This document is an Amendment of Solicitation (Standard Form 30) for Solicitation W912CH-24-Q-0055, modifying a federal contract opportunity for a Beam Type Sling with NSN 3940-20-006-8323. Amendment 0001, effective May 8, 2025, makes several key changes: (1) in Section B, changing the titles of two Contract Data Requirements List (CDRL) line items to "SERVICE DATA ITEM - NOT PRICED", (2) in Section C, adding new paragraphs requiring OPSEC Training, an OPSEC Standing Operation Procedure/Plan, and Threat Awareness Reporting Program, and (3) in Section M, adding evaluation factors for contractor responsibility and incomplete option pricing.

The solicitation is a 100% Small Business Set-Aside for procuring 28 Beam Type Slings, with a Firm Fixed Price contract type. The Technical Data Package (TDP) is export-controlled, requiring vendors to be certified under the United States/Canada Joint Certification Program to access technical documents. The contract is issued by the Army Contract Command Detroit Arsenal (ACC-DTA), with the buyer being Brian T. Hurd, and is associated with a Light Armored Vehicle weapon system. Contractors must comply with new security and training requirements, including OPSEC Level I training, annual OPSEC awareness training, and Threat Awareness Reporting Program (TARP) training.

View the file

Other files

File Type Posted
W912CH24Q0055 signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2025MAY08

W912CH

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

BRIAN T. HURD

EMAIL: BRIAN.T.HURD.CIV@ARMY.MIL

W912CH-24-Q-0055

2025MAY02

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 7

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: BRIAN T. HURD

Buyer Office Symbol/Telephone Number: CCTA-APN-A/(571)588-9137

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Light Armored Vehicle

*** End of Narrative A0000 ***

Solicitation: W912CH-24-Q-0055

Amendment: 0001

1. The purpose of Amendment 0001 to Solicitation W912CH-24-Q-0055 is to: Section B:a) Change the title of CDRL ELIN A004 from Test

Procedure Pretreatments to SERVICE DATA ITEM - NOT PRICED. B) Change the title of CDRL ELIN A005 from Test Report? Pretreatments to

SERVICE DATA ITEM - NOT PRICED.

SECTION C:c) Add paragraph C.3, OPSEC Training Requirement.

d) Add paragraph C.4, Requirement for an OPSEC Standing Operation Procedure/Plan.

e) Add paragraph C.5, Threat Awareness Reporting Program. SECTION M:f) Add M.1, CONTRACTOR RESPONSIBILITY AND ELIGIBILITY FOR AWARD. g)

Add M.2, EVALUATION OF INCOMPLETE OPTION PRICING. This concludes all Section affected by this Amendment.

2. All other terms and conditions of the solicitation, except for those addressed above, remain unchanged and are in full force and effect.

*** END OF NARRATIVE A0002 ***

2 7

W912CH-24-Q-0055

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

9000 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________

A004 SERVICE DATA ITEM -- NOT PRICED 1 LO $ ** NSP ** _______________________________ __________________

SERVICE REQUESTED: CARC TEST PROCEDURE

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A005 SERVICE DATA ITEM -- NOT PRICED 1 LO $ ** NSP ** _______________________________ __________________

SERVICE REQUESTED: CARC TEST REPORT

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

3 7

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 TECHNICAL DATA PACKAGE INFORMATION

The following Xd item applies to this solicitation:

C.1.1 [ ] There is no Technical Data Package (TDP) included with this solicitation.

C.1.2 [X] The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:

W912CH-24-Q-0055

C.1.3 To access the data through SAM:

C.1.3.1 Log on to the SAM web site: https://SAM.gov.

C.1.3.2 Search for the solicitation number.

C.1.3.3 Click on the attachment you would like to view.

C.1.3.4 If the attachment is restricted, request access to the document.

C.1.3.4.1 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec

2751,et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.

C.1.3.4.2 Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the

TDP to all SUBCONTRACTORS at every level.

C.1.3.4.3 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with

Defense Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx

C.1.4 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

C.1.4.1 If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract

Specialist and Contracting Officer at Army Contract Command Detroit Arsenal (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

C.1.4.2 If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

C.1.4.3 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and

Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.

C.2 CONFIGURATION MANAGEMENT DOCUMENTATION

C.2.1 The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

C.2.2 The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense

Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

C.2.3 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

C.2.4 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

C.2.5 All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

C.2.6 For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

C.2.6.1 for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

C.2.6.2 for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

C.2.6.3 for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

C.2.7 The Governments acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Governments sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

C.2.7.1 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).

C.2.7.2 The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

C.3 REQUIRED TAILORING LANGUAGE TO ELIMINATE CLASS I OZONE-DEPLETING SUBSTANCES (CIODS)

C.3.1 The purchase description or Technical Data Package (TDP) for this contract incorporates one or more specifications or standards that, in their unmodified form, either authorize or require the use of Class I or Class II Ozone-Depleting Substances (ODS).

C.3.1.2 Tailoring language to eliminate the authorization or requirement to use Class I or Class II (ODS) is hereby incorporated into this contract by reference. Specifications and standards affected are: MIL-STD-642.

C.3.1.3 The Class I or Class II (ODS) listing that contains the required tailoring language is listed in Section J Attachments and

4 7

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

titled Tailoring Specifications and Standards for CIODS.

C.4 DRAWING LIMITATIONS

C.4.1 The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:C.4.1.1 depict the completed (item(s), and

C.4.1.2 serve as the basis for inspection of the completed item(s).

4.2 These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.

4.3 The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

4.4 The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.

4.5 Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the

Government and no delivery schedule extension.

C.5 ACQUISITION OF SOURCE-CONTROLLED PART NUMBER

Acquisition under this contract is restricted to:

C.5.1 The manufacturers part number or numbers set forth in the Schedule or the Technical Data Package; and

C.5.2 Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the Technical Data Package; provided the nonlisted part numbers have been furnished to one of the approved manufacturers listed in the Technical Data Package and that manufacturer has substituted the nonlisted part with one of the approved part numbers, without making any changes in the characteristics or properties of the part.

C.6 ACQUISITION OF MANUFACTURER'S PART NUMBER

This acquisition is restricted to the item description set forth in the Schedule which specifies a manufacturer's part number. Since complete Government data for the item are not available, it is understood and agreed that references to specifications and drawings herein shall be deemed to include all changes or revisions thereto which the contractor has made effective as of the date of delivery of any of the items provided for in this contract; provided, that no such change or revision which affects the interchangeability of the item (ability to be interchanged with previous parts or to connect with all mating parts when assembled) shall be effected without the approval of the Contracting Officer. The contractor agrees that he will furnish to the Administrative Contracting Officer or Government

Inspector, for the purpose of making inspection under any resulting contract, copies of the applicable specifications and drawings indicating all changes or revisions.C.3 OPSEC TRAINING REQUIREMENT

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm. The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officers Representative (COR) or Procuring Contracting Officer (PCO) upon request.

C.7 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN

C.7.1 The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S.

Government OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

C.7.2 The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.

C.7.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

OPSEC Level I.

C.8 THREAT AWARENESS REPORTING PROGRAM

C.8.1 All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter

Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and

Reporting Program (TARP). The in-person training is the preferred method, and is available by contacting the local CI Office to arrange for the conduct of training.

C.8.2 The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete, the Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting

Officers Representative (COR) or Procuring Contracting Officer (PCO) upon request.

C.8.3 The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management

System (ALMS) at: www.lms.army.mil.

5 7

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE C0001 ***

6 7

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

EVALUATION FACTORS FOR AWARD

M.1 CONTRACTOR RESPONSIBILITY AND ELIGIBILITY FOR AWARD

M.1.1 The Government may award a contracts to the offerors that:

M.1.1.2 Submit the lowest evaluated offer if award is based on price only, or the offer that provides the best value to the Government if factors in addition to price are identified elsewhere in this solicitation, M.1.1.3 Submit a bid or proposal that meets all the material requirements of this solicitation, and

M.1.1.4 Meet all the responsibility criteria at FAR 9.104.

M.1.2 To make sure that an offeror meets the responsibility criteria at FAR 9.104 the Government may:

M.1.2.1 Arrange a visit to the offerors plant and perform a preaward survey;

M.1.2.2 Ask the offeror to provide financial, technical, production, or managerial background information.

M.1.3 If the offeror does not provide the Government with the data requested within 7 days from the date the requested is received, or if the offeror refuses to have an onsite visit to the offerors facility, the Government may determine the offeror to be non-responsible.

M.1.4 If the Government visits the offerors facility, please make sure that current certified financial statements and other data relevant to the bid or proposal available for Government personnel to review.

M.2 EVALUATION OF INCOMPLETE OPTION PRICING

M.2.1 Per FAR 17.203(d), offerors may price the option CLIN in this solicitation incrementally, by entering different option unit prices that will apply to different subquantities or quantity ranges (in the event that the Government elects to exercise less than 100% of the option). Notwithstanding this fact, the provision entitled EVALUATION OF OPTIONS (FAR 52.217-5, located elsewhere in this Section

M) indicates that the Government's evaluation for contract award will include each offeror's price for 100% of the option quantity.

M.2.2 In light of the above, if an offeror specifies unit prices that apply to one or more option quantity ranges, but does not specify a unit price for 100% of the option, we will evaluate that offer for award as follows. The option price for such offer shall be deemed to be the higher of the unit price that applies to the basic (non-option) quantity, or the highest unit price that is identified against any range or subquantity of the option CLIN.

*** END OF NARRATIVE M0001 ***

7 7

SUPPLEMENTAL INFORMATION
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
EVALUATION FACTORS FOR AWARD

File details come from the government source that posted it. Updated .