This document is a Request for Quote (RFQ) for the renovation of the Lake Ketelsen Recreational Area at the U.S. Army Joint Systems Manufacturing Center (JSMC) in Lima, OH. The government intends to award this action as a Section 8(a) Direct Award to Agile Enterprise Corporation.
The contractor shall provide all necessary personnel, materials, and equipment to perform the work, which includes renovating the dock, restoring the Lake Ketelsen shoreline, reclaiming the Lake Ketelsen backside shoreline, and reclaiming the Miles Pavilion grounds. The completion due date is 60 calendar days from issuance of the Notice to Proceed. Proposals are due by August 16, 2024 at 10:00 AM local time, and shall be valid for 60 calendar days. The government reserves the right to request additional information to validate the reasonableness of any offer. Pricing will be firm-fixed-price for the base requirement and any optional items.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
In accordance w ith Section 8(a) of the Small Business Act (15 USC 637(a)(1)) and the Federal Acquisition Regulation (FAR) Part 19.8, and the executed Partnership Agreement betw een the U.S. Small Business Administration (SBA) and the Department of the Army, the Government intends to aw ard this action as a Section 8(a) Direct Aw ard.
See Section A Narrative below .
See Statement of Work below .
MICHAEL GROSS 571-588-9116
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
18 JUL 2024
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. ( Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442- 101 STANDARD FORM 1442 (REV. 4-85)
Presc ribed by GSA
FAR (48 CFR) 53.236-1( e)
11. The Contractor shall begin perf ormance w ithin _______7 calendar days and complete it w ithin ________60 calendar days after receiving aw ard, X notice to proceed. This per formance per iod is mandatory, X negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to per form the w ork required are due at the place specified in Item 8 by ___________ local time _16 AUG 2024____ (date). If this is a sealed bid solicitation, of fers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in f ull text or by reference.
D. Off ers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
ARMY CONTRACTI NG C OMMAND - DTA
6501 E. 11 MI LE R D
DETROIT ARSENAL MI 48397-5000
W912CH
PAGE OF PAGES
1 OF
CODE
(Ti tle, identi fying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912CH24QL992 55
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to per form the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this off er is accepted by the Government in w riting w ithin ________ calendar days after the date off ers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required perf ormance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The of feror acknowledges receipt of amendments to the solicit ation -- give number and dat e of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or pr int)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherw ise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. ( Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Cont ractor is not required to sign this document. ) document and return _______ copies t o issuing office.) Cont ractor agrees Y our of f er on t his solicit ation, is hereby accept ed as t o t he items listed. This award con-t o f urnish and deliv er all item s or perf orm all work, requisitions identif ied sum mates the contract , which consists of (a) the Gov ernm ent solicit ation and on this f orm and any continuation sheet s f or t he consideration st ated in this y our of f er , and (b) this cont ract award. No f urther contractual document is cont ract. The rights and obligat ions of t he parties to this cont ract shall be necessary.
gov erned by (a) t his contract award, (b) t he solicitat ion, and (c) the clauses, representat ions, cer tif icat ions, and specif ications or incorporated by ref er-ence in or at tached to t his contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912CH24QL992
Section A - Solicitation/Contract Form
SECTION A NARRATIVE
PROJECT TITLE: JSMC – Lima – Renovation of Lake Ketelsen Recreation Area
PROJECT DESCRIPTION: U.S. Army Joint Systems Manufacturing Center (JSMC) has a requirement for renovation of the Lake Ketelsen Recreational Area in Lima, OH. The contractor shall provide all personnel, materials, and equipment necessary to perform this requirement. The completion due date is 60 days from issuance of Notice to Proceed (NTP).
REQUIREMENT: In accordance with Section 8(a) of the Small Business Act (15 USC 637(a)(1)) and the Federal Acquisition Regulation (FAR) Part 19.8, and the executed Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of the Army, the Government intends to award this action as a Section 8(a) Direct Award to: Agile Enterprise Corporation (CAGE: 9FPE3), Rochester Hills, MI 48307
PERFORMANCE COMPLETION DUE DATE: The completion due date is 60 days from issuance of Notice to Proceed (NTP).
PROPOSAL EXPENSES: This Request for Quote (RFQ) does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals.
OFFER EXPIRATION DATE: Proposal in response to this RFQ shall be valid for 60 calendar days.
PROPOSAL DUE DATE: Offer is due by 16 August 2024 at 10:00 a.m. Local Warren, MI time. Email proposal will be accepted. Facsimile proposal will not be accepted. Proposal shall be electronically submitted to Michael Gross, michael.e.gross28.civ@army.mil. The use of DoD SAFE to transmit documents that require encryption is mandatory. A link can be provided upon request.
PROPOSAL SUBMISSION REQUIREMENTS:
1. Review Section L of the solicitation for additional submission requirements.
2. The Government reserves the right to request additional information as necessary to validate the reasonableness of an offer.
3. Proposal in response to this solicitation shall be valid for 60 calendar days.
QUESTIONS AND ANSWERS: Email all questions to Michael Gross, michael.e.gross28.civ@army.mil by 02 August 2024 at 10:00 a.m. Local Warren, MI time.
POINT OF CONTACT: The point of contact for this requirement is Michael Gross, Contract Specialist, at michael.e.gross28.civ@army.mil.
LOCAL NARRATIVES
AS7001
ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
AS7040
ARMY CONTRACTING COMMAND – DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
https://www.tacom.army.mil/ombudsperson. (Best viewed using Google Chrome or Microsoft Edge)
AS7316
ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS
SOLICITATION WILL BE DEEMED NONRESPONSIVE.
AS7526
NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)
Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.
AS7527
NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)
In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc).
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
BASE
FFP
Renovate Dock See Section 3.1.1 of the SOW.
FOB: Destination
PSC CD: Y1EZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
OPTION OPTION 1
FFP
Restore Lake Ketelsen Shoreline See Section 3.1.2 of the SOW.
FOB: Destination
PSC CD: Y1EZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
OPTION OPTION 2
FFP
Reclaim Lake Ketelsen Backside Shoreline See Section 3.1.3 of the SOW.
FOB: Destination
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Job
OPTION OPTION 3
FFP
Reclaim Miles Pavilion Grounds See Section 3.1.4 of the SOW.
FOB: Destination
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
FOR
Renovate Lake Ketelsen Recreational Area
AT
Joint Systems Manufacturing Center Project #: 2024-01 Management, Facilities Engineering
PART 1 GENERAL
1.1 SUMMARY OF WORK
1.1.1 Project Description
a. This Statement of Work (SOW) defines the effort required for the renovation of the dock at Lake Ketelsen, renovate the shore of Lake Ketelsen, and clean up the perimeter of Lake Ketesen, and Miles Pavilion on Joint Systems Manufacturing Center.
1.1.2 Location of Work
a. The exact location will be shown by the Contracting Officer Representative (COR).
1.1.3 Period of Performance
a. The contractor shall be required to (i) commence work under this contract within 7 calendar days after the date the contractor receives notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than 60 calendar days after notice to proceed was given. The time stated for completion shall include final cleanup of the premises.
1.1.4 Hours of Operation
a. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on Friday. Federal holidays are non-workdays. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.
1.2 SUBMITTALS
1.2.1 General Submittal Requirements
a. The contractor shall provide submittal documents via e-mail to the Contracting Officer for review and approval. Provide all physical (non-document) submittals (including but not limited to material swatches, samples, etc.) directly to the Contracting Officer for review and approval. All submittals require government approval unless otherwise explicitly stated.
b. The contractor shall reference APPENDIX A “Consolidated List of Submittals” for the complete list of required submittals.
1.2.2 Contractor Safety Plan
a. The contractor shall submit a safety plan which is specific to the work activity being performed under the scope of this project for Government review and approval.
1.2.3 Lockout / Tagout (LOTO) Acknowledgement
a. The Contractor shall sign and submit a “Lockout/Tagout (LOTO) Notification Acknowledgement Record” prior to working on or de-energizing any electrical equipment.
1.2.4 Project Schedule
a. The contractor shall create a project schedule and submit for Government review and approval.
b. The project schedule shall detail the phases of work and the overall timeline for the execution of the work.
The contractor shall include delivery dates, appropriate milestones, and shall clearly detail any requirements for work performed outside of regular hours of operation.
1.3 GENERAL REQUIREMENTS
1.3.1 Joint Systems Manufacturing Center (TACOM)
a. The Contractor shall attend an initial briefing with JSMC personnel to review all pertinent safety, security, access control, general conduct etc. The contractor shall ensure all employees and subcontractors receive this briefing.
1.3.2 Safety Requirements
a. The contractor is required to provide the proper control of hazardous energy (lockout/tagout) per OSHA 29
CFR 1910.147.
1.4 APPLICABLE DOCUMENTS
1.4.1 Specifications
The following specifications accompany this Statement of Work and are a part thereof.
a. EPA 832-F-21-028H – Stormwater Best Management Practices: Riprap
1.4.2 References
The following references accompany this Statement of Work and are a part thereof.
a. TACOM Instructions for Contractors (TAIC).
b. Minnesota Stormwater Manual- Erosion Prevention Practices – Riprap
c. Everything You Need to Know About Dock Posts
1.5 CONTRACTOR EQUIPMENT
1.5.1 Equipment Identification
a. The contractor shall create and affix a label to all large equipment, dumpsters, and other mobilized property, which is weather-resistant (laminated, or within a see-thru label hanger), securely affixed to the equipment or visible through a window, and which clearly displays the General Contractor’s:
i. Company Name, POC Name (first, last), POC phone number, Project Number.
1.5.2 Waste Dumpster
a. The contractor shall place any waste dumpsters in a manner that does not interfere with thru-traffic.
b. Place waste dumpsters with a minimum of 33’ clearance from any building. The final location shall be coordinated with, and approved by the COR before any dumpsters are mobilized.
c. Cover all waste dumpsters when not in use, and before the end of each work shift. The cover shall be weather-tight.
d. Note: The Contractor shall be required to retain and submit copies of all Bills of Lading and Weight Slips associated with the disposal of construction and demolition C&D) debris.
PART 2 PRODUCTS
2.1 GENERAL
All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.
2.1.1 Hazardous Materials
a. The contractor shall submit Safety Data Sheets (SDS) for all hazardous materials to be used.
2.1.2 Asbestos, Mercury, Lead, PCB
a. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer’s original packaging.
2.1.3 DoD Green Procurement Program
a. All construction materials shall meet the applicable requirements of the DoD Green Procurement Program, specifically recycled content products, environmentally preferable products and services, bio based products, energy-and water-efficient products, alternate fuel vehicles and alternative fuels, products using renewable energy, and alternatives to hazardous or toxic chemicals as found at <http://www.acq.osd.mil/dpap/cpic/cp/docs/USA001967-08-DPAP.pdf>.
2.2 PRODUCTS
2.2.1 Dock Post
a. Posts to be of industry standard with an OD of 1-1/2 inches and a length that allows the post to be driven 4 feet into the lakebed and extend 20 inches above the water.
b. Material to be heavy duty corrosion resistant material.
2.2.2 Dock Post Auger.
a. TORQ’D Composite Dock Post Auger or equivalent.
i. Shall fit Dock Post.
2.2.3 Lake Clarifying Products
a. Muck Remover Bacteria
b. Pond Cleanse Bacteria
c. Phosphate Eliminator
2.2.4 Picnic Tables
a. Picnic Tables shall be 8-person rectangular picnic tables.
i. Table shall be white in color and made of coated metal material.
2.2.5 Erosion Control
a. Nonwoven 10 oz rip rap fabric shall be used.
b. 6-inch steel landscaping staples shall be used to staple the fabric to the ground.
c. Rip Rap rocks to consist of 4-inch rip rap and #57 as a walking surface (land side).
PART 3 EXECUTION
This project is to be bid in options.
3.1 ITEMS OF WORK
3.1.1 Base: Renovate Dock
a. The contractor shall remove and replace the dock support posts, ensuring the post anchors 4 feet below the lakebed and extends 20 inches above the waterline +/- 2 inches.
i. The contractor shall return post covers to ‘like new’ status or provide new covers, similar in style as existing. See below for restoring ‘like new’ status.
b. The contractor shall utilize a power washer or other means to completely clean the dock surface to ‘like new’ status.
i. The contractor may utilize water resistant, non-toxic white paint to touch up the dock as needed. Paint color and material must be approved by the COR and TACOM Environmental Specialist. The contractor will be required to provide SDS of all materials.
c. The contractor shall secure the dock to the posts so that it is level and a minimum of 12 inches above the waterline and no greater than 15 inches.
d. The contractor shall remove vegetation on both sides of the dock to the extent of the parking area. Total length of shoreline to clear is 120 feet and establish rip rap erosion control methods to the exposed shoreline.
i. The contractor shall remove and dispose of all vegetation off the premise of JSMC.
ii. The contractor shall grade the shoreline to match the boat launch slope and compact the soil.
iii. The contractor shall lay 10 oz unwoven filter-fabric so that the waterside of the fabric is extends 5 feet into the water on the lakebed, and the land side of the fabric extends to the existing parking area.
i. The fabric is to be secured into the compacted ground with 6-inch staples.
iv. The contractor shall emplace two layers of 4-inch rip rap on top of the fabric.
v. The contractor shall emplace three layers of #57 (land side) above the water surface as a walking surface.
The contractor shall compact the walking surface to no less than 1 foot from the water surface.
e. The contractor shall clarify Lake Ketelsen by removing any floating debris such as trees and vegetation.
The contractor shall utilize a natural phosphate eliminator solution to eliminate excessive phosphates, then, after manufacturer recommended standards, utilize a natural pond cleanse bacteria to cleanse the water with a natural muck removing bacteria to cleanse the base of the Lake. The Lake is approximately 4 acres in area. Depth may need to be verified.
f. The contractor shall remove the three picnic tables along the lake shore and at the boat dock and replace with three new 8-person picnic tables.
3.1.2 Option 1: Restore Lake Ketelsen Shoreline
a. The contractor shall remove all vegetation from the shoreline. Total length of shoreline to clear is two sections: 235 feet Northwest of the dock, and 440 feet to the East-Northeast of the dock; and establish rip rap erosion control methods to the exposed shoreline.
i. The contractor shall remove and dispose of all vegetation off the premise of JSMC.
ii. The contractor shall grade the shoreline to match the boat launch slope and compact the soil.
iii. The contractor shall lay 10 oz unwoven filter-fabric so that the waterside of the fabric is extends 5 feet into the water on the lakebed, and the land side of the fabric extends to the 10 feet on the land.
iv. The fabric is to be secured into the compacted ground with 6-inch staples.
v. The contractor shall emplace two layers of 4-inch rip rap on top of the fabric.
vi. The contractor shall emplace three layers of #57 (land side) above the water surface as a walking surface.
The contractor shall compact the walking surface to no less than 1 foot from the water surface.
3.1.3 Option 2: Reclaim Lake Ketelsen Backside Shoreline
a. The Contractor shall mow the ground from the shoreline to 20 feet along the North shoreline of Lake Ketelsen, cleaning up all fallen branches / trees along the way.
b. The contractor shall eliminate weeds using non-toxic weed killer. Contractor shall provide SDS of chemical to be used and coordinate with COR and TACOM Environmental Specialist.
3.1.4 Option 3: Reclaim Miles Pavilion Grounds
a. The contractor shall remove tree stumps to below grade, cover with topsoil, and seed.
b. The Contractor shall mow the ground around Miles Pavilion and remove all overgrowth, downed trees.
The area to mow is surrounded by the wood line to the Lake and the road. Total area is approximately 2 acres.
Growth may exceed 24 inches at some locations.
c. The contractor shall eliminate weeds using non-toxic weed killer. Contractor shall provide SDS of chemical to be used and coordinate with COR and TACOM Environmental Specialist.
3.2 CLOSEOUT REQUIREMENTS
3.2.1 Construction and Demolition Debris
a. The Contractor shall submit copies of all Bills of Lading and Weight Slips associated with the disposal of construction and demolition (C&D) debris under this scope of work. Submit documentation to project COR.
3.2.2 Cleanup of Work Site
a. The contactor shall clean all work areas and remove all tools, equipment, debris, materials, and all waste from the premises.
b. The contractor shall remove all debris from any remote holding locations, to include any excavation and concrete equipment chute cleanout debris.
c. The contractor shall remove their equipment from JSMC premises within five (5) working days after completion of project work.
3.2.3 Restoration of Work Site
a. The contractor shall repair any items, building surfaces, equipment or miscellaneous items which were damaged during the execution of this SOW. Items that cannot be repaired to restore original function or aesthetics shall be replaced in kind by the Contractor at no additional charge to the Government.
b. Grass, trees, and other vegetation affected by project work shall be restored to same or better condition as existed prior to the start of project work. The Contractor shall prepare the affected areas to eliminate uneven areas and low spots. Remove foreign materials, weeds, and damaged soil. The Contractor shall scratch the area to a depth of three (3) inches where topsoil is to be placed. Spread topsoil to a uniform, compacted depth of less than five (5) inches over areas to be reseeded. Rake until smooth. The Contractor shall seed, fertilize, and water the area to establish grass.
3.2.4 Warranty
a. The contractor shall warrant for [5] years that the shoreline rip rap, as installed, is free from defects in workmanship. When repairs due to defective workmanship are required during the contractor’s warranty period, the contractor shall make such repairs within 72 hours of notification. When repairs are not performed within the specified timeframe, emergency repairs performed by others will not void the warranty.
APPENDIX A: Consolidated List of Submittals
Line Item Submitted Submittal Needed By Submittal Reviewed By (Office) 1 Safety Data Sheets for Hazardous Materials (SDS) NLT 7 Calendar Days After Award COR & TACOM Environmental 2 Project Schedule NLT 7 Calendar Days After Award COR 3 Contractor Safety Plan NLT 7 Calendar Days After Award COR & TACOM Safety 4 Primer Product Data NLT 7 Calendar Days After Award COR 5 Paint Product Data and Samples NLT 7 Calendar Days After Award COR 6 Rip Rap Stone Sample NLT 7 Calendar Days After Award COR 7 Rip Rap Filter Fabric Sample NLT 7 Calendar Days After Award COR 8 Picnic Table Data NLT 7 Calendar Days After Award COR 9 Warranty Before Closeout COR 10 Bills of Lading, Dump Slips for C&D Debris Before Closeout COR
APPENDIX B: Quality Assurance Surveillance Plan (QASP)
PURPOSE
This Quality Assurance Surveillance Plan (QASP) will be used as a guide to Government Quality Assurance Personnel (QAP). It provides a systematic method to evaluate the services the contractor is required to furnish.
SURVEILLANCE PROCEDURES
Timeliness: Progress is maintained to assure compliance with completion time. Quality: Conformance with statement of work and industry standards.
Tasks: Performed according to statement of work requirements.
Problem Resolution: Contractor submits deliverables in accordance with the contract and resolves any deficiencies identified by the government in the final submission. Following final submission, contractor resolves any additional deficiencies identified by the government and resubmits and or corrects within one week.
Delivery: Contractor submits each deliverable in accordance with the statement of work and terms of the contract.
PERFORMANCE AREAS
Management Responsiveness: Evaluate the adequacy of the contractor’s responsiveness and their ability to keep the government informed of work progress and provides for early problem identification and effective corrective action plans.
Schedule Control: Evaluate the contractor’s adherence to completion schedule.
Performance: The contractor will be evaluated as to the workmanship and adherence to the statement of work.
EVALUATION CRITERIA
(Outstanding). Indicates performance clearly exceeds contractual requirements. The area of evaluation contains few minor problems for which corrective actions appear highly effective.
(Satisfactory). Indicates performance clearly meets contractual requirements. The area of evaluation contains some minor problems for which the corrective actions appear satisfactory.
(Unsatisfactory). Indicates the contractor failed to satisfy contractual requirements and recovery is not likely in a timely manner. The area of evaluation contains serious problems for which the corrective actions were ineffective.
DOCUMENTATION
Documentation used to perform surveillance will consist of random government inspections and inspection records, as well as the evaluation of final work product delivery by the project COR/COTR.
RATING
Contractor will be given an overall rating of Outstanding, Satisfactory, or Unsatisfactory by the Government Technical point of contact or Contracting Specialist Representative, if appointed, 3 using the above evaluation criteria.
PICTURES
The following pictures are for clarification only. Contractor to inspect the job site, verify dimensions, electrical distribution including electrical isolation switching/lock outs, verification of soundness of columns and support beams, condition of concrete, etc. Contractor to notify COR of any conditions that would require additional work not described in this SOW and alternate pricing/solutions to be incorporated into the body of work by the contractor.
Dock Overview
Dock Level Issue
Dock East Bank
Dock West Bank
Lake Ketelsen Northwest shoreline
Lake Ketelsen Northeast Shoreline
Miles Pavilion Area
LOCAL NARRATIVES
CS6522
iWATCH TRAINING
The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer (ATO)). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR, if assigned, or the Contracting Officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees’ commencing performance, with the results reported to the COR, or Contracting Officer, no later than 30 calendar days after contract award. Training may be obtained at https://www.armywarcollege.edu/iwatch/ (using Chrome browser may work better).
CS6600
TRUSTED ASSOCIATE SPONSORSHIP SYSTEM (TASS) PROGRAM
(a) The contract company is responsible for providing the appropriate documentation to the government to process applications for Common Access Cards (CAC) for every contractor employee who deploys with the military force, OR who has a need to access any government computer network in accordance with FAR 52.204-9, “Personal Identity Verification of Contractor Personnel.”
(b) The contractor is responsible for managing requests for new, renew and reverification of CACs in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The norm is at least ten calendar days’ advance notice Trusted Agent* (TA), unless there are extenuating circumstances approved by the Contracting Officer’s Representative (COR) or Contracting Officer. *The COR will be the TA for this contract.
(c) It is recommended that a “Corporate” Facility Security Officer (FSO) or other facility appointed personnel be established to serve as the firm’s single point of contact for CAC Application packages processing to G-2 and Government Trusted Agent (TA). If a FSO is not established, each contractor employee requiring a CAC card will be required to manage their own applications.
(d) CAC applications must be processed through the DoD Trusted Associate Sponsorship System (TASS). The contractor’s FSO or appointed personnel or contractor employee shall submit CAC requests via secure means such as DoD SAFE, encrypted email, password protected documents etc. to the COR. The COR will provide the request package to the command G-2 to be processed. The command G-2 will provide the AHRC TASS Form1, version 1.2 to the TA once CAC Application is approved. The list of required documents to complete the request package for an
INITIAL CAC:
• G-2 Contractor PSI_Worksheet_Nov2018
• OF 306, Declaration for Federal Employment
• Copy of birth certificate or passport or naturalization certificate (if foreign born)
• AHRC TASS Form V1.3 dated 1 May 2021
(e) The government TA will establish a TASS application account for each CAC request and will provide each contractor employee a USER ID and Password to the contractor via secure means such as DoD SAFE, encrypted email, password protected documents etc. to the FSO or appointed personnel or contractor. The contractor employee shall access the TASS site, Applicant Login and complete the CAC application (entering/editing contractor information as applicable) at https://tass-pki.dmdc.osd.mil/tass/ .
(f) The contractor employee will “Submit” completed applications in TASS. TASS will inform via email to the TA the application has been “Submitted”.
(g) The TA will process the request, TASS will automatically inform the contractor’s applicant via email of one of the following:
- Approved*. Upon approval, the information is transferred to the Defense Enrollment Eligibility Reporting System (DEERS) database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a Real-Time Automated Personnel Identification System (RAPIDS) station (https://www.dmdc.osd.mil/rsl/ provides RAPIDS locations).
- Rejected*. Government in separate correspondence will provide reason(s) for rejection.
- Returned. Additional information, or correction to the application, required by the contractor employee.
*The contractor will maintain records of all approved and rejected applications.
(h) At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor by SSN, and two forms of identification, one of which must be a picture ID. The Verification Officer will capture primary and alternate fingerprints and picture, and updates to DEERS and will then issue a CAC.
CACs require reverification every 180 days. The TA and contract employee will be notified via TASS generated email when the reverification date is approaching. The contract FSO will provide the electronically signed AHRC TASS Form 2.1 to the TA. The TA will re-verify the employee in TASS.
(i) Issued CACs shall be for a period of performance not longer than three (3) years or the individual’s contract end date (inclusive of any options) whichever is earlier. Prior to the three (3) year expiration, TASS will notify both the contractor and the TA of the expiration date. The FSO or appointed personnel will submit to the TA TASS Form 1, version 1.2 indicating REISSUE on the form.
(j) The contractor shall return CAC’s to the DEERS office upon return from deployment, when issued a new CAC, or when employment is terminated. A receipt for each card must be obtained and provided to the TA/COR. The FSO or other appointed personnel shall provide the electronically signed AHRC TASS Form 2.1 to the TA. The TA will revoke the contractors CAC in TASS.
(k) A CAC cannot be issued without evidence that a T-1 investigation has at least been initiated by the Government, G-2. Per DODI 5200.46 Section 3.d: A CAC may be issued on an interim basis based on a favorable National Agency Check OR a Federal Bureau of Investigation (FBI) National Criminal History Check (fingerprint check) adjudicated by appropriate approved automated procedures or by a trained security or human resource (HR) specialist, and successful submission to the investigative service provider (ISP) of a NACI or a personnel security investigation (PSI) equal to or greater in scope than a NACI. Once the fingerprints are done and the applicant has submitted the T1 (or other applicable investigation) in PSIP, a CAC can and should be issued to applicant on an interim basis to prevent delay of work and excess cost to the government as a result. If the employee does not have a valid background investigation, the government will initiate the T1. Once the TI investigation is open in Defense Information Security System (DISS), (between 3-4 weeks) an interim CAC eligibility is either granted or denied and an email will go out to the Supervisor, FSO, Sponsor, the COR, TASM and TA advising eligibility.
(l) Details and training on TASS will be provided by the government. Further details to obtain a CAC, contact 866- 738-3222 or Army.cacpki.helpdesk@army.mil.
CS7520
ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
a. The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management.
c. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C titled as paragraph - Access to the Detroit Arsenal; Identifying Contractor Employees; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984 52.246-16 Responsibility For Supplies APR 1984
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 60 dys. ANP 1 JOINT SYSTEMS MANUFACTURING CTR
- LIMA
TIMOTHY LOCKIE
1155 BUCKEYE RD BLDG 345
LIMA OH 45804-1825
4196045954 FOB: Destination
CK0TKV
0002 60 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
CK0TKV
0003 60 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
CK0TKV
0004 60 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
CK0TKV
CLAUSES INCORPORATED BY REFERENCE
52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Combo.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0490
Issue By DoDAAC W912CH
Admin DoDAAC** W912CH
Inspect By DoDAAC CK0TKV
Ship To Code CK0TKV
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) CK0TKV
Service Acceptor (DoDAAC) CK0TKV
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
Timothy Lockie, timothy.j.lockie.civ@army.mil
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
JUN 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023 52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.211-5 Material Requirements AUG 2000 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-8 Payrolls and Basic Records JUL 2021 52.222-41 Service Contract Labor Standards AUG 2018 52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
AUG 2018
52.222-44 Fair Labor Standards And Service Contract Labor Standards- Price Adjustment
MAY 2014
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021
52.223-11 MAY 2024
52.227-1 JUN 2020
52.227-1 JUN 2020
52.228-14 NOV 2014
52.229-4 FEB 2013
52.232-23 Alt I APR 1984
52.232-40 MAR 2023
52.236-13 NOV 1991
52.243-1 AUG 1987
52.247-68 FEB 2006
52.249-8 APR 1984
252.201-7000 DEC 1991
252.203-7000
52.219-14
Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons.
Authorization and Consent Authorization and Consent Irrevocable Letter of Credit Federal, State, And Local Taxes (State and Local Adjustments) Assignment of Claims (May 2014) - Alternate I Providing Accelerated Payments to Small Business Subcontractors Accident Prevention Changes--Fixed Price Report of Shipment (REPSHIP) Default (Fixed-Price Supply & Service) Contracting Officer's Representative Requirements Relating to Compensation of Former DoD Officials Limitation on Subcontracting
SEP 2011
OCT 2022
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7006 Billing Instructions--Cost Vouchers MAY 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
JAN 2023
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.219-7009 Section 8(a) Direct Award OCT 2018 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements JAN 2023 252.223-7001 Hazard Warning Labels DEC 1991 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7001 Buy American and Balance of Payments Program FEB 2024 252.225-7002 Qualifying Country Sources As Subcontractors MAR 2022 252.225-7016 Restriction on Acquisition of Ball and Roller Bearings JAN 2023 252.225-7030 Restriction On Acquisition Of Carbon, Alloy, And Armor
Steel Plate
DEC 2006
252.225-7033 Waiver of United Kingdom Levies APR 2003 252.225-7048 Export-Controlled Items JUN 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro
Regime
JAN 2023
252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JAN 2023
252.242-7006 Accounting System Administration FEB 2012 252.247-7023 Transportation of Supplies by Sea JAN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES) (MAY 2024)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L.
117-328), unless the agency grants an exception--see paragraph (b) of 52.204-27.
(v) 52.204-30, Federal Acquisition Supply Chain Security Act Orders--Prohibition. (DEC 2023) (Pub. L. 115-390, title II).
(vi) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(vii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(viii) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
(ix) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(xi) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(xii) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77 and 108-78 (19 U.S.C.
3805 note)).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (APR 1984).
(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii) 52.232-11, Extras (APR 1984).
(iv) 52.232-25, Prompt Payment (JAN 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi) 52.233-1, Disputes (MAY 2014).
(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (FEB 2024).
(viii) 52.253-1, Computer Generated Forms (JAN 1991).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .