9 Feb 2026 SBUR Industry Event Presentation Final.pdf

PDF 590 KB Posted

Attached to
Design-Build, Design-Bid-Build, Unrestricted with SB Business Reserve, Vertical Construction MATOC
Solicitation number
W912BV26RA021
Issued by

About this file

This document is a pre-solicitation notice and virtual industry event presentation for the USACE-Tulsa District's $495 million Small Business-Unrestricted (SB-UR) Design Build Construction MATOC (Multiple Award Task Order Contract).

The MATOC, referenced as solicitation W912BV22R0004 with amendments, targets a total of 10 contract holders—five small businesses and five unrestricted firms—sharing $495 million in capacity across a 5-year base period with no options. Five contractors were awarded Indefinite Delivery Contracts in July 2025: Ross Group Construction Corporation, LLC; Gideon Contracting, Limited Liability; Southwind Construction Services, LLC; SEA PAC Engineering Inc.; and Bristol Design Build Services, LLC. The MATOC currently holds four small businesses and one unrestricted firm. This pre-solicitation notice, issued February 2, 2026, aims specifically to refresh the unrestricted pool by targeting four additional unrestricted or large businesses for construction services; no new restricted or small businesses are being onboarded at this time. The anticipated Phase 1 solicitation issuance is on or around February 18, 2026. The NAICS code is 236220 (Commercial and Institutional Building Construction).

The scope encompasses design, new construction, repair, and alteration services for military installations primarily in Oklahoma and north Texas within the Tulsa District and Southwest Division areas of responsibility. Work includes vertical and horizontal construction projects supporting Sustainment, Restoration, and Modernization (SRM) and Military Construction (MILCON) programs, encompassing administration buildings, health facilities, warehouses, dormitories, hangars, and classrooms through both Design-Bid-Build and Design-Build delivery methods, with potential for civil projects. Notable project forecasts include $200 million in FY26 SRM spending, $4 billion-$7 billion over 10 years at Tinker AFB for KC46A and B-21 programs, and multiple MILCON projects ranging from $1 million to $50 million across installations including Vance AFB, Sheppard AFB, Fort Sill, and McAlister Army Ammunition Plant.

View the file

Other files

File Type Posted
SBUR Onboarding Virtual Industry Event Attendee List_9 FEB 2026.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE-TULSA DISTRICT

$495M SB-UR Design Build Construction MATOC On-Ramping Virtual Industry Event

9 Feb 2026 – 2:30 pm CT

AGENDA

Introduction: Pre-solicitation #W912BV26RA021

Refreshing the existing Unrestricted pool of the Design-Build, Design-

Bid-Build, Unrestricted with SB Reserve, Vertical Construction MATOC

($495M SB-UR Design Build Construction MATOC) – broad scope both

MIL & CIVIL

• This presentation is for general information and will not change the terms and conditions of any subsequent solicitation or contract

• This is part of our market research, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS PRESENTATION. No reimbursement will be made for any costs associated with providing information in response to this presentation or any follow up information requests.

DOING BUSINESS WITH USACE

• SAM.gov Registration (https://www.sam.gov/)

• PIEE Registration (https://piee.eb.mil/) https://www.sam.gov/ https://piee.eb.mil/

THE USACE TULSA DISTRICT TEAM

Contracting:

• A. Brian Brobson, Contracting Officer

• Tyler Godwin, Contract Specialist

Technical Team:

• Jay Surman, SWT Acquisition Program Manager

• Wade Woodham, Chief Construction Division

$495M SB-UR DESIGN BUILD

CONSTRUCTION MATOC

MATOC HISTORY

• Reference Solicitation W912BV22R0004 with Amendments 0001 thru 0009 in SAM.Gov.

• MATOC provides a target of five (5) small businesses for the reserve, and a target of five (5) unrestricted firms for a total of 10 contract holders with a total shared capacity of $495,000,000.

• The following contractors were awarded (July 2025) an IDC with this MATOC:

• Ross Group Construction Corporation, LLC (W912BV25D0039)

• Gideon Contracting, Limited Liability (W912BV25D0040)

• Southwind Construction Services, LLC (W912BV25D0041)

• SEA PAC Engineering Inc. (W912BV25D0042)

• Bristol Design Build Services, LLC (W912BV25D0043)

• The MATOC currently has (4) small businesses, and (1) Unrestricted Firm.

SB-UR DESIGN BUILD

CONSTRUCTION MATOC

• Therefore, IAW the On-Ramping procedures in the solicitation with the sole purpose of this Pre-Solicitation Notice being to refresh the existing Unrestricted pool for this MATOC with a target of four additional Unrestricted or Large Businesses for Construction Services.

• At this time, we are not onboarding any new restricted or small businesses.

• The MATOC has a 5-year base period with no options

• The NAICS Code is 236220 – Commercial and Institutional Building Construction

• Planned Key Dates:

• Pre-solicitation Notice was issued 2 Feb 2026

• Anticipated phase 1 solicitation issuance date: On or around 18 Feb 2026

$495M SB-UR DESIGN BUILD

MATOC Scope

CONSTRUCTION MATOC

• This MATOC is primarily for SWT and may be used within the SWD AOR. The primary area(s) of performance within the SWT AOR are military installations in Oklahoma and north Texas. Specific area(s) of performance will be identified at the time of individual task order award(s).

• Predominately used to support vertical construction projects associated with Sustainment, Restoration, and Modernization and Military Construction projects. Projects that are military funded and include horizontal construction, will also be considered within Scope.

Construction projects associated with the proposed MATOC will be DBB and DB projects. May also be used for Civil projects.

SCOPE OF WORK

CONSTRUCTION MATOC

• The scope of this SWT/SWD MATOC includes, but is not limited to, design, new construction, repair, and/or alteration to sustain, restore, replace and/or modernize administration buildings, health facilities, warehouses, office spaces, dormitories, dining facilities, aircraft hangars, classrooms, ancillary facilities or others as defined in the task order requirements.

SCOPE OF WORK

SWT PROJECT FORECASTS

TULSA DISTRICT MILITARY AND INTERAGENCY SUPPORT

Vance AFB

Tinker AFB

Altus

AFB

Fort Sill

McAlester Army Ammunition Plant

Sheppard AFB, Wichita Falls, TX

DOE Pantex Plant, Amarillo, TX

Oklahoma City VA Medical Center

Jack C.

Montgomery VA Medical Center- Muskogee, OK

Oklahoma

Texas

Tulsa ANG

Tinker AFB

• FY15-27 $800M KC46A Bed-down

• FY30-37 $1.3B B-21 Bed-down

• FY24-30 $ 3.5B-$4B MSC Support

(Software Int. Lab, CDC, etc.)

• $100M+ annual SRM program

Vance AFB

• T7A Training Bed-down FY27@ $60M

Sheppard AFB

• T7A Training Bed-down FY27-30 @ $70M

Fort Sill

• $50-80M in FY26 SRM

McAAP

• FY27 Water Treatment Plan @ $35-

$45M

• Tinker AFB $7.8B over next 10 years

• Executing $200M a year in new SRM project support

Will Rogers ANG Will Rogers ANG

• Area Development Plan

• MILCON Simulator

MILITARY CONSTRUCTION

MILCON acquisition strategy based on complexity SWT does not maintain LB

Construction IDIQs for MILCON – normally competed

Less complex discrete projects set aside-negotiated IDIQ, or competed

Subcontracting performance is carefully tracked

See SWT Forecast for other projects

Location Requirement ROM Strategy Advertise Award

Tinker AFB Child Development Center $40-$50M C - UR Q3 FY26 Q1 FY27

Vance AFB T-7A Hush House Pad $3-$5M DBB-SB Q1 FY27 Q2 FY27

Vance AFB T-7A Allied Support $5-$10M DBB-SB Q1 FY27 Q2 FY27

Vance AFB T-7A Egress Shop Addition $2-$4M DBB-SB Q1 FY27 Q2 FY27

FT Sill School Age Center $20-$25M TBD Q1 FY28 Q2 FY28

Ft Sill

TRADOC

Mission Tinker AFB

KC46A & B21

Program $4B-$7B/ 10 years

AF T-7A

Program in development for Sheppard and Vance

AFB

MILITARY CONSTRUCTION – CONT.

See SWT Forecast for other projects

Location Requirement ROM Strategy Advertise Award

Sheppard AFB T-7A Allied Support $1-$3M DBB-SB Q1FY27 Q3 FY27

Sheppard AFB T-7A Ground Base Training ADAL $30-$40M C-UR Q1FY27 Q3 FY27

Sheppard AFB T-7A Ramp Expansion $12-$17M DBB-SB Q1FY28 Q3 FY28

McAlister AAP Water Treatment Plant $35-$45M C-UR Q4 FY27 Q2 FY28

FT Sill ADA Indirect Fire

Protection Instructional Facility

$30-$40M C-UR Q4 FY27 Q2 FY28

- Access

• Most SRM requirements awarded through existing IDIQs

• Reputation gained through local experience important

• Build experience

• Teaming and Subcontracting

• Other federal and installation contracts

• Civil-Works Projects

- Future Work Total FY26 Expected SRM $200M (Ft Sill/ Tinker) Tinker AFB SRM program focused on industrial process

SUSTAINMENT, RENOVATION, MODERNIZATION

Q&A

Your feedback is important

USACE-TULSA DISTRICT
AGENDA
Doing business with Usace
The usace Tulsa District Team
$495M SB-UR Design Build Construction MATOC
SB-UR Design Build �construction MATOC
SB-UR Design Build �construction MATOC
$495M SB-UR Design Build Construction MATOC
SB-UR Design Build �construction MATOC
SB-UR Design Build� construction MATOC
SWT Project Forecasts
Tulsa district military and Interagency Support
Slide Number 13
Slide Number 14
Slide Number 15
Q&A