This is a solicitation for 6000 Area Mechanical Repairs at Fort Sill, Oklahoma. The project involves replacing dedicated outside air units at Buildings 5955 and 6050 with new chilled water units connected to the central plant, and installing a new chilled water loop. Construction will be phased, with only one wing unavailable at a time to minimize disruption. The base bid includes replacing the DOAU in Wing E at Building 5955 and the new chilled water loop. There are five options to repair additional wings. The U.S. Army Corps of Engineers is the contracting agency. The successful offeror will be responsible for design, permitting, construction documents, equipment, installation, commissioning, and ensuring the new systems integrate with the existing BAS.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV23R0013 - 0001.pdf | ||
| W912BV23R0013.pdf | ||
| 6000 Area Mech Repairs Site Visit Sign In.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
Tulsa District
SOLICITATION NO.: W912BV23R0013
6000 Area Mechanical Repairs
Ft. Sill, OK
DESIGN-BUILD RFP
PHASE 2 OF 2 PHASE SOLICITATION
June 2023
6000 Area Mechanical Repairs W912BV23R0013
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
SF30 Amendment 0002
00 11 00 Pricing (CLIN) Schedule
00 22 16 Proposal Submission Requirements, Evaluation Criteria, and Basis of Award
00 73 00 Special Contract Requirements
DIVISION 01 – GENERAL REQUIREMENTS
01 04 00 Coordination, Feld Engineering Meetings
01 10 00 Statement of Work
01 30 01 Administrative Requirement
01 32 01.00 10 Project Schedule
01 33 16.15 Digital Submittal Procedures and Correspondence
01 33 16.00 10 Design After Award
01 35 26.10 10 Government Safety Requirements
01 45 00.00 15 10 RMS Contractor Mode
01 45 00.00 16 Quality Control (DB)
01 57 19 Temporary Environmental Controls
01 57 20.10 10 Environmental Protection FSAO
01 74 19 Construction and Demolition Waste Management
01 78 00.00 15 Closeout Submittals
01 78 23.10 10 Operation and Maintenance Data
01 91 00.15 Total Building Commissioning
6000 Area Mechanical Repairs Fort Sill, OK
SECTION 01 04 00 Page 1
SECTION 01 04 00
COORDINATION, FIELD ENGINEERING, AND MEETINGS (FSAO)
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00.15 DIGITAL SUBMITTAL
PROCEDURES AND CORRESPONDENCE:
SD-09 Manufacturer's Field Reports
Survey Field Notes; G.
Promptly upon completing a survey in accordance with paragraph: QUANTITY SURVEYS, the Contractor shall furnish the originals of all field notes and all other records relating to the survey or to the layout of the work to the Contracting Officer, who shall use them as necessary to determine the amount of progress payments. The Contractor shall retain copies of all such material furnished to the Contracting Officer.
1.2 WORK SCHEDULE
Contractor shall work between 7:00 a.m. and 4:00 p.m. Monday through Friday unless otherwise directed by the Contracting Officer.
1.3 FEDERAL HOLIDAYS
The following Federal holidays are excluded from standard workdays:
HOLIDAY DATE OBSERVED
New Year's Day 1 January
Martin Luther King's Birthday 3rd Monday in January
President's Day 3rd Monday in February
Memorial Day Last Monday in May
Juneteenth Day 19 June
Independence Day 4 July
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
SECTION 01 04 00 Page 2
HOLIDAY DATE OBSERVED
Veteran's Day 11 November
Thanksgiving 4th Thursday in November
Christmas Day 25 December
1.4 UTILITY OUTAGE COORDINATION
1.4.1 Approval
The Contractor shall obtain written permission/approval from the Contracting Officer 21 days prior to:
(1) Performing any work which will close any runway or street or interrupt any utility service.
(2) Making any excavation: Any damage to underground utilities, communication lines, etc., will be the responsibility of the Contractor if the approval is not obtained.
(3) Contractors shall use extreme care in all excavations on Fort Sill.
Subsurface utilities are congested in nature. Damaging these systems in some areas could result in thousands of man-hours of lost production time, which could result in claims against the Contractor to the extent of the actual supportable damage.
(3) Refer to Attachment A located at the end of this section for additional requirements.
1.4.2 Government Right to Delay
The Government reserves the right to postpone for 7 days, any scheduled outages. There shall be no outages when the outside temperature is expected to be below 35 degrees F.
1.4.3 Government Performance
Government personnel shall perform all shutting off and turning on of valves and switches necessary to accomplish scheduled outage.
1.5 TEMPORARY POWER
Coordinate power requirements with the Fort Sill Resident Office 30 days prior to the need.
1.6 EXCAVATION ON Fort Sill, OK
1.7 QUANTITY SURVEYS (APR 1984) (FAR 52.236-16)
1.7.1 General
Quantity surveys shall be conducted, and the data derived from these surveys shall be used in computing the quantities of work performed and the actual construction completed and in place.
SECTION 01 04 00 Page 3
1.7.2 Conducting Surveys and Computations
The Contractor shall conduct the original and final surveys and surveys for any periods for which progress payments are requested. All these surveys shall be conducted under the direction of a representative of the Contracting Officer unless the Contracting Officer waives this requirement in a specific instance. The Contractor shall make the computations based on the surveys for any periods for which progress payments are requested.
The Government shall make such computations as are necessary to confirm the quantities of work performed or finally in place.
1.8 SECTION 106 CONSULTATION
This project is subject to consultation with the Fort Sill affiliated Native American Tribes and the public IAW Section 106 of the National Historic Preservation Act. Construction activities cannot commence until notification is received from the Contracting Officers Representative.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
Section 01 10 00 Page 1
SECTION 01 10 00
Statement of Work
5-9-2023
6000 Area Mechanical Repairs
Fort Sill, Oklahoma
WORK TYPE: DESIGN-BUILD / CONSTRUCTION
1.0 General
Provide all site investigations, workplans, site surveys, studies and design analysis, design drawings and specifications, construction documents, shop and manufacturing drawings, materials, labor, equipment, supervision, testing, submittals, and construction to complete the requirements of the Statement of Work (SOW) and contract documents. The prime contractor is required to coordinate with Government Representatives of the U.S. Army Corps of Engineers, Tulsa District, under the direction of the Contracting Officer (KO) and assigned representatives of the contract. Construction shall commence under the direction of the KO after the work plan(s) and associated shop drawings are completed, reviewed, and approved in writing that the workplan(s) and shop drawings have demonstrated they meet the contract requirements.
The intent of the project is to replace all Dedicated Outside Air Units (DOAU) at buildings 5955 and 6050 as well as incorporate units into the chilled water plant loop. The construction will be phased with only one wing under construction at a time. All facilities will remain occupied during construction. Buildings 5955 and 6050 are located on Rothwell Street, Fort Sill, Oklahoma.
Both the design and the construction shall be handled under the auspices of one prime contractor that shall be responsible for completing the work. It is the prime contractor’s option to subcontract the design and/or construction phase as long as the Issued for Construction (IFC) package is stamped by a licensed Professional Engineer (PE) or Registered Architect (RA) experienced in facility renovations, and the construction is accomplished by a contractor experienced in facility renovations which impact all systems (i.e., electrical, mechanical, architectural, etc.). The PE or RA that stamps the design shall be the Designer of Record (DOR).
The principal elements of the project are:
The contractor shall perform all the required work for this project in accordance with this task order and the base contract.
The contractor shall perform all the required work for this project in accordance with this task order and base contract. The below items generally address the elements included in the project, however, are not all inclusive the activities required.
1. Perform required site visit(s) to verify work required according to the documents provided and obtain field information for basis of design.
2. Workplan development
3. Electrical work
4. Welding
5. Plumbing
Section 01 10 00 Page 2
6. Painting, caulking, sealing
7. Fire alarm work
8. Materials hauling
9. Mechanical work, HVAC
10. Work at elevations over 6 feet
11. Controls week
12. General project cleanup
13. General demolition
14. Concrete work
15. Prepare and distribute all project meeting minutes
There will be SIX (6) options included in this scope of work
2.0 Applicable Criteria
All design and construction work shall be in accordance with criteria contained in the most current federal, state, county, local codes, regulations, and government standards as of the date of issue of this contract unless otherwise noted. It is the expectation of the government that the contractor shall partner with a design firm and necessary consultants required at time of proposal preparation that understand the codes and requirements of the local area to include required coordination efforts, permitting procedures, processes and costs, and special requirements to the agencies having jurisdiction over this project area. Designer of Record (DOR) shall have a thorough understanding of the listed government and industry regulations and shall partner with the contractor during the proposal preparation phase, design phase, and construction phase to assure the project is completed within these requirements. Contractor’s accepted proposal shall demonstrate this expectation has been met for this solicitation and will become a part of the contract at time of award.
If any deviations to the contract RFP are found in the contractor’s proposal after award, the RFP requirements shall be enforced in full. If during the proposal preparation phase the prime contractor and DOR determine there are listed requirements that do not apply and/or needlessly increase the project costs, the prime contractor shall issue a Request for Information (RFI) for Government review, consideration, and potential change through amendment before the contract is awarded.
The references listed below form a part of the required criteria but are not all inclusive. It is the responsibility of the contractor and DOR to assure that all applicable criteria is considered in the proposal submitted to the government and incorporated into the approved design and construction work. The Government will hold the contractor and DOR responsible in assuring the following criteria are followed in the design and during construction and quality management of the project.
Design and construction work shall be in accordance with these criteria and will be the basis of inspection and acceptance in the field by the Government. The Government will reference these requirements during design reviews through the DrChecks process. Unless otherwise noted, the latest edition for all reference standards or criteria listed shall apply. Design specifications shall utilize the reference criteria contained within the Unified Facilities Guide Specifications (UFGS) developed by the DOR. Minimum Required Criteria:
o AFBMA Std. 9, Load Ratings and Fatigue Life for Ball Bearings o AFBMA Std. 11, Load Ratings and Fatigue Life for Roller Bearings o American Concrete Institute (ACI) 318, Building Code Requirements for Structural
Concrete o American Concrete Institute (ACI) 315, Details for Detailing of Concrete Reinforcement o American Concrete Institute (ACI) 562, Code Requirements for Assessment, Repair, and
Rehabilitation of Existing Concrete Structures
Section 01 10 00 Page 3 o The Masonry Society (TMS) 402/602, Building Code Requirements and Specification for
Masonry Structures o AMCA 210, Laboratory Methods for Testing Fans for Rating o ANSI/ARI 43099, Central Station Air Handling Units o AR 3805 Department of the Army Information Security Program o ARI 310/380, Packaged Terminal AirConditioners and Heat Pumps o ARI 440, Room FanCoil and Unit Ventilator o ARI 445 550/590, Room AirInduction Units Water chilling o ARI 880 890 Air Terminal Air Diffusers o ARI 1060, Air to Air Heat Exchangers for Energy Recovery VentilationHeat Equipment o ASCE 7, Minimum Design Loads for Buildings and other Structures o ASHRAE Applications o ASHRAE Fundamentals o ASHRAE 55, Thermal Environmental Conditions for HumanOccupancy o ASHRAE 62.1, Ventilation For Acceptable Indoor Quality o AWS D1.1/D1.1M, Structural Welding Code – Steel o AWS D1.3/1.3M, Structural Welding Code – Sheet Steel o 10 CFR 430, Energy Conservation Program for Products o EISA 2007 o EPACT 2005 o ETL 02-12 IESNA o EM 38511 – USACE o IAQ Guidelines for Occupied Buildings under Construction, 1995 o IEC, Energy Conservation Code (IEC) – Deleted DEC 2007 Refer to Paragraph 5.3.2, ENERGY CONSERVATION requirements.
o IEEE C62.41 Surge Voltage in Low Voltage AC Power Circuits.
o ANSI/IEEE Std. 141, Recommended Practice for Electric Power Distribution for Industrial
Plants. - (The Red book) o IEEE Std. 142, Recommended Practice for Grounding of Industrial and Commercial Power
Systems (The Green Book) o IEEE Std. 241, Recommended Practice for Electric Power Systems in Commercial
Buildings (The Gray Book) o ANSI/IEEE Std. 242, Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems. (The Buff Book) o IEEE Std. 399, Recommended Practice for Industrial andCommercial Power Systems
Analysis (The Brown Book) o IEEE Std. 446, Recommended Practice for Emergency and Standby Power Systems for
Industrial and Commercial Applications (The Orange Book) o IEEE Std. 493, Recommended Practice for the Design of Reliable Industrial and
Commercial Power Systems (The Gold Book).
o IEEE Std. 519, Recommended Practices and Requirements for Harmonic Control in
Electrical Power Systems (Second Printing) o IEEE Std. 1100, Recommended Practice for Powering and Grounding Electronic Equipment
(The Emerald Book) o International Building Code (IBC) 2018 Edition o Note: All references in the International Building Code to the International Electrical Code shall be considered to be references to NFPA 70. All references in the International
Building Code to the International Fuel Gas Code shall be considered to be references to
NFPA 54 and/or NFPA 58. All references in the International Building Code to the
International Fire Code shall be considered to be references to NFPA 72 o International Ground Source Heat Pump Association Installation Guide o International Gas code – Not Applicable. Follow NFPA 54, National Fuel Gas Code
Section 01 10 00 Page 4 o International Green Construction Code (IGCC) 2018 Edition o International Plumbing Code 2018 Edition o International Mechanical Code 2018 Edition o International Standards Organization (ISO) o NACE RP0169, Control of External Corrosion on Underground or Submerged Metallic
Piping Systems o NEBB, Procedural Standards Procedural Standards for Testing Adjusting Balancing of
Environmental Systems o NFPA 13, Standard for the Installation of Sprinkler Systems o NFPA 24, Standard for the Installation of Private Fire Service Mains and Their Appurtances o NFPA 54, National Fuel Gas Code o NFPA 58, Liquefied Petroleum Gas Code o NFPA 70, National Electrical Code o NFPA 70E, Standard for Electrical Safety in the Workplace o NFPA 72, National Fire Alarm and Signaling Code o NFPA 101, Life Safety Code, o NFPA 90A, Installation of Air Conditioning and Ventilation Systems o SMACNA, Sheet Metal and Air Conditioning Contractor’s National Association o SMACNA HVAC Duct Construction Standards. HVAC Duct Construction Standards –
Metal and Flexible.
o SMACNA Architectural Manual “Architectural Sheet Metal Manual” o Southwestern Division Architectural and Engineering Instructions Manual (SWD-AEIM) o TM58056 Caulking and Sealing o TM58122 Firestopping o UL 50, Enclosures for Electrical Equipment o Underwriters Laboratories (UL) o Uniform Federal Accessibility Standards, Federal Register o State/Local Environmental Control Requirements.
o UFC 3-101-01 Architecture o UFC 3-110-03 Roofing o UFC 3-120-10 Interior Design o UFC 120001 DoD Building Code o UFC 1-200-02 High Performance and Sustainable Building Requirements o UFC 3-301-01 Structural Engineering o UFC 3-410-01 Heating, Ventilating, And Air-Conditioning Systems o UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control Systems o UFC 3-501-01 Electrical Engineering o UFC 360001 Fire Protection Engineering for Facilities o UFC 401001 Minimum Antiterrorism Standards for Buildings o UFC 4-010-06 Cybersecurity of Facility-Related Control Systems o National Roofing Contractors Association, and applicable manuals/bulletins o Metal Building Manufacturers Association, and applicable manuals/bulletins o RIEI Roofing Maintenance Manual (U.S. Air Force) o Fort Sill DPW Electrical Requirements o Fort Sill Design Guide o National Roofing Contractors Association
▪ NRCA Roofing Manual
▪ NRCA Waterproofing Manual
▪ NRCA Building Codes Manual, latest edition
2.1. General:
Section 01 10 00 Page 5
2.1.1. The applicable criteria identified in this scope of work shall apply to the base bid and all awarded options.
2.1.2. Work shall generally be performed during normal business working hours of
7:30 am to 4:00 pm, Monday through Friday, except as otherwise indicated.
Deviations may be requested through the Contracting Officer.
2.1.3. All construction work shall be in accordance with criteria contained in all current federal, state, and local codes, regulations, and industry standards. Criteria shall be taken from the most current references as of the date of issue of the contract unless otherwise noted.
2.1.4. Provide all engineering, design, labor, materials, equipment, and transportation to perform this task order and to provide a fully functional system. Visit the site to determine the existing conditions prior to submitting a proposal. The contractor shall submit a request for any additional information in writing. A complete site survey shall be conducted to gather any information needed to properly develop the design.
2.1.5. All elements of the project shall be provided per design and meet requirements of code and all applicable standards. When two or more apply, the most stringent shall be followed.
2.1.6. All training videos shall be compatible with Microsoft Windows current version and the standard Windows Media Player current version. The videos shall be compiled in a format compatible with standard windows media player codec’s.
2.1.7. Penetrations of above grade floor slabs, through time-rated partitions and fire walls shall be fire-stopped with appropriate materials, methods, and in accordance with applicable codes.
2.1.8. All preparatory meetings shall include a minimum of one individual on site performing work for the company. (Example: one insulator working for the insulation company performing on site work).
2.1.9. ADA compliance is not a requirement of this project.
2.1.10. Ensure arrangements are made for temporary egress in the event any path of egress is blocked during construction.
2.1.11. Products shall meet the recycled content requirements set forth by EPA see https://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products. These requirements do not negate additional requirements set forth in other sections of the contract. The more stringent requirements identified within the contract are required to be followed.
2.1.12. The following products, which is not all inclusive to the contract, are required:
(Building insulation, Carpet & carpet pads, Cement and concrete, Consolidated and reprocessed latex paint, Floor tiles, Flowable fill, Laminated paperboard, restroom dividers, roofing materials, Nonpressure pipe, Patio blocks, Railroad grade crossings/surfaces, Roofing materials, Shower and restroom dividers, Structural fiberboard) for all contractor-furnished supplies. A more https://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products https://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products
Section 01 10 00 Page 6 comprehensive list is available at the EPA.gov site.
2.1.13. Meet the BioPreferred Program requirements set forth by USDA see the list of
USDA-designated product categories at:
https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml
These requirements do not negate additional requirements set forth in other sections of the contract. The more stringent requirements identified within the contract are required to be followed.
2.1.14. Examples of the individual products include, but are not limited to: (Blast media, Carpet, Composite panels, Floor coverings (non-carpet) Interior paints and coatings, Paint removers, Penetrating liquids, Plastic insulating foam, Roof coatings Wastewater, Systems coatings, Water tank coatings, Wood and concrete sealers, Wood and concrete stains).
2.1.15. Ensure the use of energy- and water-efficient building-related products and equipment. See the link for DOE Covered Product Categories.
https://www.energy.gov/eere/femp/search-energy-efficient-products . These requirements do not negate additional requirements set forth in other sections of the contract. The more stringent requirements identified within the contract are required to be followed. Examples of the individual products include, but are not limited to: (light fixtures, boilers, gas water heaters, electric chillers, windows, doors, shower heads, LED lighting, faucets, etc).
2.1.16. All deliverables except for project design submissions and shop drawings, shall be printed double sided, and on paper that contains post-consumer fiber
(recycled content).
2.2. Notifications:
2.2.1. Work with equipment directly impacting training shall be coordinated 60
Calendar days in advance of work.
2.2.2. All utilities and any items damaged by construction operations shall be restored to its previous condition by workers skilled in trades involved at no additional cost to the government.
2.2.3. When an extended utility outage is necessary to perform the contract work in an occupied facility, regardless of whether or not the work area itself is occupied, perform the outage during non-duty hours at no additional cost to the government, unless otherwise approved by the KO. Give written notice 60 calendar days in advance of any scheduled outage.
2.3. Digging and Utilities:
2.3.1. Do not interrupt utilities serving occupied facilities unless permitted under the following conditions and then only after arranging to provide temporary utility services according to the requirements indicated. Utility interruptions of occupied facilities will be allowed only when coordinated in advance and, if work is required, arrange for security with the Government during the off hours of work. Notify the Government not less than 60 calendar days in advance of proposed utility interruptions; and do not proceed with utility interruptions https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml https://www.energy.gov/eere/femp/search-energy-efficient-products
Section 01 10 00 Page 7 without the Government's written permission. All requests for outages shall be submitted to the KO for approval and shall be scheduled through the U.S. Army
Corps of Engineers. The Point of Contact (POC) for these requests will be provided at the Post-Award/Pre-construction meeting.
2.4. Health and Safety:
2.4.1. The task order shall have on site approved toilet and hand washing facilities for prime contractor and worker use. Specifications for toilet and hand washing facilities shall be in accordance with the latest edition of EM 385-1-1.
2.4.2. Ensure all workers and subcontractors are adequately trained and qualified for classification of work they are performing (29 CFR 1926.62 and 1926.1101).
OSHA and EM385-1-1 compliance for workers is required.
2.4.3. Take necessary measures to ensure building access security. Control housekeeping, personnel access, and exposure to safety risks, including overhead work, uneven walkways, tripping hazards, noise, dust, and possible mold and asbestos contamination in work areas during the period of construction.
Sweeping and cleaning of debris generated daily by the work; and a final, thorough cleaning at construction completion.
2.5. Environmental:
2.5.1. DPW-Environmental Quality Division is located at 2515 Ringgold Road, Fort
Sill, OK 73503.
2.5.2. Comply with Federal, State, and Army laws and regulations, as well as the
Installation Asbestos & Lead Management Plans.
2.5.3. All waste materials shall be disposed of at the Fort Sill landfill unless otherwise approved by the KO.
2.5.4. No materials containing asbestos shall be used in this task order. A certification statement stating that all the materials used are asbestos free is required. No lead based paint shall be used on this project. Comply with the requirements of the attached “Environmental Specifications for Construction Contracts”.
2.5.5. The Records of Environmental Consideration are provided in this task order.
Consult these documents to determine Asbestos-Containing materials and Lead-
Containing materials that are present in the facilities within this scope. Any feature of work that may disturb these materials must be approached in accordance with all federal, state, and local laws and regulations. In addition to the materials identified in each Record of Environmental Consideration (REC).
2.5.6. All work, equipment operation, activities, and processes shall follow all with all
Federal and State air emissions and performance laws and standards.
2.5.7. Odors from construction activities shall be controlled at all times.
2.5.8. Dust particulates, aerosols, and gaseous by-products from construction activities as well as the processing and preparation of materials are to be controlled at all
Section 01 10 00 Page 8 times.
2.5.9. Keep construction activities under surveillance and control to minimize environment damage by noise in excess of those required to perform construction activities during normal business hours.
2.5.10. All environmental permitting actions, to include permits, plans, notices, etc., shall be reviewed and approved by Fort Sill Environmental Quality Directorate prior to their submission to regulatory agencies.
2.5.11. Adhere to Section 438 Energy Independence and Security Act (EISA). This project shall, to the maximum extent technically feasible, retain a 95 percentile rainfall event (1.68 in) of maintain pre-development hydrology.
2.5.12. A storm water pollution prevention plan and permit from Oklahoma Department of environmental Quality (ODEQ) shall be required if the cumulative construction related activities, Base Bid and project options exceed 1 acre of disturbance. The permit shall be maintained until a uniform vegetative cover on all unpaved surfaces is established.
2.5.13. Asbestos and lead:
2.5.13.1. Notify the Government of asbestos and lead based paint removal at least
10 days prior to work commencing. The notification forms must be reviewed by the Installation Environmental Quality Division. The abatement contractor must have an asbestos/lead supervisor physically on site during the entire abatement process. Air monitoring data not within regulatory limits will be repeated after additional cleaning of the abated area.
2.5.13.2. If air monitoring is required, the contractor will provide air monitoring
(oversight) personnel that shall be completely independent from the
Abatement contractor. The overall duty of the oversight person/company is to provide the Installation with a high level of assurance asbestos and lead abatement projects are performed in compliance with all applicable state and federal regulations as well as with any abatement specifications issued to the abatement contractor.
2.5.13.3. Oversight personnel shall be trained and qualified as a “Competent
Person” (29 CFR 1926.1101) capable of identifying asbestos or lead based paint (LBP) hazards in the workplace, capable of selecting the appropriate control strategy, and having the authority to take prompt corrective measures. If previously unidentified Potential Asbestos
Containing Material (PACM) is discovered during demolition of abatement, the oversight contractor will stop the work from disturbing the previously unidentified material and obtain samples for analysis.
2.5.14. Asbestos:
Section 01 10 00 Page 9
2.5.14.1. It shall be assumed that no asbestos containing materials will be encountered in this facility.
2.5.14.2. In the event asbestos is encountered all contractors involved in projects that include the removal/abatement and/or disposal of asbestos shall:
2.5.14.3. Handle asbestos-containing waste in strict accordance with federal guidelines found in the Code of Federal Regulations, Title 40 (40CFR)
Part 61, Subpart M. Disposal must be in accordance with 30 TAC
330.196(b)(6).
2.5.14.4. Conform to federal regulations regarding asbestos abatement activities, 29 CFR 1926.1101. Asbestos abatement shall adopt, by reference, rules regarding demolition and renovation activities covered under 40 CFR, Part 61, Subpart M (NESHAP).
2.5.14.5. Submit Asbestos handling Operator Certificates for review prior to abatement procedures.
2.5.15. Lead Based Paint (LBP):
2.5.15.1. It shall be assumed that no lead containing materials will be encountered in this facility.
2.5.15.2. All contractors involved in projects that include the removal/abatement and/or disposal of LBP shall:
2.5.15.3. Comply with OSHA 29 CFR 1926.62, Interim Final Rule for Lead
Exposure in Construction. Also comply with the OSHA respiratory protection standard 29 CFR 1910.134.
2.5.15.4. Isolate any surface that has been identified as containing LBP to limit access. Remove objects from the isolated areas and the floor if possible.
Cover fixed objects with 6 mil plastic sheeting. Lightly wet or mist the work area to reduce airborne concentrations of dust.
2.5.15.5. After completing work, containerize the LBP waste, plastic sheeting, clothing and other miscellaneous LBP contaminated items in accordance with 40 CFR 171-180. Wet wipe walls and floors with a tri-sodium phosphate detergent and thoroughly HEPA vacuum walls, floors and the work area. In facilities that house or cater to children, collect and analyze wipe samples. Clearance of lead in dust levels shall be below the HUD abatement clearance criteria before the work area is released back to the
Government.
2.5.15.6. Be responsible for providing air monitoring in conformance with OSHA standards to ensure the level of protection complies with applicable regulatory guidelines.
2.5.15.7. Properly dispose of lead debris identified by the Government as hazardous waste in accordance with all applicable federal and state
Section 01 10 00 Page 10 regulations, and the Fort Sill Hazardous Waste Management Plan.
2.5.15.8. If previously unidentified or suspected LBP is encountered and must be disturbed to comply with the contract documents, cease all work that would disturb the suspect material and immediately notify the
Contracting Officer’s Representative. Take steps, as appropriate, to ascertain the material’s composition and determine any remedial actions necessary.
2.6. Storage, Parking, Construction Trailer:
2.6.1. Limit the storage of materials, equipment, and incidentals to the immediate construction site, the identified equipment lay-down/storage area and as directed by the Corps of Engineers. The lay-down area for this project will be identified during the design phase of the facility. If required temporary staging will be identified adjacent the facility to facilitate construction. Staging shall be considered equipment / materials to be installed the same or next 3 business days. It is recommended that the contractor make arrangements for storage of equipment and materials between its delivery and its installation, as security cannot be guaranteed by the government.
2.6.2. Ensure the laydown and staging area is enclosed by a temporary chain link fence during construction. In addition, ensure that any holes or damage to the laydown area as well as the parking area resulting from the construction of this project is repaired to match existing conditions at start of construction. Furthermore, ensure that the fence tension is maintained, screening for each area is required.
2.6.3. Mow the construction areas as required to maintain a kept appearance of the project site. The construction areas for this project shall be the area between the wings of the facility, where the portable toilets are located and the area direct adjacent the laydown area extending to the facility.
2.6.4. Keep all storage areas free of debris, refuse, spills, leaks, stains, splashes and excessive materials. All storage areas shall be maintained in a neat, clean and safe condition. The contractor at no additional expense to the government shall clean up any areas that incur contamination by any hazardous material or substances immediately. Remediation may include subsequent soil analysis if directed by the government. Store all hazardous materials in a contractor supplied trailer or storage unit, which shall be leak proof or contain secondary containment devices. The storage unit shall be secured when contract personnel are not present.
2.6.5. Parking shall be near the job site, as designated by the Contracting Officer’s
Representative.
2.6.6. Limit use of premises to work in areas necessary to complete the work. Do not disturb portions of the project site beyond areas in which the work is indicated.
Approval shall be obtained from the KO for locating temporary office spaces and material storage yards. Ensure that driveways, loading areas, and entrances serving premises are clear and available at all times for ordinary / emergency vehicles. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize the use of driveways and entrances, time requirements, Section 01 10 00 Page 11 and storage of materials / equipment on site.
2.7. Project Phasing:
2.7.1. The facility is zoned in 7 areas, as depicted in the as-builts. Only one area of the facility will be unoccupied for construction at a time. Each wing must be completed prior to beginning the subsequent phase (wing). Wings that do not have an operable DOAU shall be replaced first.
2.7.1.1. Construction may only be conducted on one wing at a time regardless of options awarded, unless waived in writing by the ACO.
2.7.2. 30 days written notice is required prior to beginning a new phase of construction.
2.7.3. Work with equipment directly impacting facility operation shall be coordinated a minimum of 60 calendar days in advance of work.
2.7.4. All long-lead construction items (such as DOAU’s) and equipment that could impact the project critical path equipment shall be ON SITE prior to the start of any individual project phase. NO on site construction shall commence, to include demolition, unless waived in writing by the Administrative Contracting
Officer (ACO) or until the ACO has verified this requirement has been met.
2.8. Design
Provide a complete design package for the project, including final complete and detailed project design, design analysis, and project specific specifications. Provide any additional preliminary research documents or studies that were required in order to produce a complete and meticulously detailed design. All design submissions shall be IAW Chapter 11 of the
SWD AEIM.
A set of available as-builts from previous projects for this building will be provided to the contractor(s) at time of bid. The documents will be in .pdf, .tiff, and/or CAD format on CD.
These documents will be provided as reference documents and to assist in better determination of existing conditions with the site visit(s).
2.8.1. A parametric design is not required for this task order.
2.8.2. Verify all dimensions of the building that relate to the area identified for the installation of the building systems.
2.8.3. Conduct investigation of the existing site as required to meet the requirements of the scope of work. Findings will be documented in a report and become part of the design analysis.
2.8.4. The design shall be stamped by a licensed PE or RA having a minimum of 5 years documented mechanical engineering related experience and the construction must be accomplished by a contractor experienced in mechanical work having a minimum of 5 years documented related experience. All design
Section 01 10 00 Page 12 drawings shall be prepared and sealed by the DOR, as applicable, before
Government approval will be provided and before the contractor shall be allowed to proceed with construction work. All shop and manufacturing drawings for the mechanical and electrical systems shall be stamped by the DOR.
2.8.4.1. All electrical design pertaining to this project shall be designed by a
Registered Professional Engineer (PE) having a minimum of 5 years of documented electrical engineering related experience.
2.8.5. Review of the design documents will be required at 35%, 65%, 95%, Corrected, Issue for Construction. The DOR and contractor are required to attend the design reviews at the project site (Fort Sill, Ok) for the 35%, 65% and 95% design submission. Comply with the design schedule included in this section. Provide all available program input and output reports from any modeling software used for all design reviews and the final Design Analysis.
2.8.6. Equipment, hardware, and materials shall be standard manufactured domestic items unless otherwise specified. Replacement parts shall be standard and readily available through commercial means. Discontinued products will not be accepted unless approved by the KO. All systems shall be UL listed and installed in a way that does not compromise UL certifications.
2.8.7. The design, materials, equipment, and installation shall be in accordance with the requirements of the listed codes and design manuals, with the requirements of this section, and with the listed specifications.
2.8.8. Drawing sheets shall include building numbers for projects involving more than a single building.
2.8.9. All design aspects and deliverables shall comply with the SWD AEIM (latest version).
2.8.10. Include gas load summaries on drawings.
2.8.11. Include gas pressure calculations to equipment.
2.8.12. This project shall be designed in English inch-pound (I-P) units per the preference of the Using Agency.
2.8.13. Create design details as required but they shall conform to the requirements of the RFP and accepted proposal in accordance with the Design Build Order of
Precedence Requirements and are subject to approval by the Government.
2.8.14. Follow all Unified Facilities Guide Specifications (UFGS) already included in this Request for Proposal (RFP), and the Contractor shall also provide all other applicable, edited UFGS specifications as required for the design and construction of this project. The Unified Facilities Guide Specifications can be retrieved at http://www.wbdg.org/ccb/browse_org.php?o=70. Items to be deleted from the specifications shall use the “strikethrough” formatting process to delete any portion of the specifications. Additions to the specifications shall be shown in a color font. Unless noted otherwise, material specifications, equipment http://www.wbdg.org/ccb/browse_org.php?o=70
Section 01 10 00 Page 13 efficiencies, equipment listing (i.e., UL, ANSI, ASTM, NEMA, etc,), testing requirements, execution, etc., shall not be changed unless dictated by more stringent requirements in this RFP, including technical criteria such as codes and government and industry publications that are referenced in this RFP. Upon completion of design, a copy of the specifications edited in SpecsIntact shall be submitted with the final design submitted for government approval on CD. A copy of the final native SpecsIntact file shall be provided. Specification requirements shall not be removed or minimized to reduce effort or cost.
2.8.15. The Government shall have unlimited rights, in all drawings, designs, specifications, notes, and other works developed in the performance of this contract, including the right to use the aforementioned on any other Government design or construction without additional compensation to the Contractor.
2.8.16. All equipment installed shall be new, unless otherwise specified.
2.8.17. Ensure that the repairs, modifications, rehabilitations, and new construction meet all applicable design codes and criteria, including UFC. Identify load-carrying components which will require strengthening and provide a design correction which is compatible with the materials used in the building. The building and all design loads shall be safely supported during demolition and construction.
Another consideration is the effect of new dead loads, introduced to reinforce weak components, shall not negatively affect the structural performance of any other parts of the building. The primary code used for structural design shall be the International Building Code (IBC), and the codes referenced therein, except where modified by UFC criteria which shall take precedence (Reference UFC -1-
200-01). For any new work and the loads associated with it, the DOR shall also be responsible for strengthening of existing components to meet all applicable requirements for all other design loads as defined in the IBC such as gravity, dead, live, and wind loads. Specify and design connections and fasteners to structural and exterior wall components. Also include support for architectural features, mechanical, and electrical equipment.
2.8.18. Contractor shall verify and review all limited as-built information.
2.8.19. Design within environmental requirements currently in effect. Every effort will be made to comply with the environmental recommendations provided by the
Installation. If compliance with the requirements cannot be accomplished due to engineering problems, immediately notify the Contracting Officer in writing with recommendations.
2.8.20. The DOR shall assign a principal or key employee to serve as the Project
Manager (PM) for design and coordination. The PM shall oversee the coordination of the entire design effort and shall be capable of administering all instructions and obtaining answers to all questions during and after the design work. During the prosecution of the work under the contract, keep in close liaison with the prime contractor, who will coordinate the work with the
Government and other agencies. All requests made by the Government shall be referred to the PM through the prime contractor. At appropriate times, representatives of the Contracting Officer may review the progress and technical adequacy of the work, including adherence to the approved Quality Control Plan
(QCP). Such review will not relieve the prime contractor from performing all
Section 01 10 00 Page 14 contract requirements, except as may be waived by written instruction. The prime contractor shall notify the Government in writing prior to changing Project
Managers. The DOR’s PM shall have at least 10 years of progressively responsible experience and be either a Registered Professional Engineer or
Registered Architect.
2.8.21. The DOR and prime contractor shall become reasonably acquainted with all the available site related information to properly estimate the difficulty and/or cost of successfully performing the construction of the project.
2.8.22. No work shall be accomplished beyond this original contract scope of work unless specifically directed by the Contracting Officer. Any work done without being directed to do by the Contracting Officer through the prime contractor shall be done at the DOR's own risk.
2.8.23. The prime contractor and DOR shall cause appropriate provisions to be inserted in all subcontracts relating to this contract to ensure fulfillment of all contractual provisions by subcontractors. If for sufficient reason, at any time during the process of this contract, the DOR determines that any subcontractor is unsatisfactory or is not performing in accordance with the contract, the prime contractor shall be informed in writing accordingly and immediate steps shall be taken by the prime contractor to obtain acceptable performance or terminate the subcontract. Subletting by subcontractors shall be subject to the same requirements. Nothing contained in this contract shall be construed to create any contractual relation between any subcontractor and the Government.
2.8.24. Inspection and Acceptance:
2.8.24.1. During the progress of work, all work and all the DOR’s or subcontractor's plant and equipment engaged in the work shall be subject to, and available for, inspection by the Contracting Officer during normal office hours.
2.8.24.2. As soon as practical after delivery of work in any installment, the Contracting
Officer will spot check for serious errors or an undue number of minor errors indicating mistakes, carelessness, or lack of adequate quality control on the part of the DOR. The Contracting Officer may forego a thorough inspection and return the entire submittal for rechecking and correction by the prime contractor and DOR.
2.8.24.3. In the event that documents submitted for review are deemed to be deficient or incomplete for a particular stage of completion, the prime contractor and
DOR shall be required to correct the deficiencies and re-submit the documents in the quantities originally required and within a reasonable time as specified by the Contracting Officer. The cost of accomplishing the re-submittal data shall be borne by the prime contractor and DOR.
2.8.24.4. Tentative acceptance of work delivered in any installment shall be the basis for estimating partial payments for completed work but shall not be construed as final acceptance. Work tentatively accepted but proven by subsequent inspection to be not acceptable shall be corrected by the DOR. Final acceptance of the work shall not be made until all work under the contract has
Section 01 10 00 Page 15 been delivered and found to be acceptable.
2.9. All delivery media (CD’s) for computer data shall be certified to be free of known computer viruses. The name(s) and release date(s) of the virus scanning software used to analyze the delivery media shall be furnished to the Government at the time of delivery. The release or revision date of the virus scanning software shall be current.
If the Government finds evidence of a virus infection, the delivery media will be returned. The media shall be re-submitted at no cost to the Government.
2.10. If travel to locations not specifically covered in the lump-sum price of the contract is required, the Government will not compensate for transportation, including rental car and commercial aircraft where necessary.
2.10.1. Reference the Target Interface / Construction Compliance Inspection Checklist to be used during design. Contractor is to define what elements are the responsibility of the prime contractor and DOR and what elements is a responsibility of the Government.
2.11. 35% Design Package. This submittal will consist of a design analysis, calculations, drawings, and the Unified Facilities Guidance Specifications (UFGS) sections to be included in the final design. The Design Analysis shall incorporate information developed. The Dr.
Checks internet-based review comment program will be utilized.
2.11.1. The 35% Design submittal shall incorporate all satisfactorily addressed, and closed review comments. Also, as a minimum, include the following:
2.1.1 The 35% Design submittal shall incorporate all satisfactorily addressed, and
a. DRAWINGS:
1) Area Site Plan for Reference
2) Current Conditions Plan (show what is to be repaired, removed and replaced)
3) Inspection Findings and Survey Data Report
4) Initial Design Analysis based on the existing windows
5) Demolition Plan
6) Other plans as deemed necessary to present the 35% design in a clear and accurate way.
7) Code analysis, only to areas affected under this SOW
b. Specifications
1) Specification sections proposed for inclusion in the final design and a minimum of 35% of the specifications (including fill-in portions) completed.
c. Initial Design Analyses Report
d. Quality Control Plan
2.11.2. A 35% review conference will be conducted at Fort Sill, OK to address comments on the 35% design package and provide additional input regarding direction of the design. Furnish one person from each major discipline involved in the design and the PM to attend.
Section 01 10 00 Page 16
2.12. 65% Design Package. This submittal shall consist of a design analysis, calculations, drawings, and the Unified Facilities Guidance Specifications (UFGS) sections to be included in the final design. The Design Analysis shall incorporate information developed. The Dr. Checks internet-based review comment program will be utilized.
2.12.1. The 65% Design submittal shall incorporate all satisfactorily addressed, and
a. DRAWINGS:
1) Area Site Plan for Reference
2) Current Conditions Plan (show what is to be repaired, removed and replaced)
3) Inspection Findings and Survey Data Report
4) Design Analysis based on the existing windows
5) Demolition Plan
6) Any Required Electrical Diagrams
7) Any Required Mechanical Schedules
8) Basic Electrical Diagrams (If Required)
9) Mechanical Duct Locations (If Required)
10) Building penetration details
11) All Diagrams and Layout Drawings as required per discipline
12) Other plans as deemed necessary to present the design in a clear and accurate way.
13) Code analysis, only to areas affected under this SOW.
14) Schedules as applicable i.e.. Door, Door Hardware, Window, Plumbing, Finishes,
b. Specifications
1) Specification sections proposed for inclusion in the final design and a minimum of 65% of the specifications (including fill-in portions) completed.
c. Design Analyses Report
d. Quality Control Plan
2.12.2. A 65% review conference will be conducted at Fort Sill, OK to address comments on the 65% design package and provide additional input regarding
2.13. 95% Design Package. This submittal shall consist of a design analysis, calculations, drawings, and the Unified Facilities Guidance Specifications (UFGS) sections to be included in the final design. The Dr. Checks internet-based review comment program will be utilized.