W912CH24R02003.pdf
PDF 176 KB Posted
- Attached to
- Stock, Gun, Shoulder
- Solicitation number
- W912CH-24-R-0203
- Issued by
-
Department of the Army
About this file
This is a solicitation for a 100% small business set-aside contract to provide Stock, Gun, Shoulder (NSN: 1005-01-576-4661) to the Department of the Army under solicitation number W912CH-24-R-0203. The Army Contracting Command-Detroit Arsenal seeks to award a 5-year Indefinite Delivery, Indefinite Quantity (IDIQ) firm-fixed-price contract with a minimum quantity of 126 units and maximum quantity of 10,128 units, with estimated quantities of 4,128 units in year one and 1,500 units in each subsequent year.
The contract requires First Article Testing and includes specific requirements for heavy phosphate coating, OPSEC awareness training, and threat awareness reporting. The technical data package is export-controlled and requires vendors to have Joint Certification Program certification and sign a non-disclosure agreement before accessing. Delivery is FOB Destination with 100% of deliveries to XR Wolf Anniston Munitions Center. The contract falls under NAICS code 332994 (Small Arms, Ordinance, and Ordnance Accessories Manufacturing) and requires ISO 9001:2015 quality management system compliance. Deliveries are to be made at a rate of 344 units every 30 days, with the first article test report due within 180 days of contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W912CH-24-R-0203
X
DOA5
SEE SCHEDULE
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
LOREN FAIST
(571)588-9089
CCTA-APS-C
LOREN.M.FAIST.CIV@ARMY.MIL
1 62
X 1
X 4 X 12
X 16 X 18 X 20
X 22
X 24
X 44
X 45
X 54
X 60
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: LOREN FAIST
Buyer Office Symbol/Telephone Number: CCTA-APS-C/(571)588-9089
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.1 BACKGROUND/DESCRIPTION OF THE ACTION________________________________________
A.1.1 This solicitation is intended to result in the award of a Firm-Fixed Price (FFP), five-year Indefinite Delivery, Indefinite
Quantity (IDIQ) contract under Federal Acqusition Regulation (FAR) 16.504.
A.1.2 This solicitation is a 100% Small Business Set-Aside.
A.1.3 There is a Technical Data Package (TDP) associated with this procurement. Please refer to Section C for additional information.
A.1.4 Offerors shall follow Section L for Instructions, Conditions, and Notices to Offerors for proposal submission and Section M for
Evaluation Factors.
A.2 MINIMUM AND MAXIMUM QUANTITY________________________________
A.2.1 In accordance with FAR 16.504(a)(4)(ii), the minimum quantity of supplies the Government will acquire under the contract is 126 each. The Government will satisfy this minimum quantity requirement by issuing the first delivery order for at least the stated minimum at the time of contract award.
A.2.2 The Government is NOT obligated to purchase any additional requirements beyond the Minimum Guaranteed Quantity.
A.2.3 The maximum quantity of supplies the Government can acquire under the IDIQ contract is 10,128 each.
A.3 SOLICITATION STRUCTURE__________________________
A.3.1 The Government will utilize North American Industry Classification System (NAICS) code 332994 (Small Arms, Ordinance, and Ordnance
Acessories Mnufacturing).
A.4 ORDERING PERIOD___________________
A.4.1 There will be five, one-year ordering periods beginning the date of contract award.
A.4.2 All proposals received in response to this solicitation shall remain valid for a minimum of 120 calendar days.
A.5 DELIVERY ORDER AWARDS_________________________
A.5.1 Future delivery orders will be awarded in accordance with (IAW) FAR clause 52.216-19, Order Limitations, FAR clause 52.216-22, Indefinite Quantity.
A.6 ELECTRONIC CONTRACTING__________________________
A.6.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
A.6.2 Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
A.6.3 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
2 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.7 ACKNOWLEDGEMENT OF AMENDMENTS_________________________________
A.7.1 Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.8 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON_______________________________________________________________
A.8.1 Information regarding the Ombudsperson for this contract is located at the following website:
https://www.tacom.army.mil/ombudsperson . (Best viewed using Google Chrome or Microsoft Edge)
A.9 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE_________________________________________________________________________
A.9.1 This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act
(Section
2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States
Code). This also applies to distribution of the TDP to all
SUBCONTRACTORS at every level.
A.9.2 To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's
Section C Technical Data Package instructions.
A.9.3 Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors,and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
A.9.4 Destruction of this technical data shall be accomplished by:
shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.10 ALL OR NONE________________
A.10.1 Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
A.10.2 ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
A.10.3 OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
*** END OF NARRATIVE A0001 ***
3 62
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
IN THE FOUR DIGIT ITEM NUMBERS CLINS) THAT FOLLOW,
THE NUMBERING SYSTEM THAT IS USED IS AS FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY ITEM AND THE FOURTH
(LAST) DIGIT SIGNIFIES THE APPLICABLE CONTRACT YEAR,
i.e., CLIN 0011 IS FOR THE FIRST ITEM - FIRST
ORDERING YEAR, CLIN 0012 IS FOR THE FIRST ITEM -
SECOND ORDERING YEAR, ETC.
THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE
SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE OF
AWARD PLUS 364 DAYS.
SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS
THROUGH 729 DAYS AFTER CONTRACT AWARD.
THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS
THROUGH 1,094 DAYS AFTER CONTRACT AWARD.
FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095 DAYS
THROUGH 1,459 DAYS AFTER CONTRACT AWARD.
FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460 DAYS
THROUGH 1,824 DAYS AFTER CONTRACT AWARD.
MINIMUM CONTRACT QUANTITY:126 Each
MAXIMUM CONTRACT QUANTITY: 10,128 Each
PLEASE NOTE:
1)The quantities identified in this contract are estimates only and not a representation that conditions affecting the Government's needs will be stable.
2)The price applicable to an individual order is the price for the ordering year in which the order is issued. The delivery date does not determine the ordering year.
(End of narrative A001)
0011 FIRST ORDERING YEAR EST 4128 EA $ $ ___________________ ______________ __________________
NSN: 1005-01-576-4661
COMMODITY NAME: STOCK GUN SHOULDER
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19200
Mfr Part Number: 13026027
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
4 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
W912CH is used as a placeholder. The actual delivery location will be notated on each Delivery Order issued.
(End of narrative F001)
0012 SECOND ORDERING YEAR EST 1500 EA $ $ ____________________ ______________ __________________
NSN: 1005-01-576-4661
COMMODITY NAME: STOCK GUN SHOULDER
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19200
Mfr Part Number: 13026027
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
5 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
W912CH is used as a placeholder. The actual delivery location will be notated on each Delivery Order issued.
(End of narrative F001)
0013 THIRD ORDERING YEAR EST 1500 EA $ $ ___________________ ______________ __________________
NSN: 1005-01-576-4661
COMMODITY NAME: STOCK GUN SHOULDER
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19200
Mfr Part Number: 13026027
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
W912CH is used as a placeholder. The actual delivery location will be notated on each Delivery Order issued.
(End of narrative F001)
0014 FOURTH ORDERING YEAR EST 1500 EA $ $ ____________________ ______________ __________________
NSN: 1005-01-576-4661
COMMODITY NAME: STOCK GUN SHOULDER
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19200
Mfr Part Number: 13026027
6 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
W912CH is used as a placeholder. The actual delivery location will be notated on each Delivery Order issued.
(End of narrative F001)
0015 FIFTH ORDERING YEAR EST 1500 EA $ $ ___________________ ______________ __________________
NSN: 1005-01-576-4661
COMMODITY NAME: STOCK GUN SHOULDER
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19200
Mfr Part Number: 13026027
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
7 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
W912CH is used as a placeholder. The actual delivery location will be notated on each Delivery Order issued.
(End of narrative F001)
0021 FIRST ARTICLE TEST REPORT (FATR) 1 LO $ ________________________________ __________________
SERVICE REQUESTED: STOCK GUN SHOULDER FATR
CLIN CONTRACT TYPE:
Firm Fixed Price
First Article Test Report is required in accordance with the clause entitled First Article Approval
Contactor Testing, FAR 52.209-3 ATL I and ALT II
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
8 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1000 CONTRACT DATA REQUIREMENTS LIST (CDRL) A001-A006 ________________________________________________
A001 Service Data Item - Not Priced 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
Lists (CDRL).
See Section J, Exhibit A: DD Form 1423, A001
Engineering change proposal (ECP).
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 Service Data Item - Not Priced 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: REQUEST FOR VARIANCE
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
Lists (CDRL).
See Section J, Exhibit A: DD Form 1423, A002 Request for variance (RFV).
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
9 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A003 Service Data Item - Not Priced 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: NOTICE OF REVISION (NOR)
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
Lists (CDRL).
See Section J, Exhibit A: DD Form 1423, A003 Notice of Revision (NOR).
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A004 Service Data Item - Not Priced 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: HEAVY PHOSPHATE COATING
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
Lists (CDRL).
See Section J, Exhibit A: DD Form 1423, A004 Heavy
Phosphate Coating.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A005 Service Data Item - Not Priced 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: OPSEC AWARENESS TRAINING REPO
CLIN CONTRACT TYPE:
Firm Fixed Price
10 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
Lists (CDRL).
See Section J, Exhibit A: DD Form 1423, A005 OPSEC
Awareness Training Report.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A006 Service Data Item - Not Priced 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: TARP
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
Lists (CDRL).
See Section J, Exhibit A: DD Form 1423, A006 TARP.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
11 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov ) associated with this solicitation number:
W912CH-24-R-0203
To access the data through SAM:
C.1.1 Log on to the SAM web site: https://SAM.gov .
C.1.2 Search for the solicitation number.
C.1.3 Click on the attachment you would like to view.
C.1.4 If the attachment is restricted, request access to the document.
C.1.5 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.)or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
C.1.6 Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
C.1.7 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense
Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
C.1.8 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
C.1.9 If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Detroit Arsenal(DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
C.1.10 If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220.
Vendors are responsible for placing correct information in SAM.
C.1.11 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
C.2 CONFIGURATION MANAGEMENT DOCUMENTATION
C.2.1 The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
C.2.1.1 The Configuration Change Management section of SAE EIA-649-1 (current revision) Configuration Management Requirement for Defense
Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); and the second sentence of paragraph 3.3.1.8.1(1).
C.2.1.2 Furnished item(s) shall conform to the approved configuration requirements/revision unless an RFV is processed and approved as provided by Paragraph e. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
C.2.1.3 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1
12 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(current revision) and should be referred to Section I Clause 52.248-1 VALUE ENGINEERING.
C.2.1.4 All ECPs submitted will be deemed routine. The Contractor must include justification for an ECP it considers emergency or urgent in the submittal and include all supporting documentation.
C.2.1.5 For ECPs, RFVs, and NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/NOR without processing.
C.2.1.5.1 for Engineering Change Proposal (ECP), the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001
Engineer Change Proposal.
C.2.1.5.2 for Request for variance (RFV), the Contractor shall prepare and deliver the RFV IAW CDRL A002 Request for Variance.
C.2.1.5.3 for Notice of Variance (NOR), the Contractor shall prepare and deliver the NOR IAW CDRL A003 Notice of Revision.
C.2.1.6 The Governments acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the
Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Governments sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
C.2.1.7 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO), copy to the Administrative Contracting Officer (ACO).
C.2.1.8 The submission of an ECP/RFV/NOR does not affect the required delivery date of the contract.
C.3 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
C.3.1 The contractor is subject to provisions of the Attachment 0002 OPSEC Plan (July 2023) , per AR 530-1, Operations Security.
Attachment 0002 Opsec Plan (July 2023) specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
C.3.2 The contractor will receive a copy of the Attatchment 0002 OPSEC Plan (July 2023) located in section J at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
C.3.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I certified.
C.4 OPSEC TRAINING REQUIREMENT
C.4.1 Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm . Within 10 calendar days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the Procuring
Contracting Officer (PCO) IAW CDRL A005 OPSEC Awareness Training Report.
C.5 HEAVY PHOSPHATE COATING REQUIREMENT
C.5.1 The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL-16232.
C.5.2 Paragraph 3.1 of MIL-DTL-16232 refers to "Preproduction Inspection." The procedure shall be submitted in accordance with the
Contract Data Requirements List (CDRL) A004 Heavy Phospate Coating, contained in the contract. The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.
C.5.3 Paragraph 3.2.5-c of MIL-DTL-16232 refers to the "Chromic acid rinse, (Classes 1, 2 and 3)." The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."
C.5.4 Paragraph 4.7.3 of MIL-DTL-16232 refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."
C.5.5 Paragraph 4.7.5 of MIL-DTL-16232 refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be
13 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."
C.5.6 The "product name" along with the manufacturer of the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at
Assist Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word "Qualification".
To obtain MIL Specs, MIL Standards, QPL and QPD products see <"https://assist.dla.mil/online/start / ">.
To obtain MIL Specs, MIL Standards, QPD products see <"https://assist.dla.mil/online/start/ ">.
C.5.7 A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.
C.5.8 Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping/spraying or flash dried at 155-
175 degrees F for 10-30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.4.2.2 of MIL-
PRF-46010.
C.5.9 Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.
C.5.10 Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or CARC paint per ASTM D3359, method B along with the frequency for testing. A daily frequency is required.
C.5.11 Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM B117 for
336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM D610, no more than
5 blisters per 4" x 6" area with none larger than 3/64 inch in diameter. Under film attack at the scribe shall not exceed 1/8 inch.
C.5.12 Topcoat color shall be visual/equipment checked against the specified chip no. of SAE AMS-STD-595 per paint batch. The procedure shall include the specified color chip number.
C.5.12.1 Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL-53072. The manufacturer of the MEK solvent shall be stated in the procedure.
C.6 THREAT AWARENESS REPORTING PROGRAM
C.6.1 All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter
Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and
Reporting Program (TARP). The in-person training is the preferred method, and is available by contacting the local CI Office to arrange for the conduct of training.
C.6.2 The Contractor shall contact the CI Office within (30)calendar days of contract award to schedule TARP training. Once training is complete Contractor shall provide certificates/proof of completion of training to the Contracting Officer's Representative (COR), if assigned to the contract, or to the Procurement Contracting Officer (PCO) within (10)calendar days of completion IAW CDRL A006 TARP.
C.6.3 The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, IAW CDRL A006 TARP for certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army
Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management System (ALMS) at: www.lms.army.mil .
C.7 Contract employees will be required to maintain CUI or legacy U//FOUO at their contractor location (AR 380-5). Reference Attachment
0001 Attachment A CUI 2023 (002)"
C.8 USE AND NON-DISCLOSURE AGREEMENT REQUIRMENT
C.8.1 The Government requires Attachment 0003 Nondisclosure Agreement and Non-Use Agreement(special Licenses Rights)to be signed by an authorized representative of the offeror before the offeror is granted access to the technical data. The appropriate Agreement is available as an attachment to this solicitation, see Section J Attachments.
14 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.8.2 Follow the instructions on the Agreement and email it to the buyer at loren.m.faist.civ@army.mil. The buyer will notify the SAM administrator upon receiving the NDA. The administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before the TDP is viewable. Any questions or problems viewing the TDP, contact the contract specialist listed on the face page of the solicitation/contract.
C.9 Start of Work Meeting. The contractor shall conduct a start of work meeting with Government personnel at the contractors facility within thirty (30) days following contract award. The contractor shall summarize the meeting minutes and send them to the Government within three (3) days of the meeting (DI-ADMN-81505) Data Item A007.
C.10 Environmental Compliance. All activities must be in compliance with federal, state and local laws and regulations.
C 10.1 Safety. The contractor shall report immediately any major accident or incident (including fire) resulting in one or more of the following: causing one or more fatalities; or one or more disabling injuries; damage to Government property exceeding $10,000; affecting program planning or production schedules; degrading the safety of equipment under contract such that personal injury or property damage may be involved; identifying a potential hazard requiring corrective action. The contractor shall prepare the report in accordance with
DI-SAFT-81563, Data Item A008 for each incident in accordance with the CDRL.
C.11 X- Ray Inspection Procedure. The contractor shall furnish X-Ray Procedure Forms sixty (60) days prior to First Article in accordance with (DI-NDTI-80603, Tailored) Data Item A009.
C.12 The contractor shall prepare a Certification/Data Report (DI-MISC-80678, Tailored) Data Item A011, for all applicable tests as described in DI-MISC-80678.
C.13 Classification of Inspections Inspection requirements specified herein are classified as follows:
a. First Article Inspection (see CLIN 0021 and Section E.2)
b. Lot Acceptance Inspection (see Data Item A012)
*** END OF NARRATIVE C0001 ***
15 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
D.1.1 Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
D.1.1.1 LEVEL OF PRESERVATION: Military
D.1.1.2 LEVEL OF PACKING: B
D.1.1.3 QUANTITY PER UNIT PACKAGE: 001
D.1.1.4 SPECIAL PACKAGING INSTRUCTION NUMBER: 13026027
D.1.1.4.1 REVISION: A
D.1.1.5 DATE OF REVISION:12 May 10
D.1.1.6 THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE WITHIN THE TDP.
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ ) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging
Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
D.1.2 Unitization: Shipments of identical items going to the same destination shall be palletized if hey have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
D.1.3 Marking:
D.1.3.1 In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
D.1.3.2 Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher, or Firefox) for the current
DoD Suppliers Passive RFID Information Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at:
https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the UII and MIL-STD-129 for UII package marking requirements.
Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
D.1.4 Heat Treatment and Marking of Wood Packaging Materials (WPM):
D.1.4.1 In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15
(ISPM),Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
D.1.4.2 Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.or g). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the
16 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
necessary certifications.
D.1.4.3 Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard.markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.
D.1.5 Hazardous Materials (As applicable):
D.1.5.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
D.1.5.2 Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
D.1.5.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
D.1.6 This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
D.1.7 SUPPLEMENTAL INSTRUCTIONS: See Section C for changes/updates to SPI.
*** END OF NARRATIVE D0001 ***
17 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring Quality Management Systems_____________________________________________________________________
ISO 9001:2015 21 Oct 2015 Untailored
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
E.1.1 The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or his subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: ORIGIN
a. NAME
b. CAGE
c. ADDRESS, CITY, STATE, ZIP
ACCEPTANCE POINT: ORIGIN
a. NAME
b. CAGE
c. ADDRESS, CITY, STATE, ZIP
E.2 FIRST ARTICLE TEST REPORT (FATR) ACCEPTANCE: DESTINATION
The Government's acceptance of the First Article Test Report offered under this order shall take place at DESTINATION.
E.3 FIRST ARTICLE TEST (CONTRACTOR TESTING)
E.3.1 The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality
Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
E.3.2 The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
E.3.3 The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
E.3.3.1 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with CLIN 0021 First Article Test Report.
E.3.3.2 Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with CLIN 0021 First Article Test Report.
E.3.3.3 Corrosion resistance tests over 10 calendar days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 calendar days prior to processing the first article, and results of the tests are submitted with CLIN 0021 First Article Test Report.
E.3.3.4 Life cycle tests over 10 calendar days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with CLIN
0021 First Article Test Report.
18 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.3.3.5 Onetime qualification…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .