Attachment1-ProposalBreakdown-W912C322R0005-ReplaceChillerSystemB376-20220629.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- W912C322R0005
About this file
This document contains an attachment with a proposal breakdown and details of a related federal contract opportunity for computer room air conditioning replacement services. The opportunity is a firm fixed-price contract issued by the Mission and Installation Contracting Command of Fort Buchanan, Puerto Rico. The requirement is for replacement of the chiller system at Building 376 and has a magnitude between $1 million and $5 million. The request for proposal will be issued on or around July 1st, 2022 with a closing date of August 1st, 2022. The opportunity is a 100% total small business set-aside for NAICS code 238220 for plumbing, heating, and air conditioning contractors with a size standard of $16.5 million. Vendors must be registered in the System for Award Management database and complete the required certifications and representations. Inquiries can be directed to the points of contact provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT 1- PROPOSAL BREAKDOWN | |
| Solicitation Number: | W912C322R0005 |
| Description of Work: | Replacement Chiller System atBLDG 376 1070 Fort Buchanan, PR 00934 |
| Contractor: |
| WORK DESCRIPTION | MATERIALS | LABOR | EQUIPMENT | ||||||
| QTY | UNIT of Measure | Unit Cost | SUB-TOTAL | Unit Cost | SUB-TOTAL | Unit Cost | SUB-TOTAL | TOTAL | |
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| SUBTOTAL (1) before overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| OVERHEAD | % | - 0 | |||||||
| SUBTOTAL (2) before Profit | $ - 0 | ||||||||
| Profit | % | - 0 | |||||||
| SUBTOTAL (3) Project cost | $ - 0 | ||||||||
| Bonds | % | - 0 | |||||||
| Insurance | % | - 0 | |||||||
| Municipal Patent and Taxes | % | - 0 | |||||||
| Sales Taxes | % | - 0 | |||||||
| GRAND TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .