DRAFT SYNOPSIS_W912BV27RA004 Master Planning A-E IDC .pdf

PDF 809 KB Posted

Attached to
DRAFT Synopsis, $450M Master Planning Architect-Engineer Services MATOC
Solicitation number
W912BV27RA004
Issued by

About this file

Synopsis Summary

This is a synopsis for an Indefinite Delivery Contract (IDC) Master Planning Architect-Engineer Services solicitation for USACE Southwestern Division's Regional Planning and Environmental Center. The Government intends to award a target of ten indefinite delivery contracts: five unrestricted IDCs and five small business reserve IDCs with a total shared capacity not to exceed $450,000,000. Most task orders are anticipated to range from $25,000 to $6,000,000, with an average task order value of approximately $250,000 to $1,500,000. Each IDC will include a minimum guarantee of $2,500 applicable to the base period only, and no contractor is guaranteed any number or value of task orders beyond this minimum. Award is anticipated in late 2027 or early 2028, with a planned five-year base period plus one two-year option period. The acquisition is conducted under NAICS code 541320 (Landscape Architectural Services) with a Product Service Code of C211 and a small-business size standard of $9.0 million in average annual receipts.

The primary geographic scope includes the Southwestern Division area of responsibility (Arkansas, Oklahoma, New Mexico, Kansas, Louisiana, and Texas), the Middle East District, and the Pacific Ocean Division area of responsibility (Japan, South Korea, Kwajalein, and other Pacific locations), though work may also extend to other CONUS and OCONUS locations when authorized. Firms must demonstrate specialized experience in master-planning strategies including resilience planning, natural/historic/cultural resource management, healthy community planning, defensive planning, capacity planning, area development planning, network planning, form-based planning, facility standardization, and plan-based programming. Selection criteria prioritize specialized experience and technical competence (at least ten relevant projects with one valued at $500,000 or greater), professional qualifications of key personnel (including a Program Manager, Senior Project Manager, two Senior Master Planners, Senior Landscape Architect, Senior Architect, two Senior Professional Engineers, Senior Cost Estimator, and ten additional technical staff), past performance, capacity, knowledge of locality, small business commitment, geographic proximity, and volume of Department of Defense contract awards. Interested firms must submit one complete searchable PDF package through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module by the response deadline (to be determined). The synopsis requires response in SF 330 format with specific page limits for sections addressing experience, qualifications, and other evaluation criteria.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEFINITE DELIVERY CONTRACT (IDC)

MASTER PLANNING

ARCHITECT-ENGINEER SERVICES

FOR

USACE SOUTHWESTERN DIVISION

REGIONAL PLANNING AND ENVIRONMENTAL CENTER

Synopsis No. W912BV27RA004

Document Type Architect-Engineering Services Synopsis

Classification Code C – Architect and Engineering Services

Subject IDC / MATOC for A-E Master Planning Services; shared capacity not to exceed $450,000,000

Set-Aside Approach Unrestricted MATOC with Small Business Reserve

Response Deadline [TO BE DETERMINED DATE, TIME, AND TIME ZONE]

1. CONTRACT INFORMATION

The U.S. Army Corps of Engineers (USACE) Southwestern Division (SWD), Regional Planning and Environmental Center (RPEC), through the Tulsa District (SWT), intends to award an unrestricted multiple-award task order contract (MATOC) for architect-engineer (A- E) master planning services with a small business reserve. The acquisition will be conducted under 40 U.S.C. chapter 11 and Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Section 36.102. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required services, and compensation will be negotiated with the selected firm at fair and reasonable prices. This acquisition is conducted under NAICS code 541320 (Landscape Architectural Services). The small-business size standard is $9.0 million in average annual receipts. Product Service Code (PSC) is C211. The contract will support RPEC Master Planning Branch requirements.

The Government intends to award a target of ten indefinite delivery contracts (IDCs): five unrestricted IDCs and five Small Business reserve IDCs. The five Small Business reserve IDCs are reserved for small-business concerns as defined in RFO Part 19 and are not further restricted by socioeconomic category (e.g., 8(a), SDVOSB, WOSB, HUBZone). When a task-order requirement can be set aside for small business under the terms of the resultant contracts and applicable regulations, the TORN will be issued only to the eligible Small Business reserve awardees; otherwise, the TORN will be issued to all applicable MATOC awardees. The Government may award more or fewer contracts in each category, depending on the number of firms determined most highly qualified. A firm may receive no more than one IDC under this synopsis. The reserved-award approach and all program-specific eligibility requirements remain subject to final small business and legal review under RFO Section 19.104 and applicable program regulations.

a. Contract Capacity, Period, and Task Orders The total shared capacity of all contracts awarded under the MATOC shall not exceed $450,000,000. The Government anticipates that most task orders will range from $25,000 to

DRAFT

$6,000,000, with an average task order value of approximately $250,000 to $1,500,000. Each IDC will include a minimum guarantee of $2,500 applicable to the base period only. Individual task orders will have a minimum amount of $25,000 and a maximum amount of $25,000,000.

No contractor is guaranteed any number or value of task orders beyond the minimum guarantee.

Award is anticipated in late 2027 or early 2028. The planned ordering period is a five-year base period plus one two-year option period. Any extension beyond the ordering period will be governed only by clauses included in the resultant contracts and applicable law.

The Government will negotiate and award firm-fixed-price task orders for individual requirements. The A-E firm shall furnish all personnel, services, travel, materials, supplies, office space, quality control, supervision, and other items necessary to perform each task order. Task-order selection will follow the Task Order Request Notification (TORN) process in accordance with USACE EP 715-1-7, Chapter 6. A TORN will summarize the scope; a request for supplemental information (RSI) TORN will be issued only when existing SF 330 information needs to be supplemented to identify the most highly qualified firm. The selected firm will receive the task-order scope and a request for price proposal. Awardees will have an opportunity to update SF 330 Parts I and II annually.

The Government will consider the small business reserve before the unrestricted pool for individual requirements. When a task-order requirement can be set aside for a reserved small business category and the applicable RFO requirements are met, the TORN will be issued only to eligible reserved awardees. Otherwise, the TORN will be issued to the applicable MATOC awardees consistent with RFO Section 19.104 and the terms of the resultant contracts.

b. Geographic Scope and Place of Performance The primary geographic boundary is the SWD area of responsibility (AOR), supporting RPEC-assigned projects in the SWD Civil Works and Military boundaries—Arkansas, Oklahoma, New Mexico, Kansas, Louisiana, and Texas; primarily Fort Worth, Galveston, Little Rock, and Tulsa Districts. Work may also be performed through the Middle East District.

RPEC Master Planning Branch serves as Master Planning Agent for the USACE Pacific Ocean Division (POD) under a memorandum of agreement and may support requirements in the POD AOR, including Japan, South Korea, Kwajalein, and other Pacific locations.

Requirements may also occur in CONUS and OCONUS locations, including Europe, Asia, the Middle East, Wake Island, and locations within U.S. Pacific Command (USPACOM).

The Government may execute task orders outside the primary geographic boundary when authorized by applicable USACE policy and when the contracting officer documents that the requirement is within the technical scope of the contract, was considered in contract pricing and the award evaluation, and otherwise complies with the contract terms and applicable law and regulation.

c. Contract Administration and Other Requirements Firms must be registered in the System for Award Management (SAM) and must use the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module to submit the SF 330 as instructed in Section 4. The selected firm, including a joint venture when applicable, must maintain an active SAM registration through award and must have an active SAM registration before submitting a price proposal. If DFARS 252.204-7019 (DFARS CD 2026- O0038) is included in the solicitation, an offeror required to implement NIST SP 800-171 must have a current NIST SP 800-171 DoD Assessment in the Supplier Performance Risk System for each covered contractor information system relevant to the offer, contract, task order, or delivery order. A CMMC level is not established for the base MATOC by this synopsis. When required, a task-order solicitation will identify the applicable CMMC requirements and associated DFARS provision and clause in accordance with 32 CFR part 170 and DFARS subpart 204.75.

Service Contract Labor Standards and other labor requirements, if applicable, will be identified in the resulting contract or individual task order. State-level certifications are not substitutes for applicable Federal registration, licensing, certification, or responsibility requirements.

2. PROJECT INFORMATION

A-E services are required to provide a wide range of master planning and related support services for projects assigned to RPEC Master Planning Branch. Specific outcomes and deliverables will be defined in individual task orders.

Major master-planning strategy supports, consistent with UFC 2-100-01, include:

• Resilience Planning

• Natural, Historic, and Cultural Resource Management

• Healthy Community Planning

• Defensive Planning

• Capacity Planning

• Area Development Planning

• Network Planning

• Form-Based Planning

• Facility Standardization

• Plan-Based Programming Firms should submit example projects that collectively demonstrate experience with as many of these strategies as possible. A single project need not demonstrate all strategies; however, the total example-project portfolio of a most highly qualified firm should demonstrate substantial experience across the identified strategy supports.

Anti-terrorism/force protection and operations security requirements will be determined for each task order by the contracting officer.

3. SELECTION CRITERIA

The selection criteria below are listed in descending order of importance. Criteria A through E are primary criteria. Criteria F through H are secondary criteria, to be used only to break a tie among firms rated equally under all primary criteria. The Government will use USACE EP 715-1-7 as guidance for the evaluation and selection process. A firm that fails to respond to, or provides incomplete information for, a required criterion may be determined not qualified.

For this synopsis, “recent” means A-E or master-planning task orders or contracts completed, or at least 75 percent physically complete, within five years before the SF 330 deadline. Older projects will not be considered for Section F project experience.

A. Specialized Experience and Technical Competence Submit exactly ten relevant projects in Section F of the SF 330. At least one project shall have an A-E services value of $500,000 or greater. Each remaining project shall have an A-E services value of at least $150,000. All projects shall be completed, or at least 75 percent physically complete, within five years before the SF 330 deadline. If more than ten projects are submitted, only the first ten listed will be evaluated. A one-time increase in the number of example projects after award may be permitted only in accordance with the resultant contract and USACE EP 715-1-7.

Firms shall demonstrate technically complex master-planning experience for Department of Defense and other Federal installations, with particular relevance given to work performed within the Southwestern Division and POD AOR, addressing as many Section 2 strategies as possible.. The Government will consider the breadth, depth, and complexity of work; recent and completed projects may receive greater relevance. Firms shall demonstrate compliance with applicable DoD, agency-specific, Federal, State, and local laws, codes, and regulations.

Assertions that the firm can meet a requirement without supporting experience will not be considered sufficient.

In Section F, identify whether each cited experience is that of the prime, consultant, subcontractor, or individual. Clearly label experience of a prime office other than the office identified in Section C. State the percentage of A-E work performed in-house by the offeror and the percentage performed by a proposed subcontractor that worked on the project.

Projects with 50 percent or more work performed by the prime’s in-house resources may receive greater weight than projects performed predominantly by proposed subcontractors.

The portfolio shall demonstrate expertise in: (1) use of and compliance with DoD Unified Facilities Criteria installation master-planning guidance; and (2) individual master-planning tasks, including real property master planning, programming, facility and asset management, and geographic information systems. Relevant Section E resumes shall show individual—not merely firm—experience developing required documents for military-type facilities; similar civilian experience may be submitted in lieu of military experience.

B. Professional Qualifications The evaluation board will evaluate the education, training, professional registration or licensure, relevant experience, and longevity with the firm of the proposed key personnel.

The exact role titles below shall be used on resumes and on the organization chart. Key personnel shall not perform dual roles. Do not identify a subcontractor as an employee of the prime. Resumes are limited to two pages per individual. Additional personnel beyond the stated requirements will not be evaluated.

Required Key Personnel Minimum Requirement

Program Manager

One; prime employee; senior-level staff member with at least 15 years of professional experience, including at least 5 years as program or project manager for complex master-planning projects. Responsible for overall management and deliverable quality control. Current professional registration and AICP, LEED, or PMP certifications are preferred, not required.

Senior Project Manager

One; prime employee; at least 10 years of professional experience managing broadly scoped master-planning projects. Responsible for management of one or more task orders. A bachelor’s degree, RA/RLA/PE registration, and AICP, LEED, PMP, and UFC experience are preferred, not required.

Required Key Personnel Minimum Requirement

Senior Master Planner

Two; prime employees; each with at least 10 years of master-planning experience, including charrette facilitation and programming experience, and at least 5 years of experience with products performed in accordance with UFC 2-100-01. AICP and LEED are preferred, not required.

Senior Landscape Architect One; currently registered RLA; bachelor’s degree and at least 10 years of professional experience, including at least 5 years related to master-planning projects. AICP, LEED, and UFC experience are preferred, not required.

Senior Architect One; currently registered RA; bachelor’s degree and at least 10 years of professional experience, including at least 5 years related to master-planning projects. AICP, LEED, and UFC experience are preferred, not required.

Senior Professional Engineer Two; currently licensed environmental or civil PEs; each with at least 10 years of professional experience, including at least 5 years related to master-planning projects. PMP and UFC experience are preferred, not required.

Senior Cost Estimator

One; professional certification from AACE, Tri-Services, or another nationally recognized cost-estimating certification organization; at least 10 years of professional experience, including at least 5 years related to master-planning projects.

Technical Staff

Ten additional staff-level technical personnel who supported submitted Section F projects and will complete the project team. Each shall have at least 5 years of professional experience with broadly scoped master-planning projects. Relevant disciplines may include master planner, landscape architect, architect, interior designer, environmental engineer, civil engineer, structural engineer, electrical engineer, cost estimator, traffic engineer, surveyor, real property data analyst, economist, CADD technician, and GIS technician.

All key personnel shall show experience in Block 19 for the required project types, associated with the field of expertise identified in Section E, Block 13. Resumes shall identify school and graduation year; registration type, first-registration year, State, and registration number;

relevant project experience; and longevity with the firm. Experience may be with a prior employer, but experience with the current firm may receive greater weight.

C. Past Performance Firms shall demonstrate customer satisfaction with cost control, quality of work, and compliance with performance schedules. CPARS is the primary source of past performance;

other credible, documented evaluations may be considered. Where a firm performed as a subconsultant and no CPARS record exists in its name, completed past performance questionnaires may be submitted after Section H and are excluded from the page limitation.

The firm shall still provide the Section H narrative. The Government may review official performance-evaluation systems of record to inform its selection decision.

D. Capacity Firms shall demonstrate capacity to initiate, manage, and complete multiple simultaneous task orders at different locations within required timeframes. The Government will consider the overall size and available capacity of the proposed team; staffing in all required disciplines; ability to provide program and project management, adequate teams or crews for expedited and complex projects, and responsiveness to unforeseen schedule changes; and experience with contracts of similar size. The Government will use information in both SF 330 Parts I and II.

E. Knowledge of Locality Firms shall demonstrate knowledge of the SWD Civil Works and Military boundaries— Arkansas, Oklahoma, New Mexico, Kansas, Louisiana, and Texas—the Middle East District, and the POD AOR, including Japan, South Korea, Kwajalein, Europe, Asia, Wake Island, and locations within USPACOM, as applicable. Relevant knowledge includes State, territory, and local regulatory frameworks; political boundaries and agreements; geologic and hydrogeologic features; and other local laws, regulations, or conditions that affect technical product delivery.

F. Small Business Commitment All firms, including small business primes, shall identify planned participation by small businesses; VOSBs; SDVOSBs; HUBZone small businesses; SDBs; WOSBs; and HBCU/MIs. A small business prime may receive credit for its self-performance and may count that participation in each applicable socioeconomic category. This is a secondary criterion only and will be used only as a tie-breaker after evaluation of the primary criteria.

The expected minimum participation goals are: small business, 6.0 percent; SDB, 1.5 percent; WOSB, 2.0 percent; HUBZone, 2.0 percent; VOSB, 2.0 percent; and SDVOSB, 1.0 percent. The Government will assess the extent to which firms: (1) identify participating firms and link them to specific work; (2) make written and enforceable commitments; (3) identify the complexity and variety of work each small business will perform; and (4) provide adequate documentation supporting the proposed participation percentages, including market research when appropriate. Submit Appendix A as an attachment to the SF 330; it is excluded from the Section H page limit.

G. Geographic Proximity In Section H, identify the physical location of the firm relative to potential project locations.

This is a secondary tie-breaker and will be evaluated consistent with the geographic scope in Sections 1 and 2.

H. Volume of DoD Contract Awards In Section H, provide for each prime or joint-venture member the volume of DoD contract awards during the preceding 12 months. Identify the project name, Government agency, contract or task-order number, award amount, and month and year of award. This information will be considered for equitable distribution of DoD A-E contracts among qualified firms, including small and small disadvantaged businesses and firms without prior DoD contracts.

Do not count the award value of an IDC; count only actual task orders and modifications.

Provide this data on a separate Section H Additional Sheet, which is excluded from the 20-page Section H limitation.

4. SUBMISSION REQUIREMENTS

USACE EP 715-1-7 paragraph 3-8(b)(1) and (2) shall be followed. This is a public announcement for qualifications; solicitation packages will not be provided. This is not a request for proposal.

a. Submission Date and Method Interested A-E firms and joint ventures shall submit one complete searchable PDF package through the PIEE Solicitation Module using the applicable solicitation number no later than [TO BE DETERMINED DATE, TIME, AND TIME ZONE]. Electronic submissions through PIEE are the only acceptable submission method. Submissions by email, mail, hand delivery, facsimile, proprietary or third-party file-transfer protocol sites, or DoD SAFE will not be evaluated. Firms are responsible for allowing sufficient time for files to upload, transmit, and receive a PIEE timestamp before the deadline. Late submissions will be handled in accordance with RFO 15.107(b), as applicable.

To submit in PIEE, the user must be registered and hold the applicable Solicitation Module role, including Proposal Manager. The user’s PIEE email address must match the email address in SAM. Firms should follow current PIEE instructions for file uploads and may divide files into logically organized, clearly named parts if needed. If PIEE or the Solicitation Module is unavailable, the prospective firm shall notify both the contracting officer and contract specialist before the submission deadline. [TO BE DETERMINED DATE, TIME, AND TIME

ZONE].

b. Business Category Identification State the applicable submission category after the solicitation number in SF 330 Part I, Section A, Block 3: “UNRESTRICTED,” “SMALL BUSINESS,” “8(a) SMALL BUSINESS,” or “SDVOSB.” A firm seeking consideration in more than one eligible category shall submit a separate SF 330 for each category. A firm may receive no more than one IDC under this synopsis.

c. SF 330 Content and Format Use the current edition of the SF 330 available from GSA. Submit one Part I from the prime for the entire design team and a current, accurate Part II for the prime, each participating prime office, and each proposed subcontractor office. Part II forms must be signed and dated;

a copy of an original or facsimile signature is acceptable. Firms are encouraged to update Part II information at least annually. A firm may be found not qualified or ranked lower if missing, confusing, conflicting, obsolete, or obscure information prevents the board from determining that the firm has the required qualifications.

Do not include company literature. All files shall be searchable PDF. Use no smaller than 11-point Times New Roman or similar font for text; graphics, diagrams, and tables may use no smaller than 9-point font if clearly legible. Number SF 330 narrative paragraphs to correspond with this synopsis. Suggested file names begin with the solicitation number, followed by “RESPONSE,” the firm name, and a brief file description.

Suggested organization: (1) SF 330 Part I, Sections A–D; (2) Section E; (3) Section F; (4) Section G; (5) Sections H–I; (6) Part II; and (7) appendices, including the Small Business

Participation Plan, joint venture agreement, and signed teaming agreements or letters of commitment.

d. Page Limits and Specific SF 330 Instructions

• Section E: no more than two pages per resume.

• Section F: no more than 20 pages; submit exactly ten projects as required by Section 3.A.

• Section H: no more than 20 pages, excluding the Section H Additional Sheet containing the 12-month DoD award data. Front and back of one sheet count as two pages.

• Section B: include the Commercial and Government Entity (CAGE) code and Unique

Entity Identifier (UEI), if registered in SAM; identify whether the firm is a small business or other than small business.

• Section C: identify the discipline or service supplied by each firm and identify each firm’s small-business status and type.

• Section D: include a team project organization chart, up to two 8½ x 11-inch pages or one 11 x 17-inch page. Identify each prime and subcontractor firm listed in Section C. Job titles and chart positions must match Section 3.B key-personnel roles.

• Section E: provide resumes for all required key personnel. List each person’s firm and office location in Section G, Block 26.

• Section F, Block 24: include the contract period of performance, award value, current value, and a summary of the work performed by the firm that demonstrates relevance. For subcontractor or joint-venture experience, identify the specific role and responsibilities of the firm or joint-venture partner. In Block 25, identify the firm name, proposed role, and percentage of design performed. A joint venture without relevant joint-venture experience shall submit at least one project performed by each joint-venture partner.

• For this synopsis, a project means one individual task order or one individual C-type contract. The project may cover one site, multiple sites within one installation or facility, or multiple separate installations. Do not aggregate separate task orders or separate contracts into one project example.

• Section H: provide a narrative addressing each Selection Criteria requirement and subparagraph. Explain the Quality Management Plan generally; reference the organization chart; identify team roles, responsibilities, lines of communication, subcontractor management, and each firm’s estimated percentage involvement. A project-specific detailed Quality Management Plan is not required with the submission but will be required and approved by the Government as a condition of award.

e. Joint Ventures A joint venture shall submit its fully executed joint-venture agreement and the UEI for each joint-venture member. Failure to include the agreement may result in elimination from further evaluation.

f. Discussions The evaluation board will hold discussions with at least three of the most highly qualified firms in accordance with RFO 36.202-1(b)(2). Discussions may be conducted by Microsoft Teams, telephone, video teleconference, or in person. Firms will receive sufficient notice, all firms will be interviewed by the same method, and questions will relate to the announced selection criteria.

5. FIRM LICENSURE REQUIREMENT

To be eligible for an A-E contract, the prime firm or joint venture must be permitted by law to practice the profession of architecture or engineering, consistent with 40 U.S.C. 1102 and RFO 36.102-2. Provide documentation of firm licensure or other evidence that the firm is permitted by law to practice, as applicable. When a State does not license firms, provide a designation letter on company letterhead identifying the licensed individual responsible for the firm’s professional products. For a joint venture, documentation from at least one joint-venture member is required; when a State does not license firms, provide designation letters from both joint-venture members. Licensure of a subcontractor alone does not satisfy this requirement for the competing prime firm or joint venture.

For task orders requiring design in a State, the District of Columbia, or an outlying area of the United States, architects or engineers registered in the applicable professional field shall prepare, review, and approve the design features when required by RFO 52.236-25 and applicable State or territorial law.

6. OFFEROR QUESTIONS AND COMMENTS

Contractual and technical questions shall be submitted only through ProjNet Bidder Inquiry at https://www.projnet.org/projnet. Submit one question per inquiry. Firms should review this synopsis and posted Bidder Inquiry responses before submitting a new question.

The ProjNet Bidder Key for this synopsis is: E53G3A-RN4PT5.

The Bidder Inquiry System will close to new questions ten calendar days before the SF 330 deadline. Questions submitted after that date are untimely and may not receive a substantive response. Firms will receive an email acknowledgment and, after Government processing, a response. All inquiries and answers are visible to all interested firms.

Personal visits to discuss this synopsis are not permitted. SF 330 submissions will not be publicly opened. Information concerning evaluation status or award will not be available after receipt of submissions.

APPENDIX A – SMALL BUSINESS PARTICIPATION PLAN FORM

All firms responding in an unrestricted or reserved category shall complete this form and submit it as an appendix to the SF 330. This appendix, joint venture agreements, and signed teaming agreements or letters of commitment are excluded from the Section H page limitation. Percentages reflect the anticipated total contract effort; estimated dollar values, if requested, are planning estimates and are not a price proposal.

A. Prime Offeror Size and Socioeconomic Categories Check all applicable boxes for the prime firm only:

• ☐ Other Than Small Business Prime

• ☐ Historically Black Colleges and Universities or Minority Institutions (HBCU/MI)

• ☐ Small Business Prime

• ☐ Small Disadvantaged Business (SDB)

• ☐ Woman-Owned Small Business (WOSB)

• ☐ HUBZone Small Business

• ☐ Veteran-Owned Small Business (VOSB)

• ☐ Service-Disabled Veteran-Owned Small Business (SDVOSB)

B. Aggregate Participation

Category Percentage of anticipated effort

Other Than Small Business(es) _______%

Small business(es) _______%

Total (must equal 100 percent) _______%

C. Socioeconomic Participation A small business that qualifies in multiple socioeconomic categories may be counted in each applicable category.

Category Percentage of anticipated effort

Small Disadvantaged Business _______%

HUBZone Small Business _______%

Woman-Owned Small Business _______%

Service-Disabled Veteran-Owned Small Business _______%

Veteran-Owned Small Business _______%

HBCU/MI _______%

D. Small Business Firms and Planned Work

Firm Name Socioeconomic Category or Categories

Principal Supplies or Services

E. Commitment Describe the extent of commitment to use the listed small businesses, including whether the relationship is a small business prime, written agreement, enforceable commitment, joint venture, mentor-protégé arrangement, or another arrangement. Identify the complexity and variety of work to be performed and provide supporting market research or other documentation for the proposed participation percentages.

F. Subcontracting Plan After Selection for Negotiation Selected other-than-small businesses must submit an acceptable subcontracting plan when required by RFO 19.109 and RFO 52.219-9. Apply DFARS 252.219-7003 (DFARS CD 2026- O0038) or, for a comprehensive subcontracting plan test-program participant, DFARS 252.219-7004 (DFARS CD 2026-O0038). The plan is separate from this participation plan and shall be consistent with the commitments reflected here.

1. CONTRACT INFORMATION
a. Contract Capacity, Period, and Task Orders
b. Geographic Scope and Place of Performance
c. Contract Administration and Other Requirements
2. PROJECT INFORMATION
3. SELECTION CRITERIA
A. Specialized Experience and Technical Competence
B. Professional Qualifications
C. Past Performance
D. Capacity
E. Knowledge of Locality
F. Small Business Commitment
G. Geographic Proximity
H. Volume of DoD Contract Awards
4. SUBMISSION REQUIREMENTS
a. Submission Date and Method
b. Business Category Identification
c. SF 330 Content and Format
d. Page Limits and Specific SF 330 Instructions
e. Joint Ventures
f. Discussions
5. FIRM LICENSURE REQUIREMENT
6. OFFEROR QUESTIONS AND COMMENTS
APPENDIX A – SMALL BUSINESS PARTICIPATION PLAN FORM
A. Prime Offeror Size and Socioeconomic Categories
B. Aggregate Participation
C. Socioeconomic Participation
D. Small Business Firms and Planned Work
E. Commitment
F. Subcontracting Plan After Selection for Negotiation

File details come from the government source that posted it. Updated .