Pre-Solicitation Notice - Prado Dam Spillway Modification Project.pdf
PDF 193 KB Posted
- Solicitation number
- W912BV23R0032
About this file
This document provides a pre-solicitation notice for the Prado Dam Spillway Modification Project in Riverside County, California. The U.S. Army Corps of Engineers - Tulsa will solicit and award a firm-fixed price integrated design and construction contract using a best value tradeoff process. The project aims to implement dam safety modifications to reduce risks at Prado Dam, which has been designated as Dam Safety Action Classification 2 due to a very high risk of failure. Work will include construction of a new reinforced concrete labyrinth control structure, composite embankment connections with roller compacted concrete monoliths, new reinforced concrete chute slabs anchored to foundation rock, an underdrain system for the chute, and new reinforced concrete cantilever spillway chute walls. The estimated construction cost is over $500 million, with a planned 365 day preconstruction phase and up to 7 years for construction. The solicitation is anticipated to be issued on November 21, 2023, with proposals due on February 28, 2024 under solicitation number W912BV23R0032.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a PRE-SOLICITATION notice for the Integrated Design and Construction (IDaC) project for the Prado Dam Spillway Modification Project, Riverside County, California. THIS IS NOT A SOLICITATION FOR
PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS
SYNOPSIS.
The U.S. Army Corps of Engineers – Tulsa has been tasked to solicit and award a construction contract for the Prado Dam Spillway Modification Project. The proposed project will be a competitive, firm-fixed price, IDaC, contract procured in accordance with FAR 15, Negotiated Procurement using the Best Value trade-off process.
Prado Dam is owned by the Federal government and operated and maintained by the USACE Los Angeles District (SPL). Prado Dam is located in Riverside County, California, approximately 2 miles west of the City of Corona, northeast of the California State Route (SR) 91 (Riverside Freeway) and Corona Freeway (SR 71) interchange. Portions of the reservoir are in Riverside and San Bernardino Counties. The Prado Dam provides flood risk management (FRM) to the largest watershed in southern California, with 1.4 million residents between Riverside County and the Pacific Ocean.
The overall purpose of the Prado Dam Spillway Modification Project (DSMP) is to implement modifications at Prado Dam to decrease dam safety risks to a tolerable level and reduce life safety risks in an expeditious and efficient manner.
Prado Dam has been designated as Dam Safety Action Classification (DSAC) 2, meaning it has a very high incremental risk where the combination of life or economic consequences with likelihood of failure is very high and immediate action is required to avoid failure.
The risks associated with dam failure will be reduced through construction of a new reinforced concrete labyrinth control structure, construction of composite embankment connections including embedded roller compacted concrete (RCC) monoliths, new reinforced concrete chute slabs anchored to foundation rock, new underdrain system for the chute, and new reinforced concrete cantilever spillway chute walls.
In accordance with DFARS 236.204, the estimated magnitude of construction for this project is over $500,000,000.00.
Estimated duration of the construction phase of this project is 365 days for the preconstruction services with an option to execute the construction for a total of 2,520 calendar days (7 years).
The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $45.0M.
Small Businesses are reminded under FAR 52.219-14, (Deviation 2019-O0003), Limitations on Subcontracting. Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded. Large Businesses must comply with the FAR 52.219-9 by submitting a Small Business Subcontracting Plan should this action be solicited as Full and Open Competition and an award is made to a large business firm.
TYPE OF SET-ASIDE: NONE – This requirement will be solicited as
UNRESTRICTED.
Anticipated solicitation issuance date is on or about 21 November 2023, and the estimated proposal due date will be on or about 28 February 2024. The official solicitation number W912BV23R0032 will be issued under SAM.gov via PIEE.eb.mil