Attach-W912C3-16-T-0012-Q1135_DoorSchedule.pdf
PDF 193 KB Posted
- Attached to
- Repairs to Quarter 1135 at Fort Buchanan, PR
- Solicitation number
- W912C3-16-T-0012
About this file
Door Schedule
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Existing Concrete Openings Requiered Doors Information
Doors
ID Num.
W H Material Core Qty. Thickness (min) Finish Observation Lock Hinges Material Dimension Finish Material Thickness Finish
1 33" 90" Mahogany Semi-Solid 1 1 3/8" Oil Paint Flush, Smooth Bath & Room (ANSI Grade 3) 2 pc. Ea., 4" SS Ball bearing Mahogany 2" x 4" Oil Paint
2 33" 90" Mahogany Semi-Solid 1 1 3/8" Oil Paint Flush, Smooth Bath & Room (ANSI Grade 3) 2 pc. Ea., 4" SS Ball bearing Mahogany 2" x 4" Oil Paint
3 33" 107" Mahogany Semi-Solid 1 1 3/8" Oil Paint Flush, Smooth Bath & Room (ANSI Grade 3) 2 pc. Ea., 4" SS Ball bearing Mahogany 2" x 4" Oil Paint Mahogany ½" Oil Paint
4 27" 107" Mahogany Semi-Solid 1 1 3/8" Oil Paint Flush, Smooth Bath & Room (ANSI Grade 3) 2 pc. Ea., 4" SS Ball bearing Mahogany 2" x 4" Oil Paint Mahogany ½" Oil Paint
5 33" 107" Mahogany Solid 1 1 1/2" Varnish Swing, Louvere Bath & Room (ANSI Grade 3) 2 pc. Ea., 4" SS Ball bearing Mahogany 2" x 4" Oil Paint Mahogany ½" Oil Paint
6 32.5" 107" Mahogany Solid 1 1 1/2" Varnish Swing, Louvere Bath & Room (ANSI Grade 3) 2 pc. Ea., 4" SS Ball bearing Mahogany 2" x 4" Oil Paint Mahogany ½" Oil Paint
7 27" 80" Mahogany Solid 1 1 1/2" Varnish Swing, Louvere Bath & Room (ANSI Grade 3) 2 pc. Ea., 4" SS Ball bearing Mahogany 2" x 4" Oil Paint
8 4' - 9½" 8' - 10" Mahogany Solid 2 1 1/2" Varnish Sliding, Louvere Flush Pull, Material Bronze
9 4' - 9½" 8' - 10" Mahogany Solid 2 1 1/2" Varnish Sliding, Louvere Flush Pull, Material Bronze
10 7' - 2" 8' - 10" Mahogany Solid 2 1 1/2" Varnish Sliding, Louvere Flush Pull, Material Bronze
Notes:
1. Contractor is responsible of verifying all dimension, no changes to the contract will be make due to dimension discrepancies.
2. Doors for top of closet are not included in the table above.
3. Contractor is responsible for all trimming adjustments to make an operational closet unit.
4. All Oil Paint must be color white.
Doors Transom Dimensions Frame
File details come from the government source that posted it. Updated .