C.2.1.5.3 for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

C.2.1.6 The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in C.2.1.5.1-C.2.1.5.3 above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

C.2.1.7 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).

C.2.1.8 The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

C.3 START OF WORK MEETING

C.3.1 The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within 30 calendar days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort. The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.

C.3.2 The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in Section G or in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within 14 calendar days after the meeting is held.

C.4 USE OF CLASS I AND CLASS II OZONE DEPLETING SUBSTANCES

C.4.1 Definitions.

C.4.1.1 Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the

Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm

C.4.1.2 Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

C.4.1.3 Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.

C.4.2 Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition

Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

C.4.3 No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

C.5 CONTROLLED UNCLASSIFIED INFORMATION (CUI) GUIDELINES

C.5.1 The contractor shall comply with the requirements outlined in Attachment 0001, Controlled Unclassified Information (CUI)

Guidelines, which provides detailed information on the handling, protection, and dissemination of CUI.

C.6 REQUIREMENT FOR AN OPSEC STANDING OPERATING PROCEDURE/PLAN

C.6.1 The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government

OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

13 50

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.6.2 The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.

C.6.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

OPSEC Level I.

C.7 OPSEC TRAINING REQUIREMENT

C.7.1 Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contract Specialist and the Procuring Contracting Officer (PCO).

C.8 COUNTERINTELLIGENCE AWARENESS AND REPORTING (CIAR); FORMERLY KNOWN AS THREAT AWARENESS REPORTING PROGRAM (TARP)

C.8.1 Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete "Counterintelligence Awareness and Reporting for DoD Employees" CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements.

C.8.2 In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI

Special Agent or a CI-experienced person in addition to the annual training requirement:

- DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special

CIAR briefing prior to the travel and will be debriefed upon return. AR 38112 13 June 2025 11

- DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.

- DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.

- DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.

- Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.

- Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.

- Personnel with access to Sensitive Compartmented Information and Special Access Programs.

- Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.

- Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.

- Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.

- Professional and educational exchange programs with foreign governments.

C.8.2.1 These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent.

Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.

14 50

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE C0001 ***

PACKAGING AND MARKING

D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(4) SPECIAL PACKAGING INSTRUCTION NUMBER: P602108, dated 01 AUG 24

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the

UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees

Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating

(treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org).

The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organization's compliance program.

(e) Hazardous Materials (As applicable):

15 50

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United

Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the

SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS: PLACE A RED X AND THE WORDS "SHORT BOX" ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE

THAT BOX/BOXES WITH THE MARKINGS SHOWING ON THE TOP FRONT OF THE PALLET LOAD.

*** END OF NARRATIVE D0001 ***

INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

Quality Management System ISO 9001:2015 Requirements, not including paragraph 8.3.

General Requirements for the competence of testing and calibration laboratories ISO/IEC17025, 3rd Edition, 11/1/2017 for agent testing requires compliance but not registration or accreditation. (Limited to Gov/Contractor Labs that do Agent Testing).

16 50

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

E.2 INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL)

E.2.1 The Government's acceptance of the First Article Test Report offered under this contract shall take place at DESTINATION, as stated on CLIN 0001AB.

E.3. FIRST ARTICLE TESTING

In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:

E.3.1 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING

E.3.1.1 First Article Approval-Contractor Testing shall be performed in accordance with the terms of the contract, including FAR 52.209-

3 and CDRL A004. In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

E.3.1.2 The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

E.3.1.3 The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

E.3.1.3.1 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed within the last year and the results, with the Certificates of Conformance, are submitted with the First Article Test Report.

E.3.1.3.2 Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

E.3.1.3.3 Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the

First Article Test Report.

E.3.1.3.4 Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have

17 50

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the

First Article Test Report.

E.3.1.3.5 Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.

E.3.1.4 Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

E.3.1.5 A First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The

FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated

Government representative to determine that the First Article Test was successfully completed. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished in accordance with CDRL A004.

E.3.1.6 Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the

Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the

Government shall be borne by the Contractor.

E.3.1.6.1 When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .