W912CH-25-B-0005 (Branched Wiring Harness).pdf
PDF 204 KB Posted
- Solicitation number
- W912CH-25-B-0005
- Issued by
-
Department of the Army
About this file
This is an Invitation for Bids (IFB) for a firm-fixed-price contract to procure Wiring Harness, Branched with National Stock Number 6150-01-345-8891, part number 12347145. The solicitation is a total small business set-aside issued by the Army Contracting Command - Detroit Arsenal, with a 100% option quantity. The contract will cover 636 units of the wiring harness, with a first article test report requirement, intended for use in the Abrams M1A2 Family of Vehicles.
Key procurement details include a bid submission deadline of October 5, 2025, with bid opening scheduled for October 9, 2025, at 1:00 p.m. local time in Warren, Michigan. The solicitation requires bidders to have prior access to a Distribution D Technical Data Package, which limits access to Department of Defense and U.S. DoD contractors. Bids will be evaluated based on the lowest total price, with unit prices required for production quantity, first article test report, and unexercised option quantity. The government will award a single contract to the responsible bidder with the lowest evaluated price, with bids to be submitted electronically and evaluated without discussions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W912CH-25-B-0005 X 2025SEP05
1 signed
/SIGNED/
2025OCT0604:30pm
DOA4
2025SEP05 SEE SCHEDULE
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
STANLEY BIERNACKI
(571)588-9024
CCTA-CPG-C
STANLEY.R.BIERNACKI.CIV@ARMY.MIL
1 82
X 1
X 6 X 12
X 15 X 17 X 20
X 26
X 28
X 29
X 56
X 57
X 74
X 81
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: STANLEY BIERNACKI
Buyer Office Symbol/Telephone Number: CCTA-CPG-C/(571)588-9024
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: TANK,ABRAMS,M1A2 FAMILY OF VEHICLES(FOV)
*** End of Narrative A0000 ***
A.1. DESCRIPTION OF ACTION
(a) This Invitation for Bids (IFB) is intended to result in the award of a firm-fixed-price (FFP) contract with 100% option for the
Wiring Harness, Branched, NSN: 6150-01-345-8891, part no.: 12347145.
(b) This IFB is a total small business set-aside in accordance with Federal Acquisition Regulation (FAR) 19.502-2.
(c) There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution code "D", which limits access to
Department of Defense (DoD) and U.S. DoD contractors. Please see Section C.1 for instructions on how to access this technical data.
BIDDERS MUST BE GRANTED TDP ACCESS PRIOR TO SUBMITTING A BID OR THE BID SUBMISSION WILL BE REJECTED.
(d) Bidders are advised to carefully read and understand this entire IFB, including Sections L and M, prior to submitting a bid for evaluation. The Government will evaluate bids without discussions and does not assume the duty to search for data to cure problems it finds in any bid. Therefore, all information necessary for the review and evaluation of a bid is to be contained within the bid submission.
(e) Bidders must complete all necessary fill-ins and representations throughout this IFB, including but not limited to:
(1) STANDARD FORM 33: Blocks 13 through 18;
(2) SECTION B: The unit prices and dollar amounts requested for CLIN 0001AA: Production Quantity, CLIN 0001AB: First Article Test
Report, and CLIN 0002AA: Unexercised Option Quantity;
(3) SECTION E: E.7. Inspection and Acceptance Points - Origin;
(4) SECTION F: FAR 52.211-8 - Time of Delivery;
(5) SECTION J: Attachment 0004 - Bidder Identification and Assertions pursuant to DFARS 252.227-7017;
(6) SECTION K: FAR 52.204-8 - Annual Representations and Certifications (Deviations 2025-O00003 and 2025-O00004) - Alternate I;
(7) SECTION K: FAR 52.209-13 - Violation of Arms Control Treaties or Agreements - Certification;
(8) SECTION K: FAR 52.225-18 - Place of Manufacture; and
(9) SECTION K: FAR 52.229-11 - Tax on Certain Foreign Procurements - Notice and Representation
Failure to complete any required items may result in the rejection of a bid.
(f) Bidders shall acknowledge receipt of all IFB amendments by the date and time indicated for receipt of bids. If this IFB is amended, then all terms and conditions which are not modified remain unchanged. Please see Section A.5 and FAR 52.214-3: Amendments to IFBs
(Section L) for additional information.
(g) Bid opening will be held with all Bidders and shall commence on Thursday, 09-Oct-2025 at 1:00 p.m. local time (Warren, MI). Due to security protocols at the Detroit Arsenal, bid opening will be held virtually. Bidder attendance at this event is not required. The
Government will provide a Microsoft Teams link, teleconference number, and passcode prior to bid opening. Please contact the following personnel via e-mail, after IFB close and at least 24 hours prior to bid opening, to receive this information:
STANLEY BIERNACKI
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
E-MAIL: STANLEY.R.BIERNACKI.CIV@ARMY.MIL
-and-
2 82
W912CH-25-B-0005
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
NICHOLAS LANG
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
E-MAIL: NICHOLAS.A.LANG.CIV@ARMY.MIL
A.2. BID STRUCTURE
(a) The Government will utilize North American Industry Classification System (NAICS) code 335999 - All Other Miscellaneous Electrical
Equipment and Component Manufacturing for this procurement.
(b) Failure to register via the System for Award Management (SAM) website for the NAICS code identified above, prior to submitting a bid in response to this IFB, may preclude your firm from receiving an award. Bidders should be aware of how U.S. Small Business concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) Part 219, and 13 CFR 121 Small Business Size
Regulations. Bidders are advised to review 13 CFR 121.103, "How does SBA determine affiliation?", if applicable to this IFB.
(c) All bids received in response to this IFB shall be valid for a minimum of 90 calendar days. Please see FAR 52.214-16: Minimum Bid
Acceptance Period (Section K) for additional information.
A.3. ELECTRONIC CONTRACTING
(a) All Army Contracting Command - Detroit Arsenal IFBs will be publicized on the System for Award Management (SAM) website:
https://www.SAM.gov
Any additional attachments, including the TDP(s) when available electronically, will be separate attachments or links embedded in the
IFB.
(b) Interested Bidders shall submit a completed IFB, on the Standard Form 33, via e-mail with the subject line "IFB Submission - W912CH-
25-B-0005 (Wiring Harness, Branched)" to the following personnel:
STANLEY BIERNACKI
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
E-MAIL: STANLEY.R.BIERNACKI.CIV@ARMY.MIL
-and-
NICHOLAS LANG
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
E-MAIL: NICHOLAS.A.LANG.CIV@ARMY.MIL
Once a bid is received, the Contract Specialist will reply to the respective Bidder indicating receipt of the submission. NOTE: FAX, HARDCOPY (PAPER), AND DVD/CD-ROM BIDS WILL NOT BE ACCEPTED. HAND-CARRIED BIDS, WHETHER HARDCOPY OR ELECTRONIC, WILL ALSO NOT BE
ACCEPTED.
(c) Please pay close attention to the Issued By block on the cover page of this IFB for a closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, Bidders are responsible for submitting bids, and any revisions/modifications, so as to be received by the Government office designated in the IFB by the date and time specified.
(d) It is the Bidder's responsibility to ensure the bid is received by the date and time specified on the cover page of this IFB. In accordance with FAR 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, if the bid was not received at the initial point of entry to the Government infrastructure (in this case, received via e-mail) by the exact date and time specified on the cover page of this IFB, it will be determined late. Bid is defined to mean ALL volumes or parts required in the IFB are included in the electronic submission.
Note: There is no "expected" or "target" length of time for bid submission; size and content may be factors, therefore Bidders are strongly cautioned when submitting bids to allow adequate time for submission.
(e) IFBs may remain posted on SAM.gov after the IFB closing date. If the response deadline has passed for the IFB, vendors will no longer be able to submit electronic responses.
(f) Any award issued as a result of this IFB will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this IFB, or any subsequent modifications to the contract, the contract and modifications will be released, 3 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government's intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include cost or pricing data/information. If a Bidder objects to such release in the base contract or contract modifications, the Bidder must notify the Contracting Officer in writing prior to the closing date identified in this IFB and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on the rationale given.
(g) All questions pertaining to this IFB shall be submitted via e-mail to the following personnel by Friday, 26-Sep-2025 at 4:30 p.m.
local time (Warren, MI):
STANLEY BIERNACKI
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
E-MAIL: STANLEY.R.BIERNACKI.CIV@ARMY.MIL
-and-
NICHOLAS LANG
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
E-MAIL: NICHOLAS.A.LANG.CIV@ARMY.MIL
Responses will be furnished via a Q&A log posting to SAM.gov or as an IFB amendment, if the information is necessary in submitting bids or if the lack thereof would be prejudicial to other prospective Bidders. Please see FAR 52.214-6: Explanation to Prospective Bidders
(Section L) for additional information. The Government will review all questions received but is not obligated to answer questions submitted after the date noted above, prior to IFB close.
For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement
Technical Assistance Center (PTAC) website to locate a regional center at:
http://www.aptac-us.org
A.4. ALL OR NONE
Bids in response to this IFB must be submitted for the total quantity of items identified in the IFB:
(1) Only one award will be made as a result of this IFB.
(2) BIDS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS IFB WILL BE DEEMED NONRESPONSIVE.
A.5. ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all Government-issued IFB amendments by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.6. ARMY CONTRACTING COMMAND - DETROIT ARSENAL OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
https://tacom.army.mil/ombudsperson
Note: Website is best viewed using Google Chrome or Microsoft Edge.
4 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A.7. DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This IFB and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of
Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).
Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive
5230.25 and DoD Instruction 2040.02. THIS ALSO APPLIES TO DISTRIBUTION OF THE TDP TO ALL SUBCONTRACTORS AT EVERY LEVEL.
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) a Bidder must have a current DD 2345, "Militarily Critical
Technical Data Agreement" certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx
Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, a Bidder may request the TDP in accordance with Section C.1. Technical Data Package Information.
(c) Upon completion of the purposes for which Government technical data has been provided, the Bidder, and all subcontractors, vendors, and sub-vendors of the Bidder, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
*** END OF NARRATIVE A0001 ***
5 82
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 WIRING HARNESS,BRAN
NSN: 6150-01-345-8891
Mfr CAGE: 19207
Mfr Part Number: 12347145
0001AA PRODUCTION QUANTITY 636 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: WIRING HARNESS,BRAN
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH4C0014EH PRON AMD: 02
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection and acceptance at origin means that the contractor must contact the Defense Contract
Management Agency (DCMA) to arrange for a Government inspection before production under CLIN 0001AA is shipped.
Failure to have production inspected and accepted at origin will result in its rejection at destination.
Rejected production will be returned at the contractor's expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV3280023V W562RP J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 212 0360
002 212 0390
003 212 0420
FOB POINT: Destination
SHIP TO:
6 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(W562RP) SR W0LX ARMY GENERAL SUPPLY
CENTRAL RECEIVING POINT
7 FRANKFORD AVE BLDG 362
ANNISTON,AL,36201-4199
Please see FAR 52.211-8: Time of Delivery for a complete explanation of delivery rates.
Note: The PCO has authorized the contractor to ship early when at no additional cost to the Government.
(End of narrative F001)
0001AB FIRST ARTICLE TEST REPORT 1 LO $ _________________________ __________________
SERVICE REQUESTED: FATR
CLIN CONTRACT TYPE:
Firm Fixed Price
First Article Test Report (FATR), pursuant to the requirements listed in:
SECTION E
- E.1.: Notice Regarding First Article Test Sample
- E.2.: Notice Regarding First Article
- E.6.: Inspection and Acceptance (First Article
Approval)
SECTION I
- FAR 52.209-3: First Article Approval - Contractor
Testing
NOTE: 1 LOT IS EQUIVALENT TO 1 REPORT.
***ALL BIDDERS SHALL IDENTIFY A DOLLAR AMOUNT FOR
CLIN 0001AB: FATR, EVEN WHEN REQUESTING A FIRST
ARTICLE WAIVER IN ACCORDANCE WITH E.3. PROVISION FOR
WAIVER OF REQUIRED FIRST ARTICLE APPROVAL.***
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
GOVERNMENT APPROVAL/DISAPPROVAL: 30 CALENDAR DAYS
(End of narrative E001)
7 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0210
Note: The PCO has authorized the contractor to deliver FATR early when at no additional cost to the
Government.
(End of narrative F001)
0002 WIRING HARNESS, BRANCHED
NSN: 6150-01-345-8891
Mfr CAGE: 19207
Mfr Part Number: 12347145
0002AA UNEXERCISED OPTION QUANTITY 636 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: WIRING HARNESS, BRANCHED
CLIN CONTRACT TYPE:
Firm Fixed Price
Option quantity, pursuant to FAR 52.217-7: Option for
Increased Quantity - Separately Priced Line Item.
The quantity stated for CLIN 0002AA does not form a part of the basic contractual quantity. However, all or part of it may be added to the contract at the
Government's discretion, via exercise of the Option clause.
The offeror's failure to insert a unit price for the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated accordingly.
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection and acceptance at origin means that the contractor must contact the Defense Contract
8 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Management Agency (DCMA) to arrange for a Government inspection before production under CLIN 0002AA is shipped.
Failure to have production inspected and accepted at origin will result in its rejection at destination.
Rejected production will be returned at the contractor's expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 212 0150
002 212 0180
003 212 0210
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
CENTRAL RECEIVING POINT
7 FRANKFORD AVE BLDG 362
ANNISTON,AL,36201-4199
Please see FAR 52.211-8: Time of Delivery for a complete explanation of delivery rates.
Note: The PCO has authorized the contractor to ship early when at no additional cost to the Government.
(End of narrative F001)
9000 DATA ITEMS __________
The Exhibit Line Item Numbers (ELINs) below are associated with specific contract requirements.
Please refer to the citations listed within each ELIN for additional information.
(End of narrative A001)
A001 ENGINEERING CHANGE PROPOSAL 1 LO $ ** NSP ** ___________________________ __________________
9 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: CDRL A001 - ECP
CLIN CONTRACT TYPE:
Firm Fixed Price
Engineering Change Proposal (ECP), pursuant to the requirements listed in:
SECTION C
- C.7.: Configuration Management Documentation
ADDENDA
- Exhibit A: Contract Data Requirements List - DD
Form 1423, A001
Note: DD Form 250 not required.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 REQUEST FOR VARIANCE 1 LO $ ** NSP ** ____________________ __________________
SERVICE REQUESTED: CDRL A002 - RFV
CLIN CONTRACT TYPE:
Firm Fixed Price
Request for Variance (RFV), pursuant to the requirements listed in:
SECTION C
- C.7.: Configuration Management Documentation
ADDENDA
- Exhibit A: Contract Data Requirements List - DD
Form 1423, A002
Note: DD Form 250 not required.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
10 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 NOTICE OF REVISION 1 LO $ ** NSP ** __________________ __________________
SERVICE REQUESTED: CDRL A003 - NOR
CLIN CONTRACT TYPE:
Firm Fixed Price
Notice of Revision (NOR), pursuant to the requirements listed in:
SECTION C
- C.7.: Configuration Management Documentation
ADDENDA
- Exhibit A: Contract Data Requirements List - DD
Form 1423, A003
Note: DD Form 250 not required.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
11 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1. TECHNICAL DATA PACKAGE INFORMATION
The following "X"d item applies to this IFB:
[_ _] 1. There is no Technical Data Package (TDP) included with this IFB.
[_X_] 2. The TDP for this IFB resides within the System for Award Management (SAM) posting associated with this solicitation number:
W912CH-25-B-0005
To access the data through SAM:
a. Log on to the SAM website: https://www.SAM.gov
b. Search for the solicitation number
c. Click on the attachment you would like to view
d. If the attachment is restricted, request access to the document
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).
(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its
Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) TO OBTAIN THESE TDPs, CONTRACTORS MUST HAVE A CURRENT DD 2345, MILITARILY CRITICAL TECHNICAL DATA AGREEMENT ON FILE WITH
DEFENSE LOGISTICS INFORMATION SERVICE (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract
Specialist at Army Contract Command Detroit Arsenal with all the information needed to grant contractor access to restricted documents.
SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to:
https://www.SAM.gov
The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and
Non-Disclosure Agreement" at the same time if the IFB requires both to gain access to view the TDP.
C.2. REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
(a) The Contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
(b) The Contractor will receive a copy of the SOP/Plan (Attachment 0001) at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC
Officers.
(c) The Contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
12 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
OPSEC Level I.
C.3. OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm
The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's
Representative (COR) or Procuring Contracting Officer (PCO) upon request.
C.4. CONTROLLED UNCLASSIFIED INFORMATION GUIDELINES
The Contractor will be required to handle, access, or store Controlled Unclassified Information (CUI), legacy U//FOUO, and/or other technical data and is subject to the guidelines contained within Attachment 0002: Additional Guidelines for Controlled Unclassified
Information.
C.5. DRAWING LIMITATIONS
(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
(1) Depict the completed item(s), and
(2) Serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the
Government and no delivery schedule extension.
C.6. ACQUISITION OF MANUFACTURER'S PART NUMBER: COMPONENTS
One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item. It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability (ability to be interchanged with previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer.
C.7. CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
13 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense
Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) For ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
(ii) For RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
(iii) For NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
f. The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the
Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
*** END OF NARRATIVE C0001 ***
14 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.1. PACKAGING REQUIREMENTS (SELECTIVE GROUP PACKAGING REQUIREMENTS)
(a) Military preservation, packing, and marking for this contract shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of MIL-STD-2073-1.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(b) MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:
(1) Preservation Method Code: 41 (Table j.i. and j.ia.)
(2) Cleaning Procedure Code: 1 (Table j.ii)
(3) Preservative Material Code: 00 (Table j.iii)
(4) Wrapping Material Code: 00 (Table j.iv)
(5) Cushioning and Dunnage Code: GT (Table j.v)
(6) Thickness of Cushioning or Dunnage Code: A (Table j.vi)
(7) Unit Container Code: BS (Table j.vii)
(8) Intermediate Container Code: ED (Table j.vii)
(9) Quantity per Intermediate Container Code: 008 (Appendix J.4.11)
(10) Packing Code: A (Table j.IX and J.IXa)
(11) Special Marking Code: 00 (Table j.x)
(c) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage
(d) Marking:
All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-
7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a
15 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD clause of the contract. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at contractor's expense.
(g) Hazardous Materials (as applicable):
(1) Hazardous Materials is defined as a substance or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments)
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(h) SUPPLEMENTAL INSTRUCTIONS: Coil to 11 x 7-1/2 x 1-1/4 with connectors facing inward. Secure with tape.
*** END OF NARRATIVE D0001 ***
16 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
(1) Quality Management System: ISO 9001:2015 or equivalent
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.1. NOTICE REGARDING FIRST ARTICLE TEST SAMPLE
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of _TWO (2) EA_ that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of _NONE_ that successfully passes all specified tests, less the destructive tests, if any, serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) an aid in identifying any process changes, or 3) the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
E.2. NOTICE REGARDING FIRST ARTICLE
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
17 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.3. PROVISION FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL
(a) The Government reserves the right to waive the requirement entitled First Article Approval - Contractor Testing (FAR 52.209-3), incorporated via Section I. Bidders interested in submitting a First Article waiver request shall adhere to the following:
(1) Bidders must provide sufficient information for the Government to determine whether the First Article waiver request will be approved. If the Bidder intends to request a waiver, Attachment 0003: First Article Waiver Worksheet must be completed and submitted to the Government, along with any supporting documentation, as part of its bid. The worksheet is located in Section J of this IFB. The
Bidder's request will not be considered if the worksheet and any supporting documentation are not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet that do not apply, annotate with "N/A" (not applicable). To substantiate or clarify information provided by the Bidder, the Government may request additional information.
Incomplete worksheets may result in the waiver request being denied.
(2) Supporting Documentation. The First Article waiver request must be accompanied by documentation in support of the request. This documentation may include the following:
i. A copy of the Administrative Contracting Officer (ACO) or Procuring Contracting Officer (PCO) letter approving a First
Article Test Report (FATR) on a recent contract for the same or similar item;
ii. A copy of a FATR for the same or a similar item as that solicited herein*;
iii. A copy of an ACO or PCO letter approving a prior waiver request; and/or
iv. If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.
*NOTE: If a copy of a FATR is submitted in support of a waiver request under this IFB, the report must have been approved and signed by an authorized representative of the Government.
(3) The worksheet and any additional supporting documentation are part of your bid and must be submitted as part of the response to this IFB on company letterhead and signed by an agent of the company.
(4) Bidders shall not assume that a First Article waiver request will be approved even if the completed worksheet and any supporting documentation are submitted to the Government.
(5) Partial First Article waiver requests will neither be reviewed nor accepted.
(b) The Government will not consider any First Article waiver requests as part of its price evaluation process and will only review the successful low Bidder's First Article waiver request, following the bid opening event and prior to contract award, if submitted.
(c) Accelerated Delivery Schedule.
(1) If the Government approves a Bidder's First Article waiver request, an accelerated delivery schedule pursuant to Time of
Delivery (FAR 52.211-8), incorporated via Section F, shall apply.
(2) If a Bidder submits a First Article waiver request but takes exception to the accelerated delivery schedule, the waiver will be rejected. Consequently, any award to this Bidder will reflect either (i) the Government-required delivery schedule pursuant to FAR
52.211-8 or (ii) the Bidder-proposed delivery schedule in that clause, if the Government accepts it.
(d) Cost Considerations.
(1) If the Government approves a Bidder's First Article waiver request, the proposed FAT price, as identified by the Bidder at
Section B, CLIN 0001AB, will be deducted from the total award amount.
(2) If the Government rejects a Bidder's First Article waiver request, and the Bidder failed to separately identify its FAT price at Section B, CLIN 0001AB, the Government will require the Bidder to perform on contract at such price whether or not the First Article requirement is waived, at no additional cost to the Government.
E.4. USE OF MIL-STD 1916
(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be _VL IV_ for major characteristics and _VL II_ for minor characteristics.
18 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
E.5. TECHNICAL DATA FOR INSPECTION
(a) When…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .