W912CH24Q0061 Amendment 2.pdf

PDF 31 KB Posted

Attached to
SOLE SOURCE SOLICITATION: Canister, Chemical Federal contract opportunity
Solicitation number
W912CH24Q0061
Issued by
Department of the Army

About this file

This document is an amendment to a Request for Proposals (RFP) solicitation for the procurement of chemical canisters. Key details include:

The solicitation number is W912CH24Q0061 and it is a sole source procurement to Avon Protection Systems Inc. The Army intends to award a firm fixed price contract. The solicitation due date has been changed to August 9, 2024 at 2:00pm. Additional clauses have been added, including requirements related to export control, use of ozone depleting substances, configuration management, packaging, inspection, and rework/repair of nonconforming material. The procurement is restricted to the approved source and a technical data package is not available. The government has approved a Justification and Approval (J&A) for this other than full and open competition procurement.

View the file

Other files for this federal contract opportunity

Other files attached to SOLE SOURCE SOLICITATION: Canister, Chemical, newest first.
File Type Posted
W912CH24Q0061 Amendment 1.pdf PDF
W912CH24Q0061.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

W912CH

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

ABHIRAM E. POPURI

EMAIL: ABHIRAM.E.POPURI.CIV@ARMY.MIL

W912CH-24-Q-0061

2024JUN27

X

X 2024AUG09 02:00pm

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 8

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: ABHIRAM E. POPURI

Buyer Office Symbol/Telephone Number: CCTA-APS-A/(520)684-5015

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Gas Masks

*** End of Narrative A0000 ***

SUMMARY OF CHANGES

I. \*.AMENDMENT 1

1. \*.Updated the delivery schedule under clause 52.211-8 to accurately reflect requested quantities and delivery timeframes

2. Updated the delivery timeframe under clause 52.217-7 to provide a defined timeframe for the option

I. \*.

II. \*.AMENDMENT 2

1. \*.Changed the solicitation due date to August 9th 14:00H

2. Added Clauses Relating to

a. \*.Export Control Warning

b. ASSIST

c. Use of Class 1 Ozone Depeleting Substances

d. Configuration Management Documentation

e. Special Packaging Instructions

f. Certificate of Conformance

g. Rework and Repair of Non Conforming Material

h. Higher Level Contract QA Requirement

*** END OF NARRATIVE A0002 ***

A.__ DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section

2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States

Code). This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily

Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's

Section C Technical Data Package instructions.

(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

*** END OF NARRATIVE A0003 ***

2 8

W912CH-24-Q-0061

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.__ USE OF CLASS I and CLASS II OZONE DEPLETING SUBSTANCES

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean

Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.

(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition

Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

*** END OF NARRATIVE C0001 ***

C.__ CONFIGURATION MANAGEMENT DOCUMENTATION

a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph

3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.

d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph 3.3.1 of EIA-

649-1 for ECPs.

(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph 3.3.2 of

EIA-649-1 for RFVs.

(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph 3.3.4 of

EIA-649-1 for NORs.

(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.

f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.

g. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.C.__ CONFIGURATION MANAGEMENT DOCUMENTATION

a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph

3 8

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.

d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph 3.3.1 of EIA-

649-1 for ECPs.

(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph 3.3.2 of

EIA-649-1 for RFVs.

(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph 3.3.4 of

EIA-649-1 for NORs.

(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.

f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.

g. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.

*** END OF NARRATIVE C0002 ***

PACKAGING AND MARKING

PACKAGING AND MARKING

D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: -B-

(3) QUANTITY PER UNIT PACKAGE: -001-

(4) SPECIFICATION/STANDARD: -MIL-STD-2073-1-

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ ) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.

4 8

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher, or Firefox) for the current

DoD Suppliers Passive RFID Information Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at:

https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the UII and MIL-STD-129 for UII package marking requirements.

Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the

SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS: -Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. All variations must be approved by the Contracting Office prior to implementation. The load

5 8

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

shall be contained in a manner that will permit safe handling during shipment and storage.

Packaging shall be in accordance with MIL-STD-2073-1 and have successfully passed test levels of ASTM D 4169, Distribution Cycle 18, Assurance Level II, Acceptance Criterion 3, Military packing Level B . The warehouse stacking height shall be 16 ft. The shipping unit shall be the unit pack. Marking shall be in accordance with MIL-STD-129. Testing shall be witnessed by the Government Quality Assurance

Representative. Packaged gross weight and size shall be included on the test report as well as a detailed description of the packaging.

The Contractor is exempted from testing if other data can be provided (see para. 5.6 of MIL-STD-2073-1) and is acceptable to the

Government. Similar items do not require retesting.

-PLACE A RED X AND THE WORDS SHORT BOX ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE MARKINGS

SHOWING ON THE TOP FRONT OF THE PALLET LOAD.

-The Contractor shall provide standardized lot numbers on all Canisters, identifying the production run during which the units were produced. A copy of the records from the production runs shall be maintained by the Contractor for Government review, as requested, for a minimum time period of five years.

-Non-extendable shelf life markings (e.g., A, B, C, etc.) are required for this procurement and shall be applied in accordance with MIL-STD-129. The shelf life code is . The shelf life markings shall include, as applicable: the Manufactured or

Assembled or Cured Date: (mo/yr), and the Expiration date (mo/yr). The Expiration date shall be months in the future from the manufactured, cured, or assembled date. In accordance with DoDM 4140.27, Vol 1 and MIL-STD-129, an item shall have not less than 85 percent of shelf life remaining at time of receipt by the Government. Any part not having at least

85 percent shelf life remaining shall be considered non-conforming.

*** END OF NARRATIVE D0001 ***

INSPECTION AND ACCEPTANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

1 ADDED 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

2 CHANGED 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

Quality Management System - ISO 9001:2015 Requirements

-not including paragraph 8.3

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.__ REWORK AND REPAIR OF NONCONFORMING MATERIAL

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the

Government Representative for review and approval prior to implementation. Rework procedures are subject to the Governments disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written Government approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review and approval, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

6 8

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(e) The Government approved rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

*** END OF NARRATIVE E0001 ***

7 8

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

3 ADDED 52.211-2 Availability of Defense Specifications, Standards, and Data Item SEP/2023

Descriptions in the Acquisition Streamlining and Standardization

Information System (ASSIST) Website (Sep 2023)

Availability of Defense Specifications, Standards, and Data Item Descriptions in the Acquisition Streamlining and Standardization

Information System (ASSIST) Website (Sep 2023)

(a) Most unclassified Defense specifications and standards may be downloaded from the ASSIST website at https://assist.dla.mil .

(b) Defense documents not available from ASSIST may be requested from the Defense Standardization Program Office by--

(1) Using the ASSIST feedback module (https://assist.dla.mil/feedback ); or

(2) Contacting the Defense Standardization Program Office by telephone at 571-767-6888 or email at assisthelp@dla.mil.

(End of Provision)

8 8

PADDS ERRATA SHEET PAGE

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

ADDED EF00018 52.246-15 01-APR-1984 CERTIFICATE OF CONFORMANCE

CHANGED EF60001 52.246-11 01-DEC-2014 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

Quality Management System - ISO 9001:2015 Requirements

-not including paragraph 8.3

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

ADDED LF70003 52.211-2 01-SEP-2023 Availability of Defense Specifications, Standards, and Data Item

Descriptions in the Acquisition Streamlining and Standardization

Information System (ASSIST) Website (Sep 2023)

W912CH-24-Q-0061 0002

SUPPLEMENTAL INFORMATION
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

File details come from the government source that posted it. Updated .